SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
NAME: Peter Laing
OCCUPATION: Planning Engineer
ADDRESS: 23 Broadmeadows
East Herrington
Sunderland
SR3 3RF
TELEPHONE: Home – 0044 (0)191 5513010
Mobile – 0044 (0)7956449074
Email peterlainghome@yahoo.co.uk
PROFESSIONAL EXPERIENCE:
Sep.2013 – Present Nexen Golden Eagle HUC Project.
Position - Lead Planning Engineer
Employed by Nexen Petroleum, UK. Located in Aberdeen, UK. Work covered the
planning and monitoring of the Golden Eagle platform HUC project.
The scope of work covered the monitoring of the contractors construction schedule and
the planning and monitoring of the commissioning and start up scopes of work.
Initially onshore the role transferred to offshore on a two week about rota following the
installation of the main platform.
Primavera P6 was the primary planning system used.
Nov.2010 – Aug.2013 Nexen Buzzard North Sea Oil & Gas Installation Major Offshore Projects
Position - Lead Planning Engineer
Employed by Nexen Petroleum, UK. Located in Aberdeen, UK. Work covered the
planning and monitoring of major brownfield modification work required to maintain and
enhance production. The major projects included an additional 60 bed accommodation,
new sand handling plant and upgraded water injection facilities.
The work covered the full life cycle of the projects through the select, define, sanction
and execution phases of the detailed engineering, offshore construction and
commissioning.
The work scopes covered both work carried out during live production and shutdown
situations.
Primavera P6 was the primary planning system used.
Jan.2008 – Oct.2010 Nexen Buzzard North Sea Oil & Gas Installation Enhancement Project.
Position - Lead Planning Engineer
Employed by Nexen Petroleum, UK. Located in Aberdeen, UK. Work covered the
planning and monitoring of brownfield modifications and the hook up and commissioning
of a new gas sweetening deck. The work scopes covered both work carried out during live
production and shutdown situations.
Page 1 of 6
Primavera P3 was the primary planning system used.
May.2007 – Dec.2007 Whessoe Oil & Gas
Position - Senior Planning Engineer
Employed by Whessoe Oil & Gas. Located in Darlington, UK. Work covered the
compilation of EPC bid schedules for LNG import and storage terminals with varying
storage capacities from 30,000m3 upto 160,000m3. Sometime was spent within the
research and development group providing schedule compilation and analyses of newly
developed construction methods for the building of LNG storage tanks.
Primavera P3 & P5 were the primary planning systems used.
Dec. 2006 – Apr. 2007 AGIP Kashagan Project
Position - Senior Planning Engineer
Employed by AGIP UK. Located in Milan, Italy. Work covered the compilation of the
hook up construction plan as part of an overall project integrated plan. The tracking of
design and engineering deliverables, onshore module construction status, equipment
deliveries and simultaneous offshore operations were all considered with the view of
compiling a plan which met commissioning priorities.
Primavera P3 & P5 were the primary planning systems used.
Mar. 2003 - Nov. 2006 Nexen Buzzard North Sea Oil & Gas Installation.
Position – Senior Planning Engineer
Employed by Nexen Petroleum UK.
I joined the project just prior to sanction in the John Brown Design office situated in
London.
Carried out fabrication bid evaluations and was then relocated to the Quarters & Utilities
fabrication site at Hartlepool, Teeside, UK to overview the fabrication and onshore
commissioning phases of the schedule.
Following completion of the Quarters & Utilities deck I transferred to Aberdeen to begin
planning preparations for the offshore HUC phase.
From July 2006 I was located offshore from Aberdeen on a two week about rota covering
the planning aspects of the Buzzard HUC phase.
Primavera P3 was the primary planning system used during the fabrication and HUC
phases.
PROFESSIONAL EXPERIENCE: (cont.)
Mar. 2002 - Feb. 2003 Shell Bonga Floating Production & Storage Vessel.
Position - Senior Commissiioning Planning Engineer
Employed by Amec process and energy, located at the Wallsend Yard, Tyneside, UK.
Work involved the planning of the in yard commissioning phase and interfacing with the
construction completions group.
Primavera P3 was the primary planning system used during the fabrication and HUC
phases.
Page 2 of 6
Nov. 2000 - Feb 2002 BNFL Technologly Centre - Sellafield.
Position - Senior Planning Engineer
Employed by the AMEC-BNFL project management team.
Work involved the compiling of discipline level 4 programmes to produce integrated
multi discipline 90 day construction lookaheads.
Primavera suretrack & P3 planning packages were the primary planning systems used.
Sep. 1997 - Oct. 2000 Shearwater Development Alliance Integrated Deck Hook Up & Commissioning.
Position - Senior Planning Engineer
Employed by AMEC process and energy I joined the project at the design stage and spent
15 months in AMEC’s Golden Lane office in London.
Initially work involved preparing schedules covering the development work to allow the
timely commencement of the onshore commissioning phase.
The Artemis 7000 planning system and various Microsoft software packages were used in
this work.
Initial plans covering the onshore commissioning and offshore hook up and
commissioning phases were prepared.
Following this I moved to AMEC’s fabrication yard in Wallsend where the detailed
planning of the onshore commissioning was continued. Interfacing with the construction
site planners was carried out to arrive at reasonable system handover dates that made up
the basis of the plan.
Precedence networks input into the Artemis 7000 system were used to produce detailed
plans, progress ‘S’ curves and manpower histograms which were monitored against each
week. Progress and productivity reports were produced using AMEC’s jobcard
management system (JMS). The schedule impact of missed handover dates were analysed
and advised and short-term lookaheads were produced. During the latter stages of the
onshore phase the detailed planning of the offshore hook up and commissioning phase
was undertaken.
Using precedence networks input to the Artemis 7000 system and AMEC’s jobcard
management system, detailed plans, progress ‘S’ curve and manpower histograms were
produced.
The project then moved to offshore on a two week about rota where I monitored actual
progress against the plan and advised of schedule impacts. Short-term lookaheads were
produced in order to indicate priority work areas
Interfacing with design was carried out in order to indicate when commissioning design
deliverables were required.
PROFESSIONAL EXPERIENCE: (cont.)
.
Jul. 1996 - Aug. 1997 Shell Curlew Floating Production & Storage Vessel
Position - Senior Planning Engineer
Working for AMEC responsible for the planning of the above F.P.S.O. Work involved
the development of a project plan to cover the construction and commissioning phases.
Initially based in the AMEC London design office work was carried out on the
integration of the design and construction plans.
Following this I moved to AMEC’s Wallsend fabrication yard to cover the construction
and commissioning phases of the project.
Page 3 of 6
The project plan was developed using the Artemis 7000 system. The work was
organised by using workpacks and jobcards and monitored weekly.
Short-term lookaheads were produced with key activities required to meet project
milestones closely monitored.
Apr. 1996 - Jun.1996 B.P E.T.A.P Utilities / Accommodation Module
Position - Senior Planning Engineer
Working for Kvaerner Oil & Gas at their construction yard in Fife.
Work involved the development of a detailed plan for the construction of the Marnoch
Utilities/Accommodation module and the Mungo satellite wellhead module. Artemis
6000 & 9000 software was used.
Mar. 1994 - Mar. 1996 B.P Andrew Integrated Deck Fabrication
Position - Senior Planning Engineer
Employed by Trafalgar House Offshore Fabricators. Work involved compiling detailed
fitting out programmes by means of precedence networks input into the Artemis 6000
system. These networks were integrated with design and commissioning programmes to
form an overall project plan for the monitoring and direction of work throughout the
project.
Oct. 1993 - Mar. 1994 Shell Brent Bravo Long Term Field Development
Position - Planning Engineer
Employed offshore by A.O.C.I work involved the monitoring of progress and
productivity on a daily basis. Detailed planning of the installation of new pipework
systems was undertaken using precedence networks and the Artemis 6000 system.
Jun. 1993 - Sep. 1993 Shell Brent Alpha Shutdown
Position - Planning Engineer
Employed in Aberdeen by A.O.C.I the work involved detailed pre-planning of the work to
be carried out during a six-week production shutdown for plant refurbishment. The work
then moved offshore on a two week about rota where the actual progress was monitored
against the plan in order to direct the work effort and identify potential problem areas.
PROFESSIONAL EXPERIENCE: (cont.)
Dec. 1992 - May. 1993 AGIP Tiffany Hook Up & Commissioning
Position - Planning Engineer
Working within the Saipol management team offshore. Work involved controlling the
issue of jobcards, monitoring of progress, producing reports covering progress and
outstanding work lists using the FoxPro Computer system. Short-term lookaheads were
produced to direct the work effort.
Page 4 of 6
Aug. 1992 - Nov. 1992 ELF Saltire Hook Up & Commissioning
Position - Planning Engineer
Working for A.O.C.I within the ELF/A.O.C.I integrated management team in Tyneside
and offshore. Detailed pre-planning of the hook up & commissioning scope was carried
out in Tyneside using the Artemis 9000 system. The work then moved offshore where
progress and productivity was monitored by means of jobcards.
Dec. 1991 - Jul. 1992 B.P Miller Hook Up & Commissioning
Position - Planning Engineer
Working offshore for A.O.C.I within the B.P./A.O.C.I integrated management team. The
main duties involved the production of computer generated reports covering weekly
progress, productivity and man-hour expenditure using the Artemis 6000 system. The
control of jobcard issue and the drawing up of short-term lookaheads was also carried out.
Jun. 1990 - Nov.1991 Shell Gannet and Shell Nelson Integrated Deck Fabrication.
Position - Planning Engineer
Employed by Redpath Offshore Limited at their Teeside fabrication yard. Work involved
producing schedules generated from precedence networks at various levels of detail using
the Artemis 6000 system. Monitoring progress & productivity and manpower forecasting
was carried out.
Sep. 1988 - May. 1990 Conoco Compression Deck Fabrication
Position - Planning Engineer
Employed by Press Offshore Limited at their Wallsend fabrication yard, Work involved
producing schedules at various levels of detail using the Artemis 6000 system.
Monitoring progress & productivity and manpower forecasting was carried out.
PROFESSIONAL EXPERIENCE: (cont.)
Oct. 1984 - Aug. 1988 North East Shipbuilders Limited
Position - Planning Engineer
Production scheduling, monitoring progress and supplying information on materials
required by production. Involved with the implementation of a new labour cost control
system.
Page 5 of 6
Sep. 1975 - Sep. 1984 Position - Mechanical Fitter
On successful completion of my apprenticeship was responsible for the installation of
marine machinery, pipework and instrumentation and control
systems.
Qualifications & Training :
H.N.C
Mechanical Engineering
Combined Offshore Survival & Fire Fighting Training
Offshore Safety Training (MIST)
Offshore Safety Training (CAEBS)
Page 6 of 6
Sep. 1975 - Sep. 1984 Position - Mechanical Fitter
On successful completion of my apprenticeship was responsible for the installation of
marine machinery, pipework and instrumentation and control
systems.
Qualifications & Training :
H.N.C
Mechanical Engineering
Combined Offshore Survival & Fire Fighting Training
Offshore Safety Training (MIST)
Offshore Safety Training (CAEBS)
Page 6 of 6

More Related Content

What's hot

Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016Abi Joseph
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vincent Winkler
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick ResumeRudy Wick
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16bill ure
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhil Karow
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 

What's hot (20)

Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
res-16
res-16res-16
res-16
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
ATB PE Portfolio2016
ATB PE Portfolio2016ATB PE Portfolio2016
ATB PE Portfolio2016
 

Viewers also liked

Viewers also liked (14)

Nm feb 19, 1951
Nm feb 19, 1951Nm feb 19, 1951
Nm feb 19, 1951
 
Aditi_Neotys Webinar_FinalCopy
Aditi_Neotys Webinar_FinalCopyAditi_Neotys Webinar_FinalCopy
Aditi_Neotys Webinar_FinalCopy
 
Letter of recommendation Dominique Models
Letter of recommendation Dominique ModelsLetter of recommendation Dominique Models
Letter of recommendation Dominique Models
 
Capelozza no rio
Capelozza no rioCapelozza no rio
Capelozza no rio
 
Eficiência
EficiênciaEficiência
Eficiência
 
Jkulh
JkulhJkulh
Jkulh
 
certificate2
certificate2certificate2
certificate2
 
MDG Circle
MDG CircleMDG Circle
MDG Circle
 
20080731 019-003
20080731 019-00320080731 019-003
20080731 019-003
 
Field Check Feedback
Field Check FeedbackField Check Feedback
Field Check Feedback
 
HarvardX HDS3221.2x Certificate edX
HarvardX HDS3221.2x Certificate   edXHarvardX HDS3221.2x Certificate   edX
HarvardX HDS3221.2x Certificate edX
 
Word 2010 principal
Word 2010 principalWord 2010 principal
Word 2010 principal
 
Apresentacao chriscaetano
Apresentacao chriscaetanoApresentacao chriscaetano
Apresentacao chriscaetano
 
โครงงานคอมพิวเตอร์ (1)
โครงงานคอมพิวเตอร์ (1)โครงงานคอมพิวเตอร์ (1)
โครงงานคอมพิวเตอร์ (1)
 

Similar to CVPLAING

Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster WheelerGareth White
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2RToet
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 irlam carl
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1RToet
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP Robert Romero
 
New CV Faisal Rauf
New CV Faisal RaufNew CV Faisal Rauf
New CV Faisal Raufawrish94
 
Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Nayan Baraiya
 
EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6Darcy Pearson
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar
 

Similar to CVPLAING (20)

Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015 CV Carl Irlam 30-09-2015
CV Carl Irlam 30-09-2015
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 
New CV Faisal Rauf
New CV Faisal RaufNew CV Faisal Rauf
New CV Faisal Rauf
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya
 
Vinoth
VinothVinoth
Vinoth
 
EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
CV
CVCV
CV
 
CV for J. Moloney
CV for J. MoloneyCV for J. Moloney
CV for J. Moloney
 

CVPLAING

  • 1. CURRICULUM VITAE NAME: Peter Laing OCCUPATION: Planning Engineer ADDRESS: 23 Broadmeadows East Herrington Sunderland SR3 3RF TELEPHONE: Home – 0044 (0)191 5513010 Mobile – 0044 (0)7956449074 Email peterlainghome@yahoo.co.uk PROFESSIONAL EXPERIENCE: Sep.2013 – Present Nexen Golden Eagle HUC Project. Position - Lead Planning Engineer Employed by Nexen Petroleum, UK. Located in Aberdeen, UK. Work covered the planning and monitoring of the Golden Eagle platform HUC project. The scope of work covered the monitoring of the contractors construction schedule and the planning and monitoring of the commissioning and start up scopes of work. Initially onshore the role transferred to offshore on a two week about rota following the installation of the main platform. Primavera P6 was the primary planning system used. Nov.2010 – Aug.2013 Nexen Buzzard North Sea Oil & Gas Installation Major Offshore Projects Position - Lead Planning Engineer Employed by Nexen Petroleum, UK. Located in Aberdeen, UK. Work covered the planning and monitoring of major brownfield modification work required to maintain and enhance production. The major projects included an additional 60 bed accommodation, new sand handling plant and upgraded water injection facilities. The work covered the full life cycle of the projects through the select, define, sanction and execution phases of the detailed engineering, offshore construction and commissioning. The work scopes covered both work carried out during live production and shutdown situations. Primavera P6 was the primary planning system used. Jan.2008 – Oct.2010 Nexen Buzzard North Sea Oil & Gas Installation Enhancement Project. Position - Lead Planning Engineer Employed by Nexen Petroleum, UK. Located in Aberdeen, UK. Work covered the planning and monitoring of brownfield modifications and the hook up and commissioning of a new gas sweetening deck. The work scopes covered both work carried out during live production and shutdown situations. Page 1 of 6
  • 2. Primavera P3 was the primary planning system used. May.2007 – Dec.2007 Whessoe Oil & Gas Position - Senior Planning Engineer Employed by Whessoe Oil & Gas. Located in Darlington, UK. Work covered the compilation of EPC bid schedules for LNG import and storage terminals with varying storage capacities from 30,000m3 upto 160,000m3. Sometime was spent within the research and development group providing schedule compilation and analyses of newly developed construction methods for the building of LNG storage tanks. Primavera P3 & P5 were the primary planning systems used. Dec. 2006 – Apr. 2007 AGIP Kashagan Project Position - Senior Planning Engineer Employed by AGIP UK. Located in Milan, Italy. Work covered the compilation of the hook up construction plan as part of an overall project integrated plan. The tracking of design and engineering deliverables, onshore module construction status, equipment deliveries and simultaneous offshore operations were all considered with the view of compiling a plan which met commissioning priorities. Primavera P3 & P5 were the primary planning systems used. Mar. 2003 - Nov. 2006 Nexen Buzzard North Sea Oil & Gas Installation. Position – Senior Planning Engineer Employed by Nexen Petroleum UK. I joined the project just prior to sanction in the John Brown Design office situated in London. Carried out fabrication bid evaluations and was then relocated to the Quarters & Utilities fabrication site at Hartlepool, Teeside, UK to overview the fabrication and onshore commissioning phases of the schedule. Following completion of the Quarters & Utilities deck I transferred to Aberdeen to begin planning preparations for the offshore HUC phase. From July 2006 I was located offshore from Aberdeen on a two week about rota covering the planning aspects of the Buzzard HUC phase. Primavera P3 was the primary planning system used during the fabrication and HUC phases. PROFESSIONAL EXPERIENCE: (cont.) Mar. 2002 - Feb. 2003 Shell Bonga Floating Production & Storage Vessel. Position - Senior Commissiioning Planning Engineer Employed by Amec process and energy, located at the Wallsend Yard, Tyneside, UK. Work involved the planning of the in yard commissioning phase and interfacing with the construction completions group. Primavera P3 was the primary planning system used during the fabrication and HUC phases. Page 2 of 6
  • 3. Nov. 2000 - Feb 2002 BNFL Technologly Centre - Sellafield. Position - Senior Planning Engineer Employed by the AMEC-BNFL project management team. Work involved the compiling of discipline level 4 programmes to produce integrated multi discipline 90 day construction lookaheads. Primavera suretrack & P3 planning packages were the primary planning systems used. Sep. 1997 - Oct. 2000 Shearwater Development Alliance Integrated Deck Hook Up & Commissioning. Position - Senior Planning Engineer Employed by AMEC process and energy I joined the project at the design stage and spent 15 months in AMEC’s Golden Lane office in London. Initially work involved preparing schedules covering the development work to allow the timely commencement of the onshore commissioning phase. The Artemis 7000 planning system and various Microsoft software packages were used in this work. Initial plans covering the onshore commissioning and offshore hook up and commissioning phases were prepared. Following this I moved to AMEC’s fabrication yard in Wallsend where the detailed planning of the onshore commissioning was continued. Interfacing with the construction site planners was carried out to arrive at reasonable system handover dates that made up the basis of the plan. Precedence networks input into the Artemis 7000 system were used to produce detailed plans, progress ‘S’ curves and manpower histograms which were monitored against each week. Progress and productivity reports were produced using AMEC’s jobcard management system (JMS). The schedule impact of missed handover dates were analysed and advised and short-term lookaheads were produced. During the latter stages of the onshore phase the detailed planning of the offshore hook up and commissioning phase was undertaken. Using precedence networks input to the Artemis 7000 system and AMEC’s jobcard management system, detailed plans, progress ‘S’ curve and manpower histograms were produced. The project then moved to offshore on a two week about rota where I monitored actual progress against the plan and advised of schedule impacts. Short-term lookaheads were produced in order to indicate priority work areas Interfacing with design was carried out in order to indicate when commissioning design deliverables were required. PROFESSIONAL EXPERIENCE: (cont.) . Jul. 1996 - Aug. 1997 Shell Curlew Floating Production & Storage Vessel Position - Senior Planning Engineer Working for AMEC responsible for the planning of the above F.P.S.O. Work involved the development of a project plan to cover the construction and commissioning phases. Initially based in the AMEC London design office work was carried out on the integration of the design and construction plans. Following this I moved to AMEC’s Wallsend fabrication yard to cover the construction and commissioning phases of the project. Page 3 of 6
  • 4. The project plan was developed using the Artemis 7000 system. The work was organised by using workpacks and jobcards and monitored weekly. Short-term lookaheads were produced with key activities required to meet project milestones closely monitored. Apr. 1996 - Jun.1996 B.P E.T.A.P Utilities / Accommodation Module Position - Senior Planning Engineer Working for Kvaerner Oil & Gas at their construction yard in Fife. Work involved the development of a detailed plan for the construction of the Marnoch Utilities/Accommodation module and the Mungo satellite wellhead module. Artemis 6000 & 9000 software was used. Mar. 1994 - Mar. 1996 B.P Andrew Integrated Deck Fabrication Position - Senior Planning Engineer Employed by Trafalgar House Offshore Fabricators. Work involved compiling detailed fitting out programmes by means of precedence networks input into the Artemis 6000 system. These networks were integrated with design and commissioning programmes to form an overall project plan for the monitoring and direction of work throughout the project. Oct. 1993 - Mar. 1994 Shell Brent Bravo Long Term Field Development Position - Planning Engineer Employed offshore by A.O.C.I work involved the monitoring of progress and productivity on a daily basis. Detailed planning of the installation of new pipework systems was undertaken using precedence networks and the Artemis 6000 system. Jun. 1993 - Sep. 1993 Shell Brent Alpha Shutdown Position - Planning Engineer Employed in Aberdeen by A.O.C.I the work involved detailed pre-planning of the work to be carried out during a six-week production shutdown for plant refurbishment. The work then moved offshore on a two week about rota where the actual progress was monitored against the plan in order to direct the work effort and identify potential problem areas. PROFESSIONAL EXPERIENCE: (cont.) Dec. 1992 - May. 1993 AGIP Tiffany Hook Up & Commissioning Position - Planning Engineer Working within the Saipol management team offshore. Work involved controlling the issue of jobcards, monitoring of progress, producing reports covering progress and outstanding work lists using the FoxPro Computer system. Short-term lookaheads were produced to direct the work effort. Page 4 of 6
  • 5. Aug. 1992 - Nov. 1992 ELF Saltire Hook Up & Commissioning Position - Planning Engineer Working for A.O.C.I within the ELF/A.O.C.I integrated management team in Tyneside and offshore. Detailed pre-planning of the hook up & commissioning scope was carried out in Tyneside using the Artemis 9000 system. The work then moved offshore where progress and productivity was monitored by means of jobcards. Dec. 1991 - Jul. 1992 B.P Miller Hook Up & Commissioning Position - Planning Engineer Working offshore for A.O.C.I within the B.P./A.O.C.I integrated management team. The main duties involved the production of computer generated reports covering weekly progress, productivity and man-hour expenditure using the Artemis 6000 system. The control of jobcard issue and the drawing up of short-term lookaheads was also carried out. Jun. 1990 - Nov.1991 Shell Gannet and Shell Nelson Integrated Deck Fabrication. Position - Planning Engineer Employed by Redpath Offshore Limited at their Teeside fabrication yard. Work involved producing schedules generated from precedence networks at various levels of detail using the Artemis 6000 system. Monitoring progress & productivity and manpower forecasting was carried out. Sep. 1988 - May. 1990 Conoco Compression Deck Fabrication Position - Planning Engineer Employed by Press Offshore Limited at their Wallsend fabrication yard, Work involved producing schedules at various levels of detail using the Artemis 6000 system. Monitoring progress & productivity and manpower forecasting was carried out. PROFESSIONAL EXPERIENCE: (cont.) Oct. 1984 - Aug. 1988 North East Shipbuilders Limited Position - Planning Engineer Production scheduling, monitoring progress and supplying information on materials required by production. Involved with the implementation of a new labour cost control system. Page 5 of 6
  • 6. Sep. 1975 - Sep. 1984 Position - Mechanical Fitter On successful completion of my apprenticeship was responsible for the installation of marine machinery, pipework and instrumentation and control systems. Qualifications & Training : H.N.C Mechanical Engineering Combined Offshore Survival & Fire Fighting Training Offshore Safety Training (MIST) Offshore Safety Training (CAEBS) Page 6 of 6
  • 7. Sep. 1975 - Sep. 1984 Position - Mechanical Fitter On successful completion of my apprenticeship was responsible for the installation of marine machinery, pipework and instrumentation and control systems. Qualifications & Training : H.N.C Mechanical Engineering Combined Offshore Survival & Fire Fighting Training Offshore Safety Training (MIST) Offshore Safety Training (CAEBS) Page 6 of 6