SlideShare a Scribd company logo
1 of 3
CV
Paul Burke
Personal Details
36 Woodfield Avenue
Gee Cross
Hyde
Cheshire
SK14 5BB
Email: paulburke75@hotmail.co.uk
Mobile: +44 (0)7807 204887
Qualifications
CSCS Accreditation, ITIL V3 Foundation Certified,
WWPM Accreditation
IBM – In house Training: Leadership in a
Project Team Environment, Closing Projects Using
PCB and MSP, Defining and Planning Projects
Using MSP, Execution and Control Using PCB and
MSP
Interests
Climbing, Family, Caravanning
___________________________________________ _________________________________________
Capability summary
I am an ambitious Project Manager,whose progressive
career spanning 20 years has been established
through success within leading Corporations. I have
extensive Information Systems, Infrastructure and
software experience, providing leadership and project
delivery in dynamic and challenging environments for
market leading private sector organisations.
Key Skills:
Financial Services - Banking
Turner & Townsend
Project Manager - Barclays Branch
Transformation Programme
July 2015 to Present
 Manage the Data Cabler activities, engaging
with three third party Data Contractors, to
ensure full compliance for the delivery of the
Branch refit Programme
 To date managed the activities for 150+
Branches
 Engage with the Data Contractors for the
delivery of the IPTand Juniper Switch Migration
Projects
 Manage all the port configurations across the
Programme, engaging with Vodafone for all
CISCO and/or Juniper switch port configuration
requirements
 To date raised and managed 520+ requests
with Vodafone
 Engage with Vodafone for the delivery of the
Primary and Backup circuit
installations/commissioning for new
acquisitions. Including the switch
installations, all fail over testing and sign off.
 Responsible for an additional Project to
deliver IP connectivity to branches, to bring
online the BMS (Building Management
System) installed within
 Engaging with a third party supplier, SMART
Buildings. SMART install the BMS Panel into
the Branches and connect the buildings
services to their controller. Services such as
the electrics, gas, sensors to monitor
temperature etc.
 449 Branches currently in scope, of which I
have 282 currently connected and online,
with 73 currently going through UAT/WIP.
 The ability to actively monitor the branches
environment, and control them, has led to
huge savings for Barclays – currently
forecasted to be £6 Million per year
 Phase 2 of the BMS Programme is due to be
released in 2017, adding 400 more branches
in scope.
Information Technology and
Infrastructure
IBM UK
2006 – 2015
IBM Project Manager
During this time I successfully delivered a wide variety
of challenging projects, for many different IBM
customers, mostly in customer facing roles
Applications Project Manager
RSA
 Managed the applications packaging cycle
from XP into Win 8.0/8.1
√ Experienced IT systems, software and
Infrastructure PM
√ Sound understanding of network and telephony
√ Strong organisational and communication skills
√ Supplier Management and Engagement
√ Information Management & Reporting
√ Planning and Strategy Development
√ End to end delivery of cross-functional projects
√ Analytical and able to find solutions quickly
√ Articulate, decisive and assertive when necessary
Paul Burke - Available for Permanent or Contract Roles 02
 Created a full end to end presentation of the
process
 Tested the applications for any Win 8.0 and
8.1 incompatibilities and resolved
 Packaged as an MSI and handed over to my
team in Poland that supported the staging
servers
 Upgraded the Lumension security software.
This required a testing environment upgrade,
with full testing and sign off, then upgraded
the live distribution server
 Responsible for a folder redirection project
Boarding Project Manager
Working for a business unit in IBM called the “Build
Factory.”
 Identified UK based clients that had Projects
on the go requiring server builds and
presented options to these clients
User Migration Project Manager
Friends Provident/Life
 Built out infrastructure across two locations
to house the migration of 1500 users
 Responsible for delivering and managing
activities for the two project plans
Technical Incident Manager (“TIM”)
The role of a TIM is to ensure that any Major Incidents
are fully resolved in an agreed timeframe
 Instrumental in changing the way information
was captured and reported during MI
Infrastructure Project Manager
JLR
 Installed networking, power requirements,
racking, switches, routers, ESX farm build etc
in an IBM DC to enable the move into IBM
support of their 700 physical/virtual server
estate
 Managed seven business areas each with their
own pools of servers
 Managed the delivery of the QA/DEV group
 Delivered an urgent storage solution with two
XIV storage units one into an IBM DC and the
other into the customer’s DC with zero
business impact
 Rolled out a worldwide image project
 Procured distribution servers, installed,
configured and tested in Holland, UK, Austria
and China
 Image uploaded to the four distribution
servers
 Delivered an NSeries storage solution giving
ample storage for the entire estate
Server Build Project Manager
Arcadia
 The RFS was worth $500,000 in revenue
 First time in the UK iSeries server had been
delivered into IBM’s eBHS business
environment
 Responsible for the procurement of an iSeries
and three XSeries servers for the development
of the customer’s in house software
 Managed the complete Project from
procurement to full BAU support with no major
issues
Server Build Project Manager
Arcadia
 A RFS Project to secure, install and configure
four IBM blade serversfor their in house CUOM
application.
 Managedprocurement to full BAU support with
no issues
Repat Project Manager
Ten UK based accounts, currently being supported
from the IDC in Bangalore, back into the UK support
teams remits
 Phase 1 to return six accounts
 Phase 2 the remaining four
 Resourced FTE’s in the UK to fully support
these ten accounts
 Ensure compliance of all accounts
 Senior UK and European management
stakeholders
 Sourced a new TEC monitoring system
 Managed to upgrade them from an unstable
V3 TEC console to a new V5 stable one.
Multi Project PM
Bradford & Bingley
 Delivered six Projects, some running in
parallel/overlapping including:
o 64bit monitoring solution, and the 64bit
CITRIX monitoring solution, SNMP
monitoring solution
o Managed the installation and configuration
of the HP Load Runner utility into the dev
environment for application testing
o TSM server build, installation and
configuration for latest version of IBM’s
TSM client roll out to entire server and user
estate. Decommissioned old server.
Paul Burke - Available for Permanent or Contract Roles 03
Other positions held included:
Decom Project Manager
IDC Project Manager
Mentor
GDF Dispatcher/Team Leader
Service Account Manager
IBM 3rd
Line Exchange Support
2nd
Line Support Technician

More Related Content

What's hot

Rolston Rene _Resume
Rolston Rene _ResumeRolston Rene _Resume
Rolston Rene _ResumeRolston Rene
 
Evan Hughes (BA)
Evan Hughes (BA)Evan Hughes (BA)
Evan Hughes (BA)Evan Hughes
 
Paul cliff-2014 voip resume
Paul cliff-2014 voip resumePaul cliff-2014 voip resume
Paul cliff-2014 voip resumePaul Cliff
 
Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVermaRam Verma
 
Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017Curtis Bard
 
SomashekarJanardan-2014-Resume-Abrd
SomashekarJanardan-2014-Resume-AbrdSomashekarJanardan-2014-Resume-Abrd
SomashekarJanardan-2014-Resume-AbrdSomashekar Janardan
 
WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15William Lord
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby
 
VinhVAN_Resume
VinhVAN_ResumeVinhVAN_Resume
VinhVAN_ResumeVinh Van
 
Southbanks_Powerpoint_Presentation
Southbanks_Powerpoint_PresentationSouthbanks_Powerpoint_Presentation
Southbanks_Powerpoint_PresentationJames Shin
 
Icc Broadband Presintation
Icc Broadband PresintationIcc Broadband Presintation
Icc Broadband Presintationguestab1691
 

What's hot (20)

Rolston Rene _Resume
Rolston Rene _ResumeRolston Rene _Resume
Rolston Rene _Resume
 
Herndon's
Herndon'sHerndon's
Herndon's
 
Prakash soni
Prakash soniPrakash soni
Prakash soni
 
Evan Hughes (BA)
Evan Hughes (BA)Evan Hughes (BA)
Evan Hughes (BA)
 
Paul cliff-2014 voip resume
Paul cliff-2014 voip resumePaul cliff-2014 voip resume
Paul cliff-2014 voip resume
 
Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVerma
 
Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017
 
Wajahat iqbal cv1
Wajahat iqbal cv1Wajahat iqbal cv1
Wajahat iqbal cv1
 
Ravi-apr30
Ravi-apr30Ravi-apr30
Ravi-apr30
 
LaMima Gilbert Lewis PM
LaMima Gilbert Lewis PMLaMima Gilbert Lewis PM
LaMima Gilbert Lewis PM
 
Resume Rediker 10-21-2015
Resume Rediker 10-21-2015Resume Rediker 10-21-2015
Resume Rediker 10-21-2015
 
Prajwal Resume
Prajwal ResumePrajwal Resume
Prajwal Resume
 
SomashekarJanardan-2014-Resume-Abrd
SomashekarJanardan-2014-Resume-AbrdSomashekarJanardan-2014-Resume-Abrd
SomashekarJanardan-2014-Resume-Abrd
 
WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15WilliamLord_Resume Atos 6-15-15
WilliamLord_Resume Atos 6-15-15
 
Myresume1A (1)
Myresume1A (1)Myresume1A (1)
Myresume1A (1)
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project Manger
 
M_Wilmot Resume_7
M_Wilmot Resume_7M_Wilmot Resume_7
M_Wilmot Resume_7
 
VinhVAN_Resume
VinhVAN_ResumeVinhVAN_Resume
VinhVAN_Resume
 
Southbanks_Powerpoint_Presentation
Southbanks_Powerpoint_PresentationSouthbanks_Powerpoint_Presentation
Southbanks_Powerpoint_Presentation
 
Icc Broadband Presintation
Icc Broadband PresintationIcc Broadband Presintation
Icc Broadband Presintation
 

Similar to Paul Burke - CV

Similar to Paul Burke - CV (20)

Mohsin-Hussain Resume-31122014
Mohsin-Hussain Resume-31122014Mohsin-Hussain Resume-31122014
Mohsin-Hussain Resume-31122014
 
Mike-Romolino10[2]
Mike-Romolino10[2]Mike-Romolino10[2]
Mike-Romolino10[2]
 
Srini (1)
Srini (1)Srini (1)
Srini (1)
 
CV Zayo 07-16
CV Zayo 07-16CV Zayo 07-16
CV Zayo 07-16
 
Peter Guzman Career Resume V2 22 2011
Peter Guzman  Career Resume V2 22 2011Peter Guzman  Career Resume V2 22 2011
Peter Guzman Career Resume V2 22 2011
 
sunny singhal
sunny singhalsunny singhal
sunny singhal
 
Initiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case StudiesInitiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case Studies
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_c
 
Resume_Achhar_Kalia
Resume_Achhar_KaliaResume_Achhar_Kalia
Resume_Achhar_Kalia
 
Rich Frey External 3_2015
Rich Frey External 3_2015Rich Frey External 3_2015
Rich Frey External 3_2015
 
JBJCV0816
JBJCV0816JBJCV0816
JBJCV0816
 
Resume-Piyush_Agarwal (1)
Resume-Piyush_Agarwal (1)Resume-Piyush_Agarwal (1)
Resume-Piyush_Agarwal (1)
 
Vinoth_Perumal_Datawarehousing
Vinoth_Perumal_DatawarehousingVinoth_Perumal_Datawarehousing
Vinoth_Perumal_Datawarehousing
 
CV - ken wood on 12th feb 2016 2 pages
CV - ken wood  on  12th feb 2016   2 pagesCV - ken wood  on  12th feb 2016   2 pages
CV - ken wood on 12th feb 2016 2 pages
 
Vivek Srivastava-2015
Vivek Srivastava-2015Vivek Srivastava-2015
Vivek Srivastava-2015
 
Mohideen Khader-122316
Mohideen Khader-122316Mohideen Khader-122316
Mohideen Khader-122316
 
Sundaramoorthy resume
Sundaramoorthy resumeSundaramoorthy resume
Sundaramoorthy resume
 
Sundaramoorthy resume
Sundaramoorthy resumeSundaramoorthy resume
Sundaramoorthy resume
 
Jeremiah_Goodmancurrentresume
Jeremiah_GoodmancurrentresumeJeremiah_Goodmancurrentresume
Jeremiah_Goodmancurrentresume
 
Resume
ResumeResume
Resume
 

Paul Burke - CV

  • 1. CV Paul Burke Personal Details 36 Woodfield Avenue Gee Cross Hyde Cheshire SK14 5BB Email: paulburke75@hotmail.co.uk Mobile: +44 (0)7807 204887 Qualifications CSCS Accreditation, ITIL V3 Foundation Certified, WWPM Accreditation IBM – In house Training: Leadership in a Project Team Environment, Closing Projects Using PCB and MSP, Defining and Planning Projects Using MSP, Execution and Control Using PCB and MSP Interests Climbing, Family, Caravanning ___________________________________________ _________________________________________ Capability summary I am an ambitious Project Manager,whose progressive career spanning 20 years has been established through success within leading Corporations. I have extensive Information Systems, Infrastructure and software experience, providing leadership and project delivery in dynamic and challenging environments for market leading private sector organisations. Key Skills: Financial Services - Banking Turner & Townsend Project Manager - Barclays Branch Transformation Programme July 2015 to Present  Manage the Data Cabler activities, engaging with three third party Data Contractors, to ensure full compliance for the delivery of the Branch refit Programme  To date managed the activities for 150+ Branches  Engage with the Data Contractors for the delivery of the IPTand Juniper Switch Migration Projects  Manage all the port configurations across the Programme, engaging with Vodafone for all CISCO and/or Juniper switch port configuration requirements  To date raised and managed 520+ requests with Vodafone  Engage with Vodafone for the delivery of the Primary and Backup circuit installations/commissioning for new acquisitions. Including the switch installations, all fail over testing and sign off.  Responsible for an additional Project to deliver IP connectivity to branches, to bring online the BMS (Building Management System) installed within  Engaging with a third party supplier, SMART Buildings. SMART install the BMS Panel into the Branches and connect the buildings services to their controller. Services such as the electrics, gas, sensors to monitor temperature etc.  449 Branches currently in scope, of which I have 282 currently connected and online, with 73 currently going through UAT/WIP.  The ability to actively monitor the branches environment, and control them, has led to huge savings for Barclays – currently forecasted to be £6 Million per year  Phase 2 of the BMS Programme is due to be released in 2017, adding 400 more branches in scope. Information Technology and Infrastructure IBM UK 2006 – 2015 IBM Project Manager During this time I successfully delivered a wide variety of challenging projects, for many different IBM customers, mostly in customer facing roles Applications Project Manager RSA  Managed the applications packaging cycle from XP into Win 8.0/8.1 √ Experienced IT systems, software and Infrastructure PM √ Sound understanding of network and telephony √ Strong organisational and communication skills √ Supplier Management and Engagement √ Information Management & Reporting √ Planning and Strategy Development √ End to end delivery of cross-functional projects √ Analytical and able to find solutions quickly √ Articulate, decisive and assertive when necessary
  • 2. Paul Burke - Available for Permanent or Contract Roles 02  Created a full end to end presentation of the process  Tested the applications for any Win 8.0 and 8.1 incompatibilities and resolved  Packaged as an MSI and handed over to my team in Poland that supported the staging servers  Upgraded the Lumension security software. This required a testing environment upgrade, with full testing and sign off, then upgraded the live distribution server  Responsible for a folder redirection project Boarding Project Manager Working for a business unit in IBM called the “Build Factory.”  Identified UK based clients that had Projects on the go requiring server builds and presented options to these clients User Migration Project Manager Friends Provident/Life  Built out infrastructure across two locations to house the migration of 1500 users  Responsible for delivering and managing activities for the two project plans Technical Incident Manager (“TIM”) The role of a TIM is to ensure that any Major Incidents are fully resolved in an agreed timeframe  Instrumental in changing the way information was captured and reported during MI Infrastructure Project Manager JLR  Installed networking, power requirements, racking, switches, routers, ESX farm build etc in an IBM DC to enable the move into IBM support of their 700 physical/virtual server estate  Managed seven business areas each with their own pools of servers  Managed the delivery of the QA/DEV group  Delivered an urgent storage solution with two XIV storage units one into an IBM DC and the other into the customer’s DC with zero business impact  Rolled out a worldwide image project  Procured distribution servers, installed, configured and tested in Holland, UK, Austria and China  Image uploaded to the four distribution servers  Delivered an NSeries storage solution giving ample storage for the entire estate Server Build Project Manager Arcadia  The RFS was worth $500,000 in revenue  First time in the UK iSeries server had been delivered into IBM’s eBHS business environment  Responsible for the procurement of an iSeries and three XSeries servers for the development of the customer’s in house software  Managed the complete Project from procurement to full BAU support with no major issues Server Build Project Manager Arcadia  A RFS Project to secure, install and configure four IBM blade serversfor their in house CUOM application.  Managedprocurement to full BAU support with no issues Repat Project Manager Ten UK based accounts, currently being supported from the IDC in Bangalore, back into the UK support teams remits  Phase 1 to return six accounts  Phase 2 the remaining four  Resourced FTE’s in the UK to fully support these ten accounts  Ensure compliance of all accounts  Senior UK and European management stakeholders  Sourced a new TEC monitoring system  Managed to upgrade them from an unstable V3 TEC console to a new V5 stable one. Multi Project PM Bradford & Bingley  Delivered six Projects, some running in parallel/overlapping including: o 64bit monitoring solution, and the 64bit CITRIX monitoring solution, SNMP monitoring solution o Managed the installation and configuration of the HP Load Runner utility into the dev environment for application testing o TSM server build, installation and configuration for latest version of IBM’s TSM client roll out to entire server and user estate. Decommissioned old server.
  • 3. Paul Burke - Available for Permanent or Contract Roles 03 Other positions held included: Decom Project Manager IDC Project Manager Mentor GDF Dispatcher/Team Leader Service Account Manager IBM 3rd Line Exchange Support 2nd Line Support Technician