SlideShare a Scribd company logo
1 of 5
William Lord
89-16 212 Place,
Queens Village, NY 11427
Tel: 917-498-4275, Cell: 347-644-8038
E-mail lordwus@yahoo.com
Senior Project Manager
SUMMARY:
Senior Project Manager with extensive Data Center infrastructure experience working in a globalize environment. Worked
on offshore projects identifying possible deployment regulations, labor laws in Wynyard UK, France, Switzerland and Asia
PAC. Developed and managed several revenue driven portfolio Projects which increased profits by 55 percent. At Hewlett
Packard, Managed the procurement of all BOM equipment globally developing a scheduled to land equipment and
coordinated engineers resources. My ability to restructure failed initiatives (Projects) quickly and get themto production is
one of many multi-tasking abilities I possess. I have created and managed budgets for long termprojects, designed Project
Plans, developed milestone timelines, while maintaining multiple projects. Exceptional work ethic plus the ability to
communicate across all levels of management. Excellent ability to identify and attract talented managers when building
project teams. Superb vendor management skills resulted in completing projects under budget and prior to the projected
timeline. Wrote the Trading floor and Back Office Support proposals which were accepted by Citigroup. Other
responsibilities included interviewing managers and business analysis. Possess a strong knowledge of Excel, Power Point
and Visio as well as Microsoft Project.
TECHNICAL SKILLS:
Hardware: HP Proliant BL685c/G7, Proliant DL 585 servers, HP C7000 ENCLOSURE, Proliant BL680c G5, Proliant BL460c
G7, Dell Blade Server E01S, Dell PowerEdge R300 Servers, HP Integrity RX8640 servers, UNIX/LINUX Servers,
BES servers, web servers, VTRAK E-class, Storage Management Servers, VLS9200 tapedrives, EMC SAN/NAS,
Centerra storage, SAN TapeLibrary, Web server, Proxy Server HP Professional Workstation 5500, 6400 and 4000
series desktops, including many other desktops compatibles;HP EliteBook 8440p laptops, Compaq Evo N610C,
M300, M700, M7400, 4220T, 4160T;Toshiba TECRA 8100, Toshiba laptops PORTEGE3440, 3080 and 3020; Dell
OPTIPLEX GX 260,GX 240, Dell Latitude laptops; Mobiledevices including Tablets; most Hewlett Packard
Network laser printers. Other large format printers including Epson, NEC and Brother laser printers;Several brands
of CD-writers and players, digital cameras, JAZ and Iomega Zip drives storage devices; Digital ID cards writers
includes DataCard UG-285 IMAGEWRITER and DATACARD IMAGECARD III.
Network: L3 Core (A8812), L2 Core (A5820), Distribution Switch (A12518), Access Switch (A5820), ILO/OA (A5810), SBI
Access A5810, Check Point Firewall, V3 F5 Load Balancer, NETAPP equipment, Steelhead Riverbed, JUNIPER SG
550 M, RADWARE, F5, CHECK POINT, Security Enterprise software, ISS small/medium/large switches, layered
Cisco CATALYST C8500, C 6500 E Series, Cisco POE switches, MMI Switches, Core HPSA, Point 100 series
routers, NetGear routers/switches, Bay Network routers and switches, D-link GIG Hz Ethernet hubs.
Software: Microsoft Project 2003/2010, Microsoft Visio 2000/2002/2007, SharePoint site updates ServiceNow Ver 1.0
(SNOW), SharePoint PINE Sites, Mosaic, PlainView, HPPM, CLARITY, Microsoft Office 2010, Microsoft Visio
2010, Microsoft Project 2007/2010, Outlook 2010, Exchange 5/6, Lotus Notes R4/R5/R6, Windows server 2003,
2008 and 2010, Windows 7, Windows 8, XP/2000, Professional Workstation and Dos; SMS, Oracle Apps, Lawson,
BPM, CRM, REMEDY, XML, Weblogic, VMWARE, UNIX/LINUX (Red HAT), Solaris, AIX, VXML/IVR,
Timbuktu (Asset Management and Remote Access), LANDesk, Oracle, DB2 Server, McAfee (Asset Management),
Helpdesk (Work Coordination and Asset Management Software), Remedy, MAPS (Asset Management), Citrix,
Security Enterprise software, SEP (Backup and Disaster Recovery software), Weblogic, Anti-Malware Software,
Norton Antivirus, Norton firewall, McAfee Antivirus, Firewall and Helpdesk Enterprise.
EXPERIENCE:
Lord Consulting Corp 11/14 – Present
Project Manager MODCO, Inc
 Prepared for MODCO, Inc a deployment proposalfor new network infrastructure and CCTV installation/hosting
with remote access which was approved.
 Managed and coordinated the database migration of several ophthalmologist practice’s to the cloud, including
providing remote access solution for billing firms.
 Created business proposals for small to mid size firms identifying capacity planning for a 15 percent growth
annually.
 Drafted business proposals for clients requiring new servers and network switches/router upgrades, including
computer hardware and phone systems.
 Developed project plans for office relocation projects, server relocation, coordinated circuit landing, network
patching and switch configuration.
Consulting at McGraw Hill Financial Capital IQ Division 2/12 – 10/14
Project Manager
 Managed the ATOS Cloud Environment at McGraw Hill Financial, worked with Global team to construct a Cloud
landing Zone the size of a country for ecommerce and mobile application support. This was initially budgeted for
50 million dollars.
 Coordinated the 55 Water Street installation of Audio/Video for three Conference rooms each having a 3D
Presentation capability, integrated servers and keypad access with Exchange reserve and book these conference
rooms. This required reserving static IP address and establishing the Conference rooms as a user.
 Worked closely with the Network team at times acted as a liaison between the business and the Network team to
schedule the REIP of CISCO switches in Colorado data center as part of a global infrastructure upgrade project.
 Managed the Network deployment team when configuring Zayo Ring circuits, routers and switches promoting
secondary circuits as the Primary circuit for all Office and Data Center locations.
 Executed projects from Charter/ initiation to Release utilized ServiceNow ver. 1.0 to request resources, Open and
Close Demand Task, Project Planning/Tracking, issuing change request approvals, including milestone updates
and project health reporting.
 Coordinated the standardize build of SQL and Application servers packaged as small to medium/ large services.
Client’s accessed a Portal entered their BOM requirements and a SQL or Application server would be assigned.
 Migrated existing Database for NICE Telecom systemto new platform, included testing P to V workstations to
test and simulate normal processing events.
 Developed and deployed the Blue Coat implementation using Agile methodology completing the full lifecycle to
Production, this included installing new servers, Rack/Stacking, Network Patching, KVM configuration and data
Migration/ integration.
 Managed Multi-Million projects such as the Unix Authentication Project of over 4000 servers, Coordinated the
software configuration and imaging of servers with Active Directory.
 Responsible for developing and driving the budget approval, network infrastructure installation, milestone
planning and resource allocation for relocating 460 associates and upgrade workstations in 4 Phases over a 6 week
period. (Completed Under budget)
 Executed Multi-million dollar ZAYO Ring instillation completing SDLC for the deployment of the ZAYO Ring
Circuits connecting offices, Data Centers and DR sites.
 Coordinated office closure for McGraw Hill Education in Texas and JD Power office in Norwalk Connecticut this
included EMC storage power down and decommissioning.
 Relocated 500 CAPIQ Associates to a newly renovated floor at 55 Water Street, Coordinated installation of
variable height desk, Workstation and printers.
 Managed McGraw Hill Financial build-out of the NICE system. Implemented the completed Lifecycle for 3 Major
Call Centers comprising of 12 servers, VM’s, SANS/NAS and Centerra, including EMC Storage.
 Developed a Project Plan, maintained Risk and Issue Management for Gigamon deployment lifecycle migrated
Platform working with network field engineers to troubleshoot issues.
 Planned and implemented maintenance phases for Centennial Server Farm Nexus Switch upgrades of data center,
task comprised of REIP all Wintel, Linux/Unix servers, storage devices and access terminals .
 Updated and maintained SharePoint site with RACI Chart, including SNOW and PINE site repository for all
project documentation and weekly reporting to stakeholders. This included project plans, Risk and Issue logs,
budgets approvals, business approvals and all project related artifacts.
LORD CONSULTING CORP Worked from Home in Queens New York 9/11 - 2/12
Hewlett Packard
Sr. Project Manager Global Cloud
 Migrated databases to new business server’s environment to authenticate user access/permissioning to shared
folders.
 Managed the network engineers to draft floor Plan surveys and schedule meeting with Data Center Management
team to review and approve floor plans.
 Designed the Hewlett Packard Pre-deployment checklist for their Global Enterprise Cloud Services (ECS)
worldwide this was all multi-million dollar projects; Created ARIES request to allocate resources, budgets,
purchase order request fromthe BOM for 9 Data Centers this included EMC storage devices.
 Executed multi-million dollar project Data Center build-out which I Researched and identified contingency issues
(resource needs) while developing a globalize strategy for documenting recovery procedures for HP Disaster
Recovery sites.
 Scheduled daily meeting with Network, Server Admin and stake holders in France, Switzerland, Wynyard UK
Public Sector and Alpharetta GA to review and discuss ECS project communications.
 Procurement Manager request price quotes, escalated order request to procurement or vendors such as Check-
Point, F5, Tipping Point and Rittal.
 Reviewed and post documentation on SharePoint site of the BOM, all documentation and approvals. Coordinated
network design approval, circuit landing, network and server build-out. Mitigated mission critical task and
dependencies, maintained risk and issue logs affecting the baseline.
 Assigned resources to assist with CRM systemupgrade, document and test systemfor accurate reporting.
 Followed Waterfall methodology for developing and executing the build-out of new Data Centers in APAC and
North America.
ALLIANZ GLOBAL INVESTMENT
Data Center MigrationProject Manager - New York City 5/11 - 9/11
 Allianz Global Investments developed multi-million dollar Data Center project plan to migrate P to V servers to a
Co-Lo Cloud environment.
 Directed application team to prepare data integration process for testing in the Co-Lo environment and provide
stakeholders response time data
 Applied Waterfall methodology to manage the implementation stages of all application being moved to the Cloud
environment.
 Communicated daily by scheduling meetings with RIS and RCM AMS stakeholders to schedule the retirement and
migration of all SQL/Application servers to the Co-Lo Cloud environment.
 Worked with vendors to develop a Disaster Recovery site to mirror the main Data Center, coordinated scheduled
testing with department executives regularly to improve business continuity.
 Relocated New York office to new location and managed the conference rooms installation of Audio/ Visual
equipment including provisioning of relay equipment in the IDF closets.
 Created BFR’s for resources, department budgets for Global Data Centers in Asia regions, Germany, United
Kingdom and the United States.
 Worked with the systems and database group to develop a recovery process that identified all applications and
database in the critical path that required application and server upgrading.
 Worked with Storage team to backup and deploy EMC and Centerra storage devices to all cloud and DR facilities.
 Significant interaction with functional business users and experience in planning and conducting analysis of
business processes and problems as well as create necessary functional, business and non functionalrequirements.
 Business Process Re-engineering (BPR) and Workflow documentation expertise uploading to SharePoint site.
 Coordinated with Market Data Analysis migration plans to move applications to the Cloud environment with
written approval on seek time delays.
 Managed the Upgrading of application Enterprise servers from 2003 Platform to 2008 Enterprise Server before
migrating to a Virtualized environment on the UNIX/LINUX platform.
LORD CONSULTING CORP - New York City 12/10 – 5/11
Project Manger Private Consulting (Small to Mid-size firms)
 Installed wireless network and remote surveillance access for “Touch Of Class” stores to monitor productivity.
 Networked workstations and printers for ST Joseph Episcopal Day School.
 Migrated workstation database to new 2008 Server and provide new drive mapping to access server.
 Provided expert advice to prospective clients on installation of security camera surveillance system with remote
access and messaging alerts for Commercial and residential customers.
DEUTSCHE BANK - New York City 11/10 - 12/10
Global Data Center Transitional Project Manager
 Completed BFR’s (Cost Estimation) for existing personnel to complete the transition phase and Resource
budgeting to for the next fiscal year.
 Scheduled meetings with an agenda for executives to discuss project transition actions, readiness support and
resource staffing.
 Developed and maintained a Project Deck, identifying milestones, Risk Management and Severity levels utilizing
the waterfall methodology.
 Tasked Project Managers to research and develop franchise agreements in Asia Pac, UK, Germany and India.
 Designed and developed a SOW (Statement of work) for Global Data Center infrastructure for Asia PAC.
 Identified and packaged data center monitoring application as a standard to migration all legacy applications.
 Reviewed with Senior Management updated policy and procedures for regional Operation Centers for adequate
training and personnel coverage.
 Coordinated with management training materials for ASIA PAC Data Centers supporting response to SQL Server
access, application alerts and network outages.
 Participated in Business Continuity/Disaster Recovery planning and testing of application/Data functionality.
 Drafted lesson learnt DECK describing challenges with migrating regional Data Centers to a globalization
platform.
 Utilized Microsoft Project to drive multiple projects, also leveraged SharePoint sites as a repository for Project
artifacts such as Project Plans, BOM, TCO approvals, and record reporting.
 Migrated Authentication database to new Data Center and permissioned SystemAdministrator access to servers.
LORD CONSULTING CORP - Queens New York 10/08 – 11/10
Project Manager Private Consulting (Small to Mid-size firms)
 Server and network installation for doctor’s offices and law firms.
 Provided remote systemaccess for billing firms and government agencies.
 Assisted with EMS logic software installation to monitor and update patient records.
BACHRACK GROUP - Goshen New York 4/08 - 10/08
MEDIACOM (Regional Cable/Communications Company)
Sr. Project Manager
 Managed the implementation of the ACSR Multi-million dollar Project for MediaCom which increased revenue by
55 percent nationwide in 90 days.
 Responsible for managing 15 projects under my portfolio using the Agile and Waterfall methodology which
included budgets and resource allocation, also managed the deployment of 3,000 laptops and workstations for
Management and Field Engineers.
 Implemented the level 1 and level 3 approval process for the Program Management Office at MediaCom
(PMBOK); all projects needing authorization and budget consideration must be submitted with the proper forms
for approval.
 Orchestrated Provisioning/Ordering of circuits with AT&T for MediaCom, scheduling installation and cutover of
circuits at the Moline Call Center, including converting the phone system to VOIP. This process required
BLACKBOX (Vendor) to program and test Cisco switches in their labs prior to implementation.
 Drafted proposals to vendors for service level contracts to support new infrastructure initiatives for deployment of
truck mounts and field laptops for auditors.
 Oversaw the IP Re-design and installation of new infrastructure for 5 Call Centers which required establishing a
coordination processes between the NOC, Data Center, application support when executing cutover of switches,
routers, printers and spherical devices to the new segments.
 Conducted meetings with company Executives on the implementation of the new VOIP network companywide
which allowed customer calls to be routed internally across state lines, thus saving millions on long distance fees.
 Executed LAN Desk installation nationwide to track software and asset management of hardware equipment.
 Assembled a team for a Collection Campaign to manage the retrieval of hardware equipment and delinquent
payments nationwide, utilizing IVR dialer which is capable of contacting 120,000 households hourly, while
routing paying customer to available agents.
 Scheduled meetings with vendors and senior management on draft proposals verifying Implementation plan, risk,
resource plan, time-lines and milestones that triggered co-dependent projects.
 Tasked software development team with data integration for the IVR Dialer for existing vendor databases.
 Managed the RE-IP of 3 Data Centers and 6 Call centers, which included Re-IP of SQL and Applications servers
 Negotiated SOW with installation vendor and coordinated the deployment of 1000 Truck mounts and Laptops.
 Migrated users to new Call Center server, permissioning all Agents and Supervisor access to all servers.
ADDISON SEARCH - New York City 8/07 - 3/08
IT Manager
 Performed overall Operation and Information Technology of all offices in NYC and New Jersey. Budget approvals
of new office spaces, furniture, phone systems, servers and network infrastructure.
 Oversaw new office build-outs such as Vendor management of Telecommunication and Network infrastructure
and ordered PRI’s and instructed vendors when installing phone system which roll over numbers was associated
with a PRI.
 Installed 2008 servers and migrated database from 2003 enterprise servers, including and ADAPT server which
updated revenue generated projects and account activity, imaged, migrated and deployed 200 workstatio ns to new
domain. Designed documentation on how to created e-mail accounts on exchange servers, including creation of
user profiles on the BES, while mirroring outlook preferences.
 Implemented the back-up and migration of e-mails and contact list to the BES, and instructed Blackberry users to
sync their device with outlook. Configured and installed DSL modems, VPN router, CISCO hubs, created user
remote access accounts and permission new and existing user accounts in Active Directory.
 Troubleshoot single sign-on issues during LDAP integration with Addison’s servers, utilized imaging software to
Image workstations and provided user access to File, Print, Active Directory servers. Verified workstation
configuration and internet capability, Provided wireless solutions and advice on network security. Designed
Network Architecture for WebCom System and Pinpoint Computer installation projects, such as Wireless
networks, data migration and hardware support.
MPL SYSTEM - New York City 8/07-9/07
Sr. Project Manager
 Point-of-contact for Upgrading 500 Blackberries at Paul, Weiss, Rifkind, Wharton and Garrison, which included
data backup , migration and device activation with mobile carrier. Liaison between the business and the IT
support Teamto coordinate local access to install and sync the new Blackberry Desktop utility.
 Scheduled 30 attorneys daily for BlackBerry upgrades, provided status reports to management and escalated
Server connection issues Blackberry support team. Performed customize configuration on new Blackberry devices,
created new profiles on Exchange server and configured e-mail access on BES server.
 Configured BlackBerry by routing e-mails to RIM BES servers 3.6 environment which is utilized by Verizon for
their business customers.
DELL CORPORATION - New York City 8/04-11/06
CITIGROUP
Sr. Project Manager/Trading FloorSupport
 Drafted proposals which were utilized when conducting contract negotiations between Dell Regional executives
and CitiGroup North America Executives utilizing model matrix for time, resources and material. Managed the
infrastructure upgrade of 10,000 workstations, utilized SOE agent for remote access.
 Compiled departmental budgets and submitted BFR’s (Cost Estimation) for staff and contractors for the next fiscal
year.
 Executed full SDLC process for all Trading Floor upgrades and new deployments for hardware and software,
including Market Data products such as Bloomberg, Reuters 3000, FactSet and NASDAQ.
 Documented the multi-level platforms of UNIX and LINUX users on the trading floors. Communicated with
Executives and Senior Managers milestones on open projects, documented and scheduled task, risk management,
including evaluation of project budgets.
 Maintained daily client relations with Fixed Income and Equity divisions engaged in Coaching, mentoring,
motivating, and supervise project teammembers, including contractors .
 Worked with Voice and Turrets to survey TRID-ID’s and document user and group preferences to schedule the
relocation of equipment to new location.
 Administered and coordinated all COB/DR activities for Capital Markets (Saving the business 2 million dollars);
which comprised of COB testing, renovation, system Upgrades and BIA (Business Impact Analysis). Applied
project management techniques to meet SLA established with Senior Executives and Move Coordinators on build -
out of trading floors at their Disaster Recovery Sites.
 Managed the coordination of moves (emphasis on IMAC), strategic restacks (Comprised of multiple move
phases), CIB client/IT initiated projects as well. Conducted discovery with business line (focus on Risk
Management) to survey and plan (Post move), disconnect, reconnect, execute moves to relocate and install new
and old workstations averaging 10 to 15 moves per week.
 Interviewed over 300 applicants to fill vacancies and assist with large scale IMAC moves and deployments. Expert
with large scale Desktop/Laptop roll-outs, ability to communicate with various levels of management, documented
the multi-level platforms of UNIX, VMware and LINUX users on the trading floors.
 OTHER PROFESSIONAL EXPERIENCES: (Details to be provided upon request)
CERTIFICATIONS:
 Completed Certificate program in Computer Information Systems, 1987
 Microsoft MCSE Certification Classes Completed
 Expected completion of PMP Certification, Spring 2015
EDUCATION:
Associate in Applied Science Degree in Computer Information Systems, City University of New York at Queens Borough
Community College, Bayside, NY, 1987.

More Related Content

What's hot (18)

Resume1
Resume1Resume1
Resume1
 
Rahul_Vijay_Gosewade
Rahul_Vijay_GosewadeRahul_Vijay_Gosewade
Rahul_Vijay_Gosewade
 
LaMima Gilbert Lewis PM
LaMima Gilbert Lewis PMLaMima Gilbert Lewis PM
LaMima Gilbert Lewis PM
 
Gavin Convery - Global Transformation Project Manager - Contract CV.001
Gavin Convery - Global Transformation Project Manager - Contract CV.001Gavin Convery - Global Transformation Project Manager - Contract CV.001
Gavin Convery - Global Transformation Project Manager - Contract CV.001
 
REYNAUD_Michel_-_Resume2016-2
REYNAUD_Michel_-_Resume2016-2REYNAUD_Michel_-_Resume2016-2
REYNAUD_Michel_-_Resume2016-2
 
Mark Lasalandra 20150729
Mark Lasalandra 20150729Mark Lasalandra 20150729
Mark Lasalandra 20150729
 
Bruce Shaver Senior Project Manager 2011
Bruce Shaver   Senior Project Manager 2011Bruce Shaver   Senior Project Manager 2011
Bruce Shaver Senior Project Manager 2011
 
Resume
Resume Resume
Resume
 
Schmidt.William.Resume
Schmidt.William.ResumeSchmidt.William.Resume
Schmidt.William.Resume
 
Ammar Murtaza-IM
Ammar Murtaza-IMAmmar Murtaza-IM
Ammar Murtaza-IM
 
Mike najarian resume
Mike najarian resumeMike najarian resume
Mike najarian resume
 
Hedgepeth_Jeffrey_Resume1
Hedgepeth_Jeffrey_Resume1Hedgepeth_Jeffrey_Resume1
Hedgepeth_Jeffrey_Resume1
 
DeSimone_Resume2015
DeSimone_Resume2015DeSimone_Resume2015
DeSimone_Resume2015
 
Manigandan_narasimhan_resume
Manigandan_narasimhan_resumeManigandan_narasimhan_resume
Manigandan_narasimhan_resume
 
Adam Bielinski Resume
Adam  Bielinski ResumeAdam  Bielinski Resume
Adam Bielinski Resume
 
SCOTT M. FENNELL
SCOTT M. FENNELLSCOTT M. FENNELL
SCOTT M. FENNELL
 
Amit Porwal_resume-Latest
Amit Porwal_resume-LatestAmit Porwal_resume-Latest
Amit Porwal_resume-Latest
 
Arjun_Prathap_CV
Arjun_Prathap_CVArjun_Prathap_CV
Arjun_Prathap_CV
 

Viewers also liked

Markell Dailey Resume 2016 (1)
Markell Dailey Resume 2016 (1)Markell Dailey Resume 2016 (1)
Markell Dailey Resume 2016 (1)Markell Dailey
 
KLegrow Resume 11-16-2014
KLegrow Resume 11-16-2014KLegrow Resume 11-16-2014
KLegrow Resume 11-16-2014Kevin J. Legrow
 
Gregory Forster Resume
Gregory Forster ResumeGregory Forster Resume
Gregory Forster ResumeGreg Forster
 
Muhammad Waqas - New cv-12-10-2016
Muhammad Waqas - New cv-12-10-2016Muhammad Waqas - New cv-12-10-2016
Muhammad Waqas - New cv-12-10-2016Muhammad Waqas
 
CHARLES E DAVIS SailPoint PROFESSIONAL SUMMARY
CHARLES E DAVIS SailPoint PROFESSIONAL SUMMARYCHARLES E DAVIS SailPoint PROFESSIONAL SUMMARY
CHARLES E DAVIS SailPoint PROFESSIONAL SUMMARYChuck Davis
 
patrick mattor
patrick mattorpatrick mattor
patrick mattorPat Mattor
 
Kermitt Anderson Resume - Current As Of 1-6-2017
Kermitt Anderson Resume - Current As Of 1-6-2017Kermitt Anderson Resume - Current As Of 1-6-2017
Kermitt Anderson Resume - Current As Of 1-6-2017Kermitt Anderson
 

Viewers also liked (8)

WayneMorrisonResume
WayneMorrisonResumeWayneMorrisonResume
WayneMorrisonResume
 
Markell Dailey Resume 2016 (1)
Markell Dailey Resume 2016 (1)Markell Dailey Resume 2016 (1)
Markell Dailey Resume 2016 (1)
 
KLegrow Resume 11-16-2014
KLegrow Resume 11-16-2014KLegrow Resume 11-16-2014
KLegrow Resume 11-16-2014
 
Gregory Forster Resume
Gregory Forster ResumeGregory Forster Resume
Gregory Forster Resume
 
Muhammad Waqas - New cv-12-10-2016
Muhammad Waqas - New cv-12-10-2016Muhammad Waqas - New cv-12-10-2016
Muhammad Waqas - New cv-12-10-2016
 
CHARLES E DAVIS SailPoint PROFESSIONAL SUMMARY
CHARLES E DAVIS SailPoint PROFESSIONAL SUMMARYCHARLES E DAVIS SailPoint PROFESSIONAL SUMMARY
CHARLES E DAVIS SailPoint PROFESSIONAL SUMMARY
 
patrick mattor
patrick mattorpatrick mattor
patrick mattor
 
Kermitt Anderson Resume - Current As Of 1-6-2017
Kermitt Anderson Resume - Current As Of 1-6-2017Kermitt Anderson Resume - Current As Of 1-6-2017
Kermitt Anderson Resume - Current As Of 1-6-2017
 

Similar to WilliamLord_Resume Atos 6-15-15

Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger Berlin
 
Neil_Cavendish_CV - v1
Neil_Cavendish_CV - v1Neil_Cavendish_CV - v1
Neil_Cavendish_CV - v1Neil Cavendish
 
Brian Hendricks Resume v2
Brian Hendricks Resume v2Brian Hendricks Resume v2
Brian Hendricks Resume v2hendrixb
 
Brian Hendricks Resume v2
Brian Hendricks Resume v2Brian Hendricks Resume v2
Brian Hendricks Resume v2hendrixb
 
Pankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindraPankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindraPankaj Jagtap
 
Syed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure ManagerSyed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure ManagerSiraj Syed
 
John imor in resume
John imor in resumeJohn imor in resume
John imor in resumeJohn Imor
 
Stan Adkerson Professional Resume
Stan Adkerson Professional ResumeStan Adkerson Professional Resume
Stan Adkerson Professional ResumeStan Adkerson
 
Spry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementSpry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementStephen Spry
 
Sonny_Baker_Resume_v2
Sonny_Baker_Resume_v2Sonny_Baker_Resume_v2
Sonny_Baker_Resume_v2Sonny Baker
 
Phillip r newberry 062016
Phillip r newberry 062016Phillip r newberry 062016
Phillip r newberry 062016Phil Newberry
 
Initiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case StudiesInitiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case Studieschanderdw
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock
 
Steven k smithresume 2018
Steven k smithresume 2018Steven k smithresume 2018
Steven k smithresume 2018steven smith
 
Daniel Senior Resume
Daniel Senior ResumeDaniel Senior Resume
Daniel Senior ResumeDaniel Senior
 
CV - ken wood on 12th feb 2016 2 pages
CV - ken wood  on  12th feb 2016   2 pagesCV - ken wood  on  12th feb 2016   2 pages
CV - ken wood on 12th feb 2016 2 pagesKen Wood
 

Similar to WilliamLord_Resume Atos 6-15-15 (20)

Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15
 
Neil_Cavendish_CV - v1
Neil_Cavendish_CV - v1Neil_Cavendish_CV - v1
Neil_Cavendish_CV - v1
 
CV it infrastructure - shahnawaz ali
CV  it infrastructure - shahnawaz aliCV  it infrastructure - shahnawaz ali
CV it infrastructure - shahnawaz ali
 
Torben Verdich Resume TS-SCI
Torben Verdich Resume TS-SCITorben Verdich Resume TS-SCI
Torben Verdich Resume TS-SCI
 
Brian Hendricks Resume v2
Brian Hendricks Resume v2Brian Hendricks Resume v2
Brian Hendricks Resume v2
 
Brian Hendricks Resume v2
Brian Hendricks Resume v2Brian Hendricks Resume v2
Brian Hendricks Resume v2
 
Pankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindraPankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindra
 
resumeLF_201503
resumeLF_201503resumeLF_201503
resumeLF_201503
 
Syed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure ManagerSyed Siraj - Telecom_Infrastructure Manager
Syed Siraj - Telecom_Infrastructure Manager
 
John imor in resume
John imor in resumeJohn imor in resume
John imor in resume
 
Stan Adkerson Professional Resume
Stan Adkerson Professional ResumeStan Adkerson Professional Resume
Stan Adkerson Professional Resume
 
Spry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementSpry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-Management
 
Sonny_Baker_Resume_v2
Sonny_Baker_Resume_v2Sonny_Baker_Resume_v2
Sonny_Baker_Resume_v2
 
Phillip r newberry 062016
Phillip r newberry 062016Phillip r newberry 062016
Phillip r newberry 062016
 
Initiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case StudiesInitiative Based Technology Consulting Case Studies
Initiative Based Technology Consulting Case Studies
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised Resume
 
DS_Sreeram_7
DS_Sreeram_7DS_Sreeram_7
DS_Sreeram_7
 
Steven k smithresume 2018
Steven k smithresume 2018Steven k smithresume 2018
Steven k smithresume 2018
 
Daniel Senior Resume
Daniel Senior ResumeDaniel Senior Resume
Daniel Senior Resume
 
CV - ken wood on 12th feb 2016 2 pages
CV - ken wood  on  12th feb 2016   2 pagesCV - ken wood  on  12th feb 2016   2 pages
CV - ken wood on 12th feb 2016 2 pages
 

WilliamLord_Resume Atos 6-15-15

  • 1. William Lord 89-16 212 Place, Queens Village, NY 11427 Tel: 917-498-4275, Cell: 347-644-8038 E-mail lordwus@yahoo.com Senior Project Manager SUMMARY: Senior Project Manager with extensive Data Center infrastructure experience working in a globalize environment. Worked on offshore projects identifying possible deployment regulations, labor laws in Wynyard UK, France, Switzerland and Asia PAC. Developed and managed several revenue driven portfolio Projects which increased profits by 55 percent. At Hewlett Packard, Managed the procurement of all BOM equipment globally developing a scheduled to land equipment and coordinated engineers resources. My ability to restructure failed initiatives (Projects) quickly and get themto production is one of many multi-tasking abilities I possess. I have created and managed budgets for long termprojects, designed Project Plans, developed milestone timelines, while maintaining multiple projects. Exceptional work ethic plus the ability to communicate across all levels of management. Excellent ability to identify and attract talented managers when building project teams. Superb vendor management skills resulted in completing projects under budget and prior to the projected timeline. Wrote the Trading floor and Back Office Support proposals which were accepted by Citigroup. Other responsibilities included interviewing managers and business analysis. Possess a strong knowledge of Excel, Power Point and Visio as well as Microsoft Project. TECHNICAL SKILLS: Hardware: HP Proliant BL685c/G7, Proliant DL 585 servers, HP C7000 ENCLOSURE, Proliant BL680c G5, Proliant BL460c G7, Dell Blade Server E01S, Dell PowerEdge R300 Servers, HP Integrity RX8640 servers, UNIX/LINUX Servers, BES servers, web servers, VTRAK E-class, Storage Management Servers, VLS9200 tapedrives, EMC SAN/NAS, Centerra storage, SAN TapeLibrary, Web server, Proxy Server HP Professional Workstation 5500, 6400 and 4000 series desktops, including many other desktops compatibles;HP EliteBook 8440p laptops, Compaq Evo N610C, M300, M700, M7400, 4220T, 4160T;Toshiba TECRA 8100, Toshiba laptops PORTEGE3440, 3080 and 3020; Dell OPTIPLEX GX 260,GX 240, Dell Latitude laptops; Mobiledevices including Tablets; most Hewlett Packard Network laser printers. Other large format printers including Epson, NEC and Brother laser printers;Several brands of CD-writers and players, digital cameras, JAZ and Iomega Zip drives storage devices; Digital ID cards writers includes DataCard UG-285 IMAGEWRITER and DATACARD IMAGECARD III. Network: L3 Core (A8812), L2 Core (A5820), Distribution Switch (A12518), Access Switch (A5820), ILO/OA (A5810), SBI Access A5810, Check Point Firewall, V3 F5 Load Balancer, NETAPP equipment, Steelhead Riverbed, JUNIPER SG 550 M, RADWARE, F5, CHECK POINT, Security Enterprise software, ISS small/medium/large switches, layered Cisco CATALYST C8500, C 6500 E Series, Cisco POE switches, MMI Switches, Core HPSA, Point 100 series routers, NetGear routers/switches, Bay Network routers and switches, D-link GIG Hz Ethernet hubs. Software: Microsoft Project 2003/2010, Microsoft Visio 2000/2002/2007, SharePoint site updates ServiceNow Ver 1.0 (SNOW), SharePoint PINE Sites, Mosaic, PlainView, HPPM, CLARITY, Microsoft Office 2010, Microsoft Visio 2010, Microsoft Project 2007/2010, Outlook 2010, Exchange 5/6, Lotus Notes R4/R5/R6, Windows server 2003, 2008 and 2010, Windows 7, Windows 8, XP/2000, Professional Workstation and Dos; SMS, Oracle Apps, Lawson, BPM, CRM, REMEDY, XML, Weblogic, VMWARE, UNIX/LINUX (Red HAT), Solaris, AIX, VXML/IVR, Timbuktu (Asset Management and Remote Access), LANDesk, Oracle, DB2 Server, McAfee (Asset Management), Helpdesk (Work Coordination and Asset Management Software), Remedy, MAPS (Asset Management), Citrix, Security Enterprise software, SEP (Backup and Disaster Recovery software), Weblogic, Anti-Malware Software, Norton Antivirus, Norton firewall, McAfee Antivirus, Firewall and Helpdesk Enterprise. EXPERIENCE: Lord Consulting Corp 11/14 – Present Project Manager MODCO, Inc  Prepared for MODCO, Inc a deployment proposalfor new network infrastructure and CCTV installation/hosting with remote access which was approved.  Managed and coordinated the database migration of several ophthalmologist practice’s to the cloud, including providing remote access solution for billing firms.  Created business proposals for small to mid size firms identifying capacity planning for a 15 percent growth annually.  Drafted business proposals for clients requiring new servers and network switches/router upgrades, including computer hardware and phone systems.  Developed project plans for office relocation projects, server relocation, coordinated circuit landing, network patching and switch configuration.
  • 2. Consulting at McGraw Hill Financial Capital IQ Division 2/12 – 10/14 Project Manager  Managed the ATOS Cloud Environment at McGraw Hill Financial, worked with Global team to construct a Cloud landing Zone the size of a country for ecommerce and mobile application support. This was initially budgeted for 50 million dollars.  Coordinated the 55 Water Street installation of Audio/Video for three Conference rooms each having a 3D Presentation capability, integrated servers and keypad access with Exchange reserve and book these conference rooms. This required reserving static IP address and establishing the Conference rooms as a user.  Worked closely with the Network team at times acted as a liaison between the business and the Network team to schedule the REIP of CISCO switches in Colorado data center as part of a global infrastructure upgrade project.  Managed the Network deployment team when configuring Zayo Ring circuits, routers and switches promoting secondary circuits as the Primary circuit for all Office and Data Center locations.  Executed projects from Charter/ initiation to Release utilized ServiceNow ver. 1.0 to request resources, Open and Close Demand Task, Project Planning/Tracking, issuing change request approvals, including milestone updates and project health reporting.  Coordinated the standardize build of SQL and Application servers packaged as small to medium/ large services. Client’s accessed a Portal entered their BOM requirements and a SQL or Application server would be assigned.  Migrated existing Database for NICE Telecom systemto new platform, included testing P to V workstations to test and simulate normal processing events.  Developed and deployed the Blue Coat implementation using Agile methodology completing the full lifecycle to Production, this included installing new servers, Rack/Stacking, Network Patching, KVM configuration and data Migration/ integration.  Managed Multi-Million projects such as the Unix Authentication Project of over 4000 servers, Coordinated the software configuration and imaging of servers with Active Directory.  Responsible for developing and driving the budget approval, network infrastructure installation, milestone planning and resource allocation for relocating 460 associates and upgrade workstations in 4 Phases over a 6 week period. (Completed Under budget)  Executed Multi-million dollar ZAYO Ring instillation completing SDLC for the deployment of the ZAYO Ring Circuits connecting offices, Data Centers and DR sites.  Coordinated office closure for McGraw Hill Education in Texas and JD Power office in Norwalk Connecticut this included EMC storage power down and decommissioning.  Relocated 500 CAPIQ Associates to a newly renovated floor at 55 Water Street, Coordinated installation of variable height desk, Workstation and printers.  Managed McGraw Hill Financial build-out of the NICE system. Implemented the completed Lifecycle for 3 Major Call Centers comprising of 12 servers, VM’s, SANS/NAS and Centerra, including EMC Storage.  Developed a Project Plan, maintained Risk and Issue Management for Gigamon deployment lifecycle migrated Platform working with network field engineers to troubleshoot issues.  Planned and implemented maintenance phases for Centennial Server Farm Nexus Switch upgrades of data center, task comprised of REIP all Wintel, Linux/Unix servers, storage devices and access terminals .  Updated and maintained SharePoint site with RACI Chart, including SNOW and PINE site repository for all project documentation and weekly reporting to stakeholders. This included project plans, Risk and Issue logs, budgets approvals, business approvals and all project related artifacts. LORD CONSULTING CORP Worked from Home in Queens New York 9/11 - 2/12 Hewlett Packard Sr. Project Manager Global Cloud  Migrated databases to new business server’s environment to authenticate user access/permissioning to shared folders.  Managed the network engineers to draft floor Plan surveys and schedule meeting with Data Center Management team to review and approve floor plans.  Designed the Hewlett Packard Pre-deployment checklist for their Global Enterprise Cloud Services (ECS) worldwide this was all multi-million dollar projects; Created ARIES request to allocate resources, budgets, purchase order request fromthe BOM for 9 Data Centers this included EMC storage devices.  Executed multi-million dollar project Data Center build-out which I Researched and identified contingency issues (resource needs) while developing a globalize strategy for documenting recovery procedures for HP Disaster Recovery sites.  Scheduled daily meeting with Network, Server Admin and stake holders in France, Switzerland, Wynyard UK Public Sector and Alpharetta GA to review and discuss ECS project communications.  Procurement Manager request price quotes, escalated order request to procurement or vendors such as Check- Point, F5, Tipping Point and Rittal.  Reviewed and post documentation on SharePoint site of the BOM, all documentation and approvals. Coordinated network design approval, circuit landing, network and server build-out. Mitigated mission critical task and dependencies, maintained risk and issue logs affecting the baseline.
  • 3.  Assigned resources to assist with CRM systemupgrade, document and test systemfor accurate reporting.  Followed Waterfall methodology for developing and executing the build-out of new Data Centers in APAC and North America. ALLIANZ GLOBAL INVESTMENT Data Center MigrationProject Manager - New York City 5/11 - 9/11  Allianz Global Investments developed multi-million dollar Data Center project plan to migrate P to V servers to a Co-Lo Cloud environment.  Directed application team to prepare data integration process for testing in the Co-Lo environment and provide stakeholders response time data  Applied Waterfall methodology to manage the implementation stages of all application being moved to the Cloud environment.  Communicated daily by scheduling meetings with RIS and RCM AMS stakeholders to schedule the retirement and migration of all SQL/Application servers to the Co-Lo Cloud environment.  Worked with vendors to develop a Disaster Recovery site to mirror the main Data Center, coordinated scheduled testing with department executives regularly to improve business continuity.  Relocated New York office to new location and managed the conference rooms installation of Audio/ Visual equipment including provisioning of relay equipment in the IDF closets.  Created BFR’s for resources, department budgets for Global Data Centers in Asia regions, Germany, United Kingdom and the United States.  Worked with the systems and database group to develop a recovery process that identified all applications and database in the critical path that required application and server upgrading.  Worked with Storage team to backup and deploy EMC and Centerra storage devices to all cloud and DR facilities.  Significant interaction with functional business users and experience in planning and conducting analysis of business processes and problems as well as create necessary functional, business and non functionalrequirements.  Business Process Re-engineering (BPR) and Workflow documentation expertise uploading to SharePoint site.  Coordinated with Market Data Analysis migration plans to move applications to the Cloud environment with written approval on seek time delays.  Managed the Upgrading of application Enterprise servers from 2003 Platform to 2008 Enterprise Server before migrating to a Virtualized environment on the UNIX/LINUX platform. LORD CONSULTING CORP - New York City 12/10 – 5/11 Project Manger Private Consulting (Small to Mid-size firms)  Installed wireless network and remote surveillance access for “Touch Of Class” stores to monitor productivity.  Networked workstations and printers for ST Joseph Episcopal Day School.  Migrated workstation database to new 2008 Server and provide new drive mapping to access server.  Provided expert advice to prospective clients on installation of security camera surveillance system with remote access and messaging alerts for Commercial and residential customers. DEUTSCHE BANK - New York City 11/10 - 12/10 Global Data Center Transitional Project Manager  Completed BFR’s (Cost Estimation) for existing personnel to complete the transition phase and Resource budgeting to for the next fiscal year.  Scheduled meetings with an agenda for executives to discuss project transition actions, readiness support and resource staffing.  Developed and maintained a Project Deck, identifying milestones, Risk Management and Severity levels utilizing the waterfall methodology.  Tasked Project Managers to research and develop franchise agreements in Asia Pac, UK, Germany and India.  Designed and developed a SOW (Statement of work) for Global Data Center infrastructure for Asia PAC.  Identified and packaged data center monitoring application as a standard to migration all legacy applications.  Reviewed with Senior Management updated policy and procedures for regional Operation Centers for adequate training and personnel coverage.  Coordinated with management training materials for ASIA PAC Data Centers supporting response to SQL Server access, application alerts and network outages.  Participated in Business Continuity/Disaster Recovery planning and testing of application/Data functionality.  Drafted lesson learnt DECK describing challenges with migrating regional Data Centers to a globalization platform.  Utilized Microsoft Project to drive multiple projects, also leveraged SharePoint sites as a repository for Project artifacts such as Project Plans, BOM, TCO approvals, and record reporting.  Migrated Authentication database to new Data Center and permissioned SystemAdministrator access to servers. LORD CONSULTING CORP - Queens New York 10/08 – 11/10 Project Manager Private Consulting (Small to Mid-size firms)
  • 4.  Server and network installation for doctor’s offices and law firms.  Provided remote systemaccess for billing firms and government agencies.  Assisted with EMS logic software installation to monitor and update patient records. BACHRACK GROUP - Goshen New York 4/08 - 10/08 MEDIACOM (Regional Cable/Communications Company) Sr. Project Manager  Managed the implementation of the ACSR Multi-million dollar Project for MediaCom which increased revenue by 55 percent nationwide in 90 days.  Responsible for managing 15 projects under my portfolio using the Agile and Waterfall methodology which included budgets and resource allocation, also managed the deployment of 3,000 laptops and workstations for Management and Field Engineers.  Implemented the level 1 and level 3 approval process for the Program Management Office at MediaCom (PMBOK); all projects needing authorization and budget consideration must be submitted with the proper forms for approval.  Orchestrated Provisioning/Ordering of circuits with AT&T for MediaCom, scheduling installation and cutover of circuits at the Moline Call Center, including converting the phone system to VOIP. This process required BLACKBOX (Vendor) to program and test Cisco switches in their labs prior to implementation.  Drafted proposals to vendors for service level contracts to support new infrastructure initiatives for deployment of truck mounts and field laptops for auditors.  Oversaw the IP Re-design and installation of new infrastructure for 5 Call Centers which required establishing a coordination processes between the NOC, Data Center, application support when executing cutover of switches, routers, printers and spherical devices to the new segments.  Conducted meetings with company Executives on the implementation of the new VOIP network companywide which allowed customer calls to be routed internally across state lines, thus saving millions on long distance fees.  Executed LAN Desk installation nationwide to track software and asset management of hardware equipment.  Assembled a team for a Collection Campaign to manage the retrieval of hardware equipment and delinquent payments nationwide, utilizing IVR dialer which is capable of contacting 120,000 households hourly, while routing paying customer to available agents.  Scheduled meetings with vendors and senior management on draft proposals verifying Implementation plan, risk, resource plan, time-lines and milestones that triggered co-dependent projects.  Tasked software development team with data integration for the IVR Dialer for existing vendor databases.  Managed the RE-IP of 3 Data Centers and 6 Call centers, which included Re-IP of SQL and Applications servers  Negotiated SOW with installation vendor and coordinated the deployment of 1000 Truck mounts and Laptops.  Migrated users to new Call Center server, permissioning all Agents and Supervisor access to all servers. ADDISON SEARCH - New York City 8/07 - 3/08 IT Manager  Performed overall Operation and Information Technology of all offices in NYC and New Jersey. Budget approvals of new office spaces, furniture, phone systems, servers and network infrastructure.  Oversaw new office build-outs such as Vendor management of Telecommunication and Network infrastructure and ordered PRI’s and instructed vendors when installing phone system which roll over numbers was associated with a PRI.  Installed 2008 servers and migrated database from 2003 enterprise servers, including and ADAPT server which updated revenue generated projects and account activity, imaged, migrated and deployed 200 workstatio ns to new domain. Designed documentation on how to created e-mail accounts on exchange servers, including creation of user profiles on the BES, while mirroring outlook preferences.  Implemented the back-up and migration of e-mails and contact list to the BES, and instructed Blackberry users to sync their device with outlook. Configured and installed DSL modems, VPN router, CISCO hubs, created user remote access accounts and permission new and existing user accounts in Active Directory.  Troubleshoot single sign-on issues during LDAP integration with Addison’s servers, utilized imaging software to Image workstations and provided user access to File, Print, Active Directory servers. Verified workstation configuration and internet capability, Provided wireless solutions and advice on network security. Designed Network Architecture for WebCom System and Pinpoint Computer installation projects, such as Wireless networks, data migration and hardware support. MPL SYSTEM - New York City 8/07-9/07 Sr. Project Manager  Point-of-contact for Upgrading 500 Blackberries at Paul, Weiss, Rifkind, Wharton and Garrison, which included data backup , migration and device activation with mobile carrier. Liaison between the business and the IT support Teamto coordinate local access to install and sync the new Blackberry Desktop utility.  Scheduled 30 attorneys daily for BlackBerry upgrades, provided status reports to management and escalated Server connection issues Blackberry support team. Performed customize configuration on new Blackberry devices, created new profiles on Exchange server and configured e-mail access on BES server.
  • 5.  Configured BlackBerry by routing e-mails to RIM BES servers 3.6 environment which is utilized by Verizon for their business customers. DELL CORPORATION - New York City 8/04-11/06 CITIGROUP Sr. Project Manager/Trading FloorSupport  Drafted proposals which were utilized when conducting contract negotiations between Dell Regional executives and CitiGroup North America Executives utilizing model matrix for time, resources and material. Managed the infrastructure upgrade of 10,000 workstations, utilized SOE agent for remote access.  Compiled departmental budgets and submitted BFR’s (Cost Estimation) for staff and contractors for the next fiscal year.  Executed full SDLC process for all Trading Floor upgrades and new deployments for hardware and software, including Market Data products such as Bloomberg, Reuters 3000, FactSet and NASDAQ.  Documented the multi-level platforms of UNIX and LINUX users on the trading floors. Communicated with Executives and Senior Managers milestones on open projects, documented and scheduled task, risk management, including evaluation of project budgets.  Maintained daily client relations with Fixed Income and Equity divisions engaged in Coaching, mentoring, motivating, and supervise project teammembers, including contractors .  Worked with Voice and Turrets to survey TRID-ID’s and document user and group preferences to schedule the relocation of equipment to new location.  Administered and coordinated all COB/DR activities for Capital Markets (Saving the business 2 million dollars); which comprised of COB testing, renovation, system Upgrades and BIA (Business Impact Analysis). Applied project management techniques to meet SLA established with Senior Executives and Move Coordinators on build - out of trading floors at their Disaster Recovery Sites.  Managed the coordination of moves (emphasis on IMAC), strategic restacks (Comprised of multiple move phases), CIB client/IT initiated projects as well. Conducted discovery with business line (focus on Risk Management) to survey and plan (Post move), disconnect, reconnect, execute moves to relocate and install new and old workstations averaging 10 to 15 moves per week.  Interviewed over 300 applicants to fill vacancies and assist with large scale IMAC moves and deployments. Expert with large scale Desktop/Laptop roll-outs, ability to communicate with various levels of management, documented the multi-level platforms of UNIX, VMware and LINUX users on the trading floors.  OTHER PROFESSIONAL EXPERIENCES: (Details to be provided upon request) CERTIFICATIONS:  Completed Certificate program in Computer Information Systems, 1987  Microsoft MCSE Certification Classes Completed  Expected completion of PMP Certification, Spring 2015 EDUCATION: Associate in Applied Science Degree in Computer Information Systems, City University of New York at Queens Borough Community College, Bayside, NY, 1987.