SlideShare a Scribd company logo
1 of 6
Victor Holderby – Project Manager
513-208-4515
holderbv@yahoo.com
SUMMARY
IT Project Manager
IT Professional with proven success in Project Management and customer communication and satisfaction.
Strong knowledge of Information Technology as it relates to Datacenters and server implementations.
Strengths include gathering requirements, analyzing requirements, and managing project to implementation.
Oversee all aspects of project life cycle. Possess great customer service relationship skills with a strong
service delivery background.
EXPERIENCE
Cincinnati Bell Technology Solutions (Cincinnati, Ohio) 2005 – Current
Project Manager – Acquisitions and Divestitures
• Scheduled kick-off call with customer to gather requirements and review the contractual agreement for
divestiture.
• Worked with multi-functional teams including network design engineer, network build engineer, GE
business liaison, and business liaison to develop a design.
• Once design has been approved by all parties including security team, developed plan to get the
business off the core GE network and onto a 3PR so that they can still access some GE applications /
websites during the transition period.
• Ordered new equipment necessary to move the business to the 3PR – routers and new internet
circuits.
• Worked with network engineers to get the new routers and circuits configured and ready for the
cutover.
• Provided updates to management on all sites.
• Scheduled date for network cutover to new equipment.
• Opened bridge and coordinated all efforts during implementation window.
• Provided communication to all stakeholders on when the cutover would occur and what the schedule /
test plan / backout would be.
• Updated documentation and asset database with new information.
Project Manager – Site Re-IP
• Lead project manager for re-ip efforts for GE Aviation. This included re-ip’ing all GE Aviation sites from
the current 3.xxx environment to new 10.xxx environment.
• Scheduled kick-off call with customer to gather requirements.
• Worked with multi-functional teams including network design engineer, network build engineer, site
network specialists, and business liaison to develop plan for re-ip effort.
• Scheduled and held regular status update meetings.
Victor Holderby – Project Manager
513-208-4515
holderbv@yahoo.com
• Worked with customer to determine all devices that will be re-ip’d – routers, switches, access points,
servers, storage devices, printers, security devices (cameras, dvrs, door readers, etc…), etc…
• Provided updates to management on all sites.
• Scheduled date for implementation.
• Opened bridge and coordinated all efforts during implementation window.
• Provided communication to all stakeholders on when the re-ip would occur and what the schedule /
test plan / backout would be.
• Updated documentation and asset database with new 10.xxx information.
Project Manager – Network 3PR (3rd
party rail)
• Scheduled kick-off call with customer to gather requirements.
• Worked with multi-functional teams including network design engineer, network build engineer,
customer network specialist, 3rd
party network team to provide design solution.
• Scheduled and held regular status update meetings.
• Worked with customer to identify high risk ports / protocols and engaged security team if necessary.
• Provided updates to management on all projects.
• Scheduled date for implementation to the 3PR.
• Provided communication to all stakeholders on when the implementation to the 3PR would occur and
what the schedule / test plan / backout would be.
• Updated documentation and asset database with new 3PR drawings and information.
Project Manager – Aviation Compute Optimization
• Provided financial clarity to Aviation regarding their compute assets
• Saved Aviation 12 million dollars in compute assets
• Identified opportunities to consolidate environments and deinstall servers that were no longer needed
• Worked with customers to identify correct asset owners and operational contacts in order to update
asset database
• Worked with site leaders to identify network devices that are no longer needed. Once identified,
entered deinstall tickets and managed them to completion
• Worked on network CMDB project to provide transparency in the network bill, to the point where each
site can tie their bill to a device or service that they are using/receiving
• Migration from Cincinnati Bell Wireless to Verizon - @600 users
• Provided documentation and helped users order new Verizon phones, port their old numbers to the
new phone, and help them set up their new phones.
Project Manager – Audio Conference Migration
• Migrated @60K users from Global Crossing to InterCall
• Created and updated SOPs for new audio conference account requests
• Improved LATAM, EMEA, and ASPAC process for managing audio conference accounts
Victor Holderby – Project Manager
513-208-4515
holderbv@yahoo.com
• Customer support – worked with individual users across all businesses to answer any audio
conferencing questions
• Created, updated, and maintained new and current modules on website for InterCall, training, Audio
Conferencing Council, WebEx, and metrics
• Created SOPs to grow PSP / Items footprint for audio conferencing in EMEA, LATAM, and ASPAC
• Performed Canada cleanup / readiness to migrate from Global Crossing to InterCall
• Worked with business and InterCall to move Bahrain and Egypt from paper billing system to
centralized, automated billing system
• Created and maintained weekly scorecards for migration, InterCall adoptions, Integrated Audio, and
fraud
• Created final pricing guide with event, local, dial out, and feature costs
• Created matrix of dial in / dial out availability in all countries that have audio conferencing
Build Scheduling Manager – GE GIS Global Build Team
• Implemented Scheduling Process for all incoming server build requests. With this process, we were
able to attain schedule attainment for 85% of all server installations going into GIS.
• Created and maintain reports for all servers that have achieved schedule attainment, missed schedule
attainment, and are in danger of missing schedule attainment. With this report, I am able to work with
the GIS teams on the implementations that are in danger to get them back on track.
• Maintained monthly build metrics. With these metrics, I am able to see how many installs achieved
schedule attainment and how many missed. Using these metrics, I am able to determine what the
biggest factors are that cause an implementation to miss attainment.
Project Manager De-install process manager– GE GIS Global Build Team
• Improved out-dated de-install process. Created new processes to improve the cycle time for a server
de-installation and implemented quality control to reduce the number of mistakes by the de-install
teams.
• Worked with GIS support teams to gather requirements for every step of the de-install process.
• Created a quality assurance check to make sure all phases of the de-install were completed correctly.
Project Lead – GE GIS Global Build Team
• On core team to lift the entire datacenter in Parkersburg, VA to the datacenter in Cincinnati, OH. This
included working with the customer on outage durations, shutting the equipment down, packing it up,
and moving it to Cincinnati. Once in Cincinnati, setting up the equipment in the datacenter and
validating that the system and application came back online.
• Took on complex implementations using the knowledge that I gained while working for GE. Worked
with all the support teams within GIS to manage these implementations to completion. Examples are
NPIs, Clusters, Tech-Refreshes, etc…
• Mentored CBTS project managers working on GIS projects. Using my knowledge of the environment I
was able to help other project managers to have success within the environment.
Victor Holderby – Project Manager
513-208-4515
holderbv@yahoo.com
• Worked with customer base to determine what major projects were coming. By gathering requirements
ahead of time, I was able to make sure capacity and resources were in place.
• Created and maintained a build quality assurance checklist to ensure all builds met the correct
requirements before being turned over to the customer. The checklist covered all areas of the build
including OS, network, external storage, backups, etc...
General Electric 2000 – 2005
Process Integration Analyst
• Managed the implementation of 1500 servers to a production ready state.
• Held calls with GIS customers to gather requirements for their server installations.
• Worked with new product introductions for Linux on OS/390 platform and Linux on VMWare.
• Trained and mentored co-ops and interns that have worked within the build team at GIS.
• Worked on 2 Green Belt projects to clean up the asset database information for all GIS supported
servers in Stamford datacenter.
• Involved in numerous upgrades to Sun, Compaq, HP, and Dell hardware. Worked with vendors to
schedule the upgrades and in many cases performing the upgrades myself.
• Traveled to Budapest Hungary to perform a datacenter audit. Worked with the customer in Budapest
to share best practices on many processes, including asset database, change management, project
management, etc…
• Participated on lift teams to transition customer owned servers to GIS support in Ft. Myers, Stamford,
Alpharetta, and Budapest datacenters.
• Worked with the Stamford datacenter site leader to share best practices and help implement GIS
processes for new server installations.
General Electric 1998 – 2000
Lead Operator
• Monitored mainframe and server health.
• Worked to troubleshoot if any issues arose on mainframes or servers within the environment. If
troubleshooting efforts didn’t work, paged GIS support personnel to look into the issue.
• Co-ordinated conference calls with customer and GIS support personnel if necessary.
• Performed weekly scheduled IPLs on mainframes and reboots on servers for maintenance.
EDUCATION
Northern Kentucky University 2002-2005
Certifications:
Victor Holderby – Project Manager
513-208-4515
holderbv@yahoo.com
Project Management for IT Professionals
Influencing Skills for IT Management
Six Sigma Green Belt Certified
ITIL Foundations
Excel Level 2
Excel Level 3
Linux for Operators
Unix for Operators
Management Basics – Team
Victor Holderby – Project Manager
513-208-4515
holderbv@yahoo.com
Project Management for IT Professionals
Influencing Skills for IT Management
Six Sigma Green Belt Certified
ITIL Foundations
Excel Level 2
Excel Level 3
Linux for Operators
Unix for Operators
Management Basics – Team

More Related Content

What's hot

Marian fieldsresume 7 25-2016
Marian fieldsresume 7 25-2016Marian fieldsresume 7 25-2016
Marian fieldsresume 7 25-2016Marian Fields
 
PM Sase Study USPS MPI Project-Palantine
PM Sase Study USPS MPI Project-PalantinePM Sase Study USPS MPI Project-Palantine
PM Sase Study USPS MPI Project-PalantineDennis Usky
 
Stuart stout cv 2015 v3
Stuart stout  cv 2015 v3Stuart stout  cv 2015 v3
Stuart stout cv 2015 v3Stuart Stout
 
Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1Steve Sottile
 
Mark Gibbons - Transitional Master 2-17
Mark Gibbons - Transitional Master 2-17Mark Gibbons - Transitional Master 2-17
Mark Gibbons - Transitional Master 2-17Mark Gibbons, PMP
 
McDaniel_Resume 122014
McDaniel_Resume 122014McDaniel_Resume 122014
McDaniel_Resume 122014ronmac28
 
2016 NCS ASE short
2016 NCS ASE short2016 NCS ASE short
2016 NCS ASE shortSteve Stuck
 
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08Thomas Savard
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016Tahir Khan
 
Lumi Noah resume FY2018
Lumi Noah resume FY2018Lumi Noah resume FY2018
Lumi Noah resume FY2018Lumi Noah
 

What's hot (16)

Marian fieldsresume 7 25-2016
Marian fieldsresume 7 25-2016Marian fieldsresume 7 25-2016
Marian fieldsresume 7 25-2016
 
PM Sase Study USPS MPI Project-Palantine
PM Sase Study USPS MPI Project-PalantinePM Sase Study USPS MPI Project-Palantine
PM Sase Study USPS MPI Project-Palantine
 
CV of Lito Dela Cruz 2016
CV of Lito Dela Cruz 2016CV of Lito Dela Cruz 2016
CV of Lito Dela Cruz 2016
 
Amitabha Cv 15022010
Amitabha Cv 15022010Amitabha Cv 15022010
Amitabha Cv 15022010
 
Mark Gibbons to Linkedin
Mark Gibbons to LinkedinMark Gibbons to Linkedin
Mark Gibbons to Linkedin
 
Arindam_Sen_Gupta_CV_2_
Arindam_Sen_Gupta_CV_2_Arindam_Sen_Gupta_CV_2_
Arindam_Sen_Gupta_CV_2_
 
Stuart stout cv 2015 v3
Stuart stout  cv 2015 v3Stuart stout  cv 2015 v3
Stuart stout cv 2015 v3
 
Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1
 
Mark Gibbons - Transitional Master 2-17
Mark Gibbons - Transitional Master 2-17Mark Gibbons - Transitional Master 2-17
Mark Gibbons - Transitional Master 2-17
 
McDaniel_Resume 122014
McDaniel_Resume 122014McDaniel_Resume 122014
McDaniel_Resume 122014
 
2016 NCS ASE short
2016 NCS ASE short2016 NCS ASE short
2016 NCS ASE short
 
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
 
Rahul Sharma
Rahul SharmaRahul Sharma
Rahul Sharma
 
Lumi Noah resume FY2018
Lumi Noah resume FY2018Lumi Noah resume FY2018
Lumi Noah resume FY2018
 
CV
CVCV
CV
 

Viewers also liked

COMP 246 GROUP PROJECT PART-B v.2
COMP 246 GROUP PROJECT PART-B v.2COMP 246 GROUP PROJECT PART-B v.2
COMP 246 GROUP PROJECT PART-B v.2Rutvik Patel
 
sibinithin IT suppot
sibinithin IT suppotsibinithin IT suppot
sibinithin IT suppotsibi nithin
 
Protect the nature
Protect the natureProtect the nature
Protect the natureparedes2017
 
Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)
Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)
Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)Thomas Hunter
 
自己分析・取扱説明書 2017/01/05版
自己分析・取扱説明書 2017/01/05版自己分析・取扱説明書 2017/01/05版
自己分析・取扱説明書 2017/01/05版Takahiro Yamada
 
CERTIFICATE OF STUDIES
CERTIFICATE OF STUDIESCERTIFICATE OF STUDIES
CERTIFICATE OF STUDIESAltin Alla
 

Viewers also liked (9)

G20 170112212314
G20 170112212314G20 170112212314
G20 170112212314
 
COMP 246 GROUP PROJECT PART-B v.2
COMP 246 GROUP PROJECT PART-B v.2COMP 246 GROUP PROJECT PART-B v.2
COMP 246 GROUP PROJECT PART-B v.2
 
sibinithin IT suppot
sibinithin IT suppotsibinithin IT suppot
sibinithin IT suppot
 
Protect the nature
Protect the natureProtect the nature
Protect the nature
 
Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)
Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)
Determining Paleoflow of Glacial Fluvial Systems in Crawford County (2)
 
Resume of A S Akhtar
Resume of A S AkhtarResume of A S Akhtar
Resume of A S Akhtar
 
自己分析・取扱説明書 2017/01/05版
自己分析・取扱説明書 2017/01/05版自己分析・取扱説明書 2017/01/05版
自己分析・取扱説明書 2017/01/05版
 
CERTIFICATE OF STUDIES
CERTIFICATE OF STUDIESCERTIFICATE OF STUDIES
CERTIFICATE OF STUDIES
 
alimentos
alimentosalimentos
alimentos
 

Similar to Victor Holderby - Project Manger

Gary Marshall Updated Resume
Gary Marshall Updated ResumeGary Marshall Updated Resume
Gary Marshall Updated ResumeGary Marshall
 
Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Cathy Railey
 
Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Cathy Railey
 
Evan Hughes (BA)
Evan Hughes (BA)Evan Hughes (BA)
Evan Hughes (BA)Evan Hughes
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16Robin White, PMP
 
Sachie Thorne business resume
Sachie Thorne business resumeSachie Thorne business resume
Sachie Thorne business resumeSachie Thorne
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock
 
Copyright of leeza n. singh
Copyright of leeza n. singhCopyright of leeza n. singh
Copyright of leeza n. singhLeeza Singh
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrentJim Sundin
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Mohamed Sajid Maqba
 
Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017Curtis Bard
 

Similar to Victor Holderby - Project Manger (20)

GRANT DELP724
GRANT DELP724GRANT DELP724
GRANT DELP724
 
Gary Marshall Updated Resume
Gary Marshall Updated ResumeGary Marshall Updated Resume
Gary Marshall Updated Resume
 
Kenneth M. Fischler
Kenneth M. FischlerKenneth M. Fischler
Kenneth M. Fischler
 
Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Catherine Railey Resume - 2015
Catherine Railey Resume - 2015
 
Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Catherine Railey Resume - 2015
Catherine Railey Resume - 2015
 
Evan Hughes (BA)
Evan Hughes (BA)Evan Hughes (BA)
Evan Hughes (BA)
 
nitesh_rajpurkar_2016
nitesh_rajpurkar_2016nitesh_rajpurkar_2016
nitesh_rajpurkar_2016
 
Ravi-apr30
Ravi-apr30Ravi-apr30
Ravi-apr30
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16
 
Kamal Resume
Kamal ResumeKamal Resume
Kamal Resume
 
Sachie Thorne business resume
Sachie Thorne business resumeSachie Thorne business resume
Sachie Thorne business resume
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised Resume
 
LaMima Gilbert Lewis PM
LaMima Gilbert Lewis PMLaMima Gilbert Lewis PM
LaMima Gilbert Lewis PM
 
Bridger_IT
Bridger_ITBridger_IT
Bridger_IT
 
Copyright of leeza n. singh
Copyright of leeza n. singhCopyright of leeza n. singh
Copyright of leeza n. singh
 
Darren Hemple CV
Darren Hemple CVDarren Hemple CV
Darren Hemple CV
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016
 
Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017Curtis Bard IT Site Exec Jan 04 - 2017
Curtis Bard IT Site Exec Jan 04 - 2017
 
Aron Morgulis resume
Aron Morgulis resumeAron Morgulis resume
Aron Morgulis resume
 

Victor Holderby - Project Manger

  • 1. Victor Holderby – Project Manager 513-208-4515 holderbv@yahoo.com SUMMARY IT Project Manager IT Professional with proven success in Project Management and customer communication and satisfaction. Strong knowledge of Information Technology as it relates to Datacenters and server implementations. Strengths include gathering requirements, analyzing requirements, and managing project to implementation. Oversee all aspects of project life cycle. Possess great customer service relationship skills with a strong service delivery background. EXPERIENCE Cincinnati Bell Technology Solutions (Cincinnati, Ohio) 2005 – Current Project Manager – Acquisitions and Divestitures • Scheduled kick-off call with customer to gather requirements and review the contractual agreement for divestiture. • Worked with multi-functional teams including network design engineer, network build engineer, GE business liaison, and business liaison to develop a design. • Once design has been approved by all parties including security team, developed plan to get the business off the core GE network and onto a 3PR so that they can still access some GE applications / websites during the transition period. • Ordered new equipment necessary to move the business to the 3PR – routers and new internet circuits. • Worked with network engineers to get the new routers and circuits configured and ready for the cutover. • Provided updates to management on all sites. • Scheduled date for network cutover to new equipment. • Opened bridge and coordinated all efforts during implementation window. • Provided communication to all stakeholders on when the cutover would occur and what the schedule / test plan / backout would be. • Updated documentation and asset database with new information. Project Manager – Site Re-IP • Lead project manager for re-ip efforts for GE Aviation. This included re-ip’ing all GE Aviation sites from the current 3.xxx environment to new 10.xxx environment. • Scheduled kick-off call with customer to gather requirements. • Worked with multi-functional teams including network design engineer, network build engineer, site network specialists, and business liaison to develop plan for re-ip effort. • Scheduled and held regular status update meetings.
  • 2. Victor Holderby – Project Manager 513-208-4515 holderbv@yahoo.com • Worked with customer to determine all devices that will be re-ip’d – routers, switches, access points, servers, storage devices, printers, security devices (cameras, dvrs, door readers, etc…), etc… • Provided updates to management on all sites. • Scheduled date for implementation. • Opened bridge and coordinated all efforts during implementation window. • Provided communication to all stakeholders on when the re-ip would occur and what the schedule / test plan / backout would be. • Updated documentation and asset database with new 10.xxx information. Project Manager – Network 3PR (3rd party rail) • Scheduled kick-off call with customer to gather requirements. • Worked with multi-functional teams including network design engineer, network build engineer, customer network specialist, 3rd party network team to provide design solution. • Scheduled and held regular status update meetings. • Worked with customer to identify high risk ports / protocols and engaged security team if necessary. • Provided updates to management on all projects. • Scheduled date for implementation to the 3PR. • Provided communication to all stakeholders on when the implementation to the 3PR would occur and what the schedule / test plan / backout would be. • Updated documentation and asset database with new 3PR drawings and information. Project Manager – Aviation Compute Optimization • Provided financial clarity to Aviation regarding their compute assets • Saved Aviation 12 million dollars in compute assets • Identified opportunities to consolidate environments and deinstall servers that were no longer needed • Worked with customers to identify correct asset owners and operational contacts in order to update asset database • Worked with site leaders to identify network devices that are no longer needed. Once identified, entered deinstall tickets and managed them to completion • Worked on network CMDB project to provide transparency in the network bill, to the point where each site can tie their bill to a device or service that they are using/receiving • Migration from Cincinnati Bell Wireless to Verizon - @600 users • Provided documentation and helped users order new Verizon phones, port their old numbers to the new phone, and help them set up their new phones. Project Manager – Audio Conference Migration • Migrated @60K users from Global Crossing to InterCall • Created and updated SOPs for new audio conference account requests • Improved LATAM, EMEA, and ASPAC process for managing audio conference accounts
  • 3. Victor Holderby – Project Manager 513-208-4515 holderbv@yahoo.com • Customer support – worked with individual users across all businesses to answer any audio conferencing questions • Created, updated, and maintained new and current modules on website for InterCall, training, Audio Conferencing Council, WebEx, and metrics • Created SOPs to grow PSP / Items footprint for audio conferencing in EMEA, LATAM, and ASPAC • Performed Canada cleanup / readiness to migrate from Global Crossing to InterCall • Worked with business and InterCall to move Bahrain and Egypt from paper billing system to centralized, automated billing system • Created and maintained weekly scorecards for migration, InterCall adoptions, Integrated Audio, and fraud • Created final pricing guide with event, local, dial out, and feature costs • Created matrix of dial in / dial out availability in all countries that have audio conferencing Build Scheduling Manager – GE GIS Global Build Team • Implemented Scheduling Process for all incoming server build requests. With this process, we were able to attain schedule attainment for 85% of all server installations going into GIS. • Created and maintain reports for all servers that have achieved schedule attainment, missed schedule attainment, and are in danger of missing schedule attainment. With this report, I am able to work with the GIS teams on the implementations that are in danger to get them back on track. • Maintained monthly build metrics. With these metrics, I am able to see how many installs achieved schedule attainment and how many missed. Using these metrics, I am able to determine what the biggest factors are that cause an implementation to miss attainment. Project Manager De-install process manager– GE GIS Global Build Team • Improved out-dated de-install process. Created new processes to improve the cycle time for a server de-installation and implemented quality control to reduce the number of mistakes by the de-install teams. • Worked with GIS support teams to gather requirements for every step of the de-install process. • Created a quality assurance check to make sure all phases of the de-install were completed correctly. Project Lead – GE GIS Global Build Team • On core team to lift the entire datacenter in Parkersburg, VA to the datacenter in Cincinnati, OH. This included working with the customer on outage durations, shutting the equipment down, packing it up, and moving it to Cincinnati. Once in Cincinnati, setting up the equipment in the datacenter and validating that the system and application came back online. • Took on complex implementations using the knowledge that I gained while working for GE. Worked with all the support teams within GIS to manage these implementations to completion. Examples are NPIs, Clusters, Tech-Refreshes, etc… • Mentored CBTS project managers working on GIS projects. Using my knowledge of the environment I was able to help other project managers to have success within the environment.
  • 4. Victor Holderby – Project Manager 513-208-4515 holderbv@yahoo.com • Worked with customer base to determine what major projects were coming. By gathering requirements ahead of time, I was able to make sure capacity and resources were in place. • Created and maintained a build quality assurance checklist to ensure all builds met the correct requirements before being turned over to the customer. The checklist covered all areas of the build including OS, network, external storage, backups, etc... General Electric 2000 – 2005 Process Integration Analyst • Managed the implementation of 1500 servers to a production ready state. • Held calls with GIS customers to gather requirements for their server installations. • Worked with new product introductions for Linux on OS/390 platform and Linux on VMWare. • Trained and mentored co-ops and interns that have worked within the build team at GIS. • Worked on 2 Green Belt projects to clean up the asset database information for all GIS supported servers in Stamford datacenter. • Involved in numerous upgrades to Sun, Compaq, HP, and Dell hardware. Worked with vendors to schedule the upgrades and in many cases performing the upgrades myself. • Traveled to Budapest Hungary to perform a datacenter audit. Worked with the customer in Budapest to share best practices on many processes, including asset database, change management, project management, etc… • Participated on lift teams to transition customer owned servers to GIS support in Ft. Myers, Stamford, Alpharetta, and Budapest datacenters. • Worked with the Stamford datacenter site leader to share best practices and help implement GIS processes for new server installations. General Electric 1998 – 2000 Lead Operator • Monitored mainframe and server health. • Worked to troubleshoot if any issues arose on mainframes or servers within the environment. If troubleshooting efforts didn’t work, paged GIS support personnel to look into the issue. • Co-ordinated conference calls with customer and GIS support personnel if necessary. • Performed weekly scheduled IPLs on mainframes and reboots on servers for maintenance. EDUCATION Northern Kentucky University 2002-2005 Certifications:
  • 5. Victor Holderby – Project Manager 513-208-4515 holderbv@yahoo.com Project Management for IT Professionals Influencing Skills for IT Management Six Sigma Green Belt Certified ITIL Foundations Excel Level 2 Excel Level 3 Linux for Operators Unix for Operators Management Basics – Team
  • 6. Victor Holderby – Project Manager 513-208-4515 holderbv@yahoo.com Project Management for IT Professionals Influencing Skills for IT Management Six Sigma Green Belt Certified ITIL Foundations Excel Level 2 Excel Level 3 Linux for Operators Unix for Operators Management Basics – Team