SlideShare a Scribd company logo
1 of 3
Dear Sir/Madam
I am sending my updated CV for your Review & for Client Requirement Sees attached file. I have Long
Valuable 22 Years Exp. in the field of Electrical, Instrumentation, Cathodic Protection System In Main
Two Types ICCP Increased Current Cathodic Protection SCCP Sacrificial Current Cathodic Protection,
PAGA Public Address General Alarm System, Fire & Gas System, Telecommunication System & SCADA
Supervisory Control And Data Acquisition Work In Electrical & Instrumentation Communication System
Work & All types of P&ID Related E&I Work In All Different Sector Oil & Gas, Refinery, Pe trochemical,
LNG Liquid Natural Gas, GTL Gas To Liquid, NGL Natural Gas Liquidification Unit, LPG Liquid Petroleum
Gas, CNG Compress Natural Gas, All Types of Re-Gasification Unit after Arrival LNG to Make Original Gas
Foam, SRU Sulphur Recover Unit, Oil & Gas Exploration Project, Hook-Up Project In Jacket & Platform All
types of Hook- Up Work in Electrical & Instrumentation System Up to Hand Over to RasGas, Modification
Work All Types of Electrical & Instrumentation System, Shutdown Work Related Electrical &
Instrumentation System In Up Stream & Down Stream Any Type of Project, Brownfield Project,
Retrofitting Project, In Onshore & Offshore All Types of work Exp. Installation Up to Energization Work
In Electrical & Instrumentation System, ETCOM Erection Tes ting Commissioning Operation &
Maintenance Troubleshooting During Installation Up to Energization Work In Electrical &
Instrumentation System, Installation, Inspection, Construction, M/C Mechanical Completion Work, ICAT
Team Work From Construction Up to RFSU Ready for Start-Up Included Pre-Commissioning
Commissioning Work In Electrical & Instrumentation System, RFSU Ready For Start-Up, Start-Up &
Operation Department Hand Over to Main Client All Types of Activity In Electrical & Instrumentation
Work, RFC Ready For Commissioning OR Construction, RFP Ready for Process, I have all types of Exp.In
Long 22 Years Electrical & Instrumentation System, From Up -Stream to Down Stream All types of
Project. During 22 Years I worked in PMT Project Management Team, PMC Pro ject Management
Consultancy in Start-Up & Operation Department Electrical Engineer, and QA/QC Inspector as an
Electrical Instrumentation Side & Main Electrical Side. Basically I am Diploma In Electrical Engineering
Degree Since June 1997. So After Finished Diploma Total 17 Years Exp.in the field of Electrical &
Instrumentation System And I Worked Start from Aug 1992 as a Electrical Technician In 615 MW
Combine Cycle Power Plant at Kawas Gas Power Project Client is Indian Largest Power Producer NTPC
National Thermal Power Company During Construction & Commission Work Ongoing Main EPC
Contractor is GEC ALSTOM France Total 04 Numbers of GTG Capacity of 105 MW & 02 Numbers of STG
Steam Turbine Generator Capacity of 110 MW Power Produce & HRSG, & Aux. Boiler Here I Worked from
Aug.1992 to Sep.1993 Up to June 1995 as a Technician & NCTVT National Council Trade In Vocational
Training In M/S Narmada Cement Company Limited NCCL from Sep.1993 to Sep.1994 In Electrical Site In
Hand On Particle Exp.In Electrical System. In All Multi Billion US Project In Kazakhstan World Largest
OPF & OGS Facility In Onshore Site Karabatan & Offshore Train 1 & Train 2 In D -Island In Caspian Sea
Under SHELL In AGIP KCO NCPCO Project, Ruwais Refinery Expansion Project World Largest Grass Ro ot
Refinery in Ruwais UAE, GASCO Abu Dhabi Gas Industries Company IGD5 Process Facility & Utility &
Offsite in Habshan & Inter Connected with OGD 3 Electrical & Pipeline Cathodic Protection Work In
Habshan Site, QAPCO Qatar Petrochemical Company In Mesaieed Area LDPE3 Project Main Works
Ongoing Retrofitting of New CCB Building Included LDPE3 & LDPE1 & 2 & Ethanol Existing Plant Also
Included in Mesaieed Qatar, RasGas Barzan Offshore WHP 1, 2 & 3 Project In Arabian Sea Here All 03
Numbers of WHP Well Head Platform Work Involved From Installation Up to Client RasGas Hand Over In
All types of Electrical & Instrumentation System Work In Qatar, F2 Asia Power & Water Treatment
Project in Fujairah Under OTV & Sidem Joint Venture In UAE, RasGas Expansion Project Tra in 6, 7 &
AKG2 Under CTJV Chiyoda Technip Joint venture In Main Technip Site Worked in Common Area Main
Incoming Oil & Gas Line Come from Offshore In SlugCature Area After that Process In Common Area than
Distribute as per Project Criteria Here In Big Size Compressor Like N2 Compressor, MR Compressor & C3
Compressor This 03 Numbers of Main Compressor Connected with EVFD S ystem from Different Substation
for Treated Gas In LNG & Utility Area All Types of GTG Gas Turbine Generator, STG Steam Turbine
Generator, HRSG Heat Recovery Steam Generator, WHRB Waist Heat Recovery Boiler, Aux. Boiler, Super
Heater Boiler, Cooling Method use for FINFAN type, EDG Emergency Diesel Generator, Voltage Level
3.3KV, 6.6KV, 11KV, 33KV, 66KV, 132KV From Low Voltage Medium Voltage & High Voltage 3.3KV to
132KV SF6 Breaker, Vacuum Circuit Breaker All Medium & High Voltage Breaker make by Siemens & Air
Circuit Breaker make by Merlin Gerin, L&T, ABB In Qatar RLIC Site, Takreer Refinery Expansion Project
EPC2 Cross Country Pipeline & Tank Farm Electrical Instrumentation Substation & SIH Systematic
Instrumentation Home Building, PIB Process Interface Building, FAR Field Auxiliary Room, ISR
Instrumentation Shelter Room, CCB Central Control Building, CCR Central Control Room, CCC Central
Control Centre, In Al Alien, Sharjah, Dubai, Habshan, Ruwais, Abu Dhabi Site, Takreer Expansion Project
EPC4 for Tank Farm & Inter Connected Pipeline Project In Ruwais Site UAE, Commissioning Electrical
Supervisor under KBR C6 Utility & Offsite Area GTG, STG, EDG, HRSG, Super Heater Critical Boiler, 132KV
Synchronization In OPSS Substation Between SHELL GTL & Kaharama Elect ricity & Water Department at
Voltage Level of 132KV Government of Qatar, I Know the All SHELL DEP & CEP, AEP, SAEP & Safety HSE
Envormental Procedure. But I can’t Authorized to AEP OR SAEP due to we have Involved In All Utility
Related Equipment Commissioning like EDG, GTG, STG So we have no time to give Test for AEP OR SAEP
But I know the all Procedure of SHELL DEP & SHELL 12 Main HSE Related Safety Rules for All Over
World Working for Any SHELL Project at SHELL GTL Pearl Project In Qatar RLIC Site, All of this Project I
Involved Worked with All Types of International Agency Like CTJV Direct Hire From Qatar, Brunel Group
of Qatar, Brunel Group of India, SPIE Oil & Gas Group of Abu Dhabi, Air Energi Group of Qatar, BV Group
of Qatar, SPIE Oil & Gas Group of Saudi, BV Group of Abu Dhabi, GL Group of Qatar, Moody International
Group INTERTEK MOODY of Abu Dhabi Group, Those All Project Value is more than 4 To 22 US Multi
Billion Dollar Project. & Most are World Largest Producer in LNG, NGL, Ethanol Capacity of M illion
Metric Turn Per Annum MMTPA, Oil & Gas Barrel/Day Turn/Year TPY, LNG, NGL, Naphtha, Benzene & all
Aromatics Product, LDPE Low Density Poly Ethanol, Polypropylene PP, Petrol & Diesel Low & High
Octane, Ortho zilene, Para zilene, LPG, Ethanol, FCC Fluid Catalic Cracking, Reformer Unit, COKER,
Other all Petroleum Product Making from C1 C2 C3 C4 C5 Ethane, Methane, Propane, Butane This All
types of Work Exp.In World Largest Gross Root Refinery & Petrochemical Hub In India at JERP Project In
RPL Jamnagar, Jamnagar Export Refinery Project Client is Reliance Petroleum Limited Here I Involved In
Different types of Project Built up During Commissioning Stage of JERP Project Hydrogen Project, FCC
Fluid Catalytic Cracking Project, PP Poly Propylene Project, SRU Sulphur Recovery Unit Project, Sulphur
Handling Project, CDU Crude Distillation Unit Project, VDU Vapor De -Hydration Unit Project, Sulphur
Graduations Project, COKER For Making Petroleum Coke which is use for Coal Base power plant, Project
For this Coker Main Feed is ETP Wastage Slug, RTF Refinery Tank Farm This is the Main Area Where
Ongoing Work of Bleeding for Making High & Low Octane Petrol & Diesel As per Market Requirement
Under the Para Zilene & Ortho Zilene & Benzene this All Product from Aromatics Plant, RRTF Reliance
Refinery Tank Farm, Clean Fuel Project, ETP Effulgence Treatment Plant, MTF Marine Tank Farm Marine
Terminal Offshore Port In Also Involved for Retrofitting Work Ongoing for Pipeline & Electrical
Distribution Work for JERP Project, Aromatics Project, CPP Co-Generation Power Plant Project, Due to
Mr. H K Murthi Head of HOD In Electrical Department Take my Final Interview for Which location I am
Suitable for JERP Project After Finished my Interview Mr. H K Murthi Has Decided to Put Me O n CES
Department. He will send Me In CES Department Means Centralized Electrical Section Related JERP
Project So Here I am Involved In All Project what I All Ready Mention. I have also Very good Knowledge
of Process Site & Electrical & Instrumentation Comm unication Site Work All Types of P&ID Piping &
Instrumentation Hook- Up Drawing, All Instrument Calibration Witness During All Project, Process &
Interface Drawing Related E&I Civil Drawing During Construction work Start for Boss & Rebar Electrical
Earthing Cable laying, Instrument Earthing Cable laying, Instrumentation Safe Earthing Cable Laying,
All Under Ground & Above Ground Pipeline & Equipment Cathodic Protection Work I Involved In my
Previous Long 22 Years. Here I show all my Details Work Activity So I hope if you give me chance to work
with your Organization OR your Client I will Show my all long Exp. for your Organization OR your Client.
I Hope you will give Favorable Reply for Me ASAP if any Suitable Position match with my Updated CV in
Electrical & Instrumentation Field.
Over 22 Years and 4 Months of Rich & Cross Cultural Experience in Electrical & Instrumentation Start -Up
& Operation Department Electrical Engineer, PMT & PMC QA/QC Electrical & Instrumentation Inspector,
Commissioning Electrical Supervisor, Construction Supervision, Electrical Instrumentation Inspections,
Preventive Maintenance, Predictive Maintenance, Operation & Maintenance, Pre -Commissioning,
Commissioning, Overhauling, Maintenance and Troubleshooting in Upstream & Downstream In last 22
Years Experience In India, Middle East Qatar, UAE & CIS Country In Kazakhstan. See My Last Work
Activity In RasGas Barzan Offshore Project In Offshore Arabian Sea at Qatar.
My Last Project I worked with Ras Gas Offshore Barzan project WHP -1,2,3 Well Head Platform & Jacket
Hook-Up Work Activity I Involved as a PMT Qa/Qc Electrical & Instrumentation Inspector In Rotation
28/28 On/Off. I have long valuable 22 Years Exp.in the field of Electrical, Instrumentation, I have very
Good Knowledge of Inspection, Construction, Pre-Commissioning, Commissioning, RFSU Ready for Start -
Up, Start-Up & Operation Department & Hand Over Work to Main Client, In All Upstream & Downstream
Project, Brownfield Project, Exploration Project, Hook -up Project, PMT, PMC, EPC, EPCM. So I am sending
my updated CV for your Review and for Client Requirement. I hope you will give Favorable reply for ME
ASAP if any Suitable position matches with my Updated CV in Electrical & Instrumentation Field.
Best Regards,
PareshKumar Patel
PMT QA/QC Electrical & Instrument Inspector
Ras Gas Offshore Barzan WHP -1,2,3 Qatar
+919879528431, +919879512531, +919904431975, +917622913963

More Related Content

What's hot

What's hot (20)

RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foreman
 
Merrit CV
Merrit CVMerrit CV
Merrit CV
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
 
jamespickering
jamespickeringjamespickering
jamespickering
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
CV2014
CV2014CV2014
CV2014
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Curriculum vitae meganathan n e-16302
Curriculum vitae  meganathan n  e-16302Curriculum vitae  meganathan n  e-16302
Curriculum vitae meganathan n e-16302
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 

Viewers also liked

ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )eslam hussien
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CVMuhammad Nouman
 
Top 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesTop 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesgedihutes
 
De toekomst van ons zakendoen
De toekomst van ons zakendoenDe toekomst van ons zakendoen
De toekomst van ons zakendoenPieter Boot
 
Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...
Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...
Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...HocXuLyNuoc.com
 
Etiquettes for Teachers
Etiquettes for TeachersEtiquettes for Teachers
Etiquettes for TeachersMartinkay99
 
Israel Stockhammer - ישראל שטוקהמר - Cantor, Opera Singer
Israel Stockhammer - ישראל שטוקהמר - Cantor, Opera SingerIsrael Stockhammer - ישראל שטוקהמר - Cantor, Opera Singer
Israel Stockhammer - ישראל שטוקהמר - Cantor, Opera SingerIzhar Izhaki
 
Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252sahilkharkara1
 
O inverno acorda a nossa mente e o calor impede-nos de pensar direito
O inverno acorda a nossa mente e o calor impede-nos de pensar direitoO inverno acorda a nossa mente e o calor impede-nos de pensar direito
O inverno acorda a nossa mente e o calor impede-nos de pensar direitoTeresa Batista
 
100328プレゼンフィードバック法
100328プレゼンフィードバック法100328プレゼンフィードバック法
100328プレゼンフィードバック法Takashi Kondo
 
Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...
Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...
Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...HocXuLyNuoc.com
 

Viewers also liked (17)

Pmt engineers
Pmt engineersPmt engineers
Pmt engineers
 
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
 
Top 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesTop 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samples
 
De toekomst van ons zakendoen
De toekomst van ons zakendoenDe toekomst van ons zakendoen
De toekomst van ons zakendoen
 
Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...
Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...
Nghị định Quy định việc cấp phép thăm dò, khai thác, sử dụng tài nguyên nước,...
 
Etiquettes for Teachers
Etiquettes for TeachersEtiquettes for Teachers
Etiquettes for Teachers
 
Bangla literature mix by tanbircox
Bangla literature mix by tanbircoxBangla literature mix by tanbircox
Bangla literature mix by tanbircox
 
presentations-tips.ppt
presentations-tips.pptpresentations-tips.ppt
presentations-tips.ppt
 
Israel Stockhammer - ישראל שטוקהמר - Cantor, Opera Singer
Israel Stockhammer - ישראל שטוקהמר - Cantor, Opera SingerIsrael Stockhammer - ישראל שטוקהמר - Cantor, Opera Singer
Israel Stockhammer - ישראל שטוקהמר - Cantor, Opera Singer
 
Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252
 
O inverno acorda a nossa mente e o calor impede-nos de pensar direito
O inverno acorda a nossa mente e o calor impede-nos de pensar direitoO inverno acorda a nossa mente e o calor impede-nos de pensar direito
O inverno acorda a nossa mente e o calor impede-nos de pensar direito
 
"Sådan skal svinet skæres" af Bjarne Kjær Ersbøll, DTU
"Sådan skal svinet skæres" af Bjarne Kjær Ersbøll, DTU"Sådan skal svinet skæres" af Bjarne Kjær Ersbøll, DTU
"Sådan skal svinet skæres" af Bjarne Kjær Ersbøll, DTU
 
Bangla kobi & shahittik a2 z by tanbircox
Bangla kobi & shahittik a2 z by tanbircoxBangla kobi & shahittik a2 z by tanbircox
Bangla kobi & shahittik a2 z by tanbircox
 
1166 a
1166 a1166 a
1166 a
 
100328プレゼンフィードバック法
100328プレゼンフィードバック法100328プレゼンフィードバック法
100328プレゼンフィードバック法
 
Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...
Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...
Về ban hành Quy chế xã hội hóa dịch vụ cấp nước sạch trên địa bàn thành phố H...
 

Similar to Cover letter 20 dec.2014

Similar to Cover letter 20 dec.2014 (20)

Cv electrical
Cv electricalCv electrical
Cv electrical
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
Rana Maqsood Alam Resume, (E&I) P&S ..docx
Rana Maqsood Alam  Resume, (E&I) P&S ..docxRana Maqsood Alam  Resume, (E&I) P&S ..docx
Rana Maqsood Alam Resume, (E&I) P&S ..docx
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
M Imran
M ImranM Imran
M Imran
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc Manager
 
MY CV
MY CVMY CV
MY CV
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 

Cover letter 20 dec.2014

  • 1. Dear Sir/Madam I am sending my updated CV for your Review & for Client Requirement Sees attached file. I have Long Valuable 22 Years Exp. in the field of Electrical, Instrumentation, Cathodic Protection System In Main Two Types ICCP Increased Current Cathodic Protection SCCP Sacrificial Current Cathodic Protection, PAGA Public Address General Alarm System, Fire & Gas System, Telecommunication System & SCADA Supervisory Control And Data Acquisition Work In Electrical & Instrumentation Communication System Work & All types of P&ID Related E&I Work In All Different Sector Oil & Gas, Refinery, Pe trochemical, LNG Liquid Natural Gas, GTL Gas To Liquid, NGL Natural Gas Liquidification Unit, LPG Liquid Petroleum Gas, CNG Compress Natural Gas, All Types of Re-Gasification Unit after Arrival LNG to Make Original Gas Foam, SRU Sulphur Recover Unit, Oil & Gas Exploration Project, Hook-Up Project In Jacket & Platform All types of Hook- Up Work in Electrical & Instrumentation System Up to Hand Over to RasGas, Modification Work All Types of Electrical & Instrumentation System, Shutdown Work Related Electrical & Instrumentation System In Up Stream & Down Stream Any Type of Project, Brownfield Project, Retrofitting Project, In Onshore & Offshore All Types of work Exp. Installation Up to Energization Work In Electrical & Instrumentation System, ETCOM Erection Tes ting Commissioning Operation & Maintenance Troubleshooting During Installation Up to Energization Work In Electrical & Instrumentation System, Installation, Inspection, Construction, M/C Mechanical Completion Work, ICAT Team Work From Construction Up to RFSU Ready for Start-Up Included Pre-Commissioning Commissioning Work In Electrical & Instrumentation System, RFSU Ready For Start-Up, Start-Up & Operation Department Hand Over to Main Client All Types of Activity In Electrical & Instrumentation Work, RFC Ready For Commissioning OR Construction, RFP Ready for Process, I have all types of Exp.In Long 22 Years Electrical & Instrumentation System, From Up -Stream to Down Stream All types of Project. During 22 Years I worked in PMT Project Management Team, PMC Pro ject Management Consultancy in Start-Up & Operation Department Electrical Engineer, and QA/QC Inspector as an Electrical Instrumentation Side & Main Electrical Side. Basically I am Diploma In Electrical Engineering Degree Since June 1997. So After Finished Diploma Total 17 Years Exp.in the field of Electrical & Instrumentation System And I Worked Start from Aug 1992 as a Electrical Technician In 615 MW Combine Cycle Power Plant at Kawas Gas Power Project Client is Indian Largest Power Producer NTPC National Thermal Power Company During Construction & Commission Work Ongoing Main EPC Contractor is GEC ALSTOM France Total 04 Numbers of GTG Capacity of 105 MW & 02 Numbers of STG Steam Turbine Generator Capacity of 110 MW Power Produce & HRSG, & Aux. Boiler Here I Worked from Aug.1992 to Sep.1993 Up to June 1995 as a Technician & NCTVT National Council Trade In Vocational Training In M/S Narmada Cement Company Limited NCCL from Sep.1993 to Sep.1994 In Electrical Site In Hand On Particle Exp.In Electrical System. In All Multi Billion US Project In Kazakhstan World Largest OPF & OGS Facility In Onshore Site Karabatan & Offshore Train 1 & Train 2 In D -Island In Caspian Sea Under SHELL In AGIP KCO NCPCO Project, Ruwais Refinery Expansion Project World Largest Grass Ro ot Refinery in Ruwais UAE, GASCO Abu Dhabi Gas Industries Company IGD5 Process Facility & Utility & Offsite in Habshan & Inter Connected with OGD 3 Electrical & Pipeline Cathodic Protection Work In Habshan Site, QAPCO Qatar Petrochemical Company In Mesaieed Area LDPE3 Project Main Works Ongoing Retrofitting of New CCB Building Included LDPE3 & LDPE1 & 2 & Ethanol Existing Plant Also Included in Mesaieed Qatar, RasGas Barzan Offshore WHP 1, 2 & 3 Project In Arabian Sea Here All 03 Numbers of WHP Well Head Platform Work Involved From Installation Up to Client RasGas Hand Over In All types of Electrical & Instrumentation System Work In Qatar, F2 Asia Power & Water Treatment Project in Fujairah Under OTV & Sidem Joint Venture In UAE, RasGas Expansion Project Tra in 6, 7 & AKG2 Under CTJV Chiyoda Technip Joint venture In Main Technip Site Worked in Common Area Main Incoming Oil & Gas Line Come from Offshore In SlugCature Area After that Process In Common Area than Distribute as per Project Criteria Here In Big Size Compressor Like N2 Compressor, MR Compressor & C3 Compressor This 03 Numbers of Main Compressor Connected with EVFD S ystem from Different Substation for Treated Gas In LNG & Utility Area All Types of GTG Gas Turbine Generator, STG Steam Turbine Generator, HRSG Heat Recovery Steam Generator, WHRB Waist Heat Recovery Boiler, Aux. Boiler, Super Heater Boiler, Cooling Method use for FINFAN type, EDG Emergency Diesel Generator, Voltage Level 3.3KV, 6.6KV, 11KV, 33KV, 66KV, 132KV From Low Voltage Medium Voltage & High Voltage 3.3KV to
  • 2. 132KV SF6 Breaker, Vacuum Circuit Breaker All Medium & High Voltage Breaker make by Siemens & Air Circuit Breaker make by Merlin Gerin, L&T, ABB In Qatar RLIC Site, Takreer Refinery Expansion Project EPC2 Cross Country Pipeline & Tank Farm Electrical Instrumentation Substation & SIH Systematic Instrumentation Home Building, PIB Process Interface Building, FAR Field Auxiliary Room, ISR Instrumentation Shelter Room, CCB Central Control Building, CCR Central Control Room, CCC Central Control Centre, In Al Alien, Sharjah, Dubai, Habshan, Ruwais, Abu Dhabi Site, Takreer Expansion Project EPC4 for Tank Farm & Inter Connected Pipeline Project In Ruwais Site UAE, Commissioning Electrical Supervisor under KBR C6 Utility & Offsite Area GTG, STG, EDG, HRSG, Super Heater Critical Boiler, 132KV Synchronization In OPSS Substation Between SHELL GTL & Kaharama Elect ricity & Water Department at Voltage Level of 132KV Government of Qatar, I Know the All SHELL DEP & CEP, AEP, SAEP & Safety HSE Envormental Procedure. But I can’t Authorized to AEP OR SAEP due to we have Involved In All Utility Related Equipment Commissioning like EDG, GTG, STG So we have no time to give Test for AEP OR SAEP But I know the all Procedure of SHELL DEP & SHELL 12 Main HSE Related Safety Rules for All Over World Working for Any SHELL Project at SHELL GTL Pearl Project In Qatar RLIC Site, All of this Project I Involved Worked with All Types of International Agency Like CTJV Direct Hire From Qatar, Brunel Group of Qatar, Brunel Group of India, SPIE Oil & Gas Group of Abu Dhabi, Air Energi Group of Qatar, BV Group of Qatar, SPIE Oil & Gas Group of Saudi, BV Group of Abu Dhabi, GL Group of Qatar, Moody International Group INTERTEK MOODY of Abu Dhabi Group, Those All Project Value is more than 4 To 22 US Multi Billion Dollar Project. & Most are World Largest Producer in LNG, NGL, Ethanol Capacity of M illion Metric Turn Per Annum MMTPA, Oil & Gas Barrel/Day Turn/Year TPY, LNG, NGL, Naphtha, Benzene & all Aromatics Product, LDPE Low Density Poly Ethanol, Polypropylene PP, Petrol & Diesel Low & High Octane, Ortho zilene, Para zilene, LPG, Ethanol, FCC Fluid Catalic Cracking, Reformer Unit, COKER, Other all Petroleum Product Making from C1 C2 C3 C4 C5 Ethane, Methane, Propane, Butane This All types of Work Exp.In World Largest Gross Root Refinery & Petrochemical Hub In India at JERP Project In RPL Jamnagar, Jamnagar Export Refinery Project Client is Reliance Petroleum Limited Here I Involved In Different types of Project Built up During Commissioning Stage of JERP Project Hydrogen Project, FCC Fluid Catalytic Cracking Project, PP Poly Propylene Project, SRU Sulphur Recovery Unit Project, Sulphur Handling Project, CDU Crude Distillation Unit Project, VDU Vapor De -Hydration Unit Project, Sulphur Graduations Project, COKER For Making Petroleum Coke which is use for Coal Base power plant, Project For this Coker Main Feed is ETP Wastage Slug, RTF Refinery Tank Farm This is the Main Area Where Ongoing Work of Bleeding for Making High & Low Octane Petrol & Diesel As per Market Requirement Under the Para Zilene & Ortho Zilene & Benzene this All Product from Aromatics Plant, RRTF Reliance Refinery Tank Farm, Clean Fuel Project, ETP Effulgence Treatment Plant, MTF Marine Tank Farm Marine Terminal Offshore Port In Also Involved for Retrofitting Work Ongoing for Pipeline & Electrical Distribution Work for JERP Project, Aromatics Project, CPP Co-Generation Power Plant Project, Due to Mr. H K Murthi Head of HOD In Electrical Department Take my Final Interview for Which location I am Suitable for JERP Project After Finished my Interview Mr. H K Murthi Has Decided to Put Me O n CES Department. He will send Me In CES Department Means Centralized Electrical Section Related JERP Project So Here I am Involved In All Project what I All Ready Mention. I have also Very good Knowledge of Process Site & Electrical & Instrumentation Comm unication Site Work All Types of P&ID Piping & Instrumentation Hook- Up Drawing, All Instrument Calibration Witness During All Project, Process & Interface Drawing Related E&I Civil Drawing During Construction work Start for Boss & Rebar Electrical Earthing Cable laying, Instrument Earthing Cable laying, Instrumentation Safe Earthing Cable Laying, All Under Ground & Above Ground Pipeline & Equipment Cathodic Protection Work I Involved In my Previous Long 22 Years. Here I show all my Details Work Activity So I hope if you give me chance to work with your Organization OR your Client I will Show my all long Exp. for your Organization OR your Client. I Hope you will give Favorable Reply for Me ASAP if any Suitable Position match with my Updated CV in Electrical & Instrumentation Field. Over 22 Years and 4 Months of Rich & Cross Cultural Experience in Electrical & Instrumentation Start -Up & Operation Department Electrical Engineer, PMT & PMC QA/QC Electrical & Instrumentation Inspector, Commissioning Electrical Supervisor, Construction Supervision, Electrical Instrumentation Inspections, Preventive Maintenance, Predictive Maintenance, Operation & Maintenance, Pre -Commissioning,
  • 3. Commissioning, Overhauling, Maintenance and Troubleshooting in Upstream & Downstream In last 22 Years Experience In India, Middle East Qatar, UAE & CIS Country In Kazakhstan. See My Last Work Activity In RasGas Barzan Offshore Project In Offshore Arabian Sea at Qatar. My Last Project I worked with Ras Gas Offshore Barzan project WHP -1,2,3 Well Head Platform & Jacket Hook-Up Work Activity I Involved as a PMT Qa/Qc Electrical & Instrumentation Inspector In Rotation 28/28 On/Off. I have long valuable 22 Years Exp.in the field of Electrical, Instrumentation, I have very Good Knowledge of Inspection, Construction, Pre-Commissioning, Commissioning, RFSU Ready for Start - Up, Start-Up & Operation Department & Hand Over Work to Main Client, In All Upstream & Downstream Project, Brownfield Project, Exploration Project, Hook -up Project, PMT, PMC, EPC, EPCM. So I am sending my updated CV for your Review and for Client Requirement. I hope you will give Favorable reply for ME ASAP if any Suitable position matches with my Updated CV in Electrical & Instrumentation Field. Best Regards, PareshKumar Patel PMT QA/QC Electrical & Instrument Inspector Ras Gas Offshore Barzan WHP -1,2,3 Qatar +919879528431, +919879512531, +919904431975, +917622913963