To,
The Manager
Human Resource Department
APPLICATION FOR THE POST OF “ELECTRICAL ENGINEER”
Dear Sir,
I Would like to apply myself for the Post of “ Electrical Engineer “ having 5 Years of
comprehensive experience in Execution of MEP Projects,Electrical Wiring And Installation, BMS,
HVAC Projects, and Cable Tray system/services in different projects of low & high rise buildings,
where I have been employed in Valence Trading And Contracting Doha Qatar.
I have electrical contractor license and supervisory license issued by Govt. of India PWD
I wish to submit you here with the copy of my resume in the belief that there exists a vacancy &
looking forward towards a fruitful & meaningful association in your esteemed organization with an
assurance of high quality of work while putting in my abilities & best efforts towards the organization’s
Objectives.
Herewith I am forwarding my brief resume for your kind perusal & if I am a suitable choice to serve your
organization, I Could be present for an interview with all my testimonials.
Awaiting your positive reply.
Thanks and Regards
MOHD ILYAS KHAN,

Mob: +91 9730234132/+918856068212

Email: ilyas31372@gmail.com/er.ilyas38@gmail.com
Skype: ilyas31372
CURRICULUM VITAE
MOHD ILYAS KHAN ZAFAR KHAN
Bachelor of Electrical Engineer(E.E.P.)
Pune-India
Mob :+91 9730234132/+918856068212
Email :- ilyas31372@gmail.com,er.ilyas38@gmail.com
Skype ID: ilyas31372
CAREER OBJECTIVE
Geared up with ambition, skills & attitude to embark upon a new professional career in technology.
PERSONAL PROFILE
KEY STRENGHTS
 Analytical
 Problem-
solving
 Team-
player
 Task-
oriented
 Self-motivated, enthusiastic and diligent Engineering Graduate with strong
technical knowledge on Electrical, Electronics & Power Engineering.

 Possesses good analytical ability and decent track-record of academic
achievements.

 Driven by passion for technology & excellence, strongly believes in unflinching
commitment towards achieving set goals/objectives.

 Quick learner with an ability to adapt well to new situations with perseverance &
patience. Good communication skills, team skills & sense of humouradds to the
personal.
ACADEMIC ACHEIVMENTS
.Bachelor of Engineering PES College of Engineering 2012 72.26% (DISTINCTION)
(Electrical, Electronics & Power) BAMU, AURANGABAD (Maharashtra)
.Diploma In Electrical Engineering Government Polytechnic Khamgaon 2008 67% (FIRST CLASS)
MSBTE Mumbai
.Holding electrical supervisor Issued by PWD
license and electrical contractor (Public work department) of India
License
PROJECTS & PRESENTATIONS
“MANUFACTURING & TESTING OF CAPACITIVE VOLTAGE TRANSFORMER” (B.E. Final Year)
 A Capacitive Voltage Transformer of 11kv is developed on the concept of co-axial cylindrical
capacitors bank.

 This technique is used for the first time in the world for manufacturing of CVT.

 Technique considerably reduced the physical dimensions of CVT, obtain low-cost & maintenance free
CVT.
 It is considered big achievement in power sector to get CVT based on simplified technology.
 Team Members: 5 • Duration: 8 weeks
AWARDS & ACCOLADES
 Appreciated by HVESI(High Voltage Engineering Society of India) for developing
indigenous CVT Technique.

 Appreciated & encouraged by Dr. D.V. Ray & Mr. S.D. Mukharjee:-advised to Patent
the Technique.

 Articles & Write-ups on successful development of 11kv CVT published in various English,
Marathi & Urdu Dailies.
 Awarded Certificate of Participation at National Level Technical Paper Presentation.



PROFESSIONAL RESPONSIBILITIES


 Managing the team for good and quality productivity of output in Electrical execution systems on
site.

 Check / review Contractor's shop drawings for all electrical works, including coordination with all
the electrical, mechanical, specialist disciplines of the project and with all the regulatory
requirements

 Implement the contract documents requirements, such as design drawings,
specifications, Bill of Quantities (B.O.Q.) contract conditions, etc. on site.


 Review / check and recommend the correct completedprogress percentages of all electrical activities
to the Resident Engineer.


 Check, review and approve all electrical materials submittals, proposals, calculations and samples.

 Inform Senior Engineer and Head of Electrical dept. immediately if any serious incident occurs
which could affect the safety, stability, serviceability, adjacent structures whether in the short or long
term. If appropriate, instruct emergency procedures to avoid accidental damage

 Check quality of all electrical works to ensure compliance with the contract specification
requirements, method statements and approvals.
CURRENT EMPLOYMENT DETAILS
Company: Pragati Electrical Enterprises (Class-1 Govt. Contractor)
Designation: Project Engineer
Duration: From 25 April 2015 to Till Present
Job Profile:-

To report to the Director about the project.


Handling Industrial and Govt. Projects MEP, Maintenance and Installation and Commissioning.


To check the project drawings and find out the comments from the consultant.


To rectify the comments as per the site engineer before starting the project if any.


To arrange the documents for material submittals and submit to the consultant.


To attend all meetings related to the projects and report to the director.


To make work progress report and submit to concern consultant.


To carry out the BMS(Building Management System) projects.


Responsible for testing and commissioning of automation system.


Review and preparation of the inspection and test plan, inspection checklist and methods statement
for electrical (Low, Medium, and High Voltage Power Distribution System) and instrumentation and
control submitted by subcontractor.


Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage
Electrical Power Distribution.


Responsible for methodical and systematic routine Material Receiving Inspection, Site Acceptance
Testing and Final Inspection of electrical and instrumentation erections and installations.


Conduct vendor inspection of equipment prior to release on site and Review of Factory Acceptance

Test reports and manufacturer’s Quality Control documents.
PROFESSIONAL GULF EXPERIENCE
Company: Valence Trading and Contracting Qatar
Designation: Site Electrical Engineer
Duration: From 22 Sept. 2013 to 22 April 2015
Job Profile:-

To check the project drawings and find out the comments from the consultant.

To rectify the comments as per the site visit before starting the project if any.

To arrange the documents for material submittals and submit to the consultant.

To take out the quantity of required materials for the electrical work.

Make order and LPO for the materials and send to the suppliers for RFQ.

Prepare the bills and quotation of all electrical materials and equipment.

Arrange all the material at site, Man power and all necessary equipments.

To start the work as per the drawings.

To handle the man power on site and perform supervision of electrical works.

To make work progress report and submit to concern Manager.

Report directly to General Manager .

To carry out the HVAC projects and install and repair of all types of AC.

To carry out the Residential, Commercial and industrial wirings.

To carry out the BMS(Building Management System) projects.

Responsible for testing and commissioning of automation system.

Review and preparation of the inspection and test plan, inspection checklist and methods statement
for electrical (Low, Medium, and High Voltage Power Distribution System) and instrumentation and
control submitted by subcontractor.

Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage
Electrical Power Distribution.

Responsible for methodical and systematic routine Material Receiving Inspection, Site Acceptance
Testing and Final Inspection of electrical and instrumentation erections and installations.

Conduct vendor inspection of equipment prior to release on site and Review of Factory
Acceptance Test reports and manufacturer’s Quality Control documents.


Interpretation and application of electrical and instrumentation engineering schematics, single line
diagram, plans, isometrics, assembly drawing, hook up and instrument loop diagrams.
Review the Project Quality Plans, shop drawings, project standards and engineering specifications to
ensure efficient execution of works

Responsible for execution and monitoring of approved Quality Plan in the field of electrical and
instrumentation.



Coordinate with engineering, client and sub-contractors representative on daily basis to resolve any
quality problems or issues.

Conduct site supervision, surveillance, issuance of Quality Control Instruction and Non
Important Projects Done:-
1) Qatar General Insurance Company Barwa Ground+4 Floors MEP Project
2) Vtce Office Barwa 1 Floor MEP Project
3) Qatar Petrolium Offices(BBI) West Bay 1 Floor(P3) Electrical Work
4) Ali Bin Ali and Partner 3 Floor MEP project
5) Supreme Council Qatar 2 Floor Electrical Work
6) Qatar First Bank 3 Floor MEP Project
7) Anti Doping Laboratory For FIFA world Cup Ground+3 MEP Project
8) Qatar Chemical Company In Dafna ,Qatar Ground+8 Floor MEP Project
These all projects Fast Track Projects.
PREVIOUS EXPERIENCE
1) COMPANY: - - Icon Electricals Aurangabad. From:-15
th
July 2012 to 10
th
Sept. 2013.(15Months)
DESIGNATION: - Site Engineer.
Job Profile:

To carry out the given project within the given time with expected quality of works.

Prepare the bills and quotation of all electrical materials and equipment.

To handle the man power on site and perform supervision of electrical works.

To carry out the HVAC projects and install and repair of all types of AC.

To carry out the Residential, Commercial and industrial wirings.

To carry out the BMS(Building Management System) projects.

Responsible for testing and commissioning of automation system.

Review and preparation of the inspection and test plan, inspection checklist and methods
statement for electrical (Low, Medium, and High Voltage Power Distribution System) and
instrumentation and control submitted by subcontractor.

Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage
Electrical Power Distribution.

Responsible for methodical and systematic routine Material Receiving Inspection, Site Acceptance
Testing and Final Inspection of electrical and instrumentation erections and installations.

Conduct vendor inspection of equipment prior to release on site and Review of Factory
Acceptance Test reports and manufacturer’s Quality Control documents.

Interpretation and application of electrical and instrumentation engineering schematics, single line
diagram, plans, isometrics, assembly drawing, hook up and instrument loop diagrams.
Review the Project Quality Plans, shop drawings, project standards and engineering specifications
to ensure efficient execution of works

Responsible for execution and monitoring of approved Quality Plan in the field of electrical
and instrumentation.


Coordinate with engineering, client and sub-contractors representative on daily basis to resolve
any quality problems or issues.

Conduct site supervision, surveillance, issuance of Quality Control Instruction and Non
2) Pragati Electricals Enterprises India Duration : 20
th
Aug 2008 to 26
th
June 2009(10Months).
Designation : Site Engineer
Job Profile:-
 Trouble shooting & fault finding of various machines.
 Inspection, testing and calibration of instruments.
 Maintenance / Repairs of lighting issues.

 Carried out EMS project and customized the daily, weekly, monthly & yearly Electrical Energy
Consumption Reports.
 Monitoring and trouble shooting of fault
 Maintenance and servey of all types of motors.
 Wiring and installation of industries.
 Responsible for monitoring and checking site installations performed by subcontractors to ensure
its adherence to the drawings and specifications.
 Handle the tasks of monitoring the development of installation and update the report to senior electrical
engineers.
 Checking all terminations of control cables as per drawings.
 Ensure that the delivered material prior to placing them in the stores, are in accordance
with specification.
 Monitor Business performance by undertaking audits as directed ,Monitoring inspection reports and
other project generated information and produce reports to senior management
 Daily activity reports with the status of the site and familiar with the inspection reports with check
sheets
 Plan and implement research methodology and procedures to apply principles of electrical theory
to engineering projects.
 Perform the tasks of maintaining drawing registers, drawing files as well as site filing system
 Assigns and coordinates work to Drafters, Designers, and Engineers
 Liaise with clients and design department on installation details and design issues.
 Perform detailed calculations to compute and establish manufacturing, construction, and
installation standards and specifications.
 Perform the tasks of preparing defect schedules as well as ensure correction of the same
 Handle the tasks of supporting senior level site engineers in complex commissioning of electrical
equipment
 Closely monitoring the project activities as per the approved MEP program of work in Order to complete
the project before time & as per project specifications, Clients Satisfaction.
 Replying all the RFI’s from the contractors to get the work done as per best Engineering
 Handling the testing & commissioning of the services
IMPORTANT PROJECTS DONE:-
• Commercial wiring and installation project of BSNL ltd. Ground +3 Floors
•Residential wiring projects of Pune corporation Ground + Mezzanine + 5 Floors
•wiring and installation projects of Pune University Ground +1
•Industrial HVAC Project of Finolex Cable ltd. Ground
IT SKILLS & LANGUAGE FLUENCY
• Programming: C, C++, assembly level languages. • English, Arabic, Hindi, Urdu & Marathi
• Office Applications: MS Office,MS Excel
•Basic Knowledge of PLC
•MATLAB Basic
•Basic Knowledge of AutoCAD.
References :-
1) MOHAMED ABDUL RAHMAN SIDDIQUI
Sr. Project Engineer (Infrastructure-Design Division)
KEO International Consultants
Doha, Qatar.
2) MOHAMED RIZWAN SIDDIQUI Sr.
Mechanical Engineer (MEP) KEO
International Consultants Doha,
Qatar
ilyas-MEP CV

ilyas-MEP CV

  • 1.
    To, The Manager Human ResourceDepartment APPLICATION FOR THE POST OF “ELECTRICAL ENGINEER” Dear Sir, I Would like to apply myself for the Post of “ Electrical Engineer “ having 5 Years of comprehensive experience in Execution of MEP Projects,Electrical Wiring And Installation, BMS, HVAC Projects, and Cable Tray system/services in different projects of low & high rise buildings, where I have been employed in Valence Trading And Contracting Doha Qatar. I have electrical contractor license and supervisory license issued by Govt. of India PWD I wish to submit you here with the copy of my resume in the belief that there exists a vacancy & looking forward towards a fruitful & meaningful association in your esteemed organization with an assurance of high quality of work while putting in my abilities & best efforts towards the organization’s Objectives. Herewith I am forwarding my brief resume for your kind perusal & if I am a suitable choice to serve your organization, I Could be present for an interview with all my testimonials. Awaiting your positive reply. Thanks and Regards MOHD ILYAS KHAN,  Mob: +91 9730234132/+918856068212  Email: ilyas31372@gmail.com/er.ilyas38@gmail.com Skype: ilyas31372
  • 2.
    CURRICULUM VITAE MOHD ILYASKHAN ZAFAR KHAN Bachelor of Electrical Engineer(E.E.P.) Pune-India Mob :+91 9730234132/+918856068212 Email :- ilyas31372@gmail.com,er.ilyas38@gmail.com Skype ID: ilyas31372 CAREER OBJECTIVE Geared up with ambition, skills & attitude to embark upon a new professional career in technology. PERSONAL PROFILE KEY STRENGHTS  Analytical  Problem- solving  Team- player  Task- oriented  Self-motivated, enthusiastic and diligent Engineering Graduate with strong technical knowledge on Electrical, Electronics & Power Engineering.   Possesses good analytical ability and decent track-record of academic achievements.   Driven by passion for technology & excellence, strongly believes in unflinching commitment towards achieving set goals/objectives.   Quick learner with an ability to adapt well to new situations with perseverance & patience. Good communication skills, team skills & sense of humouradds to the personal. ACADEMIC ACHEIVMENTS .Bachelor of Engineering PES College of Engineering 2012 72.26% (DISTINCTION) (Electrical, Electronics & Power) BAMU, AURANGABAD (Maharashtra) .Diploma In Electrical Engineering Government Polytechnic Khamgaon 2008 67% (FIRST CLASS) MSBTE Mumbai .Holding electrical supervisor Issued by PWD license and electrical contractor (Public work department) of India License PROJECTS & PRESENTATIONS “MANUFACTURING & TESTING OF CAPACITIVE VOLTAGE TRANSFORMER” (B.E. Final Year)  A Capacitive Voltage Transformer of 11kv is developed on the concept of co-axial cylindrical capacitors bank.   This technique is used for the first time in the world for manufacturing of CVT.   Technique considerably reduced the physical dimensions of CVT, obtain low-cost & maintenance free CVT.  It is considered big achievement in power sector to get CVT based on simplified technology.  Team Members: 5 • Duration: 8 weeks
  • 3.
    AWARDS & ACCOLADES Appreciated by HVESI(High Voltage Engineering Society of India) for developing indigenous CVT Technique.   Appreciated & encouraged by Dr. D.V. Ray & Mr. S.D. Mukharjee:-advised to Patent the Technique.   Articles & Write-ups on successful development of 11kv CVT published in various English, Marathi & Urdu Dailies.  Awarded Certificate of Participation at National Level Technical Paper Presentation.    PROFESSIONAL RESPONSIBILITIES    Managing the team for good and quality productivity of output in Electrical execution systems on site.   Check / review Contractor's shop drawings for all electrical works, including coordination with all the electrical, mechanical, specialist disciplines of the project and with all the regulatory requirements   Implement the contract documents requirements, such as design drawings, specifications, Bill of Quantities (B.O.Q.) contract conditions, etc. on site.    Review / check and recommend the correct completedprogress percentages of all electrical activities to the Resident Engineer.    Check, review and approve all electrical materials submittals, proposals, calculations and samples.   Inform Senior Engineer and Head of Electrical dept. immediately if any serious incident occurs which could affect the safety, stability, serviceability, adjacent structures whether in the short or long term. If appropriate, instruct emergency procedures to avoid accidental damage   Check quality of all electrical works to ensure compliance with the contract specification requirements, method statements and approvals.
  • 4.
    CURRENT EMPLOYMENT DETAILS Company:Pragati Electrical Enterprises (Class-1 Govt. Contractor) Designation: Project Engineer Duration: From 25 April 2015 to Till Present Job Profile:-  To report to the Director about the project.   Handling Industrial and Govt. Projects MEP, Maintenance and Installation and Commissioning.   To check the project drawings and find out the comments from the consultant.   To rectify the comments as per the site engineer before starting the project if any.   To arrange the documents for material submittals and submit to the consultant.   To attend all meetings related to the projects and report to the director.   To make work progress report and submit to concern consultant.   To carry out the BMS(Building Management System) projects.   Responsible for testing and commissioning of automation system.   Review and preparation of the inspection and test plan, inspection checklist and methods statement for electrical (Low, Medium, and High Voltage Power Distribution System) and instrumentation and control submitted by subcontractor.   Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage Electrical Power Distribution.   Responsible for methodical and systematic routine Material Receiving Inspection, Site Acceptance Testing and Final Inspection of electrical and instrumentation erections and installations.   Conduct vendor inspection of equipment prior to release on site and Review of Factory Acceptance  Test reports and manufacturer’s Quality Control documents.
  • 5.
    PROFESSIONAL GULF EXPERIENCE Company:Valence Trading and Contracting Qatar Designation: Site Electrical Engineer Duration: From 22 Sept. 2013 to 22 April 2015 Job Profile:-  To check the project drawings and find out the comments from the consultant.  To rectify the comments as per the site visit before starting the project if any.  To arrange the documents for material submittals and submit to the consultant.  To take out the quantity of required materials for the electrical work.  Make order and LPO for the materials and send to the suppliers for RFQ.  Prepare the bills and quotation of all electrical materials and equipment.  Arrange all the material at site, Man power and all necessary equipments.  To start the work as per the drawings.  To handle the man power on site and perform supervision of electrical works.  To make work progress report and submit to concern Manager.  Report directly to General Manager .  To carry out the HVAC projects and install and repair of all types of AC.  To carry out the Residential, Commercial and industrial wirings.  To carry out the BMS(Building Management System) projects.  Responsible for testing and commissioning of automation system.  Review and preparation of the inspection and test plan, inspection checklist and methods statement for electrical (Low, Medium, and High Voltage Power Distribution System) and instrumentation and control submitted by subcontractor.  Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage Electrical Power Distribution.  Responsible for methodical and systematic routine Material Receiving Inspection, Site Acceptance Testing and Final Inspection of electrical and instrumentation erections and installations.
  • 6.
     Conduct vendor inspectionof equipment prior to release on site and Review of Factory Acceptance Test reports and manufacturer’s Quality Control documents.   Interpretation and application of electrical and instrumentation engineering schematics, single line diagram, plans, isometrics, assembly drawing, hook up and instrument loop diagrams. Review the Project Quality Plans, shop drawings, project standards and engineering specifications to ensure efficient execution of works  Responsible for execution and monitoring of approved Quality Plan in the field of electrical and instrumentation.    Coordinate with engineering, client and sub-contractors representative on daily basis to resolve any quality problems or issues.  Conduct site supervision, surveillance, issuance of Quality Control Instruction and Non Important Projects Done:- 1) Qatar General Insurance Company Barwa Ground+4 Floors MEP Project 2) Vtce Office Barwa 1 Floor MEP Project 3) Qatar Petrolium Offices(BBI) West Bay 1 Floor(P3) Electrical Work 4) Ali Bin Ali and Partner 3 Floor MEP project 5) Supreme Council Qatar 2 Floor Electrical Work 6) Qatar First Bank 3 Floor MEP Project 7) Anti Doping Laboratory For FIFA world Cup Ground+3 MEP Project 8) Qatar Chemical Company In Dafna ,Qatar Ground+8 Floor MEP Project These all projects Fast Track Projects.
  • 7.
    PREVIOUS EXPERIENCE 1) COMPANY:- - Icon Electricals Aurangabad. From:-15 th July 2012 to 10 th Sept. 2013.(15Months) DESIGNATION: - Site Engineer. Job Profile:  To carry out the given project within the given time with expected quality of works.  Prepare the bills and quotation of all electrical materials and equipment.  To handle the man power on site and perform supervision of electrical works.  To carry out the HVAC projects and install and repair of all types of AC.  To carry out the Residential, Commercial and industrial wirings.  To carry out the BMS(Building Management System) projects.  Responsible for testing and commissioning of automation system.  Review and preparation of the inspection and test plan, inspection checklist and methods statement for electrical (Low, Medium, and High Voltage Power Distribution System) and instrumentation and control submitted by subcontractor.  Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage Electrical Power Distribution.  Responsible for methodical and systematic routine Material Receiving Inspection, Site Acceptance Testing and Final Inspection of electrical and instrumentation erections and installations.  Conduct vendor inspection of equipment prior to release on site and Review of Factory Acceptance Test reports and manufacturer’s Quality Control documents.  Interpretation and application of electrical and instrumentation engineering schematics, single line diagram, plans, isometrics, assembly drawing, hook up and instrument loop diagrams. Review the Project Quality Plans, shop drawings, project standards and engineering specifications to ensure efficient execution of works  Responsible for execution and monitoring of approved Quality Plan in the field of electrical and instrumentation.   Coordinate with engineering, client and sub-contractors representative on daily basis to resolve any quality problems or issues.  Conduct site supervision, surveillance, issuance of Quality Control Instruction and Non
  • 8.
    2) Pragati ElectricalsEnterprises India Duration : 20 th Aug 2008 to 26 th June 2009(10Months). Designation : Site Engineer Job Profile:-  Trouble shooting & fault finding of various machines.  Inspection, testing and calibration of instruments.  Maintenance / Repairs of lighting issues.   Carried out EMS project and customized the daily, weekly, monthly & yearly Electrical Energy Consumption Reports.  Monitoring and trouble shooting of fault  Maintenance and servey of all types of motors.  Wiring and installation of industries.  Responsible for monitoring and checking site installations performed by subcontractors to ensure its adherence to the drawings and specifications.  Handle the tasks of monitoring the development of installation and update the report to senior electrical engineers.  Checking all terminations of control cables as per drawings.  Ensure that the delivered material prior to placing them in the stores, are in accordance with specification.  Monitor Business performance by undertaking audits as directed ,Monitoring inspection reports and other project generated information and produce reports to senior management  Daily activity reports with the status of the site and familiar with the inspection reports with check sheets  Plan and implement research methodology and procedures to apply principles of electrical theory to engineering projects.  Perform the tasks of maintaining drawing registers, drawing files as well as site filing system  Assigns and coordinates work to Drafters, Designers, and Engineers  Liaise with clients and design department on installation details and design issues.  Perform detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications.  Perform the tasks of preparing defect schedules as well as ensure correction of the same  Handle the tasks of supporting senior level site engineers in complex commissioning of electrical equipment  Closely monitoring the project activities as per the approved MEP program of work in Order to complete the project before time & as per project specifications, Clients Satisfaction.  Replying all the RFI’s from the contractors to get the work done as per best Engineering  Handling the testing & commissioning of the services IMPORTANT PROJECTS DONE:- • Commercial wiring and installation project of BSNL ltd. Ground +3 Floors •Residential wiring projects of Pune corporation Ground + Mezzanine + 5 Floors •wiring and installation projects of Pune University Ground +1 •Industrial HVAC Project of Finolex Cable ltd. Ground
  • 9.
    IT SKILLS &LANGUAGE FLUENCY • Programming: C, C++, assembly level languages. • English, Arabic, Hindi, Urdu & Marathi • Office Applications: MS Office,MS Excel •Basic Knowledge of PLC •MATLAB Basic •Basic Knowledge of AutoCAD. References :- 1) MOHAMED ABDUL RAHMAN SIDDIQUI Sr. Project Engineer (Infrastructure-Design Division) KEO International Consultants Doha, Qatar. 2) MOHAMED RIZWAN SIDDIQUI Sr. Mechanical Engineer (MEP) KEO International Consultants Doha, Qatar