SlideShare a Scribd company logo
1 of 5
Download to read offline
1/5
RESUME OF MOHAMMAD JASHIM UDDIN
Mailing Address:
Mohammad Jashim Uddin
House # 35(5th Floor-East Side), Road # 7, Block # C
Banasree, Rampura, Dhaka-1219, Bangladesh
Cell Phone: +88-01711-430529, +88-01755-203411
Skype ID: Jashim94201
e-mail: jashim94201@gmail.com, jashim.pgcb@yahoo.com
xen1-mmm400kvtlp@pgcb.org.bd
Message:
I have an excellent footstep in multiple project implementations in power sector by turnkey or EPC
contractor. Infrastructure development is the key of economic upliftment of any nation, without
which a country can’t reach to the goal of prosperity. Again use of trained/experienced human
resources for execution & supervision of development projects is the key of successful
implementation of any project i.e infrastructure development. Now I am working in power
transmission utility as an Executive Engineer (Manager) in the project implementation division. I have
a gorgeous milestone for role playing in multiple project which had completed. Our project
implementation team had completed a multiple project which amount was US$ 103.50 million where
we had constructed 107 km four ckt 132 kV transmission line (TL), extended of capacity of 5 nos
existing 230/132 kV substations (SS) (each 225 MVA), 4 nos new 132/33 kV AIS SS (each 150 MVA),
extended a 132/33 kV SS (300 MVA) & constructed a new 132/33 kV GIS SS (84 MVA). I have also an
experience on ERS system. Now our project team has started a new multiple project which name is
Matarbari-Madunaghat-Meghnaghat 400 kV Transmission Line (MMM 400 kV TL) Project. The
estimated cost of this project is US$ 731.23 million where have 314 km double ckt 400 kV TL, a
400/230/132 kV AIS, a 400/230 kV GIS, a 230/132 kV GIS & recruitment of consultant for this project. I
have handle several turnkey contractors like Siemens, ABB, KEC, CCC, Hyosung, Lg-Sejon, CCC-ETERN
& other subcontractors. I am a mid level key person of my organization. I can apply my knowledge in
practical field whatsoever has achieved from my completed project.
I have also an excellent experience record in power station operation & maintenance in electrical and
mechanical in both sides and Power plant management skills.
Carrier Summary
Total Job Length: Around 15 years
 Job-2:
Name of Organization: Power Grid Company of Bangladesh (PGCB) Ltd. www.pgcb.org.bd.
Job Length: 11 years.
I have joined in this organization on 16/03/2005. It is my second job which is Government
own power transmission utility. From the beginning I have been working in project
implementation division to till date. At first I posted as an Assistant Engineer (Assistant
Manager). In the mid time, I had been promoted as a Sub-Divisional Engineer (Deputy
Manager) in the same division. Again I have been promoted as an Executive Engineer
(Manager) in the same division.
2/5
My Responsibility in PGCB:
 To coordinate feasibility study, IEE, EIA, RAP.
 To make estimation of proposed work & coordinate to prepare DPP.
 To take clearance from the sponsoring ministry for substation land acquisition.
 To take initial process for substation land from DC Office.
 To take NoC from DC office, forest department, River authority, R&H, railway for TL etc.
 To take clearance from DoE.
 To send DPP including all necessary papers to planning ministry through power ministry.
 To taking approval of DPP from ECNEC of planning ministry.
 To prepare bid document (one envelope two stage method) for turnkey contractor (EPC).
 To prepare of bid document (EOI & RFP) for consultant & floating the tender notice.
 To evaluate of bid documents, notification award, contract negotiation, contract signing.
 To take necessary activity for design & drawing approval.
 To make bar chart/Schedule for completing the project in contractual time frame.
 To make tentative disbursement schedule for the FY.
 To ensure the quality of civil works of SS/TL related foundation works, building & road.
 To ensure the quality of erection/installation electrical equipment, structure & tower.
 To ensure the quality of stringing of TL conductor, OPGW, sky wire.
 To ensure the quality of control, power cable termination.
 To ensure the quality of 132 kV XLPE power cable termination & jointing.
 To make all kinds of reports such as monthly, quarterly, half yearly & yearly.
 To attend in the progress meeting held in HOPE, Power Ministry & ERD.
 To attend in the progress meeting with development partner like WB, ADB, JICA etc.
 To certify of Progress Invoice & delegate financial rules.
 To mitigate RoW problems for TL.
 To perform pre-commissioning test, finally commissioning test & run the system.
 To complete punch list/any defects during the defect liability period.
 To handover the substation & transmission line to the O&M division.
 To take necessary process for issuing CC(TOC) & OAC(FAC)
 To prepare all kinds of correspondence, note sheet for any kind of approval.
 To make minutes of meeting.
 To keeping all kinds of necessary documents in respective files.
 To make PCR of the project.
 Job-1:
Name of Organization: Summit Power Company Ltd. (SPCL). www.summitpower.org.
Job Length: 3 years + 8 months.
After graduating of my B.Sc. in Electrical & Electronic Engineering, at first I joined in Summit
Power Company Ltd on 01/06/2001 as a Shift Engineer i.e. Shift In-Charge of Power Plant
under O&M division. Its previous name was United Summit Power Company Ltd. It was 11
MW power generating station. There were 4 nos CATERPILLAR Gas Engine where 3 nos set
model was G3616 of each production capacity was 3871 kW & rest one set model was G3516
which production capacity was 1040 kW. There was 11/33 kV, 35 MVA power Transformer in
switch yard. I left SPCL on 28/02/2005.
3/5
My Responsibility in SPCL:
 Responsible for the safe & economic “Operation and Management” of the plant as a shift engineer
(In-charge of the shift designated shift).
 Before starting the shift operation, checked all machineries of the power plant.
 To check log book, shift diary what was happed during the previous shift and what type of
corrective measures were taken.
 During my shift, any trouble came, such as engine, radiator, transformer, breaker, LT switchgear,
that time initiated corrective measures & have to solve the trouble.
 Monitoring Spare parts, inventory control.
 Normally power plant was run in grid mode with the grid system parameters, if grid system failed,
then according to our power station capacity, one by one generator were started according local
utility requirements, that time generator was run by island mode according to local utility load
demand. If power plant frequency was lower that time informed local utility to cut their few load.
When frequency was very high that time informed local utility to increased their load. It was very
much difficult job to maintain system frequency because of less power (not larger power produce),
always monitor the system parameters. When grid was ready, then all generator breakers were
opened. Grid voltage & frequency were imported by 11kV switchgear through power transformer
and one by one generator were synchronized with imported 11 kV, national grid frequency.
 Maintained shift dairy.
Educational Achievement:
Sl.
No.
Name of the Certificate
Or Exam Title
Name of Board or University
Passing
year
Division
or Class
Result
or CGPA
1. B.Sc in Electrical &
Electronic Engineering
Dhaka University of Engineering &
Technology (DUET), www:duet.ac.bd
Former Name was Bangladesh
Institute of Technology (BIT), Dhaka
2001
First
Class
3.31
out
of 4
2. Diploma in Electrical
Engineering
Comilla Polytechnic Institute under
BTEB, www:bteb.gov.bd
1994
First
Division
72.90%
3. SSC in Science Group Govt. Laboratory High School under
Comilla, www.comillaboard.gov.bd
1991
First
Division
65.90%
Training Summary:
Sl.No. Name of the Course Training Institute Country Duration Year
1. Environmental Impact
Assessment (EIA)
Power Cell Power Division,
MoPEMR
Bangladesh 3 Days 2015
2. Project Management Bangladesh Institute of
Management
Bangladesh 1 Week 2015
3. Public Procurement & Reform
Project
IMED, Ministry of Planning
Bangladesh 2 Weeks 2014
4. Design of Tower & Foundation M/s. KEC Ltd., India Bangladesh 2 Weeks 2013
5. Project Management Skills for
Projects Engineers
National Academy for
Planning and Development
Bangladesh 2 Weeks 2012
6. Group Training Course in
Electrical System Engineering
Tohoko Electric Power
Company
Japan 5 Weeks 2009
7. Short Training on Substation
Design and Construction
M/s. Nippon KOEI, Japan Bangladesh 1 Week 2007
8. Project Training Course M/s. ABB India, Ltd. Bangladesh 2 Days 2005
4/5
9. CATERPILLAR “G3600LB Gas
Engines
M/s. CATERPILLAR ASIA
PACIFIC, Singapore
Bangladesh 1 Week 2003
10. Introduction to ISO
9001:2000” & “Internal Quality
Auditing
M/s. Quality Links
International, Pakistan Bangladesh 2 Weeks 2002
Language Proficiency:
Name of Language Speaking Reading Writing Listening
English Excellent Excellent Excellent Excellent
Bengali Excellent Excellent Excellent Excellent
Hindi Little bit - - Understand
Computer Skills:
Operating System: Win 98/200, Win XP, Windows 2007
Programming Languages: C/C++, FORTRAN (12 years ago)
Hardware Application Software: Assembling, Trouble Shooting of PC and all
all types of Software installation.
Application of Software: MS Office Application, Auto CAD, Visual Basic, Power Point, Internet Browsing,
online Assessment, MS Project, Adobe Illustrator, Adobe Photo-shop, Paint.
Extra Activities:
Play cricket, football, bally ball, table tennis & badminton; traveling, cultural activities, leasing song etc.
Engineering Membership:
Membership No. 20244
Name of the Institution: Institute Engineers Bangladesh
Driving License:
I can drive & applying for license
Personal Information:
Name : Mohammad Jashim Uddin Present Address:
Father’s Name : Md. Abdul Latif House – 35 (5th floor-east side),
Road – 7, Block – C, Banasree,
Rampura, Dhaka-1219, Bangladesh
Mother’s Name : Feroza Begum
Date of Birth : 1st October 1976
Blood Group : O+
Gender : Male Permanent Address:
Passport No. : BA 0561845 Village : Elahabad, Post
Office:Elahabad Bazar, Upazila
:Debidwar, District: Comilla,
Bangladesh
Marital Status : Married
Religion : Islam
Nationality : Bangladeshi by Birth
5/5
Reference:
1. Name of Referred Person : Engr. Md. Yeakub Elahi Chowdhury
Designation : Project Director & Superintending Engineer
Name of the Project : Dhaka-Chittagong Main Power Grid Strengthening (Matarbari-Madunaghat-
Meghnaghat 400 kV T/L Line) Project
Name of the Organization: PGCB
Mobile No. : +880-1711-644858
e-mail: Yec120@yahoo.com
Address: NLDC Bhaban (9th Floor), PGCB, Aftab Nagar, Badda, Dhaka-1212, Bangladesh
Relation : Professional
2. Name of Referred Person: Engr. Mrinal Kanti Paul
Designation: Project Director & Superintending Engineer
Name of the Project: Barisal-Bhola-Burhanuddin 230 kV Transmission Line Project
Name of the Organization: PGCB
Mobile No. : +880-1711-430526
e-mail : paul.pgcb@yahoo.com
Address : NLDC Bhaban (8th Floor), PGCB, Aftabnagar, Rampura, Dhaka-1219, Bangladesh
Relation: Professional
3. Name of Referred Person : Engr. Md. Mozammel Hossain
Designation: Deputy Managing Director, Summit Power Ltd.
: Managing Director, Summit Purbancol Power Com. Ltd’
Mobile No.: +880-1755-550065
e-mail: mozammel@summitpower.org
Address: Summit Centre, 18 Kawran Bazar C/A, Dhaka-1215, Bangladesh
Relation: Professional
(Mohammad Jashim Uddin)

More Related Content

What's hot

MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeBokam Divakar
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 

What's hot (20)

New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Resume-Sagar-1
Resume-Sagar-1Resume-Sagar-1
Resume-Sagar-1
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
NIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CVNIZAM UDDIN UPDATED CV
NIZAM UDDIN UPDATED CV
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
Athavulla new resume
Athavulla new resumeAthavulla new resume
Athavulla new resume
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 

Viewers also liked

Como crear Gafas 3 d caseras
Como crear Gafas 3 d caserasComo crear Gafas 3 d caseras
Como crear Gafas 3 d caserasDenisse Lozada
 
EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI
 EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI
EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSIFundacion Progreso y Salud
 
Presentation final Amadou December 2016
Presentation final Amadou December 2016Presentation final Amadou December 2016
Presentation final Amadou December 2016Amadou SY
 
Evolucion del Derecho laboral colectivo en venezuela.
Evolucion del Derecho laboral colectivo en venezuela. Evolucion del Derecho laboral colectivo en venezuela.
Evolucion del Derecho laboral colectivo en venezuela. Lisbella Páez
 
Multimedia Presentation and Authoring
Multimedia Presentation and AuthoringMultimedia Presentation and Authoring
Multimedia Presentation and AuthoringTamanna Sehgal
 
Object oriented testing
Object oriented testingObject oriented testing
Object oriented testingHaris Jamil
 
Discuss the rationale for Ireland’s decision to join
Discuss the rationale for Ireland’s decision to joinDiscuss the rationale for Ireland’s decision to join
Discuss the rationale for Ireland’s decision to joinseamus burke
 
Mobilitas kelas baru di dunia industri pariwisata
Mobilitas kelas baru di dunia industri pariwisataMobilitas kelas baru di dunia industri pariwisata
Mobilitas kelas baru di dunia industri pariwisata0003037202
 
7 claves para refinar la mirada
7 claves para refinar la mirada7 claves para refinar la mirada
7 claves para refinar la miradameadows42
 
IAU-gorgna Pr No.3
IAU-gorgna Pr No.3IAU-gorgna Pr No.3
IAU-gorgna Pr No.3Eng. QaSeMy
 
Power rodajoc 8-04-2016
Power rodajoc 8-04-2016Power rodajoc 8-04-2016
Power rodajoc 8-04-2016IngridBP
 
Beyond you and me (inspirations and wisdom for building community)
Beyond you and me (inspirations and wisdom for building community)Beyond you and me (inspirations and wisdom for building community)
Beyond you and me (inspirations and wisdom for building community)Ridwan Bakare
 

Viewers also liked (18)

A crise do socialismo
A crise do socialismoA crise do socialismo
A crise do socialismo
 
Informatica educativa
Informatica educativaInformatica educativa
Informatica educativa
 
Como crear Gafas 3 d caseras
Como crear Gafas 3 d caserasComo crear Gafas 3 d caseras
Como crear Gafas 3 d caseras
 
Oeschle
OeschleOeschle
Oeschle
 
EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI
 EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI
EECC en proyectos europeos y aspectos prácticos a tener en cuenta - JSI
 
Presentation final Amadou December 2016
Presentation final Amadou December 2016Presentation final Amadou December 2016
Presentation final Amadou December 2016
 
Comercio.1.8
Comercio.1.8Comercio.1.8
Comercio.1.8
 
Evolucion del Derecho laboral colectivo en venezuela.
Evolucion del Derecho laboral colectivo en venezuela. Evolucion del Derecho laboral colectivo en venezuela.
Evolucion del Derecho laboral colectivo en venezuela.
 
Multimedia Presentation and Authoring
Multimedia Presentation and AuthoringMultimedia Presentation and Authoring
Multimedia Presentation and Authoring
 
Object oriented testing
Object oriented testingObject oriented testing
Object oriented testing
 
ostad kool
ostad koolostad kool
ostad kool
 
Oc pdf
Oc pdfOc pdf
Oc pdf
 
Discuss the rationale for Ireland’s decision to join
Discuss the rationale for Ireland’s decision to joinDiscuss the rationale for Ireland’s decision to join
Discuss the rationale for Ireland’s decision to join
 
Mobilitas kelas baru di dunia industri pariwisata
Mobilitas kelas baru di dunia industri pariwisataMobilitas kelas baru di dunia industri pariwisata
Mobilitas kelas baru di dunia industri pariwisata
 
7 claves para refinar la mirada
7 claves para refinar la mirada7 claves para refinar la mirada
7 claves para refinar la mirada
 
IAU-gorgna Pr No.3
IAU-gorgna Pr No.3IAU-gorgna Pr No.3
IAU-gorgna Pr No.3
 
Power rodajoc 8-04-2016
Power rodajoc 8-04-2016Power rodajoc 8-04-2016
Power rodajoc 8-04-2016
 
Beyond you and me (inspirations and wisdom for building community)
Beyond you and me (inspirations and wisdom for building community)Beyond you and me (inspirations and wisdom for building community)
Beyond you and me (inspirations and wisdom for building community)
 

Similar to Resume of Mohammad Jashim Uddin

ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdAritra Ghosh
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM Gowthaman V
 
Electrical technician
Electrical technicianElectrical technician
Electrical techniciantanweer alam
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLBISWAJYOTI SWAIN
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentationSomejit Chakraborty
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV GULMOHAMMED IBRAHIM
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerjohn britto
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur ResumeRita Thakur
 

Similar to Resume of Mohammad Jashim Uddin (20)

ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
vikas resume
vikas resumevikas resume
vikas resume
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur Resume
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
CV
CVCV
CV
 
Srikanth Kulkarni CV
Srikanth Kulkarni CVSrikanth Kulkarni CV
Srikanth Kulkarni CV
 

More from Jashim Pd-2

RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016Jashim Pd-2
 
Experience Certificate
Experience CertificateExperience Certificate
Experience CertificateJashim Pd-2
 
Experience certificate
Experience certificateExperience certificate
Experience certificateJashim Pd-2
 
Educational certificate
Educational certificateEducational certificate
Educational certificateJashim Pd-2
 
Educational certificate diploma engineering jashim
Educational certificate diploma engineering jashimEducational certificate diploma engineering jashim
Educational certificate diploma engineering jashimJashim Pd-2
 
Educational certificate ssc jashim
Educational certificate ssc jashimEducational certificate ssc jashim
Educational certificate ssc jashimJashim Pd-2
 
Fl any company sj
Fl any company sjFl any company sj
Fl any company sjJashim Pd-2
 

More from Jashim Pd-2 (7)

RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Experience Certificate
Experience CertificateExperience Certificate
Experience Certificate
 
Experience certificate
Experience certificateExperience certificate
Experience certificate
 
Educational certificate
Educational certificateEducational certificate
Educational certificate
 
Educational certificate diploma engineering jashim
Educational certificate diploma engineering jashimEducational certificate diploma engineering jashim
Educational certificate diploma engineering jashim
 
Educational certificate ssc jashim
Educational certificate ssc jashimEducational certificate ssc jashim
Educational certificate ssc jashim
 
Fl any company sj
Fl any company sjFl any company sj
Fl any company sj
 

Recently uploaded

办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一F La
 
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)obuhobo
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一Fs sss
 
How to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfHow to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfmayank158542
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackSuhani Kapoor
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012sapnasaifi408
 
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Suhani Kapoor
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...shivangimorya083
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...Suhani Kapoor
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...
VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...
VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...Suhani Kapoor
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证obuhobo
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...Suhani Kapoor
 

Recently uploaded (20)

办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
 
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
阿德莱德大学本科毕业证成绩单咨询(书英文硕士学位证)
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 
How to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfHow to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdf
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
 
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...
VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...
VIP Russian Call Girls in Bhilai Deepika 8250192130 Independent Escort Servic...
 
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
 

Resume of Mohammad Jashim Uddin

  • 1. 1/5 RESUME OF MOHAMMAD JASHIM UDDIN Mailing Address: Mohammad Jashim Uddin House # 35(5th Floor-East Side), Road # 7, Block # C Banasree, Rampura, Dhaka-1219, Bangladesh Cell Phone: +88-01711-430529, +88-01755-203411 Skype ID: Jashim94201 e-mail: jashim94201@gmail.com, jashim.pgcb@yahoo.com xen1-mmm400kvtlp@pgcb.org.bd Message: I have an excellent footstep in multiple project implementations in power sector by turnkey or EPC contractor. Infrastructure development is the key of economic upliftment of any nation, without which a country can’t reach to the goal of prosperity. Again use of trained/experienced human resources for execution & supervision of development projects is the key of successful implementation of any project i.e infrastructure development. Now I am working in power transmission utility as an Executive Engineer (Manager) in the project implementation division. I have a gorgeous milestone for role playing in multiple project which had completed. Our project implementation team had completed a multiple project which amount was US$ 103.50 million where we had constructed 107 km four ckt 132 kV transmission line (TL), extended of capacity of 5 nos existing 230/132 kV substations (SS) (each 225 MVA), 4 nos new 132/33 kV AIS SS (each 150 MVA), extended a 132/33 kV SS (300 MVA) & constructed a new 132/33 kV GIS SS (84 MVA). I have also an experience on ERS system. Now our project team has started a new multiple project which name is Matarbari-Madunaghat-Meghnaghat 400 kV Transmission Line (MMM 400 kV TL) Project. The estimated cost of this project is US$ 731.23 million where have 314 km double ckt 400 kV TL, a 400/230/132 kV AIS, a 400/230 kV GIS, a 230/132 kV GIS & recruitment of consultant for this project. I have handle several turnkey contractors like Siemens, ABB, KEC, CCC, Hyosung, Lg-Sejon, CCC-ETERN & other subcontractors. I am a mid level key person of my organization. I can apply my knowledge in practical field whatsoever has achieved from my completed project. I have also an excellent experience record in power station operation & maintenance in electrical and mechanical in both sides and Power plant management skills. Carrier Summary Total Job Length: Around 15 years  Job-2: Name of Organization: Power Grid Company of Bangladesh (PGCB) Ltd. www.pgcb.org.bd. Job Length: 11 years. I have joined in this organization on 16/03/2005. It is my second job which is Government own power transmission utility. From the beginning I have been working in project implementation division to till date. At first I posted as an Assistant Engineer (Assistant Manager). In the mid time, I had been promoted as a Sub-Divisional Engineer (Deputy Manager) in the same division. Again I have been promoted as an Executive Engineer (Manager) in the same division.
  • 2. 2/5 My Responsibility in PGCB:  To coordinate feasibility study, IEE, EIA, RAP.  To make estimation of proposed work & coordinate to prepare DPP.  To take clearance from the sponsoring ministry for substation land acquisition.  To take initial process for substation land from DC Office.  To take NoC from DC office, forest department, River authority, R&H, railway for TL etc.  To take clearance from DoE.  To send DPP including all necessary papers to planning ministry through power ministry.  To taking approval of DPP from ECNEC of planning ministry.  To prepare bid document (one envelope two stage method) for turnkey contractor (EPC).  To prepare of bid document (EOI & RFP) for consultant & floating the tender notice.  To evaluate of bid documents, notification award, contract negotiation, contract signing.  To take necessary activity for design & drawing approval.  To make bar chart/Schedule for completing the project in contractual time frame.  To make tentative disbursement schedule for the FY.  To ensure the quality of civil works of SS/TL related foundation works, building & road.  To ensure the quality of erection/installation electrical equipment, structure & tower.  To ensure the quality of stringing of TL conductor, OPGW, sky wire.  To ensure the quality of control, power cable termination.  To ensure the quality of 132 kV XLPE power cable termination & jointing.  To make all kinds of reports such as monthly, quarterly, half yearly & yearly.  To attend in the progress meeting held in HOPE, Power Ministry & ERD.  To attend in the progress meeting with development partner like WB, ADB, JICA etc.  To certify of Progress Invoice & delegate financial rules.  To mitigate RoW problems for TL.  To perform pre-commissioning test, finally commissioning test & run the system.  To complete punch list/any defects during the defect liability period.  To handover the substation & transmission line to the O&M division.  To take necessary process for issuing CC(TOC) & OAC(FAC)  To prepare all kinds of correspondence, note sheet for any kind of approval.  To make minutes of meeting.  To keeping all kinds of necessary documents in respective files.  To make PCR of the project.  Job-1: Name of Organization: Summit Power Company Ltd. (SPCL). www.summitpower.org. Job Length: 3 years + 8 months. After graduating of my B.Sc. in Electrical & Electronic Engineering, at first I joined in Summit Power Company Ltd on 01/06/2001 as a Shift Engineer i.e. Shift In-Charge of Power Plant under O&M division. Its previous name was United Summit Power Company Ltd. It was 11 MW power generating station. There were 4 nos CATERPILLAR Gas Engine where 3 nos set model was G3616 of each production capacity was 3871 kW & rest one set model was G3516 which production capacity was 1040 kW. There was 11/33 kV, 35 MVA power Transformer in switch yard. I left SPCL on 28/02/2005.
  • 3. 3/5 My Responsibility in SPCL:  Responsible for the safe & economic “Operation and Management” of the plant as a shift engineer (In-charge of the shift designated shift).  Before starting the shift operation, checked all machineries of the power plant.  To check log book, shift diary what was happed during the previous shift and what type of corrective measures were taken.  During my shift, any trouble came, such as engine, radiator, transformer, breaker, LT switchgear, that time initiated corrective measures & have to solve the trouble.  Monitoring Spare parts, inventory control.  Normally power plant was run in grid mode with the grid system parameters, if grid system failed, then according to our power station capacity, one by one generator were started according local utility requirements, that time generator was run by island mode according to local utility load demand. If power plant frequency was lower that time informed local utility to cut their few load. When frequency was very high that time informed local utility to increased their load. It was very much difficult job to maintain system frequency because of less power (not larger power produce), always monitor the system parameters. When grid was ready, then all generator breakers were opened. Grid voltage & frequency were imported by 11kV switchgear through power transformer and one by one generator were synchronized with imported 11 kV, national grid frequency.  Maintained shift dairy. Educational Achievement: Sl. No. Name of the Certificate Or Exam Title Name of Board or University Passing year Division or Class Result or CGPA 1. B.Sc in Electrical & Electronic Engineering Dhaka University of Engineering & Technology (DUET), www:duet.ac.bd Former Name was Bangladesh Institute of Technology (BIT), Dhaka 2001 First Class 3.31 out of 4 2. Diploma in Electrical Engineering Comilla Polytechnic Institute under BTEB, www:bteb.gov.bd 1994 First Division 72.90% 3. SSC in Science Group Govt. Laboratory High School under Comilla, www.comillaboard.gov.bd 1991 First Division 65.90% Training Summary: Sl.No. Name of the Course Training Institute Country Duration Year 1. Environmental Impact Assessment (EIA) Power Cell Power Division, MoPEMR Bangladesh 3 Days 2015 2. Project Management Bangladesh Institute of Management Bangladesh 1 Week 2015 3. Public Procurement & Reform Project IMED, Ministry of Planning Bangladesh 2 Weeks 2014 4. Design of Tower & Foundation M/s. KEC Ltd., India Bangladesh 2 Weeks 2013 5. Project Management Skills for Projects Engineers National Academy for Planning and Development Bangladesh 2 Weeks 2012 6. Group Training Course in Electrical System Engineering Tohoko Electric Power Company Japan 5 Weeks 2009 7. Short Training on Substation Design and Construction M/s. Nippon KOEI, Japan Bangladesh 1 Week 2007 8. Project Training Course M/s. ABB India, Ltd. Bangladesh 2 Days 2005
  • 4. 4/5 9. CATERPILLAR “G3600LB Gas Engines M/s. CATERPILLAR ASIA PACIFIC, Singapore Bangladesh 1 Week 2003 10. Introduction to ISO 9001:2000” & “Internal Quality Auditing M/s. Quality Links International, Pakistan Bangladesh 2 Weeks 2002 Language Proficiency: Name of Language Speaking Reading Writing Listening English Excellent Excellent Excellent Excellent Bengali Excellent Excellent Excellent Excellent Hindi Little bit - - Understand Computer Skills: Operating System: Win 98/200, Win XP, Windows 2007 Programming Languages: C/C++, FORTRAN (12 years ago) Hardware Application Software: Assembling, Trouble Shooting of PC and all all types of Software installation. Application of Software: MS Office Application, Auto CAD, Visual Basic, Power Point, Internet Browsing, online Assessment, MS Project, Adobe Illustrator, Adobe Photo-shop, Paint. Extra Activities: Play cricket, football, bally ball, table tennis & badminton; traveling, cultural activities, leasing song etc. Engineering Membership: Membership No. 20244 Name of the Institution: Institute Engineers Bangladesh Driving License: I can drive & applying for license Personal Information: Name : Mohammad Jashim Uddin Present Address: Father’s Name : Md. Abdul Latif House – 35 (5th floor-east side), Road – 7, Block – C, Banasree, Rampura, Dhaka-1219, Bangladesh Mother’s Name : Feroza Begum Date of Birth : 1st October 1976 Blood Group : O+ Gender : Male Permanent Address: Passport No. : BA 0561845 Village : Elahabad, Post Office:Elahabad Bazar, Upazila :Debidwar, District: Comilla, Bangladesh Marital Status : Married Religion : Islam Nationality : Bangladeshi by Birth
  • 5. 5/5 Reference: 1. Name of Referred Person : Engr. Md. Yeakub Elahi Chowdhury Designation : Project Director & Superintending Engineer Name of the Project : Dhaka-Chittagong Main Power Grid Strengthening (Matarbari-Madunaghat- Meghnaghat 400 kV T/L Line) Project Name of the Organization: PGCB Mobile No. : +880-1711-644858 e-mail: Yec120@yahoo.com Address: NLDC Bhaban (9th Floor), PGCB, Aftab Nagar, Badda, Dhaka-1212, Bangladesh Relation : Professional 2. Name of Referred Person: Engr. Mrinal Kanti Paul Designation: Project Director & Superintending Engineer Name of the Project: Barisal-Bhola-Burhanuddin 230 kV Transmission Line Project Name of the Organization: PGCB Mobile No. : +880-1711-430526 e-mail : paul.pgcb@yahoo.com Address : NLDC Bhaban (8th Floor), PGCB, Aftabnagar, Rampura, Dhaka-1219, Bangladesh Relation: Professional 3. Name of Referred Person : Engr. Md. Mozammel Hossain Designation: Deputy Managing Director, Summit Power Ltd. : Managing Director, Summit Purbancol Power Com. Ltd’ Mobile No.: +880-1755-550065 e-mail: mozammel@summitpower.org Address: Summit Centre, 18 Kawran Bazar C/A, Dhaka-1215, Bangladesh Relation: Professional (Mohammad Jashim Uddin)