SlideShare a Scribd company logo
1 of 4
Download to read offline
MUHAMMAD ABDUL REHMAN
(SADARA) SAUDI ARAMCO APPROVED LEAD QA/QC ENGINEER/ SUPERVISOR (E&I)
Number: SDL/BLDG A-SAD/ESEC-L-0949
Experience in Oil & Gas/ MEP U.A.E: 6 Years K.S.A 2 Years
Offshore Experience: Das Island 2Years & Sarb North & South Artificial Islands 1 Year
TOTAL EXPERIENCE: 8+ Years (Present Location Dubai U.A.E)
Have Valid U.A.E/K.S.A Driving License (U.A.E Contact–00971-557390065)
E-mail: marehman86@hotmail.com
LEAD QA/QC ENGINEER/ SUPERVISOR (E&I)
PERSONAL PROFILE
Father’s Name : HAJI MUHAMMAD ASHRAF
Date of Birth : 09-June-1986
Religion : Islam
Nationality : Pakistani
N. I. C. No : 34202-3239962-7
Passport No : CF9159622
Experience Summary :
A multidimensional professional with 8+ years experience. Adequate experience of working in Process Industries, Oil and
Gas, E.P.C, Power, M.E.P and other project management facets of engineering field. Core competence in Electrical,
Instrumentation, Mechanical/ Plumbing and Quality control/Quality assurance.
LAST EMPLOYER
Most recently I was working with Sharqawi Contractor Co. as an acting (QA/QC Manager)/ Lead Qa/Qc Engineer for
SADRA SDL Building Project Package (A & B) in Jubail K.S.A (From 22-Feb-2015 to 25-Aug-2016).
OWNER: - SAUDI ARAMCO & DOW CHEMICAL AMERICA
PROJECS HISTORY
ÿ I have been worked with (AL-HASSAN ENGINEERING ABU DHBI L.L.C) as an (In-charge/Lead Engineer QA/QC E&I)
Position for SATAH AL-RAZBOOT FIELD DEV. Project Offshore at the Artificial North & South Islands.
ÿ I have worked with (AL-HASSAN ENGINEERING ABU DHBI L.L.C as an (In-charge/Lead Engineer Qa/Qc E&I) Position for
an EPC Gasco Client Project ( Ruwais –Surge Drum Protection and Battery limit ESD Valves) in Abu Dhabi UAE
(From 11-Sep-2013 to 20-Dec-2014)
MAIN CONTRACTOR: - PETROFAC (UAE), OWNER: - ADMA/OPCO
MAIN CONTRACTOR: - Al-Hassan Engineering Abu Dhbai L.L.C
OWNER: - GASCO UAE
ÿ I have successfully completed my responsibilities as a QA/QC ELECTRICAL & INSTRUMENTATION ENGINEER with
Descon Engineering on project Integrated Gas Development
(IGD HABSHAN-5) Abu Dhabi UAE.
CLIENT: JJC Japan Gas Company, OWNER: - GASCO UAE
POSITION: - QA/QC Engineer Electrical & Instrumentation from 4
th
Jul, 2011 to 1st Jan, 2012.
ÿ I have also worked with Descon Engineering UAE on Project, ASU (Air Separating Unit for Nitrogen Generation) Mirfa
and Elixier 2.
CLIENT: - Linde German, OWNER: - Elixier GASCO UAE.
POSITION: - Lead QA/QC Engineer E&I (From 26
th
Aug 2010 to 3
rd
July 2011).
ÿ I have worked with Descon Engineering in (OFFSHORE ASSOCIATED GASES) PKG-1 DAS ISLAND Abu Dhabi.
ÿ I have successfully completed my duties as a QA/QC Electrical Engineer with ETA Emirates Technical Associates M&E
Division for the construction of UAE 1st 7 STAR HOSPITAL PROJECT which was named as CCAD CLEVELAND
CLINIC ABU DHABI.
MAIN CONTRACTOR: - SAMSUNG & SIX CONSTRUCT, OWNER: - ALDAR
PROJECT MANAGER: - JACOBS PROJECT DESIGNER AECOM, PROJECT CONSULTANT
POSITION: - QA/QC Engineer Electrical, FROM 14, FEB 2012 TO 04, AUG 2013.
TRAININGS/ CERTIFICATIONS
ÿ Successfully attended and completed Lead Auditor ISO 9001: 2015 QMS (Quality Management System)
training from (SGS Switzerland) held in regional office Islamabad Pakistan.
ÿ Tropical Basic Offshore Safety Induction & Emergency Training (TBOSIET – OPITO APPROVD) & Basic H2S Training
(OPITO APPROVD) from Emirates Technical & Safety Development Centre.
ÿ HSE Training from Descon Engineering Pakistan.
ÿ HSE Training from Descon Engineering U.A.E.
ÿ HSE Training (Work on Height, Confined Space Work) from Descon Engineering Das Island (U.A.E).
ÿ HSE Training To Work At Height, Confined Space, Hydrogen Sulphide Environment
From Mepi Technip (U.A.E)
ÿ HSE Training To Work At Height, Confined Space, H2s Hydrogen Sulphide Environment
ÿ From ADGAS Das Island (U.A.E).
ÿ HSE Training of IIF (Incident and injury Free) from Descon Engineering and JGC on IGD-5 Process Plant Habshan Abu
Dhabi UAE.
KEY RESPOSIBILITIES
ÿ Responsible for submission of all MEP & E&I MS (Method Statements) ITP’S Inspection Test Plan as per Project
specification and relevant international codes/ Standards up to final approval/code.
ÿ Responsible for attending Weekly/Monthly Progress meetings in order to discuss and agreeing to resolve Qa/Qc &
Construction issues for better project progress and positive outcomes.
ÿ Responsible to maintain Qa/Qc weekly/ Monthly progress report, NCR, Surveillance, MS, ITP Logs.
ÿ Deliver technical support/guidance to inspectors for filed inspections, NCR, Surveillance and punch list closure activities.
ÿ Interacted with Sub-contractor /client/QC dept. on any start of new activities for prior approval to move forward.
ÿ Responsible for the Completion of Construction (E&I & MEP) QVD’S Check Sheets “A” and assist Pre-Commissioning
team for Check Sheets-B closeout further to review and submission of M/C dossier/ MCPN.
ÿ Achieved targets and milestones in time by commissioning substation and process plant.
ÿ Responsible for developing PQP and QIP/ ITP from specification to meet project quality inspection requirements.
ÿ Responsible for raising and closing TQ, NCR, CAR and Proactive / Surveillance
ÿ Responsible for daily monitoring of site activity along area supervisors with safety analyses measure.
ÿ Assisting pre-commissioning and commissioning team with vendor for any technical/manpower Issues.
ÿ Sufficient conception and working knowledge of ISO and Quality Management System.
ÿ Responsible for raising and closing TQ, NCR, CAR and Proactive / Surveillance.
ÿ Responsible for reviewing all MEP & E&I Material Approval Requests (MAR), also responsible for all E&I Material
Inspections FAT & SAT as per Project Specification and client requirement before Material Dispatching.
ÿ Responsible to review As Built/Red Mark Drawings as per site Modifications.
ÿ Responsible for Successful preparation of Mechanical Test Packages and Instrument Loop folders preparation and Loop
testing.
ÿ Responsible for all stage inspections with related to approved ITP’s and following up to clear punch points.
ÿ Managing people, equipment resources and organizing crew changes.
ÿ Having good understanding and Professional working knowledge of NEC, IEEE, ANSI and NEMA in various Oil and Gas
as well as in MEP.
ÿ Good understanding of Saudi Aramco Engineering Standards in order to enactment on site work.
ÿ Responsible to conduct internal company Audit in order to measure the implementation of ISO requirements and
accordingly made preparation for Client and third-party Audit for better Quality outputs.
ÿ Responsible for generating and getting approval of all Project Field Design Change, RFC & RFV requests as per site
design requirement.
ÿ Responsible for all project area job closure as per priority and client requirement.
ÿ Responsible to attend Weekly Progress all area walkthrough along with Client/ Contractor PM, CM, Site engineers and
area in charges.
PROFESSIONAL & HAND EXPERIENCE SUMMARY IN ELECTRICAL:
Handling Fiber optical cable testing using OTDR, splicing/jointing of FO cables.
Responsible for Cable laying, dressing and tagging inspections of LV, MV and HV cables as per AFC Cable Route Index
and cable schedule.
Responsible for the Inspection of complete Electrical and Instrument Earthing System, Earthing cable Installation, Cad
welds and Testing.
Responsible for the Inspection and testing of Lighting and small power and Lighting Pole installation works.
Installation inspection and Insulation Resistance IR/Continuity testing of three phase Motor winding.
Responsible for the Installation and final Inspection of LVDB’S installation.
Responsible for Cable Tray/Ladder inspections prior to cable Installation.
Responsible for the Inspection of LV, MV and HV cable testing, like Insulation Resistance test, Continuity test and HIPOT
test before and after cable termination.
Responsible for the Installation Inspection of 132 kV, 22 kV, 11kV & 415V Distribution Network.
Installation inspections and testing of LV and MV Bus Bars with micro ohm meter.
Installation Inspection of LV and MV Transformers.
Installation Inspection of 33kv single bus bar and double bus bar SF-6 insulated Switchgears and Bus Bar testing using
PROGRAMA 600A.
PROFESSIONAL & HAND EXPERIENCE SUMMARY (INSTRUMENTATION):
Responsible for calibration and Final installation inspections of all field instruments like Temperature transmitter, Pressure
transmitter, level transmitter, Flow transmitter, Delta pilot level transmitter, magnetic flow transmitter pressure indicator
temperature transmitter, anti-surge valve, solenoid valve, Control valve and Resistance Temperature Detectors (RTD’S).
Handling Fiber optical cable testing by using OTDR, splicing/jointing of single mode and multi-mode FO cables.
Responsible for the Inspection of all type process Instrument like FT, PT, LT, TT, PDT, Control Valve, On-Off valve,
Solenoid Valve, PSV’, SRV’s and others.
Insulation resistance (IR) and Continuity testing of all type of instrument cables.
Final Installation Inspection of analyzer container, equipment container.
Responsible for troubleshooting and maintenance of all field instruments in commissioning phase.
Cause and effect inspection of fire and gas detectors like H2, O2,SD,HD,VESDA PANNELS, GDS, GDT, GDR BGU’S and
FD’S.
Responsible for the Installation Inspection of Process & Security CCTV System, Public Address General Alarm System,
Telephony System and LAN/WAN network System.
Installation inspection of perforated, GRP and ladder cable trays.
Material approval from Clint and incoming material inspection as per project specification and approval.
Inspection for cable laying of fiber optic cables, instrument cables and electrical cables.
Check and maintain E&I work Status record of all site Mech. Elec. & Instr. activities.
Verification and Pre inspection of RFI’s and also preparation of weekly/monthly QC reports.
ÿ EXPERIENCE IN MEP (Hospital/ Commercial Building/ Where houses/ Power Hub Buildings
1) ASU (Air Separating Unit for Nitrogen Generation) Mirfa 1 and Elixier 2.
2) CCAD CLEVELAND CLINIC ABU DHABI UAE 1st 7 STAR HOSPITAL PROJECT
3) SDL BUILDING SADARA PROJECT JUBAIL K.S.A
ÿ Responsibilities as Acting Qa/Qc Manager
(QC Team, 12 Nos. MEP Inspectors)
Electrical:
Overall responsible for Electrical, Instrumentation and Mechanical QC Team to conduct inspections for following execution
activities:
Electrical cables, installation, Glanding, Termination, IR/Continuity and HIPOT testing.
Installation inspection of DB’S, CAPCITOR BANK AND INVERTOR PANELS.
Installation inspection of telecom rack, cat-3 cat-6 cable.
Installation inspection and testing of NOVEC system for LV, HV and Transformer rooms.
Inspection for all Electrical and ELV services like Power, EMCS, PMCS FIRE & ALRM and TELECOM prior to gypsum
wall closure.
Installation inspection of all types containments like trunking, cable Ladder /Tray.
Installation inspection of normal lighting emergency lighting systems.
Installation inspection and testing of EARTHING PIT’S (Individual Earth Rod & with Earthling Networks).
DG’S, LV Switchgear’s and MCC Cable Torquing & Termination.
Responsible for the installation and final cause and effect testing of Complete Fire and Alarm system.
Responsible for the installation and final Inspections of Complete Telecom and Antenna Control system.
Mechanical:
Overall responsible for Mechanical QC Team to conduct following Piping, HVAC, WELDING and PAINTING inspections
for all Mechanical site execution activities:
Fit-Up, welding and Hydro testing Inspection of Chilled Water, Portable water and Fire water piping.
Chilled water Piping Supply and (Return) Punch List Prior to Hydro.
Chilled Water Piping (Supply) Review of Test Pack.
Installation inspection for fire dampers.
Installation inspection for supply and return air duct.
Duct Light Testing/Leak Test for Supply and return Ducts.
Welding inspection of SS spool battery limit interface spool and fire hydrant SS spool.
Welding inspection of SS Spool SS-PIV Tiser spool.
Primer Coat Inspection for Chilled Water Line.
Third Party (Sigma) Testing for Painting of Above Ground Chilled Water Piping System.
v PROFESSIONAL EDUCATION
Bachelor of Technology (Electronics): (Attested from Saudi Culture and Embassy)
Preston Kohat University Islamabad Campus Pak in 2008.
QUALIFICATION IN IT
ÿ Project Control System (PROCeSs) Certificate from Descon Engineering in 2008 (2 weeks).
ÿ Diploma in computer hardware and networking from Nice-World College of information and technology (3 months).
ÿ Diploma in office automation from Apex College of information and technology in 2006 (3 months).
ÿ Diploma in English language from Apex College of information and technology in 2006 (3 months).
LANGUAGE SKILLS:
ENGLISH, URDU, PUNJABI & BASIC ARABIC

More Related Content

What's hot

Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorM.ZUBAIR KHAN
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineerIram shahzad khan
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSanad Samir
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)PIYUSHKUMAR PRAJAPATI
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Gary Dickson
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CVMuhammad Nouman
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cvKarthi keyan
 

What's hot (20)

Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Updated cv
Updated cvUpdated cv
Updated cv
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Resume E&I
Resume E&IResume E&I
Resume E&I
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 

Similar to Updated CV Lead QAQC Engineer Acting QaQc Manager

Similar to Updated CV Lead QAQC Engineer Acting QaQc Manager (20)

FILTHER RIEOALEX
FILTHER RIEOALEXFILTHER RIEOALEX
FILTHER RIEOALEX
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
E&I QC ENGINEER
E&I QC ENGINEERE&I QC ENGINEER
E&I QC ENGINEER
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISOR
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
M Imran
M ImranM Imran
M Imran
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
Abid hussain qaiser
Abid hussain qaiserAbid hussain qaiser
Abid hussain qaiser
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
Adil Ahmad
Adil AhmadAdil Ahmad
Adil Ahmad
 

Updated CV Lead QAQC Engineer Acting QaQc Manager

  • 1. MUHAMMAD ABDUL REHMAN (SADARA) SAUDI ARAMCO APPROVED LEAD QA/QC ENGINEER/ SUPERVISOR (E&I) Number: SDL/BLDG A-SAD/ESEC-L-0949 Experience in Oil & Gas/ MEP U.A.E: 6 Years K.S.A 2 Years Offshore Experience: Das Island 2Years & Sarb North & South Artificial Islands 1 Year TOTAL EXPERIENCE: 8+ Years (Present Location Dubai U.A.E) Have Valid U.A.E/K.S.A Driving License (U.A.E Contact–00971-557390065) E-mail: marehman86@hotmail.com LEAD QA/QC ENGINEER/ SUPERVISOR (E&I) PERSONAL PROFILE Father’s Name : HAJI MUHAMMAD ASHRAF Date of Birth : 09-June-1986 Religion : Islam Nationality : Pakistani N. I. C. No : 34202-3239962-7 Passport No : CF9159622 Experience Summary : A multidimensional professional with 8+ years experience. Adequate experience of working in Process Industries, Oil and Gas, E.P.C, Power, M.E.P and other project management facets of engineering field. Core competence in Electrical, Instrumentation, Mechanical/ Plumbing and Quality control/Quality assurance. LAST EMPLOYER Most recently I was working with Sharqawi Contractor Co. as an acting (QA/QC Manager)/ Lead Qa/Qc Engineer for SADRA SDL Building Project Package (A & B) in Jubail K.S.A (From 22-Feb-2015 to 25-Aug-2016). OWNER: - SAUDI ARAMCO & DOW CHEMICAL AMERICA PROJECS HISTORY ÿ I have been worked with (AL-HASSAN ENGINEERING ABU DHBI L.L.C) as an (In-charge/Lead Engineer QA/QC E&I) Position for SATAH AL-RAZBOOT FIELD DEV. Project Offshore at the Artificial North & South Islands. ÿ I have worked with (AL-HASSAN ENGINEERING ABU DHBI L.L.C as an (In-charge/Lead Engineer Qa/Qc E&I) Position for an EPC Gasco Client Project ( Ruwais –Surge Drum Protection and Battery limit ESD Valves) in Abu Dhabi UAE (From 11-Sep-2013 to 20-Dec-2014) MAIN CONTRACTOR: - PETROFAC (UAE), OWNER: - ADMA/OPCO MAIN CONTRACTOR: - Al-Hassan Engineering Abu Dhbai L.L.C OWNER: - GASCO UAE ÿ I have successfully completed my responsibilities as a QA/QC ELECTRICAL & INSTRUMENTATION ENGINEER with Descon Engineering on project Integrated Gas Development (IGD HABSHAN-5) Abu Dhabi UAE. CLIENT: JJC Japan Gas Company, OWNER: - GASCO UAE POSITION: - QA/QC Engineer Electrical & Instrumentation from 4 th Jul, 2011 to 1st Jan, 2012. ÿ I have also worked with Descon Engineering UAE on Project, ASU (Air Separating Unit for Nitrogen Generation) Mirfa and Elixier 2. CLIENT: - Linde German, OWNER: - Elixier GASCO UAE. POSITION: - Lead QA/QC Engineer E&I (From 26 th Aug 2010 to 3 rd July 2011). ÿ I have worked with Descon Engineering in (OFFSHORE ASSOCIATED GASES) PKG-1 DAS ISLAND Abu Dhabi.
  • 2. ÿ I have successfully completed my duties as a QA/QC Electrical Engineer with ETA Emirates Technical Associates M&E Division for the construction of UAE 1st 7 STAR HOSPITAL PROJECT which was named as CCAD CLEVELAND CLINIC ABU DHABI. MAIN CONTRACTOR: - SAMSUNG & SIX CONSTRUCT, OWNER: - ALDAR PROJECT MANAGER: - JACOBS PROJECT DESIGNER AECOM, PROJECT CONSULTANT POSITION: - QA/QC Engineer Electrical, FROM 14, FEB 2012 TO 04, AUG 2013. TRAININGS/ CERTIFICATIONS ÿ Successfully attended and completed Lead Auditor ISO 9001: 2015 QMS (Quality Management System) training from (SGS Switzerland) held in regional office Islamabad Pakistan. ÿ Tropical Basic Offshore Safety Induction & Emergency Training (TBOSIET – OPITO APPROVD) & Basic H2S Training (OPITO APPROVD) from Emirates Technical & Safety Development Centre. ÿ HSE Training from Descon Engineering Pakistan. ÿ HSE Training from Descon Engineering U.A.E. ÿ HSE Training (Work on Height, Confined Space Work) from Descon Engineering Das Island (U.A.E). ÿ HSE Training To Work At Height, Confined Space, Hydrogen Sulphide Environment From Mepi Technip (U.A.E) ÿ HSE Training To Work At Height, Confined Space, H2s Hydrogen Sulphide Environment ÿ From ADGAS Das Island (U.A.E). ÿ HSE Training of IIF (Incident and injury Free) from Descon Engineering and JGC on IGD-5 Process Plant Habshan Abu Dhabi UAE. KEY RESPOSIBILITIES ÿ Responsible for submission of all MEP & E&I MS (Method Statements) ITP’S Inspection Test Plan as per Project specification and relevant international codes/ Standards up to final approval/code. ÿ Responsible for attending Weekly/Monthly Progress meetings in order to discuss and agreeing to resolve Qa/Qc & Construction issues for better project progress and positive outcomes. ÿ Responsible to maintain Qa/Qc weekly/ Monthly progress report, NCR, Surveillance, MS, ITP Logs. ÿ Deliver technical support/guidance to inspectors for filed inspections, NCR, Surveillance and punch list closure activities. ÿ Interacted with Sub-contractor /client/QC dept. on any start of new activities for prior approval to move forward. ÿ Responsible for the Completion of Construction (E&I & MEP) QVD’S Check Sheets “A” and assist Pre-Commissioning team for Check Sheets-B closeout further to review and submission of M/C dossier/ MCPN. ÿ Achieved targets and milestones in time by commissioning substation and process plant. ÿ Responsible for developing PQP and QIP/ ITP from specification to meet project quality inspection requirements. ÿ Responsible for raising and closing TQ, NCR, CAR and Proactive / Surveillance ÿ Responsible for daily monitoring of site activity along area supervisors with safety analyses measure. ÿ Assisting pre-commissioning and commissioning team with vendor for any technical/manpower Issues. ÿ Sufficient conception and working knowledge of ISO and Quality Management System. ÿ Responsible for raising and closing TQ, NCR, CAR and Proactive / Surveillance. ÿ Responsible for reviewing all MEP & E&I Material Approval Requests (MAR), also responsible for all E&I Material Inspections FAT & SAT as per Project Specification and client requirement before Material Dispatching. ÿ Responsible to review As Built/Red Mark Drawings as per site Modifications. ÿ Responsible for Successful preparation of Mechanical Test Packages and Instrument Loop folders preparation and Loop testing. ÿ Responsible for all stage inspections with related to approved ITP’s and following up to clear punch points. ÿ Managing people, equipment resources and organizing crew changes.
  • 3. ÿ Having good understanding and Professional working knowledge of NEC, IEEE, ANSI and NEMA in various Oil and Gas as well as in MEP. ÿ Good understanding of Saudi Aramco Engineering Standards in order to enactment on site work. ÿ Responsible to conduct internal company Audit in order to measure the implementation of ISO requirements and accordingly made preparation for Client and third-party Audit for better Quality outputs. ÿ Responsible for generating and getting approval of all Project Field Design Change, RFC & RFV requests as per site design requirement. ÿ Responsible for all project area job closure as per priority and client requirement. ÿ Responsible to attend Weekly Progress all area walkthrough along with Client/ Contractor PM, CM, Site engineers and area in charges. PROFESSIONAL & HAND EXPERIENCE SUMMARY IN ELECTRICAL: Handling Fiber optical cable testing using OTDR, splicing/jointing of FO cables. Responsible for Cable laying, dressing and tagging inspections of LV, MV and HV cables as per AFC Cable Route Index and cable schedule. Responsible for the Inspection of complete Electrical and Instrument Earthing System, Earthing cable Installation, Cad welds and Testing. Responsible for the Inspection and testing of Lighting and small power and Lighting Pole installation works. Installation inspection and Insulation Resistance IR/Continuity testing of three phase Motor winding. Responsible for the Installation and final Inspection of LVDB’S installation. Responsible for Cable Tray/Ladder inspections prior to cable Installation. Responsible for the Inspection of LV, MV and HV cable testing, like Insulation Resistance test, Continuity test and HIPOT test before and after cable termination. Responsible for the Installation Inspection of 132 kV, 22 kV, 11kV & 415V Distribution Network. Installation inspections and testing of LV and MV Bus Bars with micro ohm meter. Installation Inspection of LV and MV Transformers. Installation Inspection of 33kv single bus bar and double bus bar SF-6 insulated Switchgears and Bus Bar testing using PROGRAMA 600A. PROFESSIONAL & HAND EXPERIENCE SUMMARY (INSTRUMENTATION): Responsible for calibration and Final installation inspections of all field instruments like Temperature transmitter, Pressure transmitter, level transmitter, Flow transmitter, Delta pilot level transmitter, magnetic flow transmitter pressure indicator temperature transmitter, anti-surge valve, solenoid valve, Control valve and Resistance Temperature Detectors (RTD’S). Handling Fiber optical cable testing by using OTDR, splicing/jointing of single mode and multi-mode FO cables. Responsible for the Inspection of all type process Instrument like FT, PT, LT, TT, PDT, Control Valve, On-Off valve, Solenoid Valve, PSV’, SRV’s and others. Insulation resistance (IR) and Continuity testing of all type of instrument cables. Final Installation Inspection of analyzer container, equipment container. Responsible for troubleshooting and maintenance of all field instruments in commissioning phase. Cause and effect inspection of fire and gas detectors like H2, O2,SD,HD,VESDA PANNELS, GDS, GDT, GDR BGU’S and FD’S. Responsible for the Installation Inspection of Process & Security CCTV System, Public Address General Alarm System, Telephony System and LAN/WAN network System. Installation inspection of perforated, GRP and ladder cable trays. Material approval from Clint and incoming material inspection as per project specification and approval. Inspection for cable laying of fiber optic cables, instrument cables and electrical cables. Check and maintain E&I work Status record of all site Mech. Elec. & Instr. activities. Verification and Pre inspection of RFI’s and also preparation of weekly/monthly QC reports.
  • 4. ÿ EXPERIENCE IN MEP (Hospital/ Commercial Building/ Where houses/ Power Hub Buildings 1) ASU (Air Separating Unit for Nitrogen Generation) Mirfa 1 and Elixier 2. 2) CCAD CLEVELAND CLINIC ABU DHABI UAE 1st 7 STAR HOSPITAL PROJECT 3) SDL BUILDING SADARA PROJECT JUBAIL K.S.A ÿ Responsibilities as Acting Qa/Qc Manager (QC Team, 12 Nos. MEP Inspectors) Electrical: Overall responsible for Electrical, Instrumentation and Mechanical QC Team to conduct inspections for following execution activities: Electrical cables, installation, Glanding, Termination, IR/Continuity and HIPOT testing. Installation inspection of DB’S, CAPCITOR BANK AND INVERTOR PANELS. Installation inspection of telecom rack, cat-3 cat-6 cable. Installation inspection and testing of NOVEC system for LV, HV and Transformer rooms. Inspection for all Electrical and ELV services like Power, EMCS, PMCS FIRE & ALRM and TELECOM prior to gypsum wall closure. Installation inspection of all types containments like trunking, cable Ladder /Tray. Installation inspection of normal lighting emergency lighting systems. Installation inspection and testing of EARTHING PIT’S (Individual Earth Rod & with Earthling Networks). DG’S, LV Switchgear’s and MCC Cable Torquing & Termination. Responsible for the installation and final cause and effect testing of Complete Fire and Alarm system. Responsible for the installation and final Inspections of Complete Telecom and Antenna Control system. Mechanical: Overall responsible for Mechanical QC Team to conduct following Piping, HVAC, WELDING and PAINTING inspections for all Mechanical site execution activities: Fit-Up, welding and Hydro testing Inspection of Chilled Water, Portable water and Fire water piping. Chilled water Piping Supply and (Return) Punch List Prior to Hydro. Chilled Water Piping (Supply) Review of Test Pack. Installation inspection for fire dampers. Installation inspection for supply and return air duct. Duct Light Testing/Leak Test for Supply and return Ducts. Welding inspection of SS spool battery limit interface spool and fire hydrant SS spool. Welding inspection of SS Spool SS-PIV Tiser spool. Primer Coat Inspection for Chilled Water Line. Third Party (Sigma) Testing for Painting of Above Ground Chilled Water Piping System. v PROFESSIONAL EDUCATION Bachelor of Technology (Electronics): (Attested from Saudi Culture and Embassy) Preston Kohat University Islamabad Campus Pak in 2008. QUALIFICATION IN IT ÿ Project Control System (PROCeSs) Certificate from Descon Engineering in 2008 (2 weeks). ÿ Diploma in computer hardware and networking from Nice-World College of information and technology (3 months). ÿ Diploma in office automation from Apex College of information and technology in 2006 (3 months). ÿ Diploma in English language from Apex College of information and technology in 2006 (3 months). LANGUAGE SKILLS: ENGLISH, URDU, PUNJABI & BASIC ARABIC