Overview of Presentation :-
What is Secant Pile
Where it is applicable
Construction sequence
Problems in construction
Advantages and Disadvantages
24-01-2020 3
What is Secant Pile:-
Secant pile walls are formed by constructing intersecting reinforced
concrete piles.
The secant piles are reinforced with either steel rebar or with steel beams
and are constructed by either drilling under mud or auguring.
Primary piles are installed first.
Secondary piles will construct between the primary piles with overlap.
24-01-2020 4
Where it is applicable:-
Generally secant piles are used as earth retaining structure for Deep
foundations.
In these conditions, for deep borings and with the existence of
groundwater level, diaphragm walls and secant pile walls are the only
feasible retaining earth.
Secant pile walls are usually used in hard ground, where it is not possible
to install diaphragm walls, and in rocks, and it is technically possible to
install secant pile walls in a extensive range of grounds.
24-01-2020 5
Application areas of Secant Piles:-
 Underground Metros and Parking Garages
 Basement Construction
 Cut and cover Tunnels
 Dam Construction
 Waterfront Structures
 Developments that need to maximize space right up to property boundaries
 Projects where excessive vibration will create dangerous soil disturbance
 Urban sites that can’t accommodate large construction areas
 Sites or soil conditions that cannot accommodate heavy specialized equipment
 Hard and Rocky soil conditions
 Wet soil conditions
24-01-2020 6
Construction sequence:-
 Guide Wall construction :-
• Setting of Co-ordinates by Surveyor.
• Steel template of Guide wall to be placed.
• Nominal reinforcement to be placed and concrete.
24-01-2020 7
Construction sequence:-
 Boring of Secant Pile:-
• Integrated Piling Rig used for boring.
• MS liner casing driven into bored hole.
• Polymer slurry/Bentonite slurry, those used in foundation
drilled shafts, create a polymer/Bentonite gel membrane
that serves as the barrier between the slurry and soil.
• Reinforcement cage lowering.
• Concrete pouring by tremie pipe.
24-01-2020 8
Construction sequence:-
24-01-2020 9
Construction sequence:-
24-01-2020 10
Problems in Construction:-
 Collapse/Caving of soil
• Excessive water in surrounding Soil.
• Properties of drilling mud deviation.
• Unknown utilities at deep levels.
 Verticality of Bore
• Faulty installation of liner.
• Mechanical problems of Integrated Rig like bends and dents in
rotary Kelly.
• Soil mix with Boulders creates displacement of boring.
 Concrete faults
• Segregation and Bleeding in concrete leads tremie choke.
• Gap in tremie pipe creates air lock.
• Collapse of soil while concrete.
24-01-2020 11
Advantages and Disadvantages:-
Advantages:-
• Increased construction alignment flexibility.
• Increased wall stiffness compared to sheet piles.
• Can be installed in difficult ground.
Disadvantages:-
• Verticality tolerances may be hard to achieve for deep piles.
• Total waterproofing is very difficult to obtain in joints.
• Increased cost compared to sheet pile walls.
24-01-2020 12
Construction of structures by Secant Pile Walls:-
Mumbai Metro – Underground StationCut and Cover Portion of Eurasia Tunnel,
Istanbul, Turkey.
24-01-2020 13
Construction of structures by Secant Pile Walls:-
Underground Metro Station, Shivaji Nagar, BMRCL Bangalore.
24-01-2020 14

More Related Content

What's hot

What's hot (20)

Grouting in Soils
Grouting in SoilsGrouting in Soils
Grouting in Soils
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Caisson
CaissonCaisson
Caisson
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
rock anchor methodology
rock anchor methodologyrock anchor methodology
rock anchor methodology
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 
Soil nailing
Soil nailing Soil nailing
Soil nailing
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Diaphragm Wall
 Diaphragm Wall Diaphragm Wall
Diaphragm Wall
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Laterally Loaded Piles
Laterally Loaded PilesLaterally Loaded Piles
Laterally Loaded Piles
 
Types of foundations
Types of foundationsTypes of foundations
Types of foundations
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 

Similar to Construction of secant piles presentation

Review Of Construction Theory.pdf
Review Of Construction Theory.pdfReview Of Construction Theory.pdf
Review Of Construction Theory.pdfIyrinJohn1
 
Distress in Pavement.pptx
Distress in Pavement.pptxDistress in Pavement.pptx
Distress in Pavement.pptxRomharshOli1
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxsfQyoom
 
Mat foundation
Mat foundationMat foundation
Mat foundationshuvo293
 
Retrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelRetrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelIRJET Journal
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptxAnanthakumar75
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)Adib Ramli
 
Defects in construction
Defects in constructionDefects in construction
Defects in constructionShivangi Saini
 
Defects in construction
Defects in construction Defects in construction
Defects in construction Aditya Sanyal
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesZaid Ansari
 
Construction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptxConstruction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptxvaibhavchaudhary7017
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
 

Similar to Construction of secant piles presentation (20)

Review Of Construction Theory.pdf
Review Of Construction Theory.pdfReview Of Construction Theory.pdf
Review Of Construction Theory.pdf
 
Distress in Pavement.pptx
Distress in Pavement.pptxDistress in Pavement.pptx
Distress in Pavement.pptx
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Mat foundation
Mat foundationMat foundation
Mat foundation
 
Final_ppt_puneeth.pptx
Final_ppt_puneeth.pptxFinal_ppt_puneeth.pptx
Final_ppt_puneeth.pptx
 
Retrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelRetrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck Level
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptx
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
Narrow Pavement Widening - Best Practices
Narrow Pavement Widening - Best PracticesNarrow Pavement Widening - Best Practices
Narrow Pavement Widening - Best Practices
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
Defects in construction
Defects in construction Defects in construction
Defects in construction
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
sustaibility.pptx
sustaibility.pptxsustaibility.pptx
sustaibility.pptx
 
Pile foundation
Pile foundation Pile foundation
Pile foundation
 
kuku.pptx
kuku.pptxkuku.pptx
kuku.pptx
 
Construction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptxConstruction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptx
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
 

More from PALLA NARASIMHUDU

Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stationsPALLA NARASIMHUDU
 
Decision making and technical feasibility
Decision making and technical feasibility  Decision making and technical feasibility
Decision making and technical feasibility PALLA NARASIMHUDU
 
Risk management large epc projects
Risk management  large epc projectsRisk management  large epc projects
Risk management large epc projectsPALLA NARASIMHUDU
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projectsPALLA NARASIMHUDU
 

More from PALLA NARASIMHUDU (6)

Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projects
 
Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stations
 
Project cost management
Project cost management Project cost management
Project cost management
 
Decision making and technical feasibility
Decision making and technical feasibility  Decision making and technical feasibility
Decision making and technical feasibility
 
Risk management large epc projects
Risk management  large epc projectsRisk management  large epc projects
Risk management large epc projects
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projects
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

Construction of secant piles presentation

  • 2. 24-01-2020 2 Overview of Presentation :- What is Secant Pile Where it is applicable Construction sequence Problems in construction Advantages and Disadvantages
  • 3. 24-01-2020 3 What is Secant Pile:- Secant pile walls are formed by constructing intersecting reinforced concrete piles. The secant piles are reinforced with either steel rebar or with steel beams and are constructed by either drilling under mud or auguring. Primary piles are installed first. Secondary piles will construct between the primary piles with overlap.
  • 4. 24-01-2020 4 Where it is applicable:- Generally secant piles are used as earth retaining structure for Deep foundations. In these conditions, for deep borings and with the existence of groundwater level, diaphragm walls and secant pile walls are the only feasible retaining earth. Secant pile walls are usually used in hard ground, where it is not possible to install diaphragm walls, and in rocks, and it is technically possible to install secant pile walls in a extensive range of grounds.
  • 5. 24-01-2020 5 Application areas of Secant Piles:-  Underground Metros and Parking Garages  Basement Construction  Cut and cover Tunnels  Dam Construction  Waterfront Structures  Developments that need to maximize space right up to property boundaries  Projects where excessive vibration will create dangerous soil disturbance  Urban sites that can’t accommodate large construction areas  Sites or soil conditions that cannot accommodate heavy specialized equipment  Hard and Rocky soil conditions  Wet soil conditions
  • 6. 24-01-2020 6 Construction sequence:-  Guide Wall construction :- • Setting of Co-ordinates by Surveyor. • Steel template of Guide wall to be placed. • Nominal reinforcement to be placed and concrete.
  • 7. 24-01-2020 7 Construction sequence:-  Boring of Secant Pile:- • Integrated Piling Rig used for boring. • MS liner casing driven into bored hole. • Polymer slurry/Bentonite slurry, those used in foundation drilled shafts, create a polymer/Bentonite gel membrane that serves as the barrier between the slurry and soil. • Reinforcement cage lowering. • Concrete pouring by tremie pipe.
  • 10. 24-01-2020 10 Problems in Construction:-  Collapse/Caving of soil • Excessive water in surrounding Soil. • Properties of drilling mud deviation. • Unknown utilities at deep levels.  Verticality of Bore • Faulty installation of liner. • Mechanical problems of Integrated Rig like bends and dents in rotary Kelly. • Soil mix with Boulders creates displacement of boring.  Concrete faults • Segregation and Bleeding in concrete leads tremie choke. • Gap in tremie pipe creates air lock. • Collapse of soil while concrete.
  • 11. 24-01-2020 11 Advantages and Disadvantages:- Advantages:- • Increased construction alignment flexibility. • Increased wall stiffness compared to sheet piles. • Can be installed in difficult ground. Disadvantages:- • Verticality tolerances may be hard to achieve for deep piles. • Total waterproofing is very difficult to obtain in joints. • Increased cost compared to sheet pile walls.
  • 12. 24-01-2020 12 Construction of structures by Secant Pile Walls:- Mumbai Metro – Underground StationCut and Cover Portion of Eurasia Tunnel, Istanbul, Turkey.
  • 13. 24-01-2020 13 Construction of structures by Secant Pile Walls:- Underground Metro Station, Shivaji Nagar, BMRCL Bangalore.