Palla Narasimhudu
ACPM L1 B7
Constructability of CMRL under metro stations of package no UAA-o4
 Scope of work: Design and construction of Underground Stations at Nehru Park, KMC
and Pachaiappas College and Associated Tunnels- UAA-04
 Client: Chennai Metro Rail Limited (CMRL)
 Contractor: L&T SUCG JV
 Consultant: EMBYE Consortium
 Type of contract: Engineering Procurement and Construction (EPC)
 Method of Construction: Top Down /Bottom up
Contents of Constructability
1. Geotechnical Investigation and Design of structures / Drawings
2. Utility diversion
3. Traffic Diversion
4. Diaphragm Wall Construction
5. Excavation
6. Roof, Concourse, Base Slab and other structures construction
1. Geotechnical Investigation and Design of Structures/Drawings
Below-ground investigation by boring, sampling, and testing the soil strata to establish its
compressibility, strength, and other characteristics likely to influence a construction project,
and prepare a subsurface profile and soil report. Also called foundation investigation, soil
investigation, soil test, or subsurface investigation. Based on this investigation test reports
Design of structures kick off.
 Design conclusions from soil Investigation
 Strut to be provide all Bottom up Excavations
 Nehru Park and Pachiappa’ s station need not required strut while excavation
 KMC station required strut while roof slab as well as base slab excavation.
 During Design process of Diaphragm wall, with or without strut considered additional
reinforcement introduced for without strut structures.
 Length of Diaphragm cage also split into two pieces by advising staggered lap with
welding
 Dewatering bore well location was finalised for ease of excavation
 For Top down construction, temporary openings were finalised
 Wherever sufficient width not available to accommodate traffic, decking proposals
and design
 Connection or Roof, concourse and Base slab with couplers levels and design criteria
 Other station structures like entry, exit, vent shafts, lifts, escalators and Ancillary
buildings all electrical and mechanical works design and drawings.
2. Utility Diversion
Trail pits planned for find out utilities, separate diversion proposal for dry and wet utilities
Based on the area availability we can planned for single stage diversion or inter change, inter
displacement method if area was restricted
In UAA-04 we adopted both methods, all dry utilities diverted in single sage, for wet utilities
both.
The following Utility Diversions shows the constructability of Diaphragm walls (Typical).
3. Traffic diversion
Major concern in underground station construction is traffic diversion, we need to
accommodate existing traffic along with construction activities
Stage vice diversion is only preferable, according to traffic diversion we aligned station
Diaphragm wall works for all three stations .Everywhere we introduced deking to with stand
the traffic
The following traffic diversion shows the achieve constructability of Diaphragm walls
(Typical)
4. Diaphragm wall construction
Diaphragm wall comes under category of deep foundation, it is continuous wall
constructed in ground to facilitate certain construction activities, such as
1. Retaining wall
2. Cut-off provision to support deep excavation
3. Final wall for basement or other underground structure such as tunnel and
shaft
4. Separating structure between major underground facilities
5. Form of foundation such as Barret pile/ Rectangular pile.
Diaphragm wall is a reinforced concrete structure constructed in-situ panel by panel,
this usually is designed at greater depth, mechanical excavation is thus employed by
grabbing/ rig machine
Sequence of activities to achieve constructability of Diaphragm walls (Typical).
5. Excavation
Ground water level is the major concern in excavation, to control /reduce the
ground water level, bore wells and its location, pump water from bore wells and
reduce and always keep the water level one meter below excavation.
Excavation of muck takes place by two methods
Bottom Up : In this method excavation will continue till the base level by providing
the strut with the help of crane and muck bucket . Concrete structure works takes
place from base to roof slab. Steel strut to be provide at different levels to with stand
soil pressure.
Bottom up Excavation is a part of constructability of station (Typical)
Top down: In this method Excavation will takes place up to Roof slab level ,then
with the help of temporary openings ,excavator will lowered and further excavation
works continued for concourse slab and same as base slab . Where ever required
strut to be provide.
6. Roof, Concourse, Base Slab and other structures construction
Once the excavation completed up to the roof slab level, structural work will complete and
get concreted. Same as per concourse and base also, in base extra water proofing will takes
place before concrete structure erupt. Along with provision for escalator pits, lift pits will also
provide at base.
For Entry and Exits same will follow as described in stations.
All inside construction activities are takes place as a part of constructability of station.
Station works under progress

More Related Content

What's hot

Modern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionModern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionStefan Lammert
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experiencegifanta
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parkingManoj Navneeth
 
Technical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone ProjectTechnical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone ProjectManzi Roger Dusabimana
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)vishal prakash
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasShantanu Patil
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportRajendra Jhurawat
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...Manoranjan Roy
 
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...IJERA Editor
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015ILIAS MICHALIS
 
Mihalis presentation final 10092011
Mihalis presentation final 10092011Mihalis presentation final 10092011
Mihalis presentation final 10092011ILIAS MICHALIS
 
Geo-Tech Studies for Longwall
Geo-Tech Studies for LongwallGeo-Tech Studies for Longwall
Geo-Tech Studies for LongwallVR M
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMVineeshkumar K V
 
Ilias Michalis PMV Workshop Dubai 2014
Ilias Michalis PMV Workshop Dubai 2014Ilias Michalis PMV Workshop Dubai 2014
Ilias Michalis PMV Workshop Dubai 2014ILIAS MICHALIS
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 
Analysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.ProAnalysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.Progsharda123
 
Accelerated Bridge Construction( ABC)
Accelerated Bridge  Construction( ABC)Accelerated Bridge  Construction( ABC)
Accelerated Bridge Construction( ABC)varun km
 
G+3 APARTMENT BUILDING PROJECT REPORT
G+3 APARTMENT BUILDING  PROJECT  REPORTG+3 APARTMENT BUILDING  PROJECT  REPORT
G+3 APARTMENT BUILDING PROJECT REPORTFresher Thinking
 

What's hot (20)

Modern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionModern fastening systems in tunnel construction
Modern fastening systems in tunnel construction
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experience
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
 
Technical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone ProjectTechnical memorandum -Senior Capstone Project
Technical memorandum -Senior Capstone Project
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly Areas
 
Metroppt
MetropptMetroppt
Metroppt
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training report
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
 
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Mihalis presentation final 10092011
Mihalis presentation final 10092011Mihalis presentation final 10092011
Mihalis presentation final 10092011
 
Geo-Tech Studies for Longwall
Geo-Tech Studies for LongwallGeo-Tech Studies for Longwall
Geo-Tech Studies for Longwall
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
 
Ilias Michalis PMV Workshop Dubai 2014
Ilias Michalis PMV Workshop Dubai 2014Ilias Michalis PMV Workshop Dubai 2014
Ilias Michalis PMV Workshop Dubai 2014
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 
Analysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.ProAnalysis and design of multi-storey building using staad.Pro
Analysis and design of multi-storey building using staad.Pro
 
Accelerated Bridge Construction( ABC)
Accelerated Bridge  Construction( ABC)Accelerated Bridge  Construction( ABC)
Accelerated Bridge Construction( ABC)
 
G+3 APARTMENT BUILDING PROJECT REPORT
G+3 APARTMENT BUILDING  PROJECT  REPORTG+3 APARTMENT BUILDING  PROJECT  REPORT
G+3 APARTMENT BUILDING PROJECT REPORT
 

Similar to Constructability of ug stations

Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptxAnanthakumar75
 
planning and development of metro systems
planning and development of metro systemsplanning and development of metro systems
planning and development of metro systemsShubhamSharma775952
 
Construction Technology
Construction TechnologyConstruction Technology
Construction TechnologySwapnilGorade1
 
NMRC Civil Construction
NMRC Civil Construction NMRC Civil Construction
NMRC Civil Construction ajinkyaraj
 
NSL General HdW.update nov09
NSL General HdW.update nov09NSL General HdW.update nov09
NSL General HdW.update nov09Hans De Wit
 
Metro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfMetro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfAshutoshRankawat
 
Metro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfMetro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfAshutoshRankawat
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridgesmukul srivastava
 
Top down construction
Top down constructionTop down construction
Top down constructionAmulya Kansal
 

Similar to Constructability of ug stations (20)

Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptx
 
planning and development of metro systems
planning and development of metro systemsplanning and development of metro systems
planning and development of metro systems
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
Shib
ShibShib
Shib
 
Connstruction engg ppt 2016
Connstruction engg ppt 2016Connstruction engg ppt 2016
Connstruction engg ppt 2016
 
NMRC Civil Construction
NMRC Civil Construction NMRC Civil Construction
NMRC Civil Construction
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
NSL General HdW.update nov09
NSL General HdW.update nov09NSL General HdW.update nov09
NSL General HdW.update nov09
 
Metro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfMetro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdf
 
Metro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdfMetro Underground civil structures and track structures AR.pdf
Metro Underground civil structures and track structures AR.pdf
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Unit 5
Unit 5Unit 5
Unit 5
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
 
JMRC TRAINING FINAL REPORT
JMRC TRAINING FINAL   REPORT JMRC TRAINING FINAL   REPORT
JMRC TRAINING FINAL REPORT
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Cofferdam
CofferdamCofferdam
Cofferdam
 

More from PALLA NARASIMHUDU

Construction of secant piles presentation
Construction of secant piles   presentationConstruction of secant piles   presentation
Construction of secant piles presentationPALLA NARASIMHUDU
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
Decision making and technical feasibility
Decision making and technical feasibility  Decision making and technical feasibility
Decision making and technical feasibility PALLA NARASIMHUDU
 
Risk management large epc projects
Risk management  large epc projectsRisk management  large epc projects
Risk management large epc projectsPALLA NARASIMHUDU
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projectsPALLA NARASIMHUDU
 

More from PALLA NARASIMHUDU (7)

Construction of secant piles presentation
Construction of secant piles   presentationConstruction of secant piles   presentation
Construction of secant piles presentation
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projects
 
Project cost management
Project cost management Project cost management
Project cost management
 
Decision making and technical feasibility
Decision making and technical feasibility  Decision making and technical feasibility
Decision making and technical feasibility
 
Risk management large epc projects
Risk management  large epc projectsRisk management  large epc projects
Risk management large epc projects
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projects
 

Recently uploaded

Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

Constructability of ug stations

  • 1. Constructability of CMRL underground Metro stations of package UAA-04 By Palla Narasimhudu ACPM L1 B7
  • 2. Constructability of CMRL under metro stations of package no UAA-o4  Scope of work: Design and construction of Underground Stations at Nehru Park, KMC and Pachaiappas College and Associated Tunnels- UAA-04  Client: Chennai Metro Rail Limited (CMRL)  Contractor: L&T SUCG JV  Consultant: EMBYE Consortium  Type of contract: Engineering Procurement and Construction (EPC)  Method of Construction: Top Down /Bottom up Contents of Constructability 1. Geotechnical Investigation and Design of structures / Drawings 2. Utility diversion 3. Traffic Diversion 4. Diaphragm Wall Construction 5. Excavation 6. Roof, Concourse, Base Slab and other structures construction 1. Geotechnical Investigation and Design of Structures/Drawings Below-ground investigation by boring, sampling, and testing the soil strata to establish its compressibility, strength, and other characteristics likely to influence a construction project, and prepare a subsurface profile and soil report. Also called foundation investigation, soil investigation, soil test, or subsurface investigation. Based on this investigation test reports Design of structures kick off.
  • 3.  Design conclusions from soil Investigation  Strut to be provide all Bottom up Excavations  Nehru Park and Pachiappa’ s station need not required strut while excavation  KMC station required strut while roof slab as well as base slab excavation.  During Design process of Diaphragm wall, with or without strut considered additional reinforcement introduced for without strut structures.  Length of Diaphragm cage also split into two pieces by advising staggered lap with welding  Dewatering bore well location was finalised for ease of excavation  For Top down construction, temporary openings were finalised  Wherever sufficient width not available to accommodate traffic, decking proposals and design  Connection or Roof, concourse and Base slab with couplers levels and design criteria  Other station structures like entry, exit, vent shafts, lifts, escalators and Ancillary buildings all electrical and mechanical works design and drawings.
  • 4. 2. Utility Diversion Trail pits planned for find out utilities, separate diversion proposal for dry and wet utilities Based on the area availability we can planned for single stage diversion or inter change, inter displacement method if area was restricted In UAA-04 we adopted both methods, all dry utilities diverted in single sage, for wet utilities both. The following Utility Diversions shows the constructability of Diaphragm walls (Typical).
  • 5.
  • 6. 3. Traffic diversion Major concern in underground station construction is traffic diversion, we need to accommodate existing traffic along with construction activities Stage vice diversion is only preferable, according to traffic diversion we aligned station Diaphragm wall works for all three stations .Everywhere we introduced deking to with stand the traffic The following traffic diversion shows the achieve constructability of Diaphragm walls (Typical)
  • 7. 4. Diaphragm wall construction Diaphragm wall comes under category of deep foundation, it is continuous wall constructed in ground to facilitate certain construction activities, such as 1. Retaining wall 2. Cut-off provision to support deep excavation 3. Final wall for basement or other underground structure such as tunnel and shaft 4. Separating structure between major underground facilities 5. Form of foundation such as Barret pile/ Rectangular pile. Diaphragm wall is a reinforced concrete structure constructed in-situ panel by panel, this usually is designed at greater depth, mechanical excavation is thus employed by grabbing/ rig machine Sequence of activities to achieve constructability of Diaphragm walls (Typical).
  • 8. 5. Excavation Ground water level is the major concern in excavation, to control /reduce the ground water level, bore wells and its location, pump water from bore wells and reduce and always keep the water level one meter below excavation. Excavation of muck takes place by two methods Bottom Up : In this method excavation will continue till the base level by providing the strut with the help of crane and muck bucket . Concrete structure works takes
  • 9. place from base to roof slab. Steel strut to be provide at different levels to with stand soil pressure. Bottom up Excavation is a part of constructability of station (Typical)
  • 10. Top down: In this method Excavation will takes place up to Roof slab level ,then with the help of temporary openings ,excavator will lowered and further excavation works continued for concourse slab and same as base slab . Where ever required strut to be provide.
  • 11. 6. Roof, Concourse, Base Slab and other structures construction Once the excavation completed up to the roof slab level, structural work will complete and get concreted. Same as per concourse and base also, in base extra water proofing will takes place before concrete structure erupt. Along with provision for escalator pits, lift pits will also provide at base. For Entry and Exits same will follow as described in stations. All inside construction activities are takes place as a part of constructability of station.