SlideShare a Scribd company logo
1 of 4
Download to read offline
SHAIK NAVEED BASHA
D-No: 18-4-44, Markendaya Street, Tenali, Guntur dist, A.P,
Email id:naveedbasha65@gmail.com
CAREER OBJECTIVE:
Looking for a suitable position in Engineering
strong technical contribution can be given for the fulfilment of organization goals along with the
development of professional skills.
ACADEMIC QUALIFICATION:
• B-Tech in Mechanical Engineering,
Andhra Pradesh, India (2009-2013)
Percentage: 67.85
• HVAC (Design and Drafting): M E P Centre, Ameerpet, Hyderabad
2013).
• Intermediate, Narayana junior college, Vijayawad
Percentage:85
• Secondary school examination,
Percentage:89
WORK EXPERIENCE:
BIOLOGICAL E LIMITED, Shameerpet,
CAPEX Projects (Process Equipments and Utilities)
Desig: Executive
Project-1(Blending suit 4):
Performed Installation and operational qualification
and took active part in their preparation
Autoclave of 1200l capacity
Project-2(Filling Line 3):
Performed Installation and operational
part in their preparation for filling machine of 20
distribution systems of capacity 5KL and flow rate of
Depyrogenation tunnel of output capacity 600
SHAIK NAVEED BASHA
treet, Tenali, Guntur dist, A.P, India, Pin code: 522201, Ph no: 91 9505907464,
Email id:naveedbasha65@gmail.com
position in Engineering/Process Design in utilities and process equipments
strong technical contribution can be given for the fulfilment of organization goals along with the
Mechanical Engineering, Jawaharlal Nehru Technological University, Kakinada(GMRIT),
2013).
M E P Centre, Ameerpet, Hyderabad, Andhra Pradesh, India
arayana junior college, Vijayawada, Andhra Pradesh, India (2007
Secondary school examination, Nehru Niketan High school, Tenali, Andhra Pradesh
, Hyderabad. (Since Dec 2013 to till date)
(Process Equipments and Utilities):
Performed Installation and operational qualification as per the approved
and took active part in their preparation for the equipments like Blending vessels of 50 Lit
Performed Installation and operational qualification as per the approved protocols and took active
illing machine of 20 viles/min capacity, Purified water and water for injection
distribution systems of capacity 5KL and flow rate of 4.5 m3
/hr, PFS machine of fill
of output capacity 600 viles/min and sterilize at 300°c,
Pin code: 522201, Ph no: 91 9505907464,
in utilities and process equipments where
strong technical contribution can be given for the fulfilment of organization goals along with the
Jawaharlal Nehru Technological University, Kakinada(GMRIT),
, Andhra Pradesh, India (September
(2007-2009).
Nehru Niketan High school, Tenali, Andhra Pradesh, India (2006-2007).
as per the approved protocols
vessels of 50 Lit capacity,
qualification as per the approved protocols and took active
viles/min capacity, Purified water and water for injection
filling capacity 0.2 to 3 ml,
Project-3(Block-A):
Performed Installation and operational qualification as per the approved protocols and took active part
in their preparation for Pre-Treatment RO water system of capacity 20 m3
/hr which treats the bore well
water and increases it’s quality to meet with required specifications.
Took active part with vendor in performing activities like Hydro test, Passivation, Boroscopy and
Radiography for newly installed clean utility pipe lines
Performed Installation and operational qualification as per the approved protocols and took active part in
their preparation for oxygen generation system capable of producing oxygen at a rate of 15 Nm3
/min at 3.5
bar pressure. Process chiller of 150 Tr capacity and Air compressor capable of delivering air of 215 cfm at 8
bar pressure.
Performed Installation and operational qualification as per the approved protocols and took active
part in their preparation for Purified water generation system of 1000 LPH capacity which treats potable
water to generate purified water, Pure steam generator of 300 Kg/hr capacity, Multi Effect Distillation Still to
generate water for injection at 800 LPH capacity.
Qualification of Bio-kill tank system of capacity 5 KL which treats the effluent to reduce the bio burden
and discharge the bio-waste.
Project-4(QC Lab-2):
Performed Installation and operational qualification as per the approved protocols and took
active part in their preparation for Purified water generation system of 500 LPH capacity which treats
potable water to generate purified water, Pure steam generator of 250 Kg/hr capacity, Pure steam cooler of
50 LPH to generate WFI.
Performed Installation and operational qualification as per the approved protocols and took
active part in their preparation for sterile autoclave of 1200L capacity and decontamination autoclave of
800L capacity along with performance qualification.
Along with all the above also qualified the black utilities such as compressed air(process and instrument),
plant steam
Project-5(Pertussis expansion block):
Took active part with vendor in performing activities like Hydro test, Passivation, Boroscopy and
Radiography for newly installed clean utility pipe lines while commissioning
Performed Installation and operational qualification as per the approved protocols for Process chiller of
75 Tr capacity and Air compressor capable of delivering air of 215 cfm at 8 bar pressure.
Performed Installation and operational qualification as per the approved protocols and took active
part in their preparation for Purified water storage and distribution system of 2000 L capacity and Pure
steam generator of 250 Kg/hr capacity, Multi Effect Distillation Still to generate water for injection at 800
LPH capacity and WFI cooler of 40 LPH capacity
Design work:
• Played a vital role in solving onsite problems and changes to the actual design to match the site
conditions and meet peak load demand along with the organization requirements which are as per
ASME BPE 2012.
• Performed Chilled water load calculations to be supplied foe AHU’s and the pipe line size calculations
to meet the peak load demand
• Addition of chilled water supply pump to existing distribution system to meet the peak load demand
of all equipments in terms of both flow rate and pressure.
• Preparation of P&ID ‘s of chilled water generation systems.
ACADAMIC PROJECT DETAILS:
• Mini project had been completed on study of superheaters used in boilers of thermal power plant
their type and purpose of using them in Visakhapatnam steel plant, Vizag.
• Main project had been done on Design and fabrication of Induction based metal melting furnace
which is of capacity 3KW and capable of melting metal of 20Kg whose melting point should be less
than 1000°
c.
TECHNICAL SKILLS:
• Knowledge in design software’s like AutoCAD.
• Capable of creating programmable excel worksheets.
• Sound Knowledge in programming software’s like C and JAVA.
• Knowledge in codes and standards of ASTM.
• Knowledge on codes used for process piping mainly ASME B31.3 and ASME BPVC.
• Troubleshooting of process related problems.
• Updation of P&ID’s of process equipments and utilities.
CO-CIRCULAR ACTIVITIES:
• A paper presentation on Antimatter at a national level event conducted at GMRIT, Rajam.
• A paper presentation on Hydrogen in I C Engines at a national level event conducted at GMRIT,
Rajam.
• A paper presentation on Ocean Thermal Energy Conversion at a national level event conducted at
ANITS, Vizag
• A workshop on Robotics was attended which was conducted at SRKR Engineering College,Bheemavar.
• Attended a national level seminar on ‘Insight to Manufacturing Technology’ by Prof.P.N Rao.
• Qualified in PGDC CET 2013 conducted by NPTI.
STRENGTHS:
• Capable of working in groups.
• Highly motivated and goal oriented.
PERSONAL DETAILS:
Father name : Mr Shaik Habeeb Basha.
Father’s occupation : Business
Date of Birth : 21-08-1992.
Gender : Male
Marital status : Single.
Languages known : English, Hindi, Telugu and Urdu.
Nationality : Indian
Religion : Islam
Hobbies : Preparing documentaries, short films and dancing.
PASSPORT DETAILS:
Passport no : L6001775 Date of issue : 12/11/2013
File no : HY6061052047313 Date of expiry : 11/11/2023
DECLARATION:
I hereby declare that the information provided above by me is true as of my knowledge and belief.
Place:
Date: (SK NAVEED BASHA.).

More Related Content

What's hot

Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-Pankaj Kumar Jha
 
CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015Andrew Tan
 
Harnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgradeHarnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgradeLinde Gas Benelux
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerNavneet Kumar Bhardwaj
 
Resume (CV) Deni Hendrayani
Resume (CV) Deni HendrayaniResume (CV) Deni Hendrayani
Resume (CV) Deni HendrayaniDeni Hendrayani
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utilitychirag patel
 
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...Koch Modular Process Systems, LLC.
 
baker hughes Annual Report 2008
baker hughes  Annual Report 2008baker hughes  Annual Report 2008
baker hughes Annual Report 2008finance26
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internalJeff Sperlbaum
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
Benjamin Holko Resume 2016
Benjamin Holko Resume 2016Benjamin Holko Resume 2016
Benjamin Holko Resume 2016Benjamin Holko
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CVRashid Iqbal
 
Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam maghrabi
 

What's hot (20)

Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-Pankaj K. Jha_ Senior Project_Engg__Resume-
Pankaj K. Jha_ Senior Project_Engg__Resume-
 
CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015
 
Pankaj 1
Pankaj 1Pankaj 1
Pankaj 1
 
Triq Memon (Updated)
Triq Memon (Updated)Triq Memon (Updated)
Triq Memon (Updated)
 
Harnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgradeHarnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgrade
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineer
 
Resume (CV) Deni Hendrayani
Resume (CV) Deni HendrayaniResume (CV) Deni Hendrayani
Resume (CV) Deni Hendrayani
 
BALA cv 1
BALA cv 1BALA cv 1
BALA cv 1
 
Habeeb Ahmad (CV)
Habeeb Ahmad (CV)Habeeb Ahmad (CV)
Habeeb Ahmad (CV)
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
Modularization: How Going Modular Can Mitigate Project Risk and Deliver Proje...
 
baker hughes Annual Report 2008
baker hughes  Annual Report 2008baker hughes  Annual Report 2008
baker hughes Annual Report 2008
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Benjamin Holko Resume 2016
Benjamin Holko Resume 2016Benjamin Holko Resume 2016
Benjamin Holko Resume 2016
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1
 
Vipul CV
Vipul CVVipul CV
Vipul CV
 
SRCV
SRCVSRCV
SRCV
 

Viewers also liked

CIRRICULUM VITEA OF C L HORNE 2017
CIRRICULUM VITEA OF C L HORNE 2017CIRRICULUM VITEA OF C L HORNE 2017
CIRRICULUM VITEA OF C L HORNE 2017Christi Horne
 
Castleman Disease : Symptoms, causes, diagnosis and treatment
Castleman Disease : Symptoms, causes, diagnosis and treatmentCastleman Disease : Symptoms, causes, diagnosis and treatment
Castleman Disease : Symptoms, causes, diagnosis and treatmentLazoi Lifecare Private Limited
 
Golden Casters Catalog SGS sm
Golden Casters Catalog SGS smGolden Casters Catalog SGS sm
Golden Casters Catalog SGS smTim Hickok
 
6 consejos para adoptar una mentalidad e learning
6 consejos para adoptar una mentalidad e learning 6 consejos para adoptar una mentalidad e learning
6 consejos para adoptar una mentalidad e learning William Henry Vegazo Muro
 
3Com RS232
3Com RS2323Com RS232
3Com RS232savomir
 

Viewers also liked (19)

CIRRICULUM VITEA OF C L HORNE 2017
CIRRICULUM VITEA OF C L HORNE 2017CIRRICULUM VITEA OF C L HORNE 2017
CIRRICULUM VITEA OF C L HORNE 2017
 
Fedora Modularity
Fedora ModularityFedora Modularity
Fedora Modularity
 
SAINI SARKAR
SAINI SARKARSAINI SARKAR
SAINI SARKAR
 
Macro VBA Excel2010 by A'Rong
Macro VBA Excel2010 by A'RongMacro VBA Excel2010 by A'Rong
Macro VBA Excel2010 by A'Rong
 
Castleman Disease : Symptoms, causes, diagnosis and treatment
Castleman Disease : Symptoms, causes, diagnosis and treatmentCastleman Disease : Symptoms, causes, diagnosis and treatment
Castleman Disease : Symptoms, causes, diagnosis and treatment
 
8 consejos de google para manejar tu clase
8 consejos de google para manejar tu clase8 consejos de google para manejar tu clase
8 consejos de google para manejar tu clase
 
La papa
La papaLa papa
La papa
 
Revolución digital 12 paradigmas
Revolución digital 12 paradigmasRevolución digital 12 paradigmas
Revolución digital 12 paradigmas
 
7 tics para tu marca personal
7 tics para tu marca personal 7 tics para tu marca personal
7 tics para tu marca personal
 
5 maneras de utilizar video en sus cursos
5 maneras de utilizar video en sus cursos5 maneras de utilizar video en sus cursos
5 maneras de utilizar video en sus cursos
 
Prevención
PrevenciónPrevención
Prevención
 
webinar Inventos del 2014 pt 3
webinar Inventos del 2014 pt  3webinar Inventos del 2014 pt  3
webinar Inventos del 2014 pt 3
 
Galaxy sii
Galaxy siiGalaxy sii
Galaxy sii
 
Golden Casters Catalog SGS sm
Golden Casters Catalog SGS smGolden Casters Catalog SGS sm
Golden Casters Catalog SGS sm
 
6 consejos para adoptar una mentalidad e learning
6 consejos para adoptar una mentalidad e learning 6 consejos para adoptar una mentalidad e learning
6 consejos para adoptar una mentalidad e learning
 
7 mitos sobre el aprendizaje online
7 mitos sobre el aprendizaje online7 mitos sobre el aprendizaje online
7 mitos sobre el aprendizaje online
 
3Com RS232
3Com RS2323Com RS232
3Com RS232
 
Las diez claves de la educación en polonia
Las diez claves de la educación en poloniaLas diez claves de la educación en polonia
Las diez claves de la educación en polonia
 
Aprendizaje basado en proyectos
Aprendizaje basado en proyectosAprendizaje basado en proyectos
Aprendizaje basado en proyectos
 

Similar to Resume16

Similar to Resume16 (20)

CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!
 
Resume - SKMS 13 august (2)
Resume - SKMS 13 august  (2)Resume - SKMS 13 august  (2)
Resume - SKMS 13 august (2)
 
CV
CVCV
CV
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
mayur r savale resume
mayur r savale resumemayur r savale resume
mayur r savale resume
 
Process and proposal engineer
Process and proposal engineerProcess and proposal engineer
Process and proposal engineer
 
OES PPT
OES PPTOES PPT
OES PPT
 
RENJITH CVpdf
RENJITH CVpdfRENJITH CVpdf
RENJITH CVpdf
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Chronological Curriculum vitae - Subhajit bose (1 Yr exp)
Chronological Curriculum vitae - Subhajit bose (1 Yr exp)Chronological Curriculum vitae - Subhajit bose (1 Yr exp)
Chronological Curriculum vitae - Subhajit bose (1 Yr exp)
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
Curriculum vitae of qasir abbas
Curriculum vitae of qasir abbasCurriculum vitae of qasir abbas
Curriculum vitae of qasir abbas
 
Puneet_Singh
Puneet_SinghPuneet_Singh
Puneet_Singh
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Usman Ali Resume786
Usman Ali Resume786Usman Ali Resume786
Usman Ali Resume786
 
vijay cv
vijay cvvijay cv
vijay cv
 
pk
pkpk
pk
 

Resume16

  • 1. SHAIK NAVEED BASHA D-No: 18-4-44, Markendaya Street, Tenali, Guntur dist, A.P, Email id:naveedbasha65@gmail.com CAREER OBJECTIVE: Looking for a suitable position in Engineering strong technical contribution can be given for the fulfilment of organization goals along with the development of professional skills. ACADEMIC QUALIFICATION: • B-Tech in Mechanical Engineering, Andhra Pradesh, India (2009-2013) Percentage: 67.85 • HVAC (Design and Drafting): M E P Centre, Ameerpet, Hyderabad 2013). • Intermediate, Narayana junior college, Vijayawad Percentage:85 • Secondary school examination, Percentage:89 WORK EXPERIENCE: BIOLOGICAL E LIMITED, Shameerpet, CAPEX Projects (Process Equipments and Utilities) Desig: Executive Project-1(Blending suit 4): Performed Installation and operational qualification and took active part in their preparation Autoclave of 1200l capacity Project-2(Filling Line 3): Performed Installation and operational part in their preparation for filling machine of 20 distribution systems of capacity 5KL and flow rate of Depyrogenation tunnel of output capacity 600 SHAIK NAVEED BASHA treet, Tenali, Guntur dist, A.P, India, Pin code: 522201, Ph no: 91 9505907464, Email id:naveedbasha65@gmail.com position in Engineering/Process Design in utilities and process equipments strong technical contribution can be given for the fulfilment of organization goals along with the Mechanical Engineering, Jawaharlal Nehru Technological University, Kakinada(GMRIT), 2013). M E P Centre, Ameerpet, Hyderabad, Andhra Pradesh, India arayana junior college, Vijayawada, Andhra Pradesh, India (2007 Secondary school examination, Nehru Niketan High school, Tenali, Andhra Pradesh , Hyderabad. (Since Dec 2013 to till date) (Process Equipments and Utilities): Performed Installation and operational qualification as per the approved and took active part in their preparation for the equipments like Blending vessels of 50 Lit Performed Installation and operational qualification as per the approved protocols and took active illing machine of 20 viles/min capacity, Purified water and water for injection distribution systems of capacity 5KL and flow rate of 4.5 m3 /hr, PFS machine of fill of output capacity 600 viles/min and sterilize at 300°c, Pin code: 522201, Ph no: 91 9505907464, in utilities and process equipments where strong technical contribution can be given for the fulfilment of organization goals along with the Jawaharlal Nehru Technological University, Kakinada(GMRIT), , Andhra Pradesh, India (September (2007-2009). Nehru Niketan High school, Tenali, Andhra Pradesh, India (2006-2007). as per the approved protocols vessels of 50 Lit capacity, qualification as per the approved protocols and took active viles/min capacity, Purified water and water for injection filling capacity 0.2 to 3 ml,
  • 2. Project-3(Block-A): Performed Installation and operational qualification as per the approved protocols and took active part in their preparation for Pre-Treatment RO water system of capacity 20 m3 /hr which treats the bore well water and increases it’s quality to meet with required specifications. Took active part with vendor in performing activities like Hydro test, Passivation, Boroscopy and Radiography for newly installed clean utility pipe lines Performed Installation and operational qualification as per the approved protocols and took active part in their preparation for oxygen generation system capable of producing oxygen at a rate of 15 Nm3 /min at 3.5 bar pressure. Process chiller of 150 Tr capacity and Air compressor capable of delivering air of 215 cfm at 8 bar pressure. Performed Installation and operational qualification as per the approved protocols and took active part in their preparation for Purified water generation system of 1000 LPH capacity which treats potable water to generate purified water, Pure steam generator of 300 Kg/hr capacity, Multi Effect Distillation Still to generate water for injection at 800 LPH capacity. Qualification of Bio-kill tank system of capacity 5 KL which treats the effluent to reduce the bio burden and discharge the bio-waste. Project-4(QC Lab-2): Performed Installation and operational qualification as per the approved protocols and took active part in their preparation for Purified water generation system of 500 LPH capacity which treats potable water to generate purified water, Pure steam generator of 250 Kg/hr capacity, Pure steam cooler of 50 LPH to generate WFI. Performed Installation and operational qualification as per the approved protocols and took active part in their preparation for sterile autoclave of 1200L capacity and decontamination autoclave of 800L capacity along with performance qualification. Along with all the above also qualified the black utilities such as compressed air(process and instrument), plant steam Project-5(Pertussis expansion block): Took active part with vendor in performing activities like Hydro test, Passivation, Boroscopy and Radiography for newly installed clean utility pipe lines while commissioning Performed Installation and operational qualification as per the approved protocols for Process chiller of 75 Tr capacity and Air compressor capable of delivering air of 215 cfm at 8 bar pressure. Performed Installation and operational qualification as per the approved protocols and took active part in their preparation for Purified water storage and distribution system of 2000 L capacity and Pure steam generator of 250 Kg/hr capacity, Multi Effect Distillation Still to generate water for injection at 800 LPH capacity and WFI cooler of 40 LPH capacity
  • 3. Design work: • Played a vital role in solving onsite problems and changes to the actual design to match the site conditions and meet peak load demand along with the organization requirements which are as per ASME BPE 2012. • Performed Chilled water load calculations to be supplied foe AHU’s and the pipe line size calculations to meet the peak load demand • Addition of chilled water supply pump to existing distribution system to meet the peak load demand of all equipments in terms of both flow rate and pressure. • Preparation of P&ID ‘s of chilled water generation systems. ACADAMIC PROJECT DETAILS: • Mini project had been completed on study of superheaters used in boilers of thermal power plant their type and purpose of using them in Visakhapatnam steel plant, Vizag. • Main project had been done on Design and fabrication of Induction based metal melting furnace which is of capacity 3KW and capable of melting metal of 20Kg whose melting point should be less than 1000° c. TECHNICAL SKILLS: • Knowledge in design software’s like AutoCAD. • Capable of creating programmable excel worksheets. • Sound Knowledge in programming software’s like C and JAVA. • Knowledge in codes and standards of ASTM. • Knowledge on codes used for process piping mainly ASME B31.3 and ASME BPVC. • Troubleshooting of process related problems. • Updation of P&ID’s of process equipments and utilities. CO-CIRCULAR ACTIVITIES: • A paper presentation on Antimatter at a national level event conducted at GMRIT, Rajam. • A paper presentation on Hydrogen in I C Engines at a national level event conducted at GMRIT, Rajam. • A paper presentation on Ocean Thermal Energy Conversion at a national level event conducted at ANITS, Vizag • A workshop on Robotics was attended which was conducted at SRKR Engineering College,Bheemavar. • Attended a national level seminar on ‘Insight to Manufacturing Technology’ by Prof.P.N Rao. • Qualified in PGDC CET 2013 conducted by NPTI. STRENGTHS: • Capable of working in groups. • Highly motivated and goal oriented.
  • 4. PERSONAL DETAILS: Father name : Mr Shaik Habeeb Basha. Father’s occupation : Business Date of Birth : 21-08-1992. Gender : Male Marital status : Single. Languages known : English, Hindi, Telugu and Urdu. Nationality : Indian Religion : Islam Hobbies : Preparing documentaries, short films and dancing. PASSPORT DETAILS: Passport no : L6001775 Date of issue : 12/11/2013 File no : HY6061052047313 Date of expiry : 11/11/2023 DECLARATION: I hereby declare that the information provided above by me is true as of my knowledge and belief. Place: Date: (SK NAVEED BASHA.).