Name: Sayed Asghar Mosavi
mosavi@greentech.af
mosavi2007@gmail.com
+93789529565
Skype: mosavi80
Date of Birth: 1981 Nationality: Afghan
Education:
1999-2004 B.Sc. in Sanitation Engineering (University of Tehran, Iran)
6. Membership of Professional Associations:
Afghan Engineering Association (AEA)
Afghanistan Builders Associations (ABA)
Countries of Work Experience:
Afghanistan
Languages:
English Fluent
Dari mother tongue
Employment Record:
From [Year]: 2008 To [2016]
Employer: Green Tech Construction & Engineering Co.
Number of staff in organization: more than 200 people
Positions held: CEO (ChiefExecutive Officer)
Position task assignments:
 Develop a strategic plan to advance the company's mission and objectives and to promote
revenue, profitability, and growth as an organization.
 Expand in country company operations to insure production efficiency, quality, service, and cost-
effective management of resources.
 Plan, develop, and implement strategies for generating resources and/or revenues for the
company.
 Identify acquisition and merger opportunities and direct implementation activities.
 Propose / develop company operational procedures, policies, and standards.
 Review activity reports and financial statements to determine progress and status in attaining
objectives and revise objectives and plans in accordance with current conditions.
 Evaluate performance of executives for compliance with established policies and objectives of the
company and contributions in attaining objectives.
 Represent the company at legislative sessions, committee meetings, and at formal functions.
 Promote the company to local, regional, national, and international constituencies.
 Build a fundraising network using personal contacts, direct mail, special events, and foundation
support.
 Present company report at Annual Stockholder and Board of Director meetings.
 Direct company planning and policy-making committees.
 Oversee foreign operations to include evaluating operating and financial performance.
From [Year]: 2005 To [Year]: 2008
Manager of water and wastewater division, Omran Construction Co.
Position task assignments:
 • Perform all tasks at the assigned location related to water supply and sewerage works
installations
 • Install new water supply and sewerage works
 • Maintain existing systems
 • Coordinate the water supply and sewerage works installations
 • Ensure that the water supply and sewerage works installations meet the safety standards in
accordance with international codes and regulations
 • Install maintain a service and repair water supply systems water treatment plants, water storage
facilities, sewerage networks, waste/sewage treatment plant, pumps, control panels of all
plants/pumps and other allied equipment.
 • Carry out scheduled periodic and emergency maintenance services on all installations and
equipment
 • Periodically inspect ongoing projects and report to the Project Manager on progress, timelines
and any setbacks or alterations that may occur
 • Inspect engineering work carried out by local/international contractors and ensure all stages are
completed satisfactorily prior to payment
 • Manage the daily task of contractors plumbers and other working in the area of water and
sanitation
 • Perform surveys and prepare technical reports, drawing and material quantities
 • Review; analyze Task Order Proposals on Water & Sanitation works submitted by contractors
and report to the Project Manager regarding the accuracy of technical aspect of the proposal.
 • Supervise the implementation of Task Orders on water and sanitation works to be executed by
local/international contractors in an assigned projects / locations
 Prepare material specifications for the purpose of raising requisitions
 Provide lists of spare parts for water supply and sewerage works and control panel as well as
necessary tools and equipment well in advance
 • Monitor the tools/equipment and spare parts inventory
 • Ensure the use of spare parts in the most productive manner
 • Liaise with Water and Sanitation Engineer for expert advice on water supply and sewerage
works, electrician on electrical matters and other reengineering sub-units as necessary
 • Monitor the quantity levels of supply of spare parts for routine scheduled maintenance as well
as maintenance of log books, maintenance of records and spare parts consumption records
 • Perform other duties in Water and Sanitation field as required.
Computer skill
Microsoft office package, EPA NET , Quick book , Water james, Sewer james, AutoCad
Year Employer Position
Held
Project Name and Location
2015
GreenTech
Sr.sanitation
Engineer
Qala-e-Naw, Badghis WTP & Generator upgrade , Badgheis ,
Afghanistan
Project was consist design & build for 250 m3 /day WTP including
Reverse’ Osmosis –RO- plant. In design phase, site investigation,
concept design, process design, flow diagram and detailed engineering
drawings in close cooperation with electr-mechanical design team
members considered.
2014
GreenTech
Sr.sanitationEngineer
Company: Green Tech Construction and Engineering Co.
Project Name: Water Supply System in Aybak City of Samangan
Province, Afghanistan
Prime contractor : Omran Holding Group
Responsibility:
 Design of Water Supply System including 33 KM water
transmission (HDPE pipe, diameter 18”) with 12 No branch
connection to concreted reservoir.
 Design of pressure breaking system
 Water Hammer (WH) analysis
2013
GreenTech
Sr.Advisor
Company: Green Tech Construction and Engineering Co.
Prime contractor : Omran Holding Group
Client: USACE-AED
Projects Name:
 MeS RLC/ANCOP WWTS Upgrade
Responsibility:
 Water distribution system, including 6 KM water distribution
network (2-8 inch-) and house connections to ANP unit and
barracks.
 Sewer collection system including 4 KM sewerage system
 (Forced and gravity type), diameter 8-10 inch.
 Sewer lift station including duplex grinder sewage pump with VFD
control system , one in WWTP area and another one in sewerage
system
Design and site supervision Wastewater treatment plant ;
Including two 50,000 gpd WWTP activated sludge extended aeration
system with 4 No sludge drying beds, headwork , grit removal system,
DAF system, and sand filtration.
2012
Greentech
Sr.SanitationEngineer
Company: Green Tech Construction and Engineering Co.
Prime contractor : Afghan Construction Company Umbrella (ACCU)
Client: USACE-AED
 Water supply system improvements and water storage tanks
included 10 KM of 2 to 10 inch PVC pipes, Sch. 80, twin concreted
water tanks each 500 m3.
 Sanitary sewer collection system design improvement, including 7
KM of 10 inch gravity sewer system and 2 KM forced main.
 Wastewater treatment plant expansion design and site supervision
, including 2x 100,000 gpd activated sludge extended aeration
system, disinfection units and pre- treatment system.
 Sludge drying bed (SDB) improvement, including add 2 no of
concreted SDB each 30 m * 8 m to existing SDB system.
 WWTP startup and operator training
2012
Greentech
Sr.SanitationEngineer
Company: Green Tech Construction Co.
Prime Contractor : Omran Holding Group
Client : USACE-AED
Project Name: ANA, Pole-Charkhi- Utility Build-Out PEC#3
Responsibility:
 Water and wastewater engineering; included improvement of
4 KM existing 4-6 inch , PVC type ,Sch 80 water distribution
network, pressure evaluation on site, leakage detection system
improvement, sewerage system improvement included 34 No
manholes and 8 KM PVC pipe , 10 inch , Sch 40
 QC Design of Water distribution ،sewer system and surface water
included 5 KM new water distribution network with air release
system and blow off valves consideration. verify Water hammer –
WH- system calculation and recommendation to reduce WH side
effects on site,
 QC Design of water and wastewater treatment plant,
included 2* 65, 000 gpd activated sludge system, extended
aeration with pre-treatment and disinfection units (Calcium hypo
chloride system 65%).
 Clouse out document preparation included commissioning plan,
start-up plan for WWTP and training plan.
2012
Greentech
Sr.MechanicalEngineer
COMPANY : Green tech
Prime Contractor: ECC Intl.
Client: USACE -AED
Project Name: UP Provincial HQ Kunduz WWTP
Position: Sr Mechanical Engineer
Responsibility:
 Design and calculation of WWTP and Sludge Draying bed,
included a 25,000 gpd activated sludge extended aeration system
with
pre-treatment and post disinfection system.
 Start-up & Commissioning and Training for WWTP
 Design & supervision of Water Supply System , included 6 KM
PVC pipe ( Sch 80 , vary 1 inch to 8 inch) , pump station with one
juky pump and two main booster system, 150 m deep well with all well head
and control system.
2012
Greentech
SrSanitationengineer
COMPANY : Green tech
Prime Contractor: ECC Intl.
Project Name: : 209th Infantry, Hazrat Sultan, Samangan, Afghanistan
Position:
Responsibility:
 Design & supervision of Water Supply System , included 11 KM
PVC pipe ( Sch 80 , vary 1 inch to 10 inch) , pump station with one
juky pump and two main booster system, 200 m deep well with all
well head and control system.
 Design of Site sewer supply system
 Water and wastewater engineering
 Design and sizing of wastewater treatment plant (WWTP) ,
included two number of steel type above ground packaged
system;
2 * 40,000 gpd activated sludge extended aeration system,
Sludge drying beds, pre-treatment and post treatment.
2012
GreenTech
Environmental/Processadvisor
COMPANY : Green tech
Prime Contractor: KBR Intl. and Yuksel Insaat
Project Name: : Water quality monitoring , KIA
Position:
Responsibility:
 Analysis of water quality lab result
 Recommendation to improve water quality on KIA
( Kabul International airport), a 2000 m3/day Water Treatment
Plant (WTP) with pre- treatment , Softener, reverse Osmosis (RO) plant
and related units.
 Drafted WTP (Water Treatment Plant) system technical proposal
 Preparation of BOQ to proposed WTP system
2012
GreenTech
Sr.SanitationEngineer
COMPANY : Green tech
Prime Contractor: JMCC (JAMI MASHAL CONSTRUCTION CO.)
Project Name: : WWTP & Utility upgrade ANA GArdiz ,Paktya
Client :USACE -AED
Responsibility:
 Design and site consultancy for WWTP Lagoon system handled
12,000 ANA soldiers
 WWTP Lagoon system sizing and calculation
 WWTP head work design
 Sewerage system design
 Out fall system design based on site limitation and consideration
2011-2012
Green
Tech
Design
QC
RPTC Shindand WWTP Herat , Afghanistan
2010-2011
Green
Tech
Design
Manager
Camp Shaheen ANA Base -Mazar, Afghanistan
2009-2010
Green
Tech
Mechanic
al advisor
ANA Gamberi , WWTP Jbad , Afghanistan
2008-2009
Green
Tech
Environm
ental
Expert
ANA base , WWTP Kunduz , Afghanistan
2007-2010 Omran
Mechanic
al
Engineer
6 ANP District HQ, Heart, Afghanistan
2008-2009
Green
Tech
Mechanic
al
Engineer
Guard Training Center, Kabul , Afghanistan
CV.- Sayed Asghar Mosavi VA Version!

CV.- Sayed Asghar Mosavi VA Version!

  • 1.
    Name: Sayed AsgharMosavi mosavi@greentech.af mosavi2007@gmail.com +93789529565 Skype: mosavi80 Date of Birth: 1981 Nationality: Afghan Education: 1999-2004 B.Sc. in Sanitation Engineering (University of Tehran, Iran) 6. Membership of Professional Associations: Afghan Engineering Association (AEA) Afghanistan Builders Associations (ABA) Countries of Work Experience: Afghanistan Languages: English Fluent Dari mother tongue Employment Record: From [Year]: 2008 To [2016] Employer: Green Tech Construction & Engineering Co. Number of staff in organization: more than 200 people Positions held: CEO (ChiefExecutive Officer) Position task assignments:  Develop a strategic plan to advance the company's mission and objectives and to promote revenue, profitability, and growth as an organization.  Expand in country company operations to insure production efficiency, quality, service, and cost- effective management of resources.
  • 2.
     Plan, develop,and implement strategies for generating resources and/or revenues for the company.  Identify acquisition and merger opportunities and direct implementation activities.  Propose / develop company operational procedures, policies, and standards.  Review activity reports and financial statements to determine progress and status in attaining objectives and revise objectives and plans in accordance with current conditions.  Evaluate performance of executives for compliance with established policies and objectives of the company and contributions in attaining objectives.  Represent the company at legislative sessions, committee meetings, and at formal functions.  Promote the company to local, regional, national, and international constituencies.  Build a fundraising network using personal contacts, direct mail, special events, and foundation support.  Present company report at Annual Stockholder and Board of Director meetings.  Direct company planning and policy-making committees.  Oversee foreign operations to include evaluating operating and financial performance. From [Year]: 2005 To [Year]: 2008 Manager of water and wastewater division, Omran Construction Co. Position task assignments:  • Perform all tasks at the assigned location related to water supply and sewerage works installations  • Install new water supply and sewerage works  • Maintain existing systems  • Coordinate the water supply and sewerage works installations  • Ensure that the water supply and sewerage works installations meet the safety standards in accordance with international codes and regulations
  • 3.
     • Installmaintain a service and repair water supply systems water treatment plants, water storage facilities, sewerage networks, waste/sewage treatment plant, pumps, control panels of all plants/pumps and other allied equipment.  • Carry out scheduled periodic and emergency maintenance services on all installations and equipment  • Periodically inspect ongoing projects and report to the Project Manager on progress, timelines and any setbacks or alterations that may occur  • Inspect engineering work carried out by local/international contractors and ensure all stages are completed satisfactorily prior to payment  • Manage the daily task of contractors plumbers and other working in the area of water and sanitation  • Perform surveys and prepare technical reports, drawing and material quantities  • Review; analyze Task Order Proposals on Water & Sanitation works submitted by contractors and report to the Project Manager regarding the accuracy of technical aspect of the proposal.  • Supervise the implementation of Task Orders on water and sanitation works to be executed by local/international contractors in an assigned projects / locations  Prepare material specifications for the purpose of raising requisitions  Provide lists of spare parts for water supply and sewerage works and control panel as well as necessary tools and equipment well in advance  • Monitor the tools/equipment and spare parts inventory  • Ensure the use of spare parts in the most productive manner  • Liaise with Water and Sanitation Engineer for expert advice on water supply and sewerage works, electrician on electrical matters and other reengineering sub-units as necessary  • Monitor the quantity levels of supply of spare parts for routine scheduled maintenance as well as maintenance of log books, maintenance of records and spare parts consumption records  • Perform other duties in Water and Sanitation field as required. Computer skill Microsoft office package, EPA NET , Quick book , Water james, Sewer james, AutoCad
  • 4.
    Year Employer Position Held ProjectName and Location 2015 GreenTech Sr.sanitation Engineer Qala-e-Naw, Badghis WTP & Generator upgrade , Badgheis , Afghanistan Project was consist design & build for 250 m3 /day WTP including Reverse’ Osmosis –RO- plant. In design phase, site investigation, concept design, process design, flow diagram and detailed engineering drawings in close cooperation with electr-mechanical design team members considered. 2014 GreenTech Sr.sanitationEngineer Company: Green Tech Construction and Engineering Co. Project Name: Water Supply System in Aybak City of Samangan Province, Afghanistan Prime contractor : Omran Holding Group Responsibility:  Design of Water Supply System including 33 KM water transmission (HDPE pipe, diameter 18”) with 12 No branch connection to concreted reservoir.  Design of pressure breaking system  Water Hammer (WH) analysis 2013 GreenTech Sr.Advisor Company: Green Tech Construction and Engineering Co. Prime contractor : Omran Holding Group Client: USACE-AED Projects Name:  MeS RLC/ANCOP WWTS Upgrade Responsibility:  Water distribution system, including 6 KM water distribution network (2-8 inch-) and house connections to ANP unit and barracks.  Sewer collection system including 4 KM sewerage system  (Forced and gravity type), diameter 8-10 inch.  Sewer lift station including duplex grinder sewage pump with VFD control system , one in WWTP area and another one in sewerage system Design and site supervision Wastewater treatment plant ; Including two 50,000 gpd WWTP activated sludge extended aeration system with 4 No sludge drying beds, headwork , grit removal system, DAF system, and sand filtration.
  • 5.
    2012 Greentech Sr.SanitationEngineer Company: Green TechConstruction and Engineering Co. Prime contractor : Afghan Construction Company Umbrella (ACCU) Client: USACE-AED  Water supply system improvements and water storage tanks included 10 KM of 2 to 10 inch PVC pipes, Sch. 80, twin concreted water tanks each 500 m3.  Sanitary sewer collection system design improvement, including 7 KM of 10 inch gravity sewer system and 2 KM forced main.  Wastewater treatment plant expansion design and site supervision , including 2x 100,000 gpd activated sludge extended aeration system, disinfection units and pre- treatment system.  Sludge drying bed (SDB) improvement, including add 2 no of concreted SDB each 30 m * 8 m to existing SDB system.  WWTP startup and operator training 2012 Greentech Sr.SanitationEngineer Company: Green Tech Construction Co. Prime Contractor : Omran Holding Group Client : USACE-AED Project Name: ANA, Pole-Charkhi- Utility Build-Out PEC#3 Responsibility:  Water and wastewater engineering; included improvement of 4 KM existing 4-6 inch , PVC type ,Sch 80 water distribution network, pressure evaluation on site, leakage detection system improvement, sewerage system improvement included 34 No manholes and 8 KM PVC pipe , 10 inch , Sch 40  QC Design of Water distribution ،sewer system and surface water included 5 KM new water distribution network with air release system and blow off valves consideration. verify Water hammer – WH- system calculation and recommendation to reduce WH side effects on site,  QC Design of water and wastewater treatment plant, included 2* 65, 000 gpd activated sludge system, extended aeration with pre-treatment and disinfection units (Calcium hypo chloride system 65%).  Clouse out document preparation included commissioning plan, start-up plan for WWTP and training plan.
  • 6.
    2012 Greentech Sr.MechanicalEngineer COMPANY : Greentech Prime Contractor: ECC Intl. Client: USACE -AED Project Name: UP Provincial HQ Kunduz WWTP Position: Sr Mechanical Engineer Responsibility:  Design and calculation of WWTP and Sludge Draying bed, included a 25,000 gpd activated sludge extended aeration system with pre-treatment and post disinfection system.  Start-up & Commissioning and Training for WWTP  Design & supervision of Water Supply System , included 6 KM PVC pipe ( Sch 80 , vary 1 inch to 8 inch) , pump station with one juky pump and two main booster system, 150 m deep well with all well head and control system. 2012 Greentech SrSanitationengineer COMPANY : Green tech Prime Contractor: ECC Intl. Project Name: : 209th Infantry, Hazrat Sultan, Samangan, Afghanistan Position: Responsibility:  Design & supervision of Water Supply System , included 11 KM PVC pipe ( Sch 80 , vary 1 inch to 10 inch) , pump station with one juky pump and two main booster system, 200 m deep well with all well head and control system.  Design of Site sewer supply system  Water and wastewater engineering  Design and sizing of wastewater treatment plant (WWTP) , included two number of steel type above ground packaged system; 2 * 40,000 gpd activated sludge extended aeration system, Sludge drying beds, pre-treatment and post treatment.
  • 7.
    2012 GreenTech Environmental/Processadvisor COMPANY : Greentech Prime Contractor: KBR Intl. and Yuksel Insaat Project Name: : Water quality monitoring , KIA Position: Responsibility:  Analysis of water quality lab result  Recommendation to improve water quality on KIA ( Kabul International airport), a 2000 m3/day Water Treatment Plant (WTP) with pre- treatment , Softener, reverse Osmosis (RO) plant and related units.  Drafted WTP (Water Treatment Plant) system technical proposal  Preparation of BOQ to proposed WTP system 2012 GreenTech Sr.SanitationEngineer COMPANY : Green tech Prime Contractor: JMCC (JAMI MASHAL CONSTRUCTION CO.) Project Name: : WWTP & Utility upgrade ANA GArdiz ,Paktya Client :USACE -AED Responsibility:  Design and site consultancy for WWTP Lagoon system handled 12,000 ANA soldiers  WWTP Lagoon system sizing and calculation  WWTP head work design  Sewerage system design  Out fall system design based on site limitation and consideration 2011-2012 Green Tech Design QC RPTC Shindand WWTP Herat , Afghanistan 2010-2011 Green Tech Design Manager Camp Shaheen ANA Base -Mazar, Afghanistan 2009-2010 Green Tech Mechanic al advisor ANA Gamberi , WWTP Jbad , Afghanistan 2008-2009 Green Tech Environm ental Expert ANA base , WWTP Kunduz , Afghanistan 2007-2010 Omran Mechanic al Engineer 6 ANP District HQ, Heart, Afghanistan 2008-2009 Green Tech Mechanic al Engineer Guard Training Center, Kabul , Afghanistan