18 Years of
Substations
Good pers
Project obje
ne: Mechan
ion: Bachole
a in Mecha
oard of Tec
ollege of Eng
ISO 9001
(QM
A Cour
x
x
x
x
x
nce :
n :Q
n : D
yer : S
(C
Project : S
C
Project : N
(
Project : A
(
Project : R
S
of Employer
g as QUALIT
KEY
ED IBRAHIM
Exclusive Ex
s, Water &Po
onality and
ectives on s
nical Engine
er degree in
nical Engine
hnical Educ
gineering,
:2015 Aud
S Auditor /
rse on NDT
NDT Level
NDT Level
NDT Level
NDT Level
NDT Level
QA/QC MAN
Dec. 2010–T
Saudi Servic
Closed Joint
Shoaiba Pha
orporation(
National Wa
(2012 Sep. to
Al-Adel 380/
(2013 Sep. to
Royal comm
Saudi Arabia
r’s Contract
SSEM - A
Al-Ma'a
P.O. Bo
Kingdom
Tel: (966
Y ASSURANC
Y PERS
Page Ͳ
M Prop
Ema
xperience in
ower Plant,
d drive to m
success &En
eer
n MECHANI
eering
D
cation, Tam
itor/ LeadA
/ Lead Aud
and Fractu
II (VT) Visu
II (LPT) Liqu
II (RTFI) Ra
II (RT) Rad
II (MPT) Ma
NAGER
TILL
ces for Elect
t Stock Com
ase III Wate
SWCC), Jed
ater Compa
o 2013 June
/110/13.8KV
o july 2014)
mission cont
a (2014 Sep
t: Constructi
AL-RASHID T
athar Street,
x 6341,Riyad
m of Saudi A
6-11-462551
CE MANAG
SONNE
Ͳ 1 Ͳ of 6
osed Positio
ail : ent
n Construct
oil and gas
manage dire
nforcement
English Sp
CAL ENGIN
Dates of Atte
ilnadu
AuditorTrai
ditor-cert #
ure Mecha
al Testing
uid Penetra
diographic
iographic
agnetic Pa
ro Mechan
mpany)
r Transmissio
ddah, Saud
any – RWSP
e)
V BSP Projec
tract 108-C0
p. to Till date
ion of Pum
TOWER
,
dh 11442
Arabia
1
GER in (SSEM
EL RESU
on: QA/QC
teribra@gm
tion And Qu
s projects, a
ect and gu
of safety c
peaking Cap
EERING
endanceDe
ining Cours
# AG-QMSL
anics.
ant Testing
c Testing Fi
Testing
article Testi
ics Work Co
on System, S
di Arabia (20
, Riyadh, Sa
ct, Jeddah,
01 potable
e)
p station& p
M)
UME
MANAGER
ail.com
uality Projec
and petroch
uide the tea
odes at site
pabilities: V
egree/Cert.
se Success
LAC-2016-0
g
ilm Interpre
ing
o.
Saline Wate
010 Dec. to
audi Arabia
Saudi Arab
water tank
potable wa
Age: 41
ct Managem
hemical pla
am to achi
e.
Very Good
Nationality:
sfully comp
02-13)
etation
er Conversio
2011 Dec.)
ia
Project, Jub
ater stroage
ment, Of
ant.
ieve the
Indian
pleted
on
bail,
tank
KEY PERSONNEL RESUME
Page Ͳ 2 Ͳ of 6
x The Quality Assurance Manager is responsible for Identifying those requirements of
ISO 9001: 2008 to be Implemented in the Quality Management System (QMS)
-Experience in developing and establishing multi-disciplinary construction field quality plans
and procedures.
x As a Head of the Quality Department, assigning quality personnel to various areas of
Activities.
x Review, Approve and issue of all Quality Records generated during Project.
Assigning Quality related task within the framework of project quality.
x Manage full organization of QA activities and personnel
x Prepare, review and approve project quality plan
x Prepare inspection procedures
x Prepare Inspection test Plan (ITP)
x Review and approved material requisition package
x Review and approved Inspection Assignment Package
x Apply audit and assessment requirements
x Gather and analyze relevant process data
x Interview / review prospective personnel
x Ensure correct control of documents and data
x Evaluate personnel and propose training
x Ensure maximum efficiency of resources
x Coordinate with the client items related to quality
x Communicate with all involved personnel on Quality issues
x Responsible for the implementation of project site Quality Management System for
the construction activities
x Communicate with all involved personnel on Quality issues
x Review project and other relevant specifications and standards
x Prepare project quality documents for internal audit
x Supervise and monitor the project quality personnel group
x Allocates quality control personnel to the various respective areas of concern
x Plan mobilization and de-mobilization of quality control personnel on the project
x Conduct quality meeting with his QC inspectors team
x Evolution /Review of Non-Conformances, establishing the root Cause and advising
the Corrective action for Prevention.
x Preparation of Monthly Quality Report for Submission to Customer.
Evaluating Cost of Quality.
x Arranging and conducting management reviews.
x Evaluation of Supplier / Sub-Contractors quality System and Preparation of Report.
Preparation of Inspection assignment packages.
x Review of requisition and purchase orders of Compliance with correct requirements.
Review & Recommendation of Sub-Vendors Quality Procedures.
x Preparing agenda for Pre-inspection Meeting (PIM)-Co-ordinate Inspection at Source.
Ensure Inspection assignment Packages are correctly distributed.
Specific Duties and Responsibilities / Scope of Work :
x Monitoring the execution of project as per project schedule.
x Co-ordinate and supervise commissioning and construction work teams and plan
future work programs.
KEY PERSONNEL RESUME
Page Ͳ 3 Ͳ of 6
x Coordinate with civil/mechanical project engineers and supervisors to manage
impact on other activities.
x Prepare and get approvals from ILF consultants for erection clearance check (ECC),
safety clearance check (SCC) and pre- commissioning clearance check (PCC) of
HVAC systems and firefighting systems.
x Erection of EOHTCrane, RO & Piping and HVAC systems as per project specifications.
x Daily and weekly work achieving planning with forecast requirements fulfilling.
x Prepare and get approvals from consultants for erection clearance check safety
clearance check and pre- commissioning clearance check of HVAC systems and
firefighting systems.
x Prepare as built drawing of HVAC systems and firefighting system and get approvals
from consultants
x Get approval from consultant for TAB reports (HVAC testing adjusting @ balancing for
air systems).
x Study IFC drawing and suggest modification to avoid any technical problems.
x Responsible in performing Daily Inspection and Reporting as per approved Inspection
Test Plan
x Verification for Incoming Materials based on Material Certification and Engineering
Documentation Information such as Drawing and others document that related to the
Materials.
x Ensure the quality of the work is as per quality assurance plan of the project by
performing field inspection
x Witnessing the pressure test based on a system and sub system wise along with the
client ,
x Preparation of the project execution plan and project procedures as per Clients
requirements
x Safety requirements to be ensuring while executing critical jobs.
Position :SENIOR MECHANICAL ENGINEER/ QC
Duration : Apr.2007 – 2008
Employer : AL-TUWIRQI GROUP.
Type of Project:POWER PLANT-120MW
Scope of Employer’s Contract: Construction of 110kv Substation at Power plant
Dammam
AL-TUWIRQI GROUP.
(Power Generation Plant)
Dammam Industrial City -2
P.O. Box 7600 Dammam 31472
Saudi Arabia
Tel.: +966 3 8123735
Specific Duties and Responsibilities / Scope of Work :
x Provide guidelines to the QA/QC Document engineer in preparation and compilation
of incoming/outgoing communications, correspondences and inspection reports
associated with QA/QC Department ready for audit and reviews them.
x Making appropriate changes if it is not possible to carry out the work as per IFC.
Informing site PMD/PQS about the changes & getting approval.
x Plan and review project work as per guidelines of Project manager.
x Organizing and coordinating equipment deliveries and procurement activities.
x Expediting delivery of materials and equipment for their timely on-site delivery.
x Responsible for the implementation of projects as per contact documents in the most
cost effective manner and to perform regular field surveying.
x Coordinating with Client and Contractors for smooth execution of the project.
KEY PERSONNEL RESUME
Page Ͳ 4 Ͳ of 6
x Review the drawings, reports, specification submitted by Consultant to ensure
completeness, correctness, comply with the scope of work and requirements.
x Carry out constructability review in timely manner to the sub Contractors’ submittals
and forward the comments to the consultant.
x Monitring and Controlling of Project Performance and Taking corrective Actions
x Ensure that the Contractor’s as-built drawings and operations and maintenance
manuals are in order.
Position :MECHANICAL ENGINEER
Duration :JUNE 2005 – FEB. 2007
Employer : Kuwait National Petrolum Co
Type of Project:KNPC-Maintenance
Scope of Employer’s Contract: kr-32
KUWAIT NATIONAL PETROLUM CO
Corporate Office
P.O. Box: 24081 Safat
13101 Kuwait
Tel: +965 (2) 2259000
Specific Duties and Responsibilities / Scope of Work :
x To monitor welding activities as per Project specifications and Procedures, Review the
subcontractor Daily Weld Report.
x Witnessing & reviewing of non-destructive tests such as radiographic test (RT),
ultrasonic test (UT), penetrate test (PT) and magnetic particle inspection (MPI).
x Material Receiving Inspection Records (MRIR) monitoring including Unpacking
Inspection of Material/Equipment’s at Site.
x Verification for Incoming Materials based on Material Certification and Engineering
Documentation Information such as Drawing and others document that related to the
Materials.
x Responsible in performing Daily Inspection and Reporting as per approved Inspection
Test Plan.
x Witnessing of PQR/WPS – Welder’s qualification test on Carbon Steels and Stainless
Steel materials of various projects.
x Ensure the quality of the work is as per quality assurance plan of the project by
performing field inspection.
Position : MECHANICALENGINEER
Duration :JAN 2001 – JUNE 2004
Employer : MMG
Type of Project:CONSTRUCTION OF PETROCHEMICAL PLANT
HASIM AL MUSHAWAI EST.
King Fahed Road, Ibn Khaldoun
P.O. Box 1131, Dammam 31411
Saudi Arabia
+966-3-842-1111
Specific Duties and Responsibilities / Scope of Work :
x Monitoring the QA / QC documentation of the subcontractors and ensure that all
activities are incorporated to their system on daily basis and can be traced according
to project requirement.
x Review of subcontractors welding procedure specifications (WPS), procedure
qualification record (PQR), and welder qualification test (WQT).
x Conducting tool box talks for welders, fitters, helpers on a weekly basis and
maintaining the report for the same.
x Preparing & maintaining welding log books and finally submit to the Consultant.
KEY PERSONNEL RESUME
Page Ͳ 5 Ͳ of 6
x Raising RFIs & MRIs as per the Site Engineer’s request and witness for the inspections.
x Witnessing the pressure test based on a system and sub system wise along with the
client and clears the test package if test is successfully executed.
x Welder Qualification Test Fit up inspection, Weld visual inspection, Insulation& HSS
Inspection, Painting Inspection.
x Tests pack preparation and Raw material inspection.
x Taking necessary actions to control the Repairs in the Welds.
x Implement the project quality control procedures, inspections and test plans, and
construction procedures.
x Implement the surveillance inspection program over subcontractors to ensure
conformity to project specifications/standards.
x Implement and verify the document control process at site.
x Witnessing the pressure test based on a system and sub system wise along with the
client and clears the test package if test is successfully executed.
x Reviewing the test packages as per the test pack management procedure and
checks the punch list for clearance.
x To be self-motivated, flexible to cover other discipline activities if required, work as a
team member with multi culture / national personnel.
x Daily Coordination with contractors and subcontractor.
x Preparation of the project execution plan and project procedures as per Societies
requirement. Planning and monitoring project progress and status on deliverables.
x Co-ordination with suppliers for various technical related activities and support for
closing the punch list items which are related to them.
Position : MECHANICAL ENGINEER
Duration :APRIL 1997 – JUNE 2000
Employer : AL-FARIS EST JUABIL,
Type of Project:CONSTRUCTION OF GAZZLAN POWER PLANT PHASE #II
AL-FARIS EST .
King Abdullah Road,
P.O. Box 1657, Jubail 31941
Saudi Arabia
+966-3-342-1751
x Management, site development, grading oil underground utilities such as water tanks,
water drainage, drinking and fire water hydrant etc.
x Supervise the site to meet the project needs.
x Review of material shop drawings of structural and architectural discipline according
to the specification standards.
x Incorporating the site change / deviation.
x In charge of all sites related to the contractor.
x Project scheduling, site, site lay out, supervision labor management.
x Preparation of payment certificates.
x Monitor monthly progress of accomplishments.
x Coordination with clients for payments.
Position : MECHANICAL SITE ENGINEER
Duration : AUG 1994 – JAN 1997
Employer : MARUTHI INDUSTRIES,
Type of Project:CONSTRUCTION OF HEAT EXCHANGERS &COOLING TOWERS
MARUTHI EST .
D.B. Road,
Coimbatore
India-642126
KEY PERSONNEL RESUME
Page Ͳ 6 Ͳ of 6
x Supervise the site to meet the project needs.
x Review of material shop drawings of structural and architectural discipline according
to the specification standards.
x Incorporating the site change / deviation.
x In charge of all sites related to the contractor.
x Project scheduling, site, site lay out, supervision labor management.
x Monitor monthly progress of accomplishments
x Preparation of payment certificates.
Personal Profile
Father’s Name : Abdul Jabbar
Age : 41 YEARS
Marital Status : Married
Nationality : Indian
Language Known : English, Hindi, Malayalam& Tamil.
Driving License : Saudi Arabia & India
Mobile no : 0597193035
RESUME=

More Related Content

What's hot

Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017
martin fuentes
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
arnel moncada
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
Harvey Sarda
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
Cary Dela Cruz
 
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
Leonardo Muniz
 

What's hot (20)

CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015CVMA_-_QA_Manager_-_Apr 2015
CVMA_-_QA_Manager_-_Apr 2015
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Amir QC
Amir QCAmir QC
Amir QC
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Kailash cv
Kailash cvKailash cv
Kailash cv
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Building Commissioning, Ongoing Commissioning and quality management using BACS
Building Commissioning, Ongoing Commissioning and quality management using BACSBuilding Commissioning, Ongoing Commissioning and quality management using BACS
Building Commissioning, Ongoing Commissioning and quality management using BACS
 
RESUME UPDATED 2015
RESUME UPDATED 2015RESUME UPDATED 2015
RESUME UPDATED 2015
 
The Value of Building Commissioning
The Value of Building CommissioningThe Value of Building Commissioning
The Value of Building Commissioning
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
 
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
 
Last Update of Hesham Mokhtar's CV
Last Update of Hesham Mokhtar's CVLast Update of Hesham Mokhtar's CV
Last Update of Hesham Mokhtar's CV
 

Similar to RESUME=

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
Adnan Rehmat
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
Murugan murugan
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C
 

Similar to RESUME= (20)

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Kazi nazmul cv with all attachments
Kazi nazmul cv with all attachments Kazi nazmul cv with all attachments
Kazi nazmul cv with all attachments
 
SELVAM.CV
SELVAM.CVSELVAM.CV
SELVAM.CV
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 

RESUME=

  • 1. Nam x x Disciplin Educati Diploma School State Bo RVD co Experie Position Duration Employ Type of Type of Type of Type of Scope o Working me:MAHAM 18 Years of Substations Good pers Project obje ne: Mechan ion: Bachole a in Mecha oard of Tec ollege of Eng ISO 9001 (QM A Cour x x x x x nce : n :Q n : D yer : S (C Project : S C Project : N ( Project : A ( Project : R S of Employer g as QUALIT KEY ED IBRAHIM Exclusive Ex s, Water &Po onality and ectives on s nical Engine er degree in nical Engine hnical Educ gineering, :2015 Aud S Auditor / rse on NDT NDT Level NDT Level NDT Level NDT Level NDT Level QA/QC MAN Dec. 2010–T Saudi Servic Closed Joint Shoaiba Pha orporation( National Wa (2012 Sep. to Al-Adel 380/ (2013 Sep. to Royal comm Saudi Arabia r’s Contract SSEM - A Al-Ma'a P.O. Bo Kingdom Tel: (966 Y ASSURANC Y PERS Page Ͳ M Prop Ema xperience in ower Plant, d drive to m success &En eer n MECHANI eering D cation, Tam itor/ LeadA / Lead Aud and Fractu II (VT) Visu II (LPT) Liqu II (RTFI) Ra II (RT) Rad II (MPT) Ma NAGER TILL ces for Elect t Stock Com ase III Wate SWCC), Jed ater Compa o 2013 June /110/13.8KV o july 2014) mission cont a (2014 Sep t: Constructi AL-RASHID T athar Street, x 6341,Riyad m of Saudi A 6-11-462551 CE MANAG SONNE Ͳ 1 Ͳ of 6 osed Positio ail : ent n Construct oil and gas manage dire nforcement English Sp CAL ENGIN Dates of Atte ilnadu AuditorTrai ditor-cert # ure Mecha al Testing uid Penetra diographic iographic agnetic Pa ro Mechan mpany) r Transmissio ddah, Saud any – RWSP e) V BSP Projec tract 108-C0 p. to Till date ion of Pum TOWER , dh 11442 Arabia 1 GER in (SSEM EL RESU on: QA/QC teribra@gm tion And Qu s projects, a ect and gu of safety c peaking Cap EERING endanceDe ining Cours # AG-QMSL anics. ant Testing c Testing Fi Testing article Testi ics Work Co on System, S di Arabia (20 , Riyadh, Sa ct, Jeddah, 01 potable e) p station& p M) UME MANAGER ail.com uality Projec and petroch uide the tea odes at site pabilities: V egree/Cert. se Success LAC-2016-0 g ilm Interpre ing o. Saline Wate 010 Dec. to audi Arabia Saudi Arab water tank potable wa Age: 41 ct Managem hemical pla am to achi e. Very Good Nationality: sfully comp 02-13) etation er Conversio 2011 Dec.) ia Project, Jub ater stroage ment, Of ant. ieve the Indian pleted on bail, tank
  • 2. KEY PERSONNEL RESUME Page Ͳ 2 Ͳ of 6 x The Quality Assurance Manager is responsible for Identifying those requirements of ISO 9001: 2008 to be Implemented in the Quality Management System (QMS) -Experience in developing and establishing multi-disciplinary construction field quality plans and procedures. x As a Head of the Quality Department, assigning quality personnel to various areas of Activities. x Review, Approve and issue of all Quality Records generated during Project. Assigning Quality related task within the framework of project quality. x Manage full organization of QA activities and personnel x Prepare, review and approve project quality plan x Prepare inspection procedures x Prepare Inspection test Plan (ITP) x Review and approved material requisition package x Review and approved Inspection Assignment Package x Apply audit and assessment requirements x Gather and analyze relevant process data x Interview / review prospective personnel x Ensure correct control of documents and data x Evaluate personnel and propose training x Ensure maximum efficiency of resources x Coordinate with the client items related to quality x Communicate with all involved personnel on Quality issues x Responsible for the implementation of project site Quality Management System for the construction activities x Communicate with all involved personnel on Quality issues x Review project and other relevant specifications and standards x Prepare project quality documents for internal audit x Supervise and monitor the project quality personnel group x Allocates quality control personnel to the various respective areas of concern x Plan mobilization and de-mobilization of quality control personnel on the project x Conduct quality meeting with his QC inspectors team x Evolution /Review of Non-Conformances, establishing the root Cause and advising the Corrective action for Prevention. x Preparation of Monthly Quality Report for Submission to Customer. Evaluating Cost of Quality. x Arranging and conducting management reviews. x Evaluation of Supplier / Sub-Contractors quality System and Preparation of Report. Preparation of Inspection assignment packages. x Review of requisition and purchase orders of Compliance with correct requirements. Review & Recommendation of Sub-Vendors Quality Procedures. x Preparing agenda for Pre-inspection Meeting (PIM)-Co-ordinate Inspection at Source. Ensure Inspection assignment Packages are correctly distributed. Specific Duties and Responsibilities / Scope of Work : x Monitoring the execution of project as per project schedule. x Co-ordinate and supervise commissioning and construction work teams and plan future work programs.
  • 3. KEY PERSONNEL RESUME Page Ͳ 3 Ͳ of 6 x Coordinate with civil/mechanical project engineers and supervisors to manage impact on other activities. x Prepare and get approvals from ILF consultants for erection clearance check (ECC), safety clearance check (SCC) and pre- commissioning clearance check (PCC) of HVAC systems and firefighting systems. x Erection of EOHTCrane, RO & Piping and HVAC systems as per project specifications. x Daily and weekly work achieving planning with forecast requirements fulfilling. x Prepare and get approvals from consultants for erection clearance check safety clearance check and pre- commissioning clearance check of HVAC systems and firefighting systems. x Prepare as built drawing of HVAC systems and firefighting system and get approvals from consultants x Get approval from consultant for TAB reports (HVAC testing adjusting @ balancing for air systems). x Study IFC drawing and suggest modification to avoid any technical problems. x Responsible in performing Daily Inspection and Reporting as per approved Inspection Test Plan x Verification for Incoming Materials based on Material Certification and Engineering Documentation Information such as Drawing and others document that related to the Materials. x Ensure the quality of the work is as per quality assurance plan of the project by performing field inspection x Witnessing the pressure test based on a system and sub system wise along with the client , x Preparation of the project execution plan and project procedures as per Clients requirements x Safety requirements to be ensuring while executing critical jobs. Position :SENIOR MECHANICAL ENGINEER/ QC Duration : Apr.2007 – 2008 Employer : AL-TUWIRQI GROUP. Type of Project:POWER PLANT-120MW Scope of Employer’s Contract: Construction of 110kv Substation at Power plant Dammam AL-TUWIRQI GROUP. (Power Generation Plant) Dammam Industrial City -2 P.O. Box 7600 Dammam 31472 Saudi Arabia Tel.: +966 3 8123735 Specific Duties and Responsibilities / Scope of Work : x Provide guidelines to the QA/QC Document engineer in preparation and compilation of incoming/outgoing communications, correspondences and inspection reports associated with QA/QC Department ready for audit and reviews them. x Making appropriate changes if it is not possible to carry out the work as per IFC. Informing site PMD/PQS about the changes & getting approval. x Plan and review project work as per guidelines of Project manager. x Organizing and coordinating equipment deliveries and procurement activities. x Expediting delivery of materials and equipment for their timely on-site delivery. x Responsible for the implementation of projects as per contact documents in the most cost effective manner and to perform regular field surveying. x Coordinating with Client and Contractors for smooth execution of the project.
  • 4. KEY PERSONNEL RESUME Page Ͳ 4 Ͳ of 6 x Review the drawings, reports, specification submitted by Consultant to ensure completeness, correctness, comply with the scope of work and requirements. x Carry out constructability review in timely manner to the sub Contractors’ submittals and forward the comments to the consultant. x Monitring and Controlling of Project Performance and Taking corrective Actions x Ensure that the Contractor’s as-built drawings and operations and maintenance manuals are in order. Position :MECHANICAL ENGINEER Duration :JUNE 2005 – FEB. 2007 Employer : Kuwait National Petrolum Co Type of Project:KNPC-Maintenance Scope of Employer’s Contract: kr-32 KUWAIT NATIONAL PETROLUM CO Corporate Office P.O. Box: 24081 Safat 13101 Kuwait Tel: +965 (2) 2259000 Specific Duties and Responsibilities / Scope of Work : x To monitor welding activities as per Project specifications and Procedures, Review the subcontractor Daily Weld Report. x Witnessing & reviewing of non-destructive tests such as radiographic test (RT), ultrasonic test (UT), penetrate test (PT) and magnetic particle inspection (MPI). x Material Receiving Inspection Records (MRIR) monitoring including Unpacking Inspection of Material/Equipment’s at Site. x Verification for Incoming Materials based on Material Certification and Engineering Documentation Information such as Drawing and others document that related to the Materials. x Responsible in performing Daily Inspection and Reporting as per approved Inspection Test Plan. x Witnessing of PQR/WPS – Welder’s qualification test on Carbon Steels and Stainless Steel materials of various projects. x Ensure the quality of the work is as per quality assurance plan of the project by performing field inspection. Position : MECHANICALENGINEER Duration :JAN 2001 – JUNE 2004 Employer : MMG Type of Project:CONSTRUCTION OF PETROCHEMICAL PLANT HASIM AL MUSHAWAI EST. King Fahed Road, Ibn Khaldoun P.O. Box 1131, Dammam 31411 Saudi Arabia +966-3-842-1111 Specific Duties and Responsibilities / Scope of Work : x Monitoring the QA / QC documentation of the subcontractors and ensure that all activities are incorporated to their system on daily basis and can be traced according to project requirement. x Review of subcontractors welding procedure specifications (WPS), procedure qualification record (PQR), and welder qualification test (WQT). x Conducting tool box talks for welders, fitters, helpers on a weekly basis and maintaining the report for the same. x Preparing & maintaining welding log books and finally submit to the Consultant.
  • 5. KEY PERSONNEL RESUME Page Ͳ 5 Ͳ of 6 x Raising RFIs & MRIs as per the Site Engineer’s request and witness for the inspections. x Witnessing the pressure test based on a system and sub system wise along with the client and clears the test package if test is successfully executed. x Welder Qualification Test Fit up inspection, Weld visual inspection, Insulation& HSS Inspection, Painting Inspection. x Tests pack preparation and Raw material inspection. x Taking necessary actions to control the Repairs in the Welds. x Implement the project quality control procedures, inspections and test plans, and construction procedures. x Implement the surveillance inspection program over subcontractors to ensure conformity to project specifications/standards. x Implement and verify the document control process at site. x Witnessing the pressure test based on a system and sub system wise along with the client and clears the test package if test is successfully executed. x Reviewing the test packages as per the test pack management procedure and checks the punch list for clearance. x To be self-motivated, flexible to cover other discipline activities if required, work as a team member with multi culture / national personnel. x Daily Coordination with contractors and subcontractor. x Preparation of the project execution plan and project procedures as per Societies requirement. Planning and monitoring project progress and status on deliverables. x Co-ordination with suppliers for various technical related activities and support for closing the punch list items which are related to them. Position : MECHANICAL ENGINEER Duration :APRIL 1997 – JUNE 2000 Employer : AL-FARIS EST JUABIL, Type of Project:CONSTRUCTION OF GAZZLAN POWER PLANT PHASE #II AL-FARIS EST . King Abdullah Road, P.O. Box 1657, Jubail 31941 Saudi Arabia +966-3-342-1751 x Management, site development, grading oil underground utilities such as water tanks, water drainage, drinking and fire water hydrant etc. x Supervise the site to meet the project needs. x Review of material shop drawings of structural and architectural discipline according to the specification standards. x Incorporating the site change / deviation. x In charge of all sites related to the contractor. x Project scheduling, site, site lay out, supervision labor management. x Preparation of payment certificates. x Monitor monthly progress of accomplishments. x Coordination with clients for payments. Position : MECHANICAL SITE ENGINEER Duration : AUG 1994 – JAN 1997 Employer : MARUTHI INDUSTRIES, Type of Project:CONSTRUCTION OF HEAT EXCHANGERS &COOLING TOWERS MARUTHI EST . D.B. Road, Coimbatore India-642126
  • 6. KEY PERSONNEL RESUME Page Ͳ 6 Ͳ of 6 x Supervise the site to meet the project needs. x Review of material shop drawings of structural and architectural discipline according to the specification standards. x Incorporating the site change / deviation. x In charge of all sites related to the contractor. x Project scheduling, site, site lay out, supervision labor management. x Monitor monthly progress of accomplishments x Preparation of payment certificates. Personal Profile Father’s Name : Abdul Jabbar Age : 41 YEARS Marital Status : Married Nationality : Indian Language Known : English, Hindi, Malayalam& Tamil. Driving License : Saudi Arabia & India Mobile no : 0597193035