SlideShare a Scribd company logo
1 of 7
C U R R I C U L U M V I T A E 
JAFAR HUSSAIN 
S/O: MUHAMMAD ANWAR 
Permanent Address: Kot Hayat Khan Check No 171/ R-B Tehsil Safadarabad, 
District Nankana 
Cell Phone No: +966506410644 
+923424014756 
E-mail: Jafarhussain@atsc-sa.com, 
Jafar.atsc@gmail.com 
Objective 
Aspiring to achieve a suitable challenging position in Organizational Team Structure 
where opportunities exist for development & Growth 
Experience & Academic Summary : ( Over All 8+years of professional Experience in 
Project Engineering Designing & Execution in Multinational Commercial Field 
Two years excellent experience in the Project Management in Electro- 
Mechanical field in Saudi Arabia 
Five & half years experience in MEP Designing, Estimation, Planning & Execution 
field with Pakistanis companies (particulars referred below) 
All type of HVAC, Fire fighting, Plumbing & Electrical works execution 
Expertise in Designing, Estimation, Planning & Execution of All MEP Commercial 
Construction & Renovations Projects. 
Academic Qualification 
B. TEC H (Mechanical Power with Specialization in Ref. & Air-Conditioning) 
From: - University of Engineering and Technology Lahore. 
1st division from UET Lahore: 
D.A.E (Mechanical Power with Specialization in Ref. & Air-Conditioning) 
From: - Government College of Technology Railway Road Lahore 
1st division in Punjab Board of Technical Education at all 
Three Years 
MATRIC (Science Subjects) 
From: - From White Rose High School Manawala
1st Division in Board of Intermediate and Secondary 
Education, Lahore 
WORKING ORGANIZATION DETAIL 
Organization: ADVANCE TELECOM SYSTEM FOR CONTRACTING 
Riyadh -11351 P.O. Box: 51-C.O.C Member No. 137981 
From December 2012 to Till Date 
Designation; Project Manager (Electro-Mechanical) 
Executed Project; Prince Sultan Air Base @ Al-Kharj Project Saudi Arabia 
Client: Management of Prince Sultan air base 
Military Industrial Corporation@ Al-Kharj Project Saudi Arabia 
Client: Military Industrial Corporation 
Organization: IZHAR GROUP OF COMPANIES/MEP SOLUTION (PVT) LTD 
Office # 3 First Floor Ross Residencial, 234-Dhana Singhwala, 
1-Campus Road, Canal Bank Lahore, Pakistan. 
From June 2010 to November 2012 
Designation; Deputy Project Manager (MEP) 
Executed Project; Attock Oil Office Building On Morgah Road, Rawalpindi 
Client: Attock Leisure Management associates 
Nust Examination Centre, Islamabad, 
Client: Management of Nust University 
Organization: AL-JAWAHIR TECHNICAL PAKISTANIAN CONTRACTING LLC 
/ TECHNICAL ASSOCIATES PAKISTAN (PVT) LTD 
4-Bawa Park, Upper mall, LAHORE 
From August 2008 to June 2010 
Designation; Mechanical Engineer 
Executed Project; 250 BED H.H. Shaikh Khalifa Bin Zayed Al Hospitals at 
Muzaffarabad, Azad Kashmir, Pakistan. 
Client: Department of Municipal affairs municipality of Abu 
Dhabi city United Arab Emirates 
Designation; Project Coordinator
Executed Project; 250 BED H.H. Shaikh Khalifa Bin Zayed Al Hospitals at 
Rawalakot, Azad Kashmir, Pakistan. 
Client: Department of Municipal affairs municipality of Abu 
Dhabi city United Arab Emirates 
Organization: H. A CONSTRUCTION (CONTRACTOR) 
10-B/295, TUFAIL ROAD, LAHORE CANTT, LAHORE 
From July, 2007 to August 2008 
Designation; Site Supervisor 
Executed Project; TAVUUN HOCKEY STADIUM LAHORE 
Client: TAVUUN UAE 
INTERNATIONAL SAILKOT AIR PORT. 
Client: Sail Group Pakistan 
Professional Experience 
Responsibilities : 
· Tendering, Estimation and procurement of Building Construction (MEP Works) 
and Infrastructure large scale projects. 
· Reviewing tender documents, including scope of work, BOQ, drawings and 
specifications 
· Enlisting all the items in the BOQ for the inquiries to be floated to suppliers. 
· To plan and implement engineering program, including defining project 
philosophy, activities, milestones, and manpower projection as per 
customer/contract requirements. 
· MIR & RFI with consultant and client. 
· Preparation of Technical Material Submittals, Method of Statement and 
Inspection, Testing Plan as per project documents for Approval of consultant, 
client and project management. 
· Frequent Sites Visits for Projects Feasibilities that Include Shop Drawings and all 
other Works Related to MEP and HVAC. 
· Coordination with Consultant, Project Management and Client 
· To develop and maintain schedule and budget for assigned projects. 
· To provide reports on the status of project milestone and to adjust the schedule 
according. 
· To ensure the execution for compliance with engineering principles, company’s 
standards, customer requirements/contract specification. 
· To coordinate activities concerned with technical development, scheduling and 
resolving engineering design problems. Evaluating design changes,
specifications and As-built drawing releases. 
· To prepare interim and monthly completion project reports and get it certified 
by client/consultant/contractor whichever is needed. 
· To lead a project team and facilitate the communication and interaction 
amongst the functional representative. 
· Preparation for the tracking of project against its schedule, budget and against 
phase review objectives. 
· To assist the top management to develop and implement recovery plans for off 
schedule and unanticipated eventualities. 
· To prepare and conduct project meeting with client, contractor and consultant. 
· To prepare requisitions for equipment’s, materials and miscellaneous items as 
required, more specifically at the beginning of project and on a weekly basis. 
· To provide feedback to management regarding employee performance. 
· To support supervisors, foremen, technicians and field labor to achieve 
deadlines and specification. 
· To recommend new processes where needed for quality improvement, cost 
reduction and on time delivery. 
· Cooperation and guide to QC teams up with their inspections. Provide 
information relevant to the quality Audit, knowledge deficiency reports, provide 
reasons, take corrective actions and to ensure the project works carried out as 
per contract specification/standards. 
· Arrangements of quotation/rates from venders for filling of Tenders/BOQ’s. 
Scheduling & budgeting of the project. 
· Extraction of required material as per schedule for procurement and selection 
of vender/suppliers & manufacturer for the supply of required material. 
· Inventory control of all material to avoid wastages and Checking and inspection 
of material for projects.. 
· Assistance In Making Company’s Tender for Client 
· Material Quantity (BOQ) Calculations and processing of Bills of MEP and HVAC 
Works 
· Making HVAC Drawings on Auto-CAD (Coordination, Shop and As Built 
Drawings). 
· Record Keeping 
· Pump Head Calculation of Different On Going Project and Involvement in HVAC 
Duct/Pipe Designing. 
· Checking, Correction and Measurements of Bill Item's, 
Estimation & Procurement Responsibilities: 
· As a team Leader monitors all Estimation & Procurement activities. 
· Technical and commercial Comparison of the material as per project 
documents. 
· Negotiation and issuing of the LOI and Purchase Order.
Key Skills 
Over 7+ years of experience in, execution, Supervision, of different nature of 
projects, and monitoring of day to day site activities, controlling the quality of 
work, inspection and solving site problems regarding contractors, checking of 
drawings, Coordination of structural, architectural, electro-mechanical activities 
of the project, project monitoring, verification of bills, dealing with clients, 
consultants, contractor, manufacturers and suppliers. Mostly participate in a 
different kind of activity as 
· Designing & Execution of Complete Air Conditioning work (Ducting 
and Piping works, Fire Damper, Split Demper, Sound Attenuator, 
Access Panels Chiller, AHU’s, FCU’s, Secondary & Primery Pumps , 
VFD pumps, Air Separators, Package machines, VAV System, VRF 
System, Cooling Tower Etc) 
· Execution of Complete Fire Fighting Works (Piping works, Fire 
Sprinkler, Fire extinguisher, Fire Hose Cabinet, Fire Hydrant, Fire 
Breaching Oulet Fire Pumps, Fire Alram Check Valve, Zone Control 
Assebly Etc) 
· Execution of Complete Plumbing Work (UPVC & PPR Piping, PRV, 
Sanitary ware & Fixture Etc) 
· Execution of complete Irrigation System (P.E Piping Works, 
irrigation Hydrant, POP Up Sprinkler system, Solenoid Valves 
Control stations Etc.) 
· Execution of Electrical Work (Conduiting, Wiring, DB’s, MCC’s, HT 
& LT Panels, lights, Pole Lights, Dus Tie Ducts Etc) 
· Execution of Low Current System IP base and conventional 
system, (Fire Alarm System, Public Address System, CCTV, MATV, 
Computer Networking system, Nurse Call System etc.) 
· Execution of Complete Building management system (Conduiting 
& Wiring work, DDC Panels, Room Thermostate, Motor/Damper 
Actuator,Temperature & Humidity Sensor, Smoke Detector VAV 
System Etc) 
· New Installation & Renovation of complete Sewage Treatment 
Plants and Water Treatment plants. 
Computer Skills & Training 
1. Computer Information Technology (Diploma of Three month C.I.T) 
From: - Hera College of Technology Sheikhpura. 
2. AutoCAD (Diploma of Three months) 
From: - Government College of Technology Railway Road Lahore.
3. Project management professional (36 PDU’s) 
Other Expertise: Installation and Using the HVAC Load Calculation Software, Installation 
of other Software’s, Troubleshooting of Hardware and Internet Application. 
Reference 
Reference could be furnished, if required.
3. Project management professional (36 PDU’s) 
Other Expertise: Installation and Using the HVAC Load Calculation Software, Installation 
of other Software’s, Troubleshooting of Hardware and Internet Application. 
Reference 
Reference could be furnished, if required.

More Related Content

What's hot

What's hot (17)

Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Resume
ResumeResume
Resume
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
JBA_CV_updated
 
Bill resume
Bill resumeBill resume
Bill resume
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 

Similar to jafar hussain 07-06-2014

Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updatedMOHAMED ILYAS
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerSidharth Sunny
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123abdul suboor
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy GandhiNallu Samy
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerOmer Mohammed
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manageryasir arafath
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 

Similar to jafar hussain 07-06-2014 (20)

Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
RESUME=
RESUME=RESUME=
RESUME=
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
CV
CVCV
CV
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manager
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 

jafar hussain 07-06-2014

  • 1. C U R R I C U L U M V I T A E JAFAR HUSSAIN S/O: MUHAMMAD ANWAR Permanent Address: Kot Hayat Khan Check No 171/ R-B Tehsil Safadarabad, District Nankana Cell Phone No: +966506410644 +923424014756 E-mail: Jafarhussain@atsc-sa.com, Jafar.atsc@gmail.com Objective Aspiring to achieve a suitable challenging position in Organizational Team Structure where opportunities exist for development & Growth Experience & Academic Summary : ( Over All 8+years of professional Experience in Project Engineering Designing & Execution in Multinational Commercial Field Two years excellent experience in the Project Management in Electro- Mechanical field in Saudi Arabia Five & half years experience in MEP Designing, Estimation, Planning & Execution field with Pakistanis companies (particulars referred below) All type of HVAC, Fire fighting, Plumbing & Electrical works execution Expertise in Designing, Estimation, Planning & Execution of All MEP Commercial Construction & Renovations Projects. Academic Qualification B. TEC H (Mechanical Power with Specialization in Ref. & Air-Conditioning) From: - University of Engineering and Technology Lahore. 1st division from UET Lahore: D.A.E (Mechanical Power with Specialization in Ref. & Air-Conditioning) From: - Government College of Technology Railway Road Lahore 1st division in Punjab Board of Technical Education at all Three Years MATRIC (Science Subjects) From: - From White Rose High School Manawala
  • 2. 1st Division in Board of Intermediate and Secondary Education, Lahore WORKING ORGANIZATION DETAIL Organization: ADVANCE TELECOM SYSTEM FOR CONTRACTING Riyadh -11351 P.O. Box: 51-C.O.C Member No. 137981 From December 2012 to Till Date Designation; Project Manager (Electro-Mechanical) Executed Project; Prince Sultan Air Base @ Al-Kharj Project Saudi Arabia Client: Management of Prince Sultan air base Military Industrial Corporation@ Al-Kharj Project Saudi Arabia Client: Military Industrial Corporation Organization: IZHAR GROUP OF COMPANIES/MEP SOLUTION (PVT) LTD Office # 3 First Floor Ross Residencial, 234-Dhana Singhwala, 1-Campus Road, Canal Bank Lahore, Pakistan. From June 2010 to November 2012 Designation; Deputy Project Manager (MEP) Executed Project; Attock Oil Office Building On Morgah Road, Rawalpindi Client: Attock Leisure Management associates Nust Examination Centre, Islamabad, Client: Management of Nust University Organization: AL-JAWAHIR TECHNICAL PAKISTANIAN CONTRACTING LLC / TECHNICAL ASSOCIATES PAKISTAN (PVT) LTD 4-Bawa Park, Upper mall, LAHORE From August 2008 to June 2010 Designation; Mechanical Engineer Executed Project; 250 BED H.H. Shaikh Khalifa Bin Zayed Al Hospitals at Muzaffarabad, Azad Kashmir, Pakistan. Client: Department of Municipal affairs municipality of Abu Dhabi city United Arab Emirates Designation; Project Coordinator
  • 3. Executed Project; 250 BED H.H. Shaikh Khalifa Bin Zayed Al Hospitals at Rawalakot, Azad Kashmir, Pakistan. Client: Department of Municipal affairs municipality of Abu Dhabi city United Arab Emirates Organization: H. A CONSTRUCTION (CONTRACTOR) 10-B/295, TUFAIL ROAD, LAHORE CANTT, LAHORE From July, 2007 to August 2008 Designation; Site Supervisor Executed Project; TAVUUN HOCKEY STADIUM LAHORE Client: TAVUUN UAE INTERNATIONAL SAILKOT AIR PORT. Client: Sail Group Pakistan Professional Experience Responsibilities : · Tendering, Estimation and procurement of Building Construction (MEP Works) and Infrastructure large scale projects. · Reviewing tender documents, including scope of work, BOQ, drawings and specifications · Enlisting all the items in the BOQ for the inquiries to be floated to suppliers. · To plan and implement engineering program, including defining project philosophy, activities, milestones, and manpower projection as per customer/contract requirements. · MIR & RFI with consultant and client. · Preparation of Technical Material Submittals, Method of Statement and Inspection, Testing Plan as per project documents for Approval of consultant, client and project management. · Frequent Sites Visits for Projects Feasibilities that Include Shop Drawings and all other Works Related to MEP and HVAC. · Coordination with Consultant, Project Management and Client · To develop and maintain schedule and budget for assigned projects. · To provide reports on the status of project milestone and to adjust the schedule according. · To ensure the execution for compliance with engineering principles, company’s standards, customer requirements/contract specification. · To coordinate activities concerned with technical development, scheduling and resolving engineering design problems. Evaluating design changes,
  • 4. specifications and As-built drawing releases. · To prepare interim and monthly completion project reports and get it certified by client/consultant/contractor whichever is needed. · To lead a project team and facilitate the communication and interaction amongst the functional representative. · Preparation for the tracking of project against its schedule, budget and against phase review objectives. · To assist the top management to develop and implement recovery plans for off schedule and unanticipated eventualities. · To prepare and conduct project meeting with client, contractor and consultant. · To prepare requisitions for equipment’s, materials and miscellaneous items as required, more specifically at the beginning of project and on a weekly basis. · To provide feedback to management regarding employee performance. · To support supervisors, foremen, technicians and field labor to achieve deadlines and specification. · To recommend new processes where needed for quality improvement, cost reduction and on time delivery. · Cooperation and guide to QC teams up with their inspections. Provide information relevant to the quality Audit, knowledge deficiency reports, provide reasons, take corrective actions and to ensure the project works carried out as per contract specification/standards. · Arrangements of quotation/rates from venders for filling of Tenders/BOQ’s. Scheduling & budgeting of the project. · Extraction of required material as per schedule for procurement and selection of vender/suppliers & manufacturer for the supply of required material. · Inventory control of all material to avoid wastages and Checking and inspection of material for projects.. · Assistance In Making Company’s Tender for Client · Material Quantity (BOQ) Calculations and processing of Bills of MEP and HVAC Works · Making HVAC Drawings on Auto-CAD (Coordination, Shop and As Built Drawings). · Record Keeping · Pump Head Calculation of Different On Going Project and Involvement in HVAC Duct/Pipe Designing. · Checking, Correction and Measurements of Bill Item's, Estimation & Procurement Responsibilities: · As a team Leader monitors all Estimation & Procurement activities. · Technical and commercial Comparison of the material as per project documents. · Negotiation and issuing of the LOI and Purchase Order.
  • 5. Key Skills Over 7+ years of experience in, execution, Supervision, of different nature of projects, and monitoring of day to day site activities, controlling the quality of work, inspection and solving site problems regarding contractors, checking of drawings, Coordination of structural, architectural, electro-mechanical activities of the project, project monitoring, verification of bills, dealing with clients, consultants, contractor, manufacturers and suppliers. Mostly participate in a different kind of activity as · Designing & Execution of Complete Air Conditioning work (Ducting and Piping works, Fire Damper, Split Demper, Sound Attenuator, Access Panels Chiller, AHU’s, FCU’s, Secondary & Primery Pumps , VFD pumps, Air Separators, Package machines, VAV System, VRF System, Cooling Tower Etc) · Execution of Complete Fire Fighting Works (Piping works, Fire Sprinkler, Fire extinguisher, Fire Hose Cabinet, Fire Hydrant, Fire Breaching Oulet Fire Pumps, Fire Alram Check Valve, Zone Control Assebly Etc) · Execution of Complete Plumbing Work (UPVC & PPR Piping, PRV, Sanitary ware & Fixture Etc) · Execution of complete Irrigation System (P.E Piping Works, irrigation Hydrant, POP Up Sprinkler system, Solenoid Valves Control stations Etc.) · Execution of Electrical Work (Conduiting, Wiring, DB’s, MCC’s, HT & LT Panels, lights, Pole Lights, Dus Tie Ducts Etc) · Execution of Low Current System IP base and conventional system, (Fire Alarm System, Public Address System, CCTV, MATV, Computer Networking system, Nurse Call System etc.) · Execution of Complete Building management system (Conduiting & Wiring work, DDC Panels, Room Thermostate, Motor/Damper Actuator,Temperature & Humidity Sensor, Smoke Detector VAV System Etc) · New Installation & Renovation of complete Sewage Treatment Plants and Water Treatment plants. Computer Skills & Training 1. Computer Information Technology (Diploma of Three month C.I.T) From: - Hera College of Technology Sheikhpura. 2. AutoCAD (Diploma of Three months) From: - Government College of Technology Railway Road Lahore.
  • 6. 3. Project management professional (36 PDU’s) Other Expertise: Installation and Using the HVAC Load Calculation Software, Installation of other Software’s, Troubleshooting of Hardware and Internet Application. Reference Reference could be furnished, if required.
  • 7. 3. Project management professional (36 PDU’s) Other Expertise: Installation and Using the HVAC Load Calculation Software, Installation of other Software’s, Troubleshooting of Hardware and Internet Application. Reference Reference could be furnished, if required.