The document provides a resume for Mohammad Hasnat, who has over 14 years of experience as an instrumentation quality and control inspector and engineer. He has worked on numerous projects in Saudi Arabia for companies like Saudi Aramco, conducting inspections and ensuring quality control. His responsibilities included implementing quality plans, inspecting instrumentation installations, preparing reports, and being familiar with international codes and standards. He is seeking new opportunities as an innovative professional who can respond to challenges in the field of instrumentation.
I am submitting to express my keen interest in the position Sr. Electrical & Instrument Engineer
I am currently worked as Sr. Instrument Field Engineer at Egypt Khalda Petroleum Company (Apache) with 10+ years of overall experience at Construction, commissioning, start-up, planning and Engineering and I Expected Monthly Salary As project budget however my last total net salary 6300$
I worked as QA/QC E&I Engineer / Inspector at the world's largest gas to liquids (GTL) Pearl plant in Qatar, The plant a joint development by Qatar Petroleum and Shell, GTL feed about 15% of worldwide gas resources.
I worked as Sr. QA/QC E&I Engineer / Inspector client (SEPOC, SAFER Exploration & Production Operations Company) representative at the largest project at Yemen Central Processing Unit (CPU) LNG plant at Marib area with total and YLNG joint.
I worked as Sr. Electrical and Instrument Engineer /Supervisor at the largest project at Egypt, with Samsung Engineering.
Dear Sir/ Madam,
Good day!
Hope my Mail finds you well, and greetings to your good-self and your respected family,
I am Manoj Kumar and i have 11 years of working experience in instrumentation and i have attached my CV and all scanned documents along with this mail kindly acknowledge me once you receive my mail.
Skype id : manojkumar2870
Notice Period: Immediate
Thanks With Best Regards,
Manoj Kumar
M: +917506966847
Email:manojk940@yahoo.com
je vous prie de trouver ci-joint mon curriculum vitae. Comme vous pourrez le constater a sa lecture, depuis près de 7 ans, j'ai acquis une riche expérience dans le domaine Instrumentation .
Maintenant je travailler à CNDG de Hassi R'mel avec ABB mais le projet est en voie d'achèvement, je recherche un emploi de superviseur en instrumentation secteur pétrolier ou d'autres secteur .
Je suis très intéressé à travailler dans votre entreprise,en souhaitant que ma candidature retienne votre attention et restant à votre entière disposition pour tout entretien à votre convenance.
Je vous remercie de votre temps et de votre considération, et j'ai hâte d'avoir de vos nouvelles bientôt.
• A competent professional with over 8 years of rich & versatile experience in Quality Control & Inspection and Instrument Maintenance commissioning-pre commissioning Operations (Onshore) in India & Middle East across Oil & Gas industry
• Well versed with the concepts of process control, calibration, loop checking, pre-commissioning, commissioning and troubleshooting for Pneumatic, Electro-Pneumatic & Smart Instruments
• Holds the merit of working with renowned organizations like Supreme Group FZE (Fuels), Qatar Engineering & Construction Company W.L.L., Petromar (Saipem) Soyo Base, Hofincons Infotech Industrial Services, J Ray Mc Dermott Middle East Inc. and Sabero Organics Gujarat Ltd.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
I am submitting to express my keen interest in the position Sr. Electrical & Instrument Engineer
I am currently worked as Sr. Instrument Field Engineer at Egypt Khalda Petroleum Company (Apache) with 10+ years of overall experience at Construction, commissioning, start-up, planning and Engineering and I Expected Monthly Salary As project budget however my last total net salary 6300$
I worked as QA/QC E&I Engineer / Inspector at the world's largest gas to liquids (GTL) Pearl plant in Qatar, The plant a joint development by Qatar Petroleum and Shell, GTL feed about 15% of worldwide gas resources.
I worked as Sr. QA/QC E&I Engineer / Inspector client (SEPOC, SAFER Exploration & Production Operations Company) representative at the largest project at Yemen Central Processing Unit (CPU) LNG plant at Marib area with total and YLNG joint.
I worked as Sr. Electrical and Instrument Engineer /Supervisor at the largest project at Egypt, with Samsung Engineering.
Dear Sir/ Madam,
Good day!
Hope my Mail finds you well, and greetings to your good-self and your respected family,
I am Manoj Kumar and i have 11 years of working experience in instrumentation and i have attached my CV and all scanned documents along with this mail kindly acknowledge me once you receive my mail.
Skype id : manojkumar2870
Notice Period: Immediate
Thanks With Best Regards,
Manoj Kumar
M: +917506966847
Email:manojk940@yahoo.com
je vous prie de trouver ci-joint mon curriculum vitae. Comme vous pourrez le constater a sa lecture, depuis près de 7 ans, j'ai acquis une riche expérience dans le domaine Instrumentation .
Maintenant je travailler à CNDG de Hassi R'mel avec ABB mais le projet est en voie d'achèvement, je recherche un emploi de superviseur en instrumentation secteur pétrolier ou d'autres secteur .
Je suis très intéressé à travailler dans votre entreprise,en souhaitant que ma candidature retienne votre attention et restant à votre entière disposition pour tout entretien à votre convenance.
Je vous remercie de votre temps et de votre considération, et j'ai hâte d'avoir de vos nouvelles bientôt.
• A competent professional with over 8 years of rich & versatile experience in Quality Control & Inspection and Instrument Maintenance commissioning-pre commissioning Operations (Onshore) in India & Middle East across Oil & Gas industry
• Well versed with the concepts of process control, calibration, loop checking, pre-commissioning, commissioning and troubleshooting for Pneumatic, Electro-Pneumatic & Smart Instruments
• Holds the merit of working with renowned organizations like Supreme Group FZE (Fuels), Qatar Engineering & Construction Company W.L.L., Petromar (Saipem) Soyo Base, Hofincons Infotech Industrial Services, J Ray Mc Dermott Middle East Inc. and Sabero Organics Gujarat Ltd.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
THIRTEEN (13.4) years of extensive experience as Mechanical ,Piping , Shutdown project, Material Inspection/Material Prevention in Laydown Area or site area/ Structural QA/QC Inspector & QC Supervisor in Mechanical field of construction in various projects like Oil & Gas Industries, Petro chemicals, Chemical Plants, high rise building and infrastructure sector.
I would like to enroll in your esteemed organization as a candidate for an opening in the field of QA/QC Manager . I expect to here from your end in near future.
Excellent planner and strategist with proven abilities in surveying the projects of all kinds of earth works, power plant, chemical plant, water treatment plant, oil & gas plant etc.
Strong analytical and Organizational abilities with skills to plan and implement novel ideas
1. 1
MOHAMMAD HASNAT
INSTRUMENT QA/QC INSPECTOR / ENGINEER
Mob:+966-531303443
E-mail:hsntmksd@gmail.com
CAREER PROFILE:-
Having overall 14 years experience in the field of Instrumentation Quality & Construction
and familiar with the International Industry Codes and Standards.
Worked in various projects of SAUDI ARAMCO, KNPC, SIPCHEM, etc as an Instrument QA/QC
InspectorandEngineer.
To emerge as an innovative professional and applying various concepts to new situation so as
to enable myself to respond to various challenges in the field of Instrumentation.
EXPERIENCE AND JOB RESPONSIBILITIES:
Regular surveillance and conduct inspection of construction activities as per ITP and project
specification.
Responsible for the Implementation of Project Quality Control Plan and Client specification
through inspection and surveillance.
Responsible for the Implementation of Inspection and Test Plan (ITP) as required by project
specification and standards.
Responsible for assuring that the required RFI being raised are as per ITP and the previous
concerned RFI’s are approved.
Coordinate with construction personnel about on going inspection issues.
Responsible for coordinating with engineering personnel regarding engineering drawing
issues.
Regular reporting to QC Engineer & Manager, on any major issues which require immediate
action.
Familiar with the international industry code and standard such as NEC, ANSI, IEEE, NEMA
VE1, NEMA VE 2, and UL 94.
Personal details:-
Name : Mohammad Hasnat
Father’s Name : Maksood
Date of Birth : 13.03.1975
Nationality : Indian
Marital Status : Married
Religion : Islam (Muslim)
Languages Known : English, Hindi, Urdu & Arabic
Technical Qualification : Diploma in Instrumentation
Education Qualification : H.S.C. Passed from B.I.E.C
S.S.C. Passed from B.S.E.B
Computer knowledge : MS-Word, Excel & Power point.
Passport No : K9605571
Date of Issue : 08.12.2014
Date of Expiry : 07.12.2024
Place of Issue : RIYADH K.S.A
Old passport No : K-9605571
2. 2
PROFESSIONAL WORKING EXPERIENCE:
1. Name of the Company : GS Engineering & Cons(Dong Yeong E & C Co., Ltd)
Position : Instrument QC Inspector
Project : Rabigh-II Refining & Petrochemical (CP3&CP4), K.S.A
Duration : 18 .04 .2015 to Present
Responsible for all field quality verification and inspection activities according to method of
statement, inspection and test plans such as cable pulling and termination of Instrument
cables, installation of cable tray, installation of field mounted Instrument, witness calibration
check of Instrument to higher accuracy and standards for process control measurement in gas
plant, etc.
Responsible for the preparation of all inspection report prior for the acceptance of the client.
Review of all instrument accepted documents such as Instrument data sheet, vendor
drawings, Instrument and Piping diagram with latest revisions, quality control inspection
report documents signed by QC inspector and Owner representatives.
Responsible for punch list clearing to ensure that the installation of instruments are complete
and accepted by the client
Responsible for the quality control and assurance, performs planning and supervising of all
field quality verification and inspection activities, monitoring adherence to drawings,
specifications and standards
Responsible for the preparation of all inspection report prior for the acceptance of the client.
2. Name of the Company : DAEWOO Engineering & Construction Ltd.
(Dong Yeong E & C Co. Ltd)
Position : Instrument QC Inspector
Project : SADARA Tank Farm, Jubail, K.S.A
Duration : 06 .12 .2014 to 05.03.2015
Reviewed EPC contractor procedures, test reports, checklists, engineering drawings and
attend owner-contractor weekly construction progress, QA/QC meeting and HSE surveillance
and auditing.
Developed inspection procedure as required. Ensure adequate design documentation and
standards procedures are available for testing & construction. Ensure drawings are updated if
there are changes.
Ensured that construction and testing meet the project schedule. Coordinated with EPC
contractor in
To ensure that verification and inspection activities are carried out as per approved Quality
Plan standard and specification.
Review the project quality plan, drawing, project standard and engineering specification
ensure efficient execution of work.
Inspection of all type cable tray and conduit installation as per NEMA V2 & ANSI.C80 with IFC
drawing.
Inspection of installation of JB marshaling cabinet and wiring continuity gladding
termination, as per NEC.
Witnessed and approved quality assurance and control of materials procured, drawings and
documentation, specification checks, installation, calibration, SAT, field and workshop tests,
system.
3. 3
3. Name of the Company : G.S Engineering & Construction Ltd.
(Dong Yeong E & C Co. Ltd.)
Position : Instrument QC Inspector
Project : Saudi International Petrochemical, Jubail, K.S.A
Duration : 21 .07.2012 to 25. 12. 2013
Conduct inspection for instrumentation system as per ITP and project specification.
Review and study the drawing prior to inspection on location and types of inspection.
Witness / Inspection the Field and Bench Test and Calibration to ensure that reference Code
and standards are complied with.
Installation and inspection such as Cable Tray Installation, Underground and Aboveground
Conduit, Cable Installation, Instrument Panel, Junction Box Installation and Field Mounted
Instrument Installation as per approved IFC Drawing and standards.
Insure that types of inspection complies the ITP and SAUDI INTERNATIONAL
PETROCHEMICAL COMPANY STANDARD (SIPCHEM).
Coordinates sites engineer if there is comments on the pre-inspection of the installation to be
Rectified prior to the preparation of REQUEST FOR INSPECTION RFI to SIPCHEM IPMT
Witness / Inspect Insulation Resistance and Continuity test of all instrument main cable from
marshalling panel to field junction box.
Preparing surveillance reports for all kinds of instrumentation activities at site
Review the following procedures of Cable installation and Termination, Cable splicing
Installation of grounding cable, Mcc panel installation, Lighting power panel, Instrument
installation, Instrument tubing installation, Tubing leak testing, Loop testing, energization,
etc.
Insure that all types of instruments shall be installed in accordance with manufacture`s
instruction, the requirements of the standard and good practice.
4 Name of the Company : Hyundai Engineering & Construction Ltd
(Dae Myung Engineering & Construction Co. Ltd)
Position : Instrument QC Inspector
Project : Karan Gas Facilities Project (Saudi Aramco)
Duration : 15.07.2010 to 03.01.2012
Perform quality control inspection for material receiving, calibration, installation, pre-
commissioning of various types of field instruments.
Familiar working in Hazardous/classified locations as per applicable codes and standards
with caring of instruments.
Responsible to implement the project quality plan through Saudi Aramco engineering
standards as per client requirement.
Raise the RFI’s (request for inspection) for the completion of construction activities and
inspect as per approved project inspection and test plan (ITP).
Issuance of surveillance/Non-conformance report (NCR), if found any non-conformity at job
site to ensure good quality and monitor the corrective action.
Inspection of instrument duct bank, red tile and yellow tape installation for underground
cables and backfilling.
Inspection activities of impulse tubing installation as per Hook up & airline installation and
witness for the leak test from root valve to instrument.
Coordination with the construction manager and site engineers to perform the job as per
approved plan and procedure.
Coordinating with the management and contractor for achieving the target at specified time.
Monitoring the progress of the Quality control departments & solving the issues related to
inspection of the instruments.
4. 4
Familiar with Saudi Aramco Inspection & test plan .Saudi Aramco test reports (SATR) & Saudi
Aramco inspection check list in addition to Saudi Aramco engineering standards
Carry out inspection as per approve Inspection and Test Plan (ITP) procedure and
Construction Method Statement.
Preparing Inspection Test Plan (ITP) for all kinds of instrument activities at site.
Insure that all types of instruments shall be installed in accordance with manufacture`s
instruction, the requirements of the standard and good practice.
5 Name of the Company : HYUNDAI Engineering & construction Ltd.
Position : Instrument field Engineer
Project : Khurais Gas Project (Saudi Aramco)
Duration : 21.06.2008 to 05.02.2010
Experience in supervision in erection, installation, of process control instrument, panel wiring
system, cable laying, tray and junction box erection. Junction box, support fabrication and
installation having as per hook up drawing, airline pipe from sub header to valve point as per
drawing. Site observation and co-ordination with client to solve the construction related issue.
Supervision of installation of all type instrument activities like cable tray, conduit, cable
pulling, cable dressing, glanding, tagging, termination, continuity and meggering field to
substation, Involve in all type of system related commissioning activities like loop check
testing and calibration of instruments.
Supervision in installation of fire & gas related activities, Loop checking as per cause & effect.
Conducting tool box meeting. Assessing and detailing the manpower for day’s task.
Ensuring the safety rules are being maintain while at work
Direct and Supervise field construction and maintenance activities for the project in such way
a way as to utilize labor, materials and equipment efficiently and cost effectively.
Assist for vendor in commissioning activities.
Commissioning and maintenance jobs during guarantee period
Adjust repair and calibrate electronic mechanical and pneumatic instrument.
Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control
elements.
Calibration of all field instrument transmitter in loading skid
Termination of instrument control cables at marshalling, Junction Box (JB) and instrument
side.
Installation of fire alarm panel equipment heat detector pull down station switch, smoke
detector, module and panel
Control room to field instrument, meggering tests all instrument cable.
Assist vendor for commissioning activity up to start up and plant stabilized.
6 Name of the Company : Kuwait Controls Co.WLL
Position : Instrument Field Supervisor
Project : K.N.P.C Shoiba Refinery & W.D.C Subiye Kuwait
Duration : 01.12.2004 to 28.01.2008
Ability to read the Piping and Instrument Diagram (PI&D), Instrument Loop Diagram (ILD),
Instrument Data Sheet and DCS and ESD wiring and interconnection diagrams, etc.
Installation of Cable Tray, Underground and Aboveground Conduit, Cable Installation,
Instrument Panel, Junction Box Installation and Field Mounted Instrument Installation as per
approved IFC Drawing and Standard.
Understand and interpret approved for construction drawing for field installation of
instrument impulse tubing, termination drawing etc.
Loop-checking for various instruments such as transmitter control valve, switches and others.
5. 5
Familiar with the mechanical inspection of newly installed instrument as per client
requirement.
Assist for vendor in commissioning activities.
Commissioning and maintenance jobs during guarantee period
Adjust repair and calibrate electronic mechanical and pneumatic instrument.
Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control
elements.
Calibration of all field instrument transmitter in loading skid
Termination of instrument control cables at marshalling, Junction Box and instrument side.
Installation of fire alarm panel equipment heat detector pull down station switch, smoke
detector, module and panel
Control room to field instrument, mongering tests all instrument cable.
Assist vendor for commissioning activity up to start up and plant stabilized.
7 Name of the Company : Miraj Instrumentation Services
Position : Instrument Field Supervisor
Project : Oswal chemicals & fertilizer LTD.
Duration : 25.01.2003 to 14.09.2004
Calibration of instruments such as transmitter control valves, switches, relief valve and others
Assist Honeywell vendor and installed system cable of marshalling cabinet.
Loop-checking for various instruments such as transmitter control valve, switches and others.
Understand and interpret approve for construction drawing.
Gained experience in erection, pre-commissioning and commissioning activity up to start up
and plant stabilized.
8 Name of the Company : Supertech Instrumentation Services (I) Pvt. Ltd.
Position : Instrument Supervisor
Project : Reliance Industrial Jamnagar, (Gujarat)
Duration : 28.12.2001 to 07.12.2002
Calibration of all field instrument transmitters.
Understand and interpret approved for construction drawing for field installation of
instrument impulse tubing, termination drawing etc.
Loop-checking for various instruments such as transmitter control valve, switches and others.
Familiar with the mechanical inspection of newly installed instrument as per client
requirement.
Assist for vendor in commissioning activities.
Commissioning and maintenance jobs during guarantee period
Inspect, test, adjust repair and calibrate electronic mechanical and pneumatic instrument.
Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control
elements.
9 Name of the Company : Taikisha Engineering India Ltd.
Position : Instrument Technician
Project : FCCU & HPCL Refinery, Mahul Gaon, Maharashtra
Duration : 10.12.1998 to 08.06.2001
Date :
Place : (Mohammad Hasnat)