SlideShare a Scribd company logo
1
MOHAMMAD HASNAT
INSTRUMENT QA/QC INSPECTOR / ENGINEER
Mob:+966-531303443
E-mail:hsntmksd@gmail.com
CAREER PROFILE:-
 Having overall 14 years experience in the field of Instrumentation Quality & Construction
and familiar with the International Industry Codes and Standards.
 Worked in various projects of SAUDI ARAMCO, KNPC, SIPCHEM, etc as an Instrument QA/QC
InspectorandEngineer.
 To emerge as an innovative professional and applying various concepts to new situation so as
to enable myself to respond to various challenges in the field of Instrumentation.
EXPERIENCE AND JOB RESPONSIBILITIES:
 Regular surveillance and conduct inspection of construction activities as per ITP and project
specification.
 Responsible for the Implementation of Project Quality Control Plan and Client specification
through inspection and surveillance.
 Responsible for the Implementation of Inspection and Test Plan (ITP) as required by project
specification and standards.
 Responsible for assuring that the required RFI being raised are as per ITP and the previous
concerned RFI’s are approved.
 Coordinate with construction personnel about on going inspection issues.
 Responsible for coordinating with engineering personnel regarding engineering drawing
issues.
 Regular reporting to QC Engineer & Manager, on any major issues which require immediate
action.
 Familiar with the international industry code and standard such as NEC, ANSI, IEEE, NEMA
VE1, NEMA VE 2, and UL 94.
Personal details:-
Name : Mohammad Hasnat
Father’s Name : Maksood
Date of Birth : 13.03.1975
Nationality : Indian
Marital Status : Married
Religion : Islam (Muslim)
Languages Known : English, Hindi, Urdu & Arabic
Technical Qualification : Diploma in Instrumentation
Education Qualification : H.S.C. Passed from B.I.E.C
S.S.C. Passed from B.S.E.B
Computer knowledge : MS-Word, Excel & Power point.
Passport No : K9605571
Date of Issue : 08.12.2014
Date of Expiry : 07.12.2024
Place of Issue : RIYADH K.S.A
Old passport No : K-9605571
2
PROFESSIONAL WORKING EXPERIENCE:
1. Name of the Company : GS Engineering & Cons(Dong Yeong E & C Co., Ltd)
Position : Instrument QC Inspector
Project : Rabigh-II Refining & Petrochemical (CP3&CP4), K.S.A
Duration : 18 .04 .2015 to Present
 Responsible for all field quality verification and inspection activities according to method of
statement, inspection and test plans such as cable pulling and termination of Instrument
cables, installation of cable tray, installation of field mounted Instrument, witness calibration
check of Instrument to higher accuracy and standards for process control measurement in gas
plant, etc.
 Responsible for the preparation of all inspection report prior for the acceptance of the client.
 Review of all instrument accepted documents such as Instrument data sheet, vendor
drawings, Instrument and Piping diagram with latest revisions, quality control inspection
report documents signed by QC inspector and Owner representatives.
 Responsible for punch list clearing to ensure that the installation of instruments are complete
and accepted by the client
 Responsible for the quality control and assurance, performs planning and supervising of all
field quality verification and inspection activities, monitoring adherence to drawings,
specifications and standards
 Responsible for the preparation of all inspection report prior for the acceptance of the client.
2. Name of the Company : DAEWOO Engineering & Construction Ltd.
(Dong Yeong E & C Co. Ltd)
Position : Instrument QC Inspector
Project : SADARA Tank Farm, Jubail, K.S.A
Duration : 06 .12 .2014 to 05.03.2015
 Reviewed EPC contractor procedures, test reports, checklists, engineering drawings and
attend owner-contractor weekly construction progress, QA/QC meeting and HSE surveillance
and auditing.
 Developed inspection procedure as required. Ensure adequate design documentation and
standards procedures are available for testing & construction. Ensure drawings are updated if
there are changes.
 Ensured that construction and testing meet the project schedule. Coordinated with EPC
contractor in
 To ensure that verification and inspection activities are carried out as per approved Quality
Plan standard and specification.
 Review the project quality plan, drawing, project standard and engineering specification
ensure efficient execution of work.
 Inspection of all type cable tray and conduit installation as per NEMA V2 & ANSI.C80 with IFC
drawing.
 Inspection of installation of JB marshaling cabinet and wiring continuity gladding
termination, as per NEC.
 Witnessed and approved quality assurance and control of materials procured, drawings and
documentation, specification checks, installation, calibration, SAT, field and workshop tests,
system.
3
3. Name of the Company : G.S Engineering & Construction Ltd.
(Dong Yeong E & C Co. Ltd.)
Position : Instrument QC Inspector
Project : Saudi International Petrochemical, Jubail, K.S.A
Duration : 21 .07.2012 to 25. 12. 2013
 Conduct inspection for instrumentation system as per ITP and project specification.
 Review and study the drawing prior to inspection on location and types of inspection.
 Witness / Inspection the Field and Bench Test and Calibration to ensure that reference Code
and standards are complied with.
 Installation and inspection such as Cable Tray Installation, Underground and Aboveground
Conduit, Cable Installation, Instrument Panel, Junction Box Installation and Field Mounted
Instrument Installation as per approved IFC Drawing and standards.
 Insure that types of inspection complies the ITP and SAUDI INTERNATIONAL
PETROCHEMICAL COMPANY STANDARD (SIPCHEM).
 Coordinates sites engineer if there is comments on the pre-inspection of the installation to be
Rectified prior to the preparation of REQUEST FOR INSPECTION RFI to SIPCHEM IPMT
 Witness / Inspect Insulation Resistance and Continuity test of all instrument main cable from
marshalling panel to field junction box.
 Preparing surveillance reports for all kinds of instrumentation activities at site
 Review the following procedures of Cable installation and Termination, Cable splicing
Installation of grounding cable, Mcc panel installation, Lighting power panel, Instrument
installation, Instrument tubing installation, Tubing leak testing, Loop testing, energization,
etc.
 Insure that all types of instruments shall be installed in accordance with manufacture`s
instruction, the requirements of the standard and good practice.
4 Name of the Company : Hyundai Engineering & Construction Ltd
(Dae Myung Engineering & Construction Co. Ltd)
Position : Instrument QC Inspector
Project : Karan Gas Facilities Project (Saudi Aramco)
Duration : 15.07.2010 to 03.01.2012
 Perform quality control inspection for material receiving, calibration, installation, pre-
commissioning of various types of field instruments.
 Familiar working in Hazardous/classified locations as per applicable codes and standards
with caring of instruments.
 Responsible to implement the project quality plan through Saudi Aramco engineering
standards as per client requirement.
 Raise the RFI’s (request for inspection) for the completion of construction activities and
inspect as per approved project inspection and test plan (ITP).
 Issuance of surveillance/Non-conformance report (NCR), if found any non-conformity at job
site to ensure good quality and monitor the corrective action.
 Inspection of instrument duct bank, red tile and yellow tape installation for underground
cables and backfilling.
 Inspection activities of impulse tubing installation as per Hook up & airline installation and
witness for the leak test from root valve to instrument.
 Coordination with the construction manager and site engineers to perform the job as per
approved plan and procedure.
 Coordinating with the management and contractor for achieving the target at specified time.
 Monitoring the progress of the Quality control departments & solving the issues related to
inspection of the instruments.
4
 Familiar with Saudi Aramco Inspection & test plan .Saudi Aramco test reports (SATR) & Saudi
Aramco inspection check list in addition to Saudi Aramco engineering standards
 Carry out inspection as per approve Inspection and Test Plan (ITP) procedure and
Construction Method Statement.
 Preparing Inspection Test Plan (ITP) for all kinds of instrument activities at site.
 Insure that all types of instruments shall be installed in accordance with manufacture`s
instruction, the requirements of the standard and good practice.
5 Name of the Company : HYUNDAI Engineering & construction Ltd.
Position : Instrument field Engineer
Project : Khurais Gas Project (Saudi Aramco)
Duration : 21.06.2008 to 05.02.2010
 Experience in supervision in erection, installation, of process control instrument, panel wiring
system, cable laying, tray and junction box erection. Junction box, support fabrication and
installation having as per hook up drawing, airline pipe from sub header to valve point as per
drawing. Site observation and co-ordination with client to solve the construction related issue.
 Supervision of installation of all type instrument activities like cable tray, conduit, cable
pulling, cable dressing, glanding, tagging, termination, continuity and meggering field to
substation, Involve in all type of system related commissioning activities like loop check
testing and calibration of instruments.
 Supervision in installation of fire & gas related activities, Loop checking as per cause & effect.
 Conducting tool box meeting. Assessing and detailing the manpower for day’s task.
 Ensuring the safety rules are being maintain while at work
 Direct and Supervise field construction and maintenance activities for the project in such way
a way as to utilize labor, materials and equipment efficiently and cost effectively.
 Assist for vendor in commissioning activities.
 Commissioning and maintenance jobs during guarantee period
 Adjust repair and calibrate electronic mechanical and pneumatic instrument.
 Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control
elements.
 Calibration of all field instrument transmitter in loading skid
 Termination of instrument control cables at marshalling, Junction Box (JB) and instrument
side.
 Installation of fire alarm panel equipment heat detector pull down station switch, smoke
detector, module and panel
 Control room to field instrument, meggering tests all instrument cable.
 Assist vendor for commissioning activity up to start up and plant stabilized.
6 Name of the Company : Kuwait Controls Co.WLL
Position : Instrument Field Supervisor
Project : K.N.P.C Shoiba Refinery & W.D.C Subiye Kuwait
Duration : 01.12.2004 to 28.01.2008
 Ability to read the Piping and Instrument Diagram (PI&D), Instrument Loop Diagram (ILD),
Instrument Data Sheet and DCS and ESD wiring and interconnection diagrams, etc.
 Installation of Cable Tray, Underground and Aboveground Conduit, Cable Installation,
Instrument Panel, Junction Box Installation and Field Mounted Instrument Installation as per
approved IFC Drawing and Standard.
 Understand and interpret approved for construction drawing for field installation of
instrument impulse tubing, termination drawing etc.
 Loop-checking for various instruments such as transmitter control valve, switches and others.
5
 Familiar with the mechanical inspection of newly installed instrument as per client
requirement.
 Assist for vendor in commissioning activities.
 Commissioning and maintenance jobs during guarantee period
 Adjust repair and calibrate electronic mechanical and pneumatic instrument.
 Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control
elements.
 Calibration of all field instrument transmitter in loading skid
 Termination of instrument control cables at marshalling, Junction Box and instrument side.
 Installation of fire alarm panel equipment heat detector pull down station switch, smoke
detector, module and panel
 Control room to field instrument, mongering tests all instrument cable.
 Assist vendor for commissioning activity up to start up and plant stabilized.
7 Name of the Company : Miraj Instrumentation Services
Position : Instrument Field Supervisor
Project : Oswal chemicals & fertilizer LTD.
Duration : 25.01.2003 to 14.09.2004
 Calibration of instruments such as transmitter control valves, switches, relief valve and others
 Assist Honeywell vendor and installed system cable of marshalling cabinet.
 Loop-checking for various instruments such as transmitter control valve, switches and others.
 Understand and interpret approve for construction drawing.
 Gained experience in erection, pre-commissioning and commissioning activity up to start up
and plant stabilized.
8 Name of the Company : Supertech Instrumentation Services (I) Pvt. Ltd.
Position : Instrument Supervisor
Project : Reliance Industrial Jamnagar, (Gujarat)
Duration : 28.12.2001 to 07.12.2002
 Calibration of all field instrument transmitters.
 Understand and interpret approved for construction drawing for field installation of
instrument impulse tubing, termination drawing etc.
 Loop-checking for various instruments such as transmitter control valve, switches and others.
 Familiar with the mechanical inspection of newly installed instrument as per client
requirement.
 Assist for vendor in commissioning activities.
 Commissioning and maintenance jobs during guarantee period
 Inspect, test, adjust repair and calibrate electronic mechanical and pneumatic instrument.
 Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control
elements.
9 Name of the Company : Taikisha Engineering India Ltd.
Position : Instrument Technician
Project : FCCU & HPCL Refinery, Mahul Gaon, Maharashtra
Duration : 10.12.1998 to 08.06.2001
Date :
Place : (Mohammad Hasnat)

More Related Content

What's hot

INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
Sanad Samir
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument TechnicianPANDI MUTHU
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
Instrument Technician CV
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
Manoj Kumar Yadav
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
Yacine Sayad
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument SupervisorSatish Patel
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
Hemantkumar patel
 

What's hot (20)

Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
Instrument Technician CV
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 

Similar to Resume_Inst. QC_Hasnat

Varun Resume
Varun Resume Varun Resume
Varun Resume varun k
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
MOHAMMAD JAMAL AKTAR
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016amiel barcelon
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish Murugesan
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISORMOHAMMAD MAZID
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
MOHAMMED ZUBAIR
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMadan Kumar
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 

Similar to Resume_Inst. QC_Hasnat (20)

Varun Resume
Varun Resume Varun Resume
Varun Resume
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
QC
QCQC
QC
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISOR
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Sujit TPI CV
Sujit TPI CVSujit TPI CV
Sujit TPI CV
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 

Resume_Inst. QC_Hasnat

  • 1. 1 MOHAMMAD HASNAT INSTRUMENT QA/QC INSPECTOR / ENGINEER Mob:+966-531303443 E-mail:hsntmksd@gmail.com CAREER PROFILE:-  Having overall 14 years experience in the field of Instrumentation Quality & Construction and familiar with the International Industry Codes and Standards.  Worked in various projects of SAUDI ARAMCO, KNPC, SIPCHEM, etc as an Instrument QA/QC InspectorandEngineer.  To emerge as an innovative professional and applying various concepts to new situation so as to enable myself to respond to various challenges in the field of Instrumentation. EXPERIENCE AND JOB RESPONSIBILITIES:  Regular surveillance and conduct inspection of construction activities as per ITP and project specification.  Responsible for the Implementation of Project Quality Control Plan and Client specification through inspection and surveillance.  Responsible for the Implementation of Inspection and Test Plan (ITP) as required by project specification and standards.  Responsible for assuring that the required RFI being raised are as per ITP and the previous concerned RFI’s are approved.  Coordinate with construction personnel about on going inspection issues.  Responsible for coordinating with engineering personnel regarding engineering drawing issues.  Regular reporting to QC Engineer & Manager, on any major issues which require immediate action.  Familiar with the international industry code and standard such as NEC, ANSI, IEEE, NEMA VE1, NEMA VE 2, and UL 94. Personal details:- Name : Mohammad Hasnat Father’s Name : Maksood Date of Birth : 13.03.1975 Nationality : Indian Marital Status : Married Religion : Islam (Muslim) Languages Known : English, Hindi, Urdu & Arabic Technical Qualification : Diploma in Instrumentation Education Qualification : H.S.C. Passed from B.I.E.C S.S.C. Passed from B.S.E.B Computer knowledge : MS-Word, Excel & Power point. Passport No : K9605571 Date of Issue : 08.12.2014 Date of Expiry : 07.12.2024 Place of Issue : RIYADH K.S.A Old passport No : K-9605571
  • 2. 2 PROFESSIONAL WORKING EXPERIENCE: 1. Name of the Company : GS Engineering & Cons(Dong Yeong E & C Co., Ltd) Position : Instrument QC Inspector Project : Rabigh-II Refining & Petrochemical (CP3&CP4), K.S.A Duration : 18 .04 .2015 to Present  Responsible for all field quality verification and inspection activities according to method of statement, inspection and test plans such as cable pulling and termination of Instrument cables, installation of cable tray, installation of field mounted Instrument, witness calibration check of Instrument to higher accuracy and standards for process control measurement in gas plant, etc.  Responsible for the preparation of all inspection report prior for the acceptance of the client.  Review of all instrument accepted documents such as Instrument data sheet, vendor drawings, Instrument and Piping diagram with latest revisions, quality control inspection report documents signed by QC inspector and Owner representatives.  Responsible for punch list clearing to ensure that the installation of instruments are complete and accepted by the client  Responsible for the quality control and assurance, performs planning and supervising of all field quality verification and inspection activities, monitoring adherence to drawings, specifications and standards  Responsible for the preparation of all inspection report prior for the acceptance of the client. 2. Name of the Company : DAEWOO Engineering & Construction Ltd. (Dong Yeong E & C Co. Ltd) Position : Instrument QC Inspector Project : SADARA Tank Farm, Jubail, K.S.A Duration : 06 .12 .2014 to 05.03.2015  Reviewed EPC contractor procedures, test reports, checklists, engineering drawings and attend owner-contractor weekly construction progress, QA/QC meeting and HSE surveillance and auditing.  Developed inspection procedure as required. Ensure adequate design documentation and standards procedures are available for testing & construction. Ensure drawings are updated if there are changes.  Ensured that construction and testing meet the project schedule. Coordinated with EPC contractor in  To ensure that verification and inspection activities are carried out as per approved Quality Plan standard and specification.  Review the project quality plan, drawing, project standard and engineering specification ensure efficient execution of work.  Inspection of all type cable tray and conduit installation as per NEMA V2 & ANSI.C80 with IFC drawing.  Inspection of installation of JB marshaling cabinet and wiring continuity gladding termination, as per NEC.  Witnessed and approved quality assurance and control of materials procured, drawings and documentation, specification checks, installation, calibration, SAT, field and workshop tests, system.
  • 3. 3 3. Name of the Company : G.S Engineering & Construction Ltd. (Dong Yeong E & C Co. Ltd.) Position : Instrument QC Inspector Project : Saudi International Petrochemical, Jubail, K.S.A Duration : 21 .07.2012 to 25. 12. 2013  Conduct inspection for instrumentation system as per ITP and project specification.  Review and study the drawing prior to inspection on location and types of inspection.  Witness / Inspection the Field and Bench Test and Calibration to ensure that reference Code and standards are complied with.  Installation and inspection such as Cable Tray Installation, Underground and Aboveground Conduit, Cable Installation, Instrument Panel, Junction Box Installation and Field Mounted Instrument Installation as per approved IFC Drawing and standards.  Insure that types of inspection complies the ITP and SAUDI INTERNATIONAL PETROCHEMICAL COMPANY STANDARD (SIPCHEM).  Coordinates sites engineer if there is comments on the pre-inspection of the installation to be Rectified prior to the preparation of REQUEST FOR INSPECTION RFI to SIPCHEM IPMT  Witness / Inspect Insulation Resistance and Continuity test of all instrument main cable from marshalling panel to field junction box.  Preparing surveillance reports for all kinds of instrumentation activities at site  Review the following procedures of Cable installation and Termination, Cable splicing Installation of grounding cable, Mcc panel installation, Lighting power panel, Instrument installation, Instrument tubing installation, Tubing leak testing, Loop testing, energization, etc.  Insure that all types of instruments shall be installed in accordance with manufacture`s instruction, the requirements of the standard and good practice. 4 Name of the Company : Hyundai Engineering & Construction Ltd (Dae Myung Engineering & Construction Co. Ltd) Position : Instrument QC Inspector Project : Karan Gas Facilities Project (Saudi Aramco) Duration : 15.07.2010 to 03.01.2012  Perform quality control inspection for material receiving, calibration, installation, pre- commissioning of various types of field instruments.  Familiar working in Hazardous/classified locations as per applicable codes and standards with caring of instruments.  Responsible to implement the project quality plan through Saudi Aramco engineering standards as per client requirement.  Raise the RFI’s (request for inspection) for the completion of construction activities and inspect as per approved project inspection and test plan (ITP).  Issuance of surveillance/Non-conformance report (NCR), if found any non-conformity at job site to ensure good quality and monitor the corrective action.  Inspection of instrument duct bank, red tile and yellow tape installation for underground cables and backfilling.  Inspection activities of impulse tubing installation as per Hook up & airline installation and witness for the leak test from root valve to instrument.  Coordination with the construction manager and site engineers to perform the job as per approved plan and procedure.  Coordinating with the management and contractor for achieving the target at specified time.  Monitoring the progress of the Quality control departments & solving the issues related to inspection of the instruments.
  • 4. 4  Familiar with Saudi Aramco Inspection & test plan .Saudi Aramco test reports (SATR) & Saudi Aramco inspection check list in addition to Saudi Aramco engineering standards  Carry out inspection as per approve Inspection and Test Plan (ITP) procedure and Construction Method Statement.  Preparing Inspection Test Plan (ITP) for all kinds of instrument activities at site.  Insure that all types of instruments shall be installed in accordance with manufacture`s instruction, the requirements of the standard and good practice. 5 Name of the Company : HYUNDAI Engineering & construction Ltd. Position : Instrument field Engineer Project : Khurais Gas Project (Saudi Aramco) Duration : 21.06.2008 to 05.02.2010  Experience in supervision in erection, installation, of process control instrument, panel wiring system, cable laying, tray and junction box erection. Junction box, support fabrication and installation having as per hook up drawing, airline pipe from sub header to valve point as per drawing. Site observation and co-ordination with client to solve the construction related issue.  Supervision of installation of all type instrument activities like cable tray, conduit, cable pulling, cable dressing, glanding, tagging, termination, continuity and meggering field to substation, Involve in all type of system related commissioning activities like loop check testing and calibration of instruments.  Supervision in installation of fire & gas related activities, Loop checking as per cause & effect.  Conducting tool box meeting. Assessing and detailing the manpower for day’s task.  Ensuring the safety rules are being maintain while at work  Direct and Supervise field construction and maintenance activities for the project in such way a way as to utilize labor, materials and equipment efficiently and cost effectively.  Assist for vendor in commissioning activities.  Commissioning and maintenance jobs during guarantee period  Adjust repair and calibrate electronic mechanical and pneumatic instrument.  Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control elements.  Calibration of all field instrument transmitter in loading skid  Termination of instrument control cables at marshalling, Junction Box (JB) and instrument side.  Installation of fire alarm panel equipment heat detector pull down station switch, smoke detector, module and panel  Control room to field instrument, meggering tests all instrument cable.  Assist vendor for commissioning activity up to start up and plant stabilized. 6 Name of the Company : Kuwait Controls Co.WLL Position : Instrument Field Supervisor Project : K.N.P.C Shoiba Refinery & W.D.C Subiye Kuwait Duration : 01.12.2004 to 28.01.2008  Ability to read the Piping and Instrument Diagram (PI&D), Instrument Loop Diagram (ILD), Instrument Data Sheet and DCS and ESD wiring and interconnection diagrams, etc.  Installation of Cable Tray, Underground and Aboveground Conduit, Cable Installation, Instrument Panel, Junction Box Installation and Field Mounted Instrument Installation as per approved IFC Drawing and Standard.  Understand and interpret approved for construction drawing for field installation of instrument impulse tubing, termination drawing etc.  Loop-checking for various instruments such as transmitter control valve, switches and others.
  • 5. 5  Familiar with the mechanical inspection of newly installed instrument as per client requirement.  Assist for vendor in commissioning activities.  Commissioning and maintenance jobs during guarantee period  Adjust repair and calibrate electronic mechanical and pneumatic instrument.  Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control elements.  Calibration of all field instrument transmitter in loading skid  Termination of instrument control cables at marshalling, Junction Box and instrument side.  Installation of fire alarm panel equipment heat detector pull down station switch, smoke detector, module and panel  Control room to field instrument, mongering tests all instrument cable.  Assist vendor for commissioning activity up to start up and plant stabilized. 7 Name of the Company : Miraj Instrumentation Services Position : Instrument Field Supervisor Project : Oswal chemicals & fertilizer LTD. Duration : 25.01.2003 to 14.09.2004  Calibration of instruments such as transmitter control valves, switches, relief valve and others  Assist Honeywell vendor and installed system cable of marshalling cabinet.  Loop-checking for various instruments such as transmitter control valve, switches and others.  Understand and interpret approve for construction drawing.  Gained experience in erection, pre-commissioning and commissioning activity up to start up and plant stabilized. 8 Name of the Company : Supertech Instrumentation Services (I) Pvt. Ltd. Position : Instrument Supervisor Project : Reliance Industrial Jamnagar, (Gujarat) Duration : 28.12.2001 to 07.12.2002  Calibration of all field instrument transmitters.  Understand and interpret approved for construction drawing for field installation of instrument impulse tubing, termination drawing etc.  Loop-checking for various instruments such as transmitter control valve, switches and others.  Familiar with the mechanical inspection of newly installed instrument as per client requirement.  Assist for vendor in commissioning activities.  Commissioning and maintenance jobs during guarantee period  Inspect, test, adjust repair and calibrate electronic mechanical and pneumatic instrument.  Check, diagnose and calibrate of instrument of instrument sensors, transmitters and control elements. 9 Name of the Company : Taikisha Engineering India Ltd. Position : Instrument Technician Project : FCCU & HPCL Refinery, Mahul Gaon, Maharashtra Duration : 10.12.1998 to 08.06.2001 Date : Place : (Mohammad Hasnat)