OBJECTIVE
ERFAN-UL-HAQUE FAROOQUI
Mobile: +97152-6244449
Email: e_farooqui786@hotmail.com
Primary objective is to secure a responsible Business Development cumManagerialposition in the company to
accomplish all challenging and creative tasks successfully and to develop and maintain an effective and efficient
environment in order to achieve the goals as set by the organization. The tasks may include,but not being limited to,
the following:
 Managing large scale multi-disciplinary projects
 To develop businessand secure jobs
 Performing full coordination with both internal multi-disciplinary teams as well as external parties such as
clients,contractors,vendors,suppliers,approvingauthorities,third party accredit checkers etc.This will
include managing meetings and keeping records forvarious communications.
 Ensuring that the design conforms to the latest engineeringCodes and Standards ofPractice.
 Planning for deadlines as perproject requirements and performing project controls by assigning/re-
assigning and directingwork,appraising and counselling the teams at high pressure times.
 Securing new businessopportunities fromnewclients and at the same time maintaining and developing
relationships with existing/repeatclients.This is to ensure company’s growthbothlocally and
internationally.
OVERALL EXPERIENCE
Twenty five (25) years of diversified Managerial and Technical experience in the field of Structural
Engineering, both local and international,including countries like Singapore, Malaysia, Pakistan, Qatar, and
the UAE. Professional experience includes that in Railways (MRT / LRT), High-rise buildings and Oil &
Gas.
EDUCATION
Masters (MS) Degree in Structural Engineering 1993
California State University, Northridge, USA
BS Degree in Civil Engineering 1990
NED University of Engineering and Technology,
Karachi.
PERSONAL
Citizen of Singapore
Marital Status: Married
Date of birth: 24th August '66
AREAS OF EXPERTISE
1. Managerial Expertise:
Managerial experience in different capacities can be outlines as follows:
a) As Regional Manager/Executive Director in Engineering Associates International (EAI), Dubai:
 Setting-up a new branch office for Engineering Consultancy Services with regards to all
disciplines including Civil, Structural, Architectural, Mechanical, and Electrical
 Acquiring Municipality license, liaising with Ministry of Economics and Trade.
 Marketing the consultancy services with focus on specialized areas such as high-rise structures,
tunnels and bridges (precast, post-tensioned).
 Acquiring engineering design projects for the company.
 Processing the projects to client’s satisfaction.
 Managing the finances of the company yielding profitability.
 Focusing on growing as a multi-disciplinary and multi-national engineering organization.
b) As Team Leader of Singapore Circle Line MRT project: (heading PYL and Bishan interchange
stations)
 Managing large scale multi-disciplinary Singapore CCL Rail projects.
 Performing full coordination with both internal multi-disciplinary teams as well as external parties
as Building Control Unit (BCU), Consultants, Contractors, Vendors, Suppliers, and Third party
accredited checkers etc.
 Ensuring that the design conforms to the then latest engineering Codes and Standards of Practice.
 Managing deadlines as per project requirements and performing project controls by assigning/re-
assigning and directing work.
2. Technical
Technical experience in different areas/specialized fields can be outlined as follows:
a) Mass Rail Transit (MRT) and Light Rail Transit (LRT) System
(Singapore and Kuala Lumpur)
 Planning and designing ofMass Rapid Transit (MRT) and Light Rail Transit (LRT) structures.
 Design of Viaducts, Bored Tunnels, X-over Tunnels, Tunnel Lining, TBM works etc.
 Underground Structures with deep excavations, sequential construction, diaphragm walls, barrette
piles etc.
 Specialization in Top-down construction.
 Underpinning of existing structures, their real time monitoring and analyses.
 Safety HAZARD/HAZOP analysis of Rail projects.
b) Buildings, Bridges and Infrastructure
 Planning, analyses and design of High Rise Buildings using software like SAP, ETABS,
 British or American Codes and Standards.
 Earthquake designs as perAmerican (ACI / UBC / IBC) codes.
 Wind Tunnel Testing
 Computer modeling of 3D complex structures using latest software such as SAP, ETABS, S-
FRAME, SAFE etc.
 Glazing design and glass failure models.
 Steel structures especially bridges with Static force-deflection testing, and Dynamic testing with
damper applications.
 Amendments and Alteration (A&A) works to existing infrastructures.
 Review of technical submissions like engineering materials, drawings and calculations.
c) Oil and Gas Fields:
 Structures related to Oil and Gas field including liquid and gas supply pipelines with their
installations and alignments, design for the pipe supports, control rooms for gas stations and
sub-stations, environmental impacts, design for fire stations, blast-resistant buildings within oil
fields, design for culverts, roads and otherrelevant civil engineering facilities.
 Full coordination with multi-disciplines like Process, Plant, Loss Prevention, Instrumentation,
Piping, Electrical, Mechanical, Building Services etc.
 Safety HAZARD/HAZOP analysis of O&G projects.
 Construction and closure of Landfill cells involving Environmental regulations.
 High Voltage Sub-stations, Power Correction Factor Facilities, Hazardous waste collection,
testing and disposal facilities.
 Slug Catcher facilities, Degassing Stations, Compressor foundations with dynamic loadings,and
IT Disaster Recovery centers with blast resistance etc.
QUALITY MANAGEMENT
 ISO 9001:2000 Certified Internal Quality Auditor since 1999.
 GSAS certification: Certified Professionalfor Global SustainabilityAssessment System for
Green Building Practices.
COMPUTER SKILLS
 General-use Packages: MSWord, MS Access,Lotus notes,PowerPoint
 Engineering Packages: SAP, SAFE-IN, ETABS, GT STRUDL, STAAD PRO, RAPT,
PROCON, S-FRAME, WALLAP, P-FRAME
SUMMARY OF EXPERIENCE
Period Company/ Organization Area of expertise
Country
2015 to
date
Engineering Associates, Dubai
Executive Director
Marketing, fee negotiations,
setting up working teams, Dubai, UAE
2006 to
2015
Qatar Petroleum, Doha
Senior Civil/ Structural Engineer Oil & Gas Doha, Qatar
2003 to
2006
Engineering Associates, Dubai
Regional Manager High-rise Buildings Dubai, UAE
1998 – 2003
Land Transport Authority, Spore
Management Exec. Engineer / Team
Leader PYL Interchange Station
MRT/ LRT Railways Singapore
1995 – 1998
Meinhardt (Singapore) Pvt. Ltd
Structural Engineer
High-rise buildings and
MRT/LRT Railways Singapore,
Malaysia
1994 – 1995
A.A. Associates Karachi
Structural Engineer Bridges and Buildings Karachi,
Pakistan
1993 – 1994
Mushtaq and Bilal Consultants
Structural Engineer High-rise buildings
Karachi,
Pakistan
DETAILS OF WORK EXPERIENCE
(In chronological order from current to previous)
1) Executive Director Sep’15 to Date
ENGINEERING ASSOCIATES INTERNATIONAL (EAI), DUBAI – UAE
Primary Role: To set-up a new local office for Engineering Consultancy Services with regards to Civil,
Structural, Architectural, Mechanical, and Electrical facilities. Solely responsible to market the services and
acquire jobs, process them and manage the finances yielding profitability.
Securing new businessopportunitiesfromnewclients and at the same time maintaining and developing relationships
with existing/repeat clients.This is to ensure company’s growth both locally and internationally.
Development of engineering and drafting teams, their continual training, maintaining work quality, and above
all keeping the clients satisfied through timely submissions were among the key responsibilities.
2) Senior Civil / Structural Engineer April’06 to Aug’15
QATAR PETROLEUM, DOHA – QATAR
Primary Role: To provide, with full responsibility and accountability, technical service to the Corporation for
Onshore Projects and Plant Change Requests (PCRs), in all areas of Civil and Structural works during definition
and execution stages ensuring that designs are in compliance with the latest Codes, Standards, National and
Corporation requirements and procedures.
Also, to liaises with Project Engineers, other Discipline Engineers and End-Users, in order to develop cost
effective and fit for purpose design solutions, to fulfill the Corporation requirements. Also included is
technical support during tender process and bid evaluation.
Work covered in Civil/Structural engineering and infrastructure projects include land surveying,
geotechnical and site investigations, roads, residential, commercial and industrial buildings, water storage and
distribution, drainage systems, construction of retaining walls, telecommunication towers, jetties and other marine
works, port control towers, plant modifications/ de-bottle-necking, preparation of specifications and
equipment data sheets, scope of works for tenders, preparation of design philosophies, work-site visits to
establish existing conditions, review applicability of existing drawings, Standards and Specifications and to
recommend appropriate changes.
PROJECT TITLE DETAILS SPECIALTY SOFTWARE
APPLIED
HAZARDOUS WASTE
TRANSFER
STATION IN
DUKHAN
New waste collection
and transferstation to
be built including its
associated
infrastructure
Collection,segregation, temporary
storage, packaging,labeling and
transportation ofallsolid and liquid
hazardous waste generated in oil
and gas related facilities.
SAFE
HIGH VOLTAGE
UPGRADE IN
DKHAN
INVOLVING
PROCESS SUB-
STATION AND
POWER
CORRECTION
FACTOR
FACILITY
Involving various sub-
stations and high voltage
cable laying across existing
services.
Safe distances fromoil wells,gas
lines passing in the vicinity.
STAADPRO
NGL SUPPORT
CAMPUS IN
MESAIEED
Including twelve (12)
facilities such as
Environmental Laboratory,
Administration building,
Warehouses,Central
Workshop,Transport
Depot, Shutdown Wash
Down Area
Each building facility with separate
and unique requirement.
SAFE, SAP2000
MULTI-PURPOSE
COMPLEX FOR
RAS LAFFAN
CITY
QR 3 BILLION
QP Complex forRas
Laffan City comprising
more than 10 buildings and
ancillary works including
office towers, training
centers etc.
Complex steelstructures,
Composite constructions, Post-
tensioned floors
ETABS, SAP &
SAFE
GAS SUPPLY TO
MESAIEED AREA
7km pipe-line to supply gas
to Kahramaa. Involved
wide variety of Civil
Engineering works like
pavements,pipe supports,
anchorblocks,design of
pipes forpressures,culverts
etc.
Horizontal Directional
Drilling.
STAAD,RAPT
REPLACEMENT OF A
TWO STAGE HP
FLARE WITH A
THREE STAGE
DESIGN FOR ARAB
D PLANT.
Reducing smokiness ofthe
flare as perthe
requirements of SCENR
(Environment regulating
body in Qatar).
EnvironmentalImpacts. N/A
GAS AND LIQUID
HYDROCARBON
DISTRIBUTION
SYSTEM TIDINESS
AND SAFETY SYSTEM
UPGRADE
Various options studied. Safety related issues in the Oil &
Gas environment.
N/A
ENGINEERING
SERVICES FOR IT
DISASTER
RECOVERY
BUILDING IN
DUKHAN
High security-facility
building acting as a back-up
for all the IT related QP
data.
Blast resistant computer IT Facility. SAFE, STAAD,
RAPT.
EXTENSION AND
UPGRADE OF NEW
DUKHAN
SEWERAGE
TREATMENT
PLANT.
To increase the numberof
Sequencing Batching
Reactor (SBR) within the
up and running Sewerage
Treatment Plant (STP).
Treatment philosophy and design
for large vessels.
N/A
3) Regional Manager Sep’03 to March’06
ENGINEERING ASSOCIATES PRIVATE LIMITED, DUBAI – UAE
Primary Role: To set-up a new branch office for Engineering Consultancy Services with regards to Civil,
Structural, Architectural, Mechanical, and Electrical facilities. Solely responsible to market the services and
acquire jobs, process themand manage the finances yielding profitability to the parent company (the Head Office).
Development of engineering and drafting teams, their continual training, maintaining work quality, an above all
keeping the clients satisfied through timely submissions were among the key responsibilities. During the two and a
half year tenure, some major projects worth highlighting are Jumeirah Beach Residence Towers and Palm Jumeirah
under water vehicle tunnel.
PROJECT TITLE DETAILS SPECIALTY SOFTWARE
APPLIED
JUMEIRA BEACH
RESIDENCE AED 900
MILLION
As a Design Manager
consisting seven high rise
towers - 50 storied.
Designed for earthquake Zone
2A. SAFE, ETABS,
RAPT
JUMEIRA BEACH
RESIDENCE SCTOR 01
TOTAL COST AED 700
MILLION
Giving Consultancy to
Contractor for temporary
work involving
geotechnical and structural
design.
Tower Crane and Hoist – way
design.
SAP2000
VEHICULAR TUNNEL
PALM JUMEIRA
BEACH COST AED 900
MILLION
Vetting of temporary
works and permanent
works for 1.3 Km
immersed tunnel.
Sheet pile design, soil parameter
establishment, box section
check.
SAP2000, GMSv5.0:
SEEP2D
DUBAI FESTIVAL
CITY TOTAL COST
$200 MILLION
Zone 8B including Hotels
and Residential towers.
Liaising with Contractor and
Consultants to coordinate all
disciplines design.
STEEL PAC RCD
DUBAI
INTERNATIONAL
FINANCE CENTER
TOTAL COST $85
MILLION
Design of Twin Towers
including completely
structural and MEP design.
A Challenging high rise set of
Towers. ETABS, SAP2000,
SAFE
4) Management Executive Engineer Mar’98 to Sep’03
LAND TRANSPORT AUTHORITY OF SINGAPORE.
Primary Role:
Managing large scale multi-disciplinary Singapore Circle Line (CCL) Rail projects.
Performing full coordination with both internal multi-disciplinary teams as well as external parties as Building
Control Unit (BCU), Consultants, Contractors, Vendors, Suppliers, and Third party accredited checkers etc.
Ensuring that the design conforms to the then latest engineering Codes and Standards of Practice.
Managing deadlines as per project requirements and performing project controls by assigning/re-assigning and
directing work.
Planning and designing ofMass Rapid Transit (MRT) and Light Rail Transit (LRT) structures.
Design of Viaducts, Bored Tunnels, X-over Tunnels, Tunnel Lining, TBM works etc.
Underground Structures with deep excavations,sequentialconstruction,diaphragmwalls, barrette piles etc.
Specialization in Top-down construction.
Underpinning of existing structures, their real time monitoring and analyses.
Safety HAZARD/HAZOP analysis of Rail projects.
PROJECT TITLE DETAILS SPECIALTY SOFTWARE
APPLIED
CIRCLE LINE
PROJECT: (CCL)
SINGAPORE CIRCLE
LINE, A FULLY
AUTOMATED
GNDERGROUND,
MEDIUM CAPACITY
RAPID TRANSIT
SYSTEM WAS BUILT IN
STAGES. TOTAL COST
IS $3.4 B
Heavily involved in
the design of two of
its in-house design
stations. Also
reviewed five (5)
stations done by
External
Consultants.
Underpinning of running Viaducts of
trains, soil vs structural interactions
using FEM, A&A works etc. Ground
monitoring, sequential diaphragm
wall strutting including both
temporary and permanent
construction stages.
SAP2000; S-
Frame; Rapt
CHANGI AIRPORT
LINE (CAL) OF
SINGAPORE: IT
CONSISTED OF 1KM
ELEVATED, 5KM
UNDERGROUND WITH
2 WORLD CLASS
STATIONS, EXPO AND
CHANGI. THE LINE
RUNS UNDER THE
CURRENT AIRPORT
RUNWAY. TOTAL
COST $850M.
Involved in the
design of both
Changi and Expo
Stations.
Car park B of the Airport was
underpinned to facilitate the tunnel
running below. Various Under-
pinning techniques were adopted
depending on soil conditions and
structural systems. Design of Cross-
passages, Cross-over and Over run
tunnels. Models with complete soil-
structure interactions.
SAP2000; SAFE;
RAPT
5) Structural Engineer July’95 to Feb’98
MEINHARDT (SINGAPORE) PTE LTD.
Primary Role:
Planning, analyses and design of High Rise Buildings using software like SAP, ETABS,
British or American Codes and Standards.
Earthquake designs as perAmerican (ACI / UBC / IBC) codes.
Wind Tunnel Testing
Computer modeling of 3D complex structures using latest software such as SAP, ETABS, S-FRAME, SAFE etc.
Glazing design and glass failure models.
Steel structures especially bridges with Static force-deflection testing, and Dynamic testing with damper applications.
Amendments and Alteration (A&A) works to existing infrastructures.
PROJECT TITLE DETAILS SPECIALTY SOFWARE
APPLIED
KULA LAMPUR
RAILWAY
CONNECTION TO
INTERNATIONAL
AIRPORT
Mainly Precast Prestressed
construction, Steel
Structure Depot and many
adjacent associated
developments.
Systemwide considerations, A &
A works and heavy track works
RAPT SAFE
MENARA RAJAWALI
INDONESIA.
27-Storied with two
basements and mechanical
floors
Core wall- frame interactions.
Dynamic analysis ETABS, RAPT
GUNUNG WENANG
HOTEL, MANADO,
INDONESIA.
14-Storied Hotel with
basement in seismic zone
Complete 3-D DYNAMIC
ANALYSIS using ELCENTRO
response spectrum
ETABS
ETABS 6.0
SAP90
NATIONAL MUSEUM,
SINGAPORE
4-Storeied artifacts
repository
Flat Slab Structure. Free Standing
Steel Staircase
RAPT PFRAME
SAFE SAP
A.C.S COMPUTERS PTE
LTD, SINGAPORE
Part 4/ Part 6 Story factory
with ancillary office and a
car park basement
Partly reinforced Concrete and
partly prestressed concrete
construction
PFRAME RAPT
6) Structural Engineer Oct'94 to June’95
A.A. ASSOCIATES , KARACHI, PAKISTAN.
PROJECT TITLE DETAILS SPECIALTY SOFTWARE
APPLIED
IBRAHIM FIBERS
LTD., FAISALABAD
Polymer plant, spinning
and fiber line buildings
and warehouses
Raft foundations, Rib-slab,
Machine-foundations, Vibration
Analysis, Drainage Systems, Fire-
proof detailing
SAFE,
MICROFEEP-II
S.G.RAYON (Pvt) LTD
Power Station Machine Foundations, Corbel
Design
SAFE
WELLCOME PAKISTAN
(Pvt) LTD.
Ground plus 5 Story
Factory Bldg. and
Warehouse
Intermediate Moment Resisting
Space Frame with Shear Walls RECTCOL
FAUJI FOUNDATION
PAKISTAN Vetting of the Structure Waffle Slab MICROFEEP (P-
II) for Grillage
Analysis
7) Structural Design Engineer April '93 to Sep '94
MUSHTAQ AND BILAL CONSULTANTS, KARACHI, PAKISTAN.
PROJECT TITLE
DETAILS SPECIALTY SOFTWARE
APPLIED
HABIB BANK
BUILDING,
ISLAMABAD
Ground plus 22 storied Bldg. Flat Slab Modeling PLATE ANALYSIS
NACON HOUSE
Analysis and Design of
Office Bldg. Ground plus 18
Storied.
Pile Foundations, Earthquake
Consideration
SAP-90 for soil
Modeling
SUI SOUTHERN GAS
COMPANY LTD.
KARACHI
Analysis and Design of
1) Main Bldg. Basement plus
Ground plus 9 stories
2)Ancillary Bldg. Ground
plus 3 storied.
Static Modeling of Long Columns,
Earthquake Analysis
PFRAME
UNICOLUNM(SDL)
PEARL
CONTINENTAL,
BHURBAN
Steel Elevated Roof
Fiber Roof Designed for Snow
Loading RISA 2D
PUBLICATIONS, RESEARCH, TECHNICAL PAPERS & PRESENTATIONS
a) “Capital Projects Gate Approvals for Oil and Gas”, Qatar Petroleum, October 2010.
b) “Changi Airport Mezzanine Bridge: Construction and Static Testing”, International Conference on Rail
Transit, April 2003.
c) “Top Down Technique of Changi Airport Station: Design and Construction”, International
Conference on Rail Transit,April 2003.
d) “Singapore Changi Airport MRT Station: Design and Construction of Glass Atria”, International
Conference on Rail Transit,April 2003.
e) “Total Work flow for Rail Transit Projects”,Civil and Structural Department, Land Transport
Authority, Singapore, August 2003.
f) “Glazing Specifications”, Civil and Structural Department, Land Transport Authority, Singapore,
2003.
g) “Why Glass Design is Based Upon Probabilistic Approach of 8 Failures to 1000!” Singapore
2003.
h) “Glass Balustrade Design for MRT Stations”, Civil Design Department, Land Transport
Authority, Singapore, 2003
i) “Probable Protective Measures for CAL Atria by Placing Anchoring film over glass panels”,Changi
Airport Line 2003.
j) “Understanding Issues and Challenges of Certifying Innovative Products”, CDE, 2002
k) “Technical report on Changi Glass Shattering”, Changi Airport Line, Land Transport Authority,
Singapore, 2002.
l) “Getting a high Buildability Score” Civil and Structural Department, Land Transport Authority,
Singapore, 2001.
m) “Technical Report on Glass Parapet at Boon Lay MRT Station” Singapore, 2001.
n) “Effects of Sonic Boom on Glass Atria of Changi Airport Station”, 1999.
o) “Design & Construction of Changi Airport Station”, International Conference on Rail Transit
March 1999.
p) “Ductility ofReinforced Concrete Framing Systems”, University of California, USA, 1993.
SEMINARS AND TRAINING:
1) Managerial:
 People skills formanagers.
 How to lead, manage and supervise people.
 Developing high performance teams.
 Eradicating problems and making effective decisions.
 Seven habits ofhighly effective people.
 How to handle difficult situations and manage anger.
 Effective time management.
 Delivering projects to budget.
 Risk Management and Construction.
 The essentials of project and risk management.
 Quality Management System for Organizations
 GSAS certification: Global Sustainability Assessment System for Green Building Practices.
2) Technical:
 Engineers and The Law (Part 1 & 2).
 Construction claims: Preparation, Appraisal, Negotiation and Settlement.
 Contract Specifications Writing.
 Discovery in Buildability.
 Noise and Vibrations: Structural Dynamics.
 Non- Handicapping Environment for You and Me.
 Statnamic Pile Testing.
 Systems Integration in Rail Projects.
 Talks on Waterproofing Membranes in Tunnel Construction.
 IBM Lotus Notes r8.5
 The use of Immersed Tube Tunnels.
 Tunnel Ventilation and Air Conditioning for Singapore MRT.
 Underground Singapore 2001.
 Threaded Bar System by M/s VSL
 Structural Water-proofing System by M/s Fosroc
 Steelwork Clamping Techniques by M/s Lindaptor
 Green Building Design
 Sustainability and the Built Environment
 Presentation on Petro Skills Competency Development, Management and Assurance System
PROFESSIONAL AFFILIATIONS
Certified Green ProfessionalfromGSAS.
Member, Structural Steel Society ofSingapore. (MSSSS)
Member, Tunneling and Underground Construction Society ofSingapore. (MTUCS)
Member, American Society forCivil Engineers, (ASCE)
Registered Professional Engineer, Pakistan
Member, Pakistan Engineering Council, (M.P.E.C.)
Member, Society ofCivil Engineers,United Arab Emirates
REFERENCE
Available upon request.

More Related Content

What's hot

EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEduardo H. Pare
 
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016Yehia Mohamed Ibrahim Bekhit
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CVAlaa Mohan
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021Eduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitaeSALEM MOHAMMED
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Dr Sabih Laham
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07Khalid Alismail
 

What's hot (17)

EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
Sr. ARCHITECT Yehia Mohamed Ibrahim Bekhit CV March - 2016
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CV
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015
 
Mohamed Abdelaal cv
Mohamed Abdelaal cvMohamed Abdelaal cv
Mohamed Abdelaal cv
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
Erin Kingston - CV
Erin Kingston - CVErin Kingston - CV
Erin Kingston - CV
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 

Viewers also liked

Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Hamed Zarei
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATMluisaam
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machineNaquiakhter
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...Bhaddin Al-Naqshabandi
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 

Viewers also liked (7)

Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATM
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machine
 
Tunneling
Tunneling Tunneling
Tunneling
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 

Similar to Erfan Farooqui CV- 17072016

Similar to Erfan Farooqui CV- 17072016 (20)

EDUARDO H. PARE CV
EDUARDO H. PARE  CVEDUARDO H. PARE  CV
EDUARDO H. PARE CV
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
Moath ahmad cv (1)
Moath ahmad cv (1)Moath ahmad cv (1)
Moath ahmad cv (1)
 
Mano_CV
Mano_CVMano_CV
Mano_CV
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
CV-Osama Amin ..........
CV-Osama Amin  ..........CV-Osama Amin  ..........
CV-Osama Amin ..........
 
CV-Anto-2016
CV-Anto-2016CV-Anto-2016
CV-Anto-2016
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
Resume Gp
Resume GpResume Gp
Resume Gp
 

Erfan Farooqui CV- 17072016

  • 1. OBJECTIVE ERFAN-UL-HAQUE FAROOQUI Mobile: +97152-6244449 Email: e_farooqui786@hotmail.com Primary objective is to secure a responsible Business Development cumManagerialposition in the company to accomplish all challenging and creative tasks successfully and to develop and maintain an effective and efficient environment in order to achieve the goals as set by the organization. The tasks may include,but not being limited to, the following:  Managing large scale multi-disciplinary projects  To develop businessand secure jobs  Performing full coordination with both internal multi-disciplinary teams as well as external parties such as clients,contractors,vendors,suppliers,approvingauthorities,third party accredit checkers etc.This will include managing meetings and keeping records forvarious communications.  Ensuring that the design conforms to the latest engineeringCodes and Standards ofPractice.  Planning for deadlines as perproject requirements and performing project controls by assigning/re- assigning and directingwork,appraising and counselling the teams at high pressure times.  Securing new businessopportunities fromnewclients and at the same time maintaining and developing relationships with existing/repeatclients.This is to ensure company’s growthbothlocally and internationally. OVERALL EXPERIENCE Twenty five (25) years of diversified Managerial and Technical experience in the field of Structural Engineering, both local and international,including countries like Singapore, Malaysia, Pakistan, Qatar, and the UAE. Professional experience includes that in Railways (MRT / LRT), High-rise buildings and Oil & Gas. EDUCATION Masters (MS) Degree in Structural Engineering 1993 California State University, Northridge, USA BS Degree in Civil Engineering 1990 NED University of Engineering and Technology, Karachi. PERSONAL Citizen of Singapore Marital Status: Married Date of birth: 24th August '66
  • 2. AREAS OF EXPERTISE 1. Managerial Expertise: Managerial experience in different capacities can be outlines as follows: a) As Regional Manager/Executive Director in Engineering Associates International (EAI), Dubai:  Setting-up a new branch office for Engineering Consultancy Services with regards to all disciplines including Civil, Structural, Architectural, Mechanical, and Electrical  Acquiring Municipality license, liaising with Ministry of Economics and Trade.  Marketing the consultancy services with focus on specialized areas such as high-rise structures, tunnels and bridges (precast, post-tensioned).  Acquiring engineering design projects for the company.  Processing the projects to client’s satisfaction.  Managing the finances of the company yielding profitability.  Focusing on growing as a multi-disciplinary and multi-national engineering organization. b) As Team Leader of Singapore Circle Line MRT project: (heading PYL and Bishan interchange stations)  Managing large scale multi-disciplinary Singapore CCL Rail projects.  Performing full coordination with both internal multi-disciplinary teams as well as external parties as Building Control Unit (BCU), Consultants, Contractors, Vendors, Suppliers, and Third party accredited checkers etc.  Ensuring that the design conforms to the then latest engineering Codes and Standards of Practice.  Managing deadlines as per project requirements and performing project controls by assigning/re- assigning and directing work. 2. Technical Technical experience in different areas/specialized fields can be outlined as follows: a) Mass Rail Transit (MRT) and Light Rail Transit (LRT) System (Singapore and Kuala Lumpur)  Planning and designing ofMass Rapid Transit (MRT) and Light Rail Transit (LRT) structures.  Design of Viaducts, Bored Tunnels, X-over Tunnels, Tunnel Lining, TBM works etc.  Underground Structures with deep excavations, sequential construction, diaphragm walls, barrette piles etc.  Specialization in Top-down construction.  Underpinning of existing structures, their real time monitoring and analyses.  Safety HAZARD/HAZOP analysis of Rail projects. b) Buildings, Bridges and Infrastructure  Planning, analyses and design of High Rise Buildings using software like SAP, ETABS,  British or American Codes and Standards.  Earthquake designs as perAmerican (ACI / UBC / IBC) codes.  Wind Tunnel Testing  Computer modeling of 3D complex structures using latest software such as SAP, ETABS, S-
  • 3. FRAME, SAFE etc.  Glazing design and glass failure models.  Steel structures especially bridges with Static force-deflection testing, and Dynamic testing with damper applications.  Amendments and Alteration (A&A) works to existing infrastructures.  Review of technical submissions like engineering materials, drawings and calculations. c) Oil and Gas Fields:  Structures related to Oil and Gas field including liquid and gas supply pipelines with their installations and alignments, design for the pipe supports, control rooms for gas stations and sub-stations, environmental impacts, design for fire stations, blast-resistant buildings within oil fields, design for culverts, roads and otherrelevant civil engineering facilities.  Full coordination with multi-disciplines like Process, Plant, Loss Prevention, Instrumentation, Piping, Electrical, Mechanical, Building Services etc.  Safety HAZARD/HAZOP analysis of O&G projects.  Construction and closure of Landfill cells involving Environmental regulations.  High Voltage Sub-stations, Power Correction Factor Facilities, Hazardous waste collection, testing and disposal facilities.  Slug Catcher facilities, Degassing Stations, Compressor foundations with dynamic loadings,and IT Disaster Recovery centers with blast resistance etc. QUALITY MANAGEMENT  ISO 9001:2000 Certified Internal Quality Auditor since 1999.  GSAS certification: Certified Professionalfor Global SustainabilityAssessment System for Green Building Practices. COMPUTER SKILLS  General-use Packages: MSWord, MS Access,Lotus notes,PowerPoint  Engineering Packages: SAP, SAFE-IN, ETABS, GT STRUDL, STAAD PRO, RAPT, PROCON, S-FRAME, WALLAP, P-FRAME
  • 4. SUMMARY OF EXPERIENCE Period Company/ Organization Area of expertise Country 2015 to date Engineering Associates, Dubai Executive Director Marketing, fee negotiations, setting up working teams, Dubai, UAE 2006 to 2015 Qatar Petroleum, Doha Senior Civil/ Structural Engineer Oil & Gas Doha, Qatar 2003 to 2006 Engineering Associates, Dubai Regional Manager High-rise Buildings Dubai, UAE 1998 – 2003 Land Transport Authority, Spore Management Exec. Engineer / Team Leader PYL Interchange Station MRT/ LRT Railways Singapore 1995 – 1998 Meinhardt (Singapore) Pvt. Ltd Structural Engineer High-rise buildings and MRT/LRT Railways Singapore, Malaysia 1994 – 1995 A.A. Associates Karachi Structural Engineer Bridges and Buildings Karachi, Pakistan 1993 – 1994 Mushtaq and Bilal Consultants Structural Engineer High-rise buildings Karachi, Pakistan
  • 5. DETAILS OF WORK EXPERIENCE (In chronological order from current to previous) 1) Executive Director Sep’15 to Date ENGINEERING ASSOCIATES INTERNATIONAL (EAI), DUBAI – UAE Primary Role: To set-up a new local office for Engineering Consultancy Services with regards to Civil, Structural, Architectural, Mechanical, and Electrical facilities. Solely responsible to market the services and acquire jobs, process them and manage the finances yielding profitability. Securing new businessopportunitiesfromnewclients and at the same time maintaining and developing relationships with existing/repeat clients.This is to ensure company’s growth both locally and internationally. Development of engineering and drafting teams, their continual training, maintaining work quality, and above all keeping the clients satisfied through timely submissions were among the key responsibilities. 2) Senior Civil / Structural Engineer April’06 to Aug’15 QATAR PETROLEUM, DOHA – QATAR Primary Role: To provide, with full responsibility and accountability, technical service to the Corporation for Onshore Projects and Plant Change Requests (PCRs), in all areas of Civil and Structural works during definition and execution stages ensuring that designs are in compliance with the latest Codes, Standards, National and Corporation requirements and procedures. Also, to liaises with Project Engineers, other Discipline Engineers and End-Users, in order to develop cost effective and fit for purpose design solutions, to fulfill the Corporation requirements. Also included is technical support during tender process and bid evaluation. Work covered in Civil/Structural engineering and infrastructure projects include land surveying, geotechnical and site investigations, roads, residential, commercial and industrial buildings, water storage and distribution, drainage systems, construction of retaining walls, telecommunication towers, jetties and other marine works, port control towers, plant modifications/ de-bottle-necking, preparation of specifications and equipment data sheets, scope of works for tenders, preparation of design philosophies, work-site visits to establish existing conditions, review applicability of existing drawings, Standards and Specifications and to recommend appropriate changes. PROJECT TITLE DETAILS SPECIALTY SOFTWARE APPLIED HAZARDOUS WASTE TRANSFER STATION IN DUKHAN New waste collection and transferstation to be built including its associated infrastructure Collection,segregation, temporary storage, packaging,labeling and transportation ofallsolid and liquid hazardous waste generated in oil and gas related facilities. SAFE
  • 6. HIGH VOLTAGE UPGRADE IN DKHAN INVOLVING PROCESS SUB- STATION AND POWER CORRECTION FACTOR FACILITY Involving various sub- stations and high voltage cable laying across existing services. Safe distances fromoil wells,gas lines passing in the vicinity. STAADPRO NGL SUPPORT CAMPUS IN MESAIEED Including twelve (12) facilities such as Environmental Laboratory, Administration building, Warehouses,Central Workshop,Transport Depot, Shutdown Wash Down Area Each building facility with separate and unique requirement. SAFE, SAP2000 MULTI-PURPOSE COMPLEX FOR RAS LAFFAN CITY QR 3 BILLION QP Complex forRas Laffan City comprising more than 10 buildings and ancillary works including office towers, training centers etc. Complex steelstructures, Composite constructions, Post- tensioned floors ETABS, SAP & SAFE GAS SUPPLY TO MESAIEED AREA 7km pipe-line to supply gas to Kahramaa. Involved wide variety of Civil Engineering works like pavements,pipe supports, anchorblocks,design of pipes forpressures,culverts etc. Horizontal Directional Drilling. STAAD,RAPT REPLACEMENT OF A TWO STAGE HP FLARE WITH A THREE STAGE DESIGN FOR ARAB D PLANT. Reducing smokiness ofthe flare as perthe requirements of SCENR (Environment regulating body in Qatar). EnvironmentalImpacts. N/A GAS AND LIQUID HYDROCARBON DISTRIBUTION SYSTEM TIDINESS AND SAFETY SYSTEM UPGRADE Various options studied. Safety related issues in the Oil & Gas environment. N/A
  • 7. ENGINEERING SERVICES FOR IT DISASTER RECOVERY BUILDING IN DUKHAN High security-facility building acting as a back-up for all the IT related QP data. Blast resistant computer IT Facility. SAFE, STAAD, RAPT. EXTENSION AND UPGRADE OF NEW DUKHAN SEWERAGE TREATMENT PLANT. To increase the numberof Sequencing Batching Reactor (SBR) within the up and running Sewerage Treatment Plant (STP). Treatment philosophy and design for large vessels. N/A 3) Regional Manager Sep’03 to March’06 ENGINEERING ASSOCIATES PRIVATE LIMITED, DUBAI – UAE Primary Role: To set-up a new branch office for Engineering Consultancy Services with regards to Civil, Structural, Architectural, Mechanical, and Electrical facilities. Solely responsible to market the services and acquire jobs, process themand manage the finances yielding profitability to the parent company (the Head Office). Development of engineering and drafting teams, their continual training, maintaining work quality, an above all keeping the clients satisfied through timely submissions were among the key responsibilities. During the two and a half year tenure, some major projects worth highlighting are Jumeirah Beach Residence Towers and Palm Jumeirah under water vehicle tunnel. PROJECT TITLE DETAILS SPECIALTY SOFTWARE APPLIED JUMEIRA BEACH RESIDENCE AED 900 MILLION As a Design Manager consisting seven high rise towers - 50 storied. Designed for earthquake Zone 2A. SAFE, ETABS, RAPT JUMEIRA BEACH RESIDENCE SCTOR 01 TOTAL COST AED 700 MILLION Giving Consultancy to Contractor for temporary work involving geotechnical and structural design. Tower Crane and Hoist – way design. SAP2000
  • 8. VEHICULAR TUNNEL PALM JUMEIRA BEACH COST AED 900 MILLION Vetting of temporary works and permanent works for 1.3 Km immersed tunnel. Sheet pile design, soil parameter establishment, box section check. SAP2000, GMSv5.0: SEEP2D DUBAI FESTIVAL CITY TOTAL COST $200 MILLION Zone 8B including Hotels and Residential towers. Liaising with Contractor and Consultants to coordinate all disciplines design. STEEL PAC RCD DUBAI INTERNATIONAL FINANCE CENTER TOTAL COST $85 MILLION Design of Twin Towers including completely structural and MEP design. A Challenging high rise set of Towers. ETABS, SAP2000, SAFE
  • 9. 4) Management Executive Engineer Mar’98 to Sep’03 LAND TRANSPORT AUTHORITY OF SINGAPORE. Primary Role: Managing large scale multi-disciplinary Singapore Circle Line (CCL) Rail projects. Performing full coordination with both internal multi-disciplinary teams as well as external parties as Building Control Unit (BCU), Consultants, Contractors, Vendors, Suppliers, and Third party accredited checkers etc. Ensuring that the design conforms to the then latest engineering Codes and Standards of Practice. Managing deadlines as per project requirements and performing project controls by assigning/re-assigning and directing work. Planning and designing ofMass Rapid Transit (MRT) and Light Rail Transit (LRT) structures. Design of Viaducts, Bored Tunnels, X-over Tunnels, Tunnel Lining, TBM works etc. Underground Structures with deep excavations,sequentialconstruction,diaphragmwalls, barrette piles etc. Specialization in Top-down construction. Underpinning of existing structures, their real time monitoring and analyses. Safety HAZARD/HAZOP analysis of Rail projects. PROJECT TITLE DETAILS SPECIALTY SOFTWARE APPLIED CIRCLE LINE PROJECT: (CCL) SINGAPORE CIRCLE LINE, A FULLY AUTOMATED GNDERGROUND, MEDIUM CAPACITY RAPID TRANSIT SYSTEM WAS BUILT IN STAGES. TOTAL COST IS $3.4 B Heavily involved in the design of two of its in-house design stations. Also reviewed five (5) stations done by External Consultants. Underpinning of running Viaducts of trains, soil vs structural interactions using FEM, A&A works etc. Ground monitoring, sequential diaphragm wall strutting including both temporary and permanent construction stages. SAP2000; S- Frame; Rapt CHANGI AIRPORT LINE (CAL) OF SINGAPORE: IT CONSISTED OF 1KM ELEVATED, 5KM UNDERGROUND WITH 2 WORLD CLASS STATIONS, EXPO AND CHANGI. THE LINE RUNS UNDER THE CURRENT AIRPORT RUNWAY. TOTAL COST $850M. Involved in the design of both Changi and Expo Stations. Car park B of the Airport was underpinned to facilitate the tunnel running below. Various Under- pinning techniques were adopted depending on soil conditions and structural systems. Design of Cross- passages, Cross-over and Over run tunnels. Models with complete soil- structure interactions. SAP2000; SAFE; RAPT
  • 10. 5) Structural Engineer July’95 to Feb’98 MEINHARDT (SINGAPORE) PTE LTD. Primary Role: Planning, analyses and design of High Rise Buildings using software like SAP, ETABS, British or American Codes and Standards. Earthquake designs as perAmerican (ACI / UBC / IBC) codes. Wind Tunnel Testing Computer modeling of 3D complex structures using latest software such as SAP, ETABS, S-FRAME, SAFE etc. Glazing design and glass failure models. Steel structures especially bridges with Static force-deflection testing, and Dynamic testing with damper applications. Amendments and Alteration (A&A) works to existing infrastructures. PROJECT TITLE DETAILS SPECIALTY SOFWARE APPLIED KULA LAMPUR RAILWAY CONNECTION TO INTERNATIONAL AIRPORT Mainly Precast Prestressed construction, Steel Structure Depot and many adjacent associated developments. Systemwide considerations, A & A works and heavy track works RAPT SAFE MENARA RAJAWALI INDONESIA. 27-Storied with two basements and mechanical floors Core wall- frame interactions. Dynamic analysis ETABS, RAPT GUNUNG WENANG HOTEL, MANADO, INDONESIA. 14-Storied Hotel with basement in seismic zone Complete 3-D DYNAMIC ANALYSIS using ELCENTRO response spectrum ETABS ETABS 6.0 SAP90 NATIONAL MUSEUM, SINGAPORE 4-Storeied artifacts repository Flat Slab Structure. Free Standing Steel Staircase RAPT PFRAME SAFE SAP A.C.S COMPUTERS PTE LTD, SINGAPORE Part 4/ Part 6 Story factory with ancillary office and a car park basement Partly reinforced Concrete and partly prestressed concrete construction PFRAME RAPT
  • 11. 6) Structural Engineer Oct'94 to June’95 A.A. ASSOCIATES , KARACHI, PAKISTAN. PROJECT TITLE DETAILS SPECIALTY SOFTWARE APPLIED IBRAHIM FIBERS LTD., FAISALABAD Polymer plant, spinning and fiber line buildings and warehouses Raft foundations, Rib-slab, Machine-foundations, Vibration Analysis, Drainage Systems, Fire- proof detailing SAFE, MICROFEEP-II S.G.RAYON (Pvt) LTD Power Station Machine Foundations, Corbel Design SAFE WELLCOME PAKISTAN (Pvt) LTD. Ground plus 5 Story Factory Bldg. and Warehouse Intermediate Moment Resisting Space Frame with Shear Walls RECTCOL FAUJI FOUNDATION PAKISTAN Vetting of the Structure Waffle Slab MICROFEEP (P- II) for Grillage Analysis
  • 12. 7) Structural Design Engineer April '93 to Sep '94 MUSHTAQ AND BILAL CONSULTANTS, KARACHI, PAKISTAN. PROJECT TITLE DETAILS SPECIALTY SOFTWARE APPLIED HABIB BANK BUILDING, ISLAMABAD Ground plus 22 storied Bldg. Flat Slab Modeling PLATE ANALYSIS NACON HOUSE Analysis and Design of Office Bldg. Ground plus 18 Storied. Pile Foundations, Earthquake Consideration SAP-90 for soil Modeling SUI SOUTHERN GAS COMPANY LTD. KARACHI Analysis and Design of 1) Main Bldg. Basement plus Ground plus 9 stories 2)Ancillary Bldg. Ground plus 3 storied. Static Modeling of Long Columns, Earthquake Analysis PFRAME UNICOLUNM(SDL) PEARL CONTINENTAL, BHURBAN Steel Elevated Roof Fiber Roof Designed for Snow Loading RISA 2D
  • 13. PUBLICATIONS, RESEARCH, TECHNICAL PAPERS & PRESENTATIONS a) “Capital Projects Gate Approvals for Oil and Gas”, Qatar Petroleum, October 2010. b) “Changi Airport Mezzanine Bridge: Construction and Static Testing”, International Conference on Rail Transit, April 2003. c) “Top Down Technique of Changi Airport Station: Design and Construction”, International Conference on Rail Transit,April 2003. d) “Singapore Changi Airport MRT Station: Design and Construction of Glass Atria”, International Conference on Rail Transit,April 2003. e) “Total Work flow for Rail Transit Projects”,Civil and Structural Department, Land Transport Authority, Singapore, August 2003. f) “Glazing Specifications”, Civil and Structural Department, Land Transport Authority, Singapore, 2003. g) “Why Glass Design is Based Upon Probabilistic Approach of 8 Failures to 1000!” Singapore 2003. h) “Glass Balustrade Design for MRT Stations”, Civil Design Department, Land Transport Authority, Singapore, 2003 i) “Probable Protective Measures for CAL Atria by Placing Anchoring film over glass panels”,Changi Airport Line 2003. j) “Understanding Issues and Challenges of Certifying Innovative Products”, CDE, 2002 k) “Technical report on Changi Glass Shattering”, Changi Airport Line, Land Transport Authority, Singapore, 2002. l) “Getting a high Buildability Score” Civil and Structural Department, Land Transport Authority, Singapore, 2001. m) “Technical Report on Glass Parapet at Boon Lay MRT Station” Singapore, 2001. n) “Effects of Sonic Boom on Glass Atria of Changi Airport Station”, 1999. o) “Design & Construction of Changi Airport Station”, International Conference on Rail Transit March 1999. p) “Ductility ofReinforced Concrete Framing Systems”, University of California, USA, 1993.
  • 14. SEMINARS AND TRAINING: 1) Managerial:  People skills formanagers.  How to lead, manage and supervise people.  Developing high performance teams.  Eradicating problems and making effective decisions.  Seven habits ofhighly effective people.  How to handle difficult situations and manage anger.  Effective time management.  Delivering projects to budget.  Risk Management and Construction.  The essentials of project and risk management.  Quality Management System for Organizations  GSAS certification: Global Sustainability Assessment System for Green Building Practices. 2) Technical:  Engineers and The Law (Part 1 & 2).  Construction claims: Preparation, Appraisal, Negotiation and Settlement.  Contract Specifications Writing.  Discovery in Buildability.  Noise and Vibrations: Structural Dynamics.  Non- Handicapping Environment for You and Me.  Statnamic Pile Testing.  Systems Integration in Rail Projects.  Talks on Waterproofing Membranes in Tunnel Construction.  IBM Lotus Notes r8.5  The use of Immersed Tube Tunnels.  Tunnel Ventilation and Air Conditioning for Singapore MRT.  Underground Singapore 2001.  Threaded Bar System by M/s VSL  Structural Water-proofing System by M/s Fosroc  Steelwork Clamping Techniques by M/s Lindaptor  Green Building Design  Sustainability and the Built Environment  Presentation on Petro Skills Competency Development, Management and Assurance System PROFESSIONAL AFFILIATIONS Certified Green ProfessionalfromGSAS. Member, Structural Steel Society ofSingapore. (MSSSS) Member, Tunneling and Underground Construction Society ofSingapore. (MTUCS) Member, American Society forCivil Engineers, (ASCE) Registered Professional Engineer, Pakistan Member, Pakistan Engineering Council, (M.P.E.C.) Member, Society ofCivil Engineers,United Arab Emirates REFERENCE Available upon request.