SlideShare a Scribd company logo
1 of 29
SAFETY PRECAUTIONS
DURING MARCH’09
SHUT DOWN
PRESENTED BY,
Mr. Jahanzeb Khan
Date: 07.03.11
KRIBHCO SHYAM FERTILISER LTD.
AMMONIA PLANT
 COMMISSIONED ON
22/11/1995
 REASSESSED CAPACITY
1520 MTPD
(w.e.f. 01/04/2000)
 TECHNOLOGY
HALDOR TOPSOE
UREA PLANT
 COMMISSIONED ON
23/11/1995
 REASSESSED CAPACITY
2 X 1310 MTPD
(w.e.f. 01/04/2000)
 TECHNOLOGY
SNAM PROGETTI
ATR- March 2009
 Duration- 19.5 Days
 Dates
-Start of shut down : 13/03/2009
-Urea one unit production : 31/03/2009
-Ammonia production : 01/04/2009
-Urea 2nd
unit start up: 01/04/2009
Ammonia Plant
-Primary reformer tube & catalyst replacement.
-Secondary reformer job
-RG Boiler job
-HTS Catalyst job
-Synthesis gas turbine overhauling
-Ammonia converter jobs
-Synthesis loop boiler Replacement
MAJOR JOBS
Energy saving Schemes
 Ammonia Product Heater installation
 PR NG Fuel pre heating
 PAC discharge line modification
 CAPH duct modification
 Ammonia Plant DCS replacement
Urea Plant
 Urea reactors and stripper inspection
 Exchangers cleaning
 Blow down and vent stack pipe replacement
 HP passivation air compressor installation
 Prilling Tower epoxy coating
 Bentley Nevada vibration monitoring system
hook up
Offsites
 CT return header shifting Job
 GTG-I Generator overhauling
Why Annual Turnarounds ????
 ATR, a planned activity- annually or biannually
 Annual turnarounds for:
-Jobs – Breakdowns, repairs, overhauls, improvements,
modifications etc
-Statutory compliances
-Cleaning of equipment
-Catalyst loading, washings, internal repairs
-Inspections and testing of equipment & machines
-Adding new equipments
-Up gradations & replacements
Shutdown job lists
 ATR job list include
-Uncompleted jobs from the previous ATR
-Jobs identified during the entire year
-Special inspections – statutory, testing,
improvements
-Jobs out of analysis reports – NDT, tech suppliers,
OEMs
-Jobs that can be only done during utilities stoppage
-Jobs on vessels for catalyst change, cleaning,
repairs etc
Jobs Planning
 Job lists reviewed on monthly basis between
departments
 Unique job number for each job which gets frozen
 All jobs are identified & tagged in field before ATR
 Each job planned – manpower, material & timelines
 Bar chart for major planned jobs
 Spacing of jobs as per vendor availability
 Risk assessment for each job by process &
maintenance
 No job done without a permit
Material / Spares planning
 Done well in advance – ATR material separately
identified
 Early orders for each critical items & OEM supplies
 All temporary lines, fittings, structures - pre fabricated
 Prior testing & overhauling of equipments like
 Cranes, forklifts, lifting tools etc
 Access equipment, hydraulic platforms etc
 Portable tools like grinders, drills, welding machines etc
 Advance availability of materials & tools from
contractors
Services planning
 Advance intimation of the ATR dates to all
 Pre visits of service providers for job understanding
 Tests for skilled workers conducted – welders,
riggers etc
 Clear guidelines for safety in job execution
 Safety training given in advance to all external work
force
Annual Turn Around – Job Cycle
Start
Preparation of ATR job list
Meetings between Production & Maintenance
functions to finalize the Shut Down Manual.
Check the Risk
Assessments
Identify the Safety Guide lines
/ PPE requirements
Inputs:
Maintenance repairs
Inspections
Process requirements
NDT recommendations
Cleaning
Carry out risk
assessment
Continued ……
YES
No
JOB CYCLE…. Continued
Include all Guide line in Shut Down
Manual against Each Job.
Hand Over the S/D Manual to all
Concerned Dept. /Section/ Persons
Stoppage, Isolation and Purging
of Equipments as Per SOP
Issue the SWP for
Maintenance crew
Return all SWP
after completing
the Job to S/I
Updation on SAP
Trial Run by
Production
Carry out the job with
full Adherence of SWP
Guidelines
Process Planning – Shutdown Manual
 A Comprehensive Process Handbook which includes:
 Schedule of shutdown & start up
 Detailed job lists (Area wise) & Bar chart for major jobs
 Risk assessment of each activity
 Procedures for Shutdown of each section
 Special activities - hydro testing, catalyst replacement,
cleaning
 Purging of sections & checklist of major maintenance jobs with
sketches
 Critical inspections & vessel entry
 Start up of utilities & each sections
Safe Work Procedures
A safe work procedure can be defined as the
written instruction of a task/activity outlining
the preferred method whilst emphasizing
ways to minimise any risk(s) of harm. A safe
work procedure outlines the hazards, risks
and associated controls measures to be
applied to ensure the task/activity is
conducted in a way to reduce the risk of
injury.
DEVELOPMENT
Safe work procedures should be developed
for all tasks/activities, processes, and the
operation of equipment and machinery,
where a risk assessment identifies the
requirements as a suitable control measure
to reduce the risk of injury.
PROCESS STEPS
To aid in the development of a safe work
procedure the following steps should be
followed:
Step 1. Observe the task or process;
Step 2. Record the sequence of basic job steps
Step 3. Assess potential hazards of each steps
Step 4. Review associated legislative
requirements
Step 5. Assess the risk of Hazards;
Step 6. Suggest ways of eliminating and controlling
the hazards;
Step 7. Test the procedure by consultation and
verify relevant issues are documented
Step 8. Obtain approval of the procedure from a
supervisor or manager.
In determining potential hazards in a task
or process the following factors could be
considered
 Is there exposure to noise, fumes or dust?
 How can equipment fail in any way?
 Is the work physically strainers?
 Is the work made harder by external factors ( climate,
noise etc.)?
 Is there enough space to move about?
 Can the person be caught in, on or between anything
 Can the person be struck by or contacted by anything
while doing this step of the job
 Do loads need to be lifted/or handled?
 Can the person slip or trip or fall
 What level of supervision is required?
 Is the work made harder by the way it is organised ?
 Is there any requirement specified in relevant legislation?
PRIORITIES
It is recognized that, in some areas, the preparation of
safe work procedures may take some time.
The priorities for the preparation of safe work
procedure should be:
 All new task where there is a high to medium risk
should have safe work procedures prepared before
they are put into general use;
 For existing processes, safe work procedures for high
risk tasks should be prepared first, followed by
medium and low risk tasks;
Safety Systems in ATR
 Safety of Man, Machine & Equipment – Top Priority
 No job without Risk assessment & Scheme / procedure
 No job without Safety Permit
 All class 1 permits - Inspected by Safety officer
 Additional process people posted as safety officers
 Safety observers – Internal & External
 Cross functional inspection teams for entry & box up of
each Vessel
 Check lists and sign-offs for each inspection
 Registers for blinds / vessel entry with sign-offs
Safety in ATR
 Training
 Communication of safety norms to all personnel
 Safety talk every morning & before start of each job
Contractors
 Medical tests before jobs
 Training & tests on job execution
 Checking & certification of all new equipment brought to
site
 100% adherence to use of PPEs
 Proper arrangements for rescue - availability of crane,
 ambulance & constant watch on working personnel inside
the vessel
Checking of Safety Systems & Logics
 Each component of safety logic is checked
 Trip switches, transmitters, vibration probes & other
key elements are removed, calibrated & installed
back
 After installation all Trip interlocks cross checked
through manual simulation
 Stroke checking of ALL control valves
 Calibration of all critical PSVs
 Hydro test of all critical exchangers
Start up
 Systematic leak check - initially with IG at lower
pressure then at operating pressure
 For each activity like purging, filling, start up etc
 A documented procedure cum check list
 Optimum utilization of trained manpower for different
activities
 Comparison of efficiencies – machines, reactors,
 exchangers, catalysts performance etc
Shutdown Report & Records
 Shutdown report includes:
 Planned vs. actual timings for major activities
 Details of key jobs done
 Section wise observations of inspections & repairs
 Surprises
 Analysis & improvements achieved
 Observations regarding safety & environment lapses
 Identification of area of improvements
 Learning & best practices observed
AFTER ATR
 AMMONIA PLANT CAPACITY : 1725 TPD
 UREA PLANT CAPACITY : 2825 MTPD
 ON STREAM DAYS : 350
 ANNUAL UREA PRODUCTION : 988750 MT
THANK YOU

More Related Content

What's hot

Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013John Newquist
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Cairn India Limited
 
Process Safety
Process SafetyProcess Safety
Process SafetyConsultivo
 
Asse 04 process_safety_management
Asse 04 process_safety_managementAsse 04 process_safety_management
Asse 04 process_safety_managementFoued DRIDI
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_ManagementEssam Osmaan
 
Kp bloch psm preparedness final rev
Kp bloch psm preparedness final revKp bloch psm preparedness final rev
Kp bloch psm preparedness final revAnn-Marie Roche
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety ManagementShirazeh arghami
 
Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)TheSafetyGuru
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyDesign World
 
Construction safety Management Training by NMMCC
Construction safety Management Training by NMMCCConstruction safety Management Training by NMMCC
Construction safety Management Training by NMMCCAtlantic Training, LLC.
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedureMohammed Alam
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsDoina Dobre, P.Eng, GSC
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)Herman Moral
 

What's hot (20)

venkat resume
venkat resumevenkat resume
venkat resume
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
 
Process Safety
Process SafetyProcess Safety
Process Safety
 
Asse 04 process_safety_management
Asse 04 process_safety_managementAsse 04 process_safety_management
Asse 04 process_safety_management
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_Management
 
Kp bloch psm preparedness final rev
Kp bloch psm preparedness final revKp bloch psm preparedness final rev
Kp bloch psm preparedness final rev
 
14 Tips for Process Safety Management
14 Tips for Process Safety Management14 Tips for Process Safety Management
14 Tips for Process Safety Management
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety Management
 
Process Safety Management
Process Safety ManagementProcess Safety Management
Process Safety Management
 
Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 
LOTO system integration with Permit to Work Software
LOTO system integration with Permit to Work SoftwareLOTO system integration with Permit to Work Software
LOTO system integration with Permit to Work Software
 
Oil & Gas Maintenance Guide
Oil & Gas Maintenance GuideOil & Gas Maintenance Guide
Oil & Gas Maintenance Guide
 
Construction safety Management Training by NMMCC
Construction safety Management Training by NMMCCConstruction safety Management Training by NMMCC
Construction safety Management Training by NMMCC
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating Considerations
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 

Viewers also liked

Scheduled Shutdown Maintenance
Scheduled Shutdown MaintenanceScheduled Shutdown Maintenance
Scheduled Shutdown Maintenancejdparfett
 
Shutdown Scheduling
Shutdown SchedulingShutdown Scheduling
Shutdown Schedulingcgentile
 
Process simulation of urea plant
Process simulation of urea plantProcess simulation of urea plant
Process simulation of urea plantGajanan Hange
 
technical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europetechnical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europeT.A. Cook
 
Turnaround Project Planner Primer
Turnaround Project Planner PrimerTurnaround Project Planner Primer
Turnaround Project Planner Primerahmad bassiouny
 
Operation of urea fertilizers plant
Operation of urea fertilizers plantOperation of urea fertilizers plant
Operation of urea fertilizers plantPrem Baboo
 
Ammonia plant fundamentals
Ammonia plant fundamentalsAmmonia plant fundamentals
Ammonia plant fundamentalsPrem Baboo
 
Ammonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingAmmonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingGerard B. Hawkins
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivityahmad bassiouny
 

Viewers also liked (10)

Plant shutdown
Plant shutdownPlant shutdown
Plant shutdown
 
Scheduled Shutdown Maintenance
Scheduled Shutdown MaintenanceScheduled Shutdown Maintenance
Scheduled Shutdown Maintenance
 
Shutdown Scheduling
Shutdown SchedulingShutdown Scheduling
Shutdown Scheduling
 
Process simulation of urea plant
Process simulation of urea plantProcess simulation of urea plant
Process simulation of urea plant
 
technical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europetechnical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europe
 
Turnaround Project Planner Primer
Turnaround Project Planner PrimerTurnaround Project Planner Primer
Turnaround Project Planner Primer
 
Operation of urea fertilizers plant
Operation of urea fertilizers plantOperation of urea fertilizers plant
Operation of urea fertilizers plant
 
Ammonia plant fundamentals
Ammonia plant fundamentalsAmmonia plant fundamentals
Ammonia plant fundamentals
 
Ammonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingAmmonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator training
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 

Similar to Safe work procedure1

Similar to Safe work procedure1 (20)

M ZAIDI resume 2015
M ZAIDI resume 2015M ZAIDI resume 2015
M ZAIDI resume 2015
 
Work permit system
Work permit systemWork permit system
Work permit system
 
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
HSE Engineer
HSE EngineerHSE Engineer
HSE Engineer
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CV
 
parveer
parveerparveer
parveer
 
Cv of nilesh rk
Cv of nilesh rkCv of nilesh rk
Cv of nilesh rk
 
Resume
ResumeResume
Resume
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
Jatin_inst (1)
Jatin_inst (1)Jatin_inst (1)
Jatin_inst (1)
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
REY CV
REY CVREY CV
REY CV
 
CV3
CV3CV3
CV3
 
Safety cycle
Safety cycleSafety cycle
Safety cycle
 
Srinivasa Rao - HSE
Srinivasa Rao - HSESrinivasa Rao - HSE
Srinivasa Rao - HSE
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 

More from Jahanzeb Khan

मुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdf
मुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdfमुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdf
मुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdfJahanzeb Khan
 
नैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdf
नैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdfनैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdf
नैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdfJahanzeb Khan
 
सामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdf
सामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdfसामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdf
सामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdfJahanzeb Khan
 
आखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdf
आखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdfआखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdf
आखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdfJahanzeb Khan
 
सम्पूर्ण चिकित्सा-1.pdf
सम्पूर्ण चिकित्सा-1.pdfसम्पूर्ण चिकित्सा-1.pdf
सम्पूर्ण चिकित्सा-1.pdfJahanzeb Khan
 
सकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdf
सकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdfसकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdf
सकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdfJahanzeb Khan
 
नमक_स्वाद_अनुसार@All_in_one_noval.pdf
नमक_स्वाद_अनुसार@All_in_one_noval.pdfनमक_स्वाद_अनुसार@All_in_one_noval.pdf
नमक_स्वाद_अनुसार@All_in_one_noval.pdfJahanzeb Khan
 
चंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdf
चंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdfचंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdf
चंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdfJahanzeb Khan
 
तेजस्वी मन.pdf
तेजस्वी मन.pdfतेजस्वी मन.pdf
तेजस्वी मन.pdfJahanzeb Khan
 
कर्म_का_सिध्दांत_दादा_भगवान.pdf
कर्म_का_सिध्दांत_दादा_भगवान.pdfकर्म_का_सिध्दांत_दादा_भगवान.pdf
कर्म_का_सिध्दांत_दादा_भगवान.pdfJahanzeb Khan
 
दुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdf
दुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdfदुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdf
दुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdfJahanzeb Khan
 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine EfficiencyJahanzeb Khan
 
Developments in Ammonia Production Technology
Developments in Ammonia Production TechnologyDevelopments in Ammonia Production Technology
Developments in Ammonia Production TechnologyJahanzeb Khan
 

More from Jahanzeb Khan (13)

मुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdf
मुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdfमुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdf
मुट्‍ठी_में_तकदीर_रॉबिन_शर्मा_THE1.pdf
 
नैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdf
नैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdfनैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdf
नैतिकता_का_सुख_Joy_of_Ethics_हिंदी.pdf
 
सामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdf
सामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdfसामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdf
सामुद्रिक_शास्‍त्र_भाग्‍य_निर्णय.pdf
 
आखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdf
आखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdfआखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdf
आखिरी_शिकार_आशीष_गौतम_सीरीज_Book.pdf
 
सम्पूर्ण चिकित्सा-1.pdf
सम्पूर्ण चिकित्सा-1.pdfसम्पूर्ण चिकित्सा-1.pdf
सम्पूर्ण चिकित्सा-1.pdf
 
सकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdf
सकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdfसकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdf
सकारात्मक_और_प्रेरक_लघुकथाएं_बालकृष्ण_गुप्ता_गुरु.pdf
 
नमक_स्वाद_अनुसार@All_in_one_noval.pdf
नमक_स्वाद_अनुसार@All_in_one_noval.pdfनमक_स्वाद_अनुसार@All_in_one_noval.pdf
नमक_स्वाद_अनुसार@All_in_one_noval.pdf
 
चंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdf
चंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdfचंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdf
चंद्र_गुप्त_मौर्य_Chandragupta_Maurya_Hindi.pdf
 
तेजस्वी मन.pdf
तेजस्वी मन.pdfतेजस्वी मन.pdf
तेजस्वी मन.pdf
 
कर्म_का_सिध्दांत_दादा_भगवान.pdf
कर्म_का_सिध्दांत_दादा_भगवान.pdfकर्म_का_सिध्दांत_दादा_भगवान.pdf
कर्म_का_सिध्दांत_दादा_भगवान.pdf
 
दुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdf
दुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdfदुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdf
दुनिया_का_सबसे_अनमोल_रत्न_प्रेमचंद.pdf
 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine Efficiency
 
Developments in Ammonia Production Technology
Developments in Ammonia Production TechnologyDevelopments in Ammonia Production Technology
Developments in Ammonia Production Technology
 

Safe work procedure1

  • 1. SAFETY PRECAUTIONS DURING MARCH’09 SHUT DOWN PRESENTED BY, Mr. Jahanzeb Khan Date: 07.03.11
  • 2. KRIBHCO SHYAM FERTILISER LTD. AMMONIA PLANT  COMMISSIONED ON 22/11/1995  REASSESSED CAPACITY 1520 MTPD (w.e.f. 01/04/2000)  TECHNOLOGY HALDOR TOPSOE UREA PLANT  COMMISSIONED ON 23/11/1995  REASSESSED CAPACITY 2 X 1310 MTPD (w.e.f. 01/04/2000)  TECHNOLOGY SNAM PROGETTI
  • 3. ATR- March 2009  Duration- 19.5 Days  Dates -Start of shut down : 13/03/2009 -Urea one unit production : 31/03/2009 -Ammonia production : 01/04/2009 -Urea 2nd unit start up: 01/04/2009
  • 4. Ammonia Plant -Primary reformer tube & catalyst replacement. -Secondary reformer job -RG Boiler job -HTS Catalyst job -Synthesis gas turbine overhauling -Ammonia converter jobs -Synthesis loop boiler Replacement MAJOR JOBS
  • 5. Energy saving Schemes  Ammonia Product Heater installation  PR NG Fuel pre heating  PAC discharge line modification  CAPH duct modification  Ammonia Plant DCS replacement
  • 6. Urea Plant  Urea reactors and stripper inspection  Exchangers cleaning  Blow down and vent stack pipe replacement  HP passivation air compressor installation  Prilling Tower epoxy coating  Bentley Nevada vibration monitoring system hook up
  • 7. Offsites  CT return header shifting Job  GTG-I Generator overhauling
  • 8. Why Annual Turnarounds ????  ATR, a planned activity- annually or biannually  Annual turnarounds for: -Jobs – Breakdowns, repairs, overhauls, improvements, modifications etc -Statutory compliances -Cleaning of equipment -Catalyst loading, washings, internal repairs -Inspections and testing of equipment & machines -Adding new equipments -Up gradations & replacements
  • 9. Shutdown job lists  ATR job list include -Uncompleted jobs from the previous ATR -Jobs identified during the entire year -Special inspections – statutory, testing, improvements -Jobs out of analysis reports – NDT, tech suppliers, OEMs -Jobs that can be only done during utilities stoppage -Jobs on vessels for catalyst change, cleaning, repairs etc
  • 10. Jobs Planning  Job lists reviewed on monthly basis between departments  Unique job number for each job which gets frozen  All jobs are identified & tagged in field before ATR  Each job planned – manpower, material & timelines  Bar chart for major planned jobs  Spacing of jobs as per vendor availability  Risk assessment for each job by process & maintenance  No job done without a permit
  • 11. Material / Spares planning  Done well in advance – ATR material separately identified  Early orders for each critical items & OEM supplies  All temporary lines, fittings, structures - pre fabricated  Prior testing & overhauling of equipments like  Cranes, forklifts, lifting tools etc  Access equipment, hydraulic platforms etc  Portable tools like grinders, drills, welding machines etc  Advance availability of materials & tools from contractors
  • 12. Services planning  Advance intimation of the ATR dates to all  Pre visits of service providers for job understanding  Tests for skilled workers conducted – welders, riggers etc  Clear guidelines for safety in job execution  Safety training given in advance to all external work force
  • 13. Annual Turn Around – Job Cycle Start Preparation of ATR job list Meetings between Production & Maintenance functions to finalize the Shut Down Manual. Check the Risk Assessments Identify the Safety Guide lines / PPE requirements Inputs: Maintenance repairs Inspections Process requirements NDT recommendations Cleaning Carry out risk assessment Continued …… YES No
  • 14. JOB CYCLE…. Continued Include all Guide line in Shut Down Manual against Each Job. Hand Over the S/D Manual to all Concerned Dept. /Section/ Persons Stoppage, Isolation and Purging of Equipments as Per SOP Issue the SWP for Maintenance crew Return all SWP after completing the Job to S/I Updation on SAP Trial Run by Production Carry out the job with full Adherence of SWP Guidelines
  • 15. Process Planning – Shutdown Manual  A Comprehensive Process Handbook which includes:  Schedule of shutdown & start up  Detailed job lists (Area wise) & Bar chart for major jobs  Risk assessment of each activity  Procedures for Shutdown of each section  Special activities - hydro testing, catalyst replacement, cleaning  Purging of sections & checklist of major maintenance jobs with sketches  Critical inspections & vessel entry  Start up of utilities & each sections
  • 16. Safe Work Procedures A safe work procedure can be defined as the written instruction of a task/activity outlining the preferred method whilst emphasizing ways to minimise any risk(s) of harm. A safe work procedure outlines the hazards, risks and associated controls measures to be applied to ensure the task/activity is conducted in a way to reduce the risk of injury.
  • 17. DEVELOPMENT Safe work procedures should be developed for all tasks/activities, processes, and the operation of equipment and machinery, where a risk assessment identifies the requirements as a suitable control measure to reduce the risk of injury.
  • 18. PROCESS STEPS To aid in the development of a safe work procedure the following steps should be followed: Step 1. Observe the task or process; Step 2. Record the sequence of basic job steps Step 3. Assess potential hazards of each steps Step 4. Review associated legislative requirements
  • 19. Step 5. Assess the risk of Hazards; Step 6. Suggest ways of eliminating and controlling the hazards; Step 7. Test the procedure by consultation and verify relevant issues are documented Step 8. Obtain approval of the procedure from a supervisor or manager.
  • 20. In determining potential hazards in a task or process the following factors could be considered  Is there exposure to noise, fumes or dust?  How can equipment fail in any way?  Is the work physically strainers?  Is the work made harder by external factors ( climate, noise etc.)?  Is there enough space to move about?  Can the person be caught in, on or between anything
  • 21.  Can the person be struck by or contacted by anything while doing this step of the job  Do loads need to be lifted/or handled?  Can the person slip or trip or fall  What level of supervision is required?  Is the work made harder by the way it is organised ?  Is there any requirement specified in relevant legislation?
  • 22. PRIORITIES It is recognized that, in some areas, the preparation of safe work procedures may take some time. The priorities for the preparation of safe work procedure should be:  All new task where there is a high to medium risk should have safe work procedures prepared before they are put into general use;  For existing processes, safe work procedures for high risk tasks should be prepared first, followed by medium and low risk tasks;
  • 23. Safety Systems in ATR  Safety of Man, Machine & Equipment – Top Priority  No job without Risk assessment & Scheme / procedure  No job without Safety Permit  All class 1 permits - Inspected by Safety officer  Additional process people posted as safety officers  Safety observers – Internal & External  Cross functional inspection teams for entry & box up of each Vessel  Check lists and sign-offs for each inspection  Registers for blinds / vessel entry with sign-offs
  • 24. Safety in ATR  Training  Communication of safety norms to all personnel  Safety talk every morning & before start of each job Contractors  Medical tests before jobs  Training & tests on job execution  Checking & certification of all new equipment brought to site  100% adherence to use of PPEs  Proper arrangements for rescue - availability of crane,  ambulance & constant watch on working personnel inside the vessel
  • 25. Checking of Safety Systems & Logics  Each component of safety logic is checked  Trip switches, transmitters, vibration probes & other key elements are removed, calibrated & installed back  After installation all Trip interlocks cross checked through manual simulation  Stroke checking of ALL control valves  Calibration of all critical PSVs  Hydro test of all critical exchangers
  • 26. Start up  Systematic leak check - initially with IG at lower pressure then at operating pressure  For each activity like purging, filling, start up etc  A documented procedure cum check list  Optimum utilization of trained manpower for different activities  Comparison of efficiencies – machines, reactors,  exchangers, catalysts performance etc
  • 27. Shutdown Report & Records  Shutdown report includes:  Planned vs. actual timings for major activities  Details of key jobs done  Section wise observations of inspections & repairs  Surprises  Analysis & improvements achieved  Observations regarding safety & environment lapses  Identification of area of improvements  Learning & best practices observed
  • 28. AFTER ATR  AMMONIA PLANT CAPACITY : 1725 TPD  UREA PLANT CAPACITY : 2825 MTPD  ON STREAM DAYS : 350  ANNUAL UREA PRODUCTION : 988750 MT