HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Site
Preparation /
Excavation
R D Sliding of loose soil. AN Body
Injury
1. Barricading of Excavated
Pits, Shuttering of Loose soil
wall. ( OCP)
2.Provision of PPEs.
3.Work Permit System (OCP)
4. Periodic safety
awareness campaign
3 2 3 3 1 54 Constant awareness
for use of PPE by 100%
workers
3 1 3 3 1 27 (Treat
&
Tolerate)
R D Fall of soil on
worker.
AN Body
Injury
3 2 3 3 1 54 Constant awareness
for use of PPE by 100%
workers
3 1 3 3 1
R D Fall of Material from
edge
AN Body
Injury
1.Provision of PPEs
2. Good House Keeping
practices ( Admn)
2 2 3 3 1 36 Constant awareness
for use of PPE by 100%
workers
36 (Treat
&
Tolerate)
R D Accidental exposure
due to Underground
utilities like Electrical
Cable & Other Pipes
AN Fatal
Injury
1. Follow up of Proper
Signalling Procedure.( OCP)
2. Careful excavation (OCP).
1 1 5 3 1 15 Constant monitoring of
OCP effectiveness
15
(Treat)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/
Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,)
Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time
incident ( Able to join in next scheduled working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic
Diseases, Major Fracture etc- Any Lost Time incident (Not able to join
in next scheduled working shift)
4 Mechanism in place but not
reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 01
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
02 Brick work &
Masonry Work
R D Fall from Height A Fatal
Injury
1.Provision of Proper work
platform with proper Access. ( OCP
2. Provision of PPEs.
4. Work permit System (OCP)
1 1 5 3 1 15 Constant awareness
for use of PPE by
100% workers /
Constant monitoring
of OCP effectiveness
15
(Treat &
Tolerate)
R D Fall of Material
from height
A Body
Injury
1. Area Barricading use of
Caution Board & safety
Ribbon. ( Admn)
2. Periodic Training to
Workers ( Admn).
4. Provision of PPEs.
3 2 3 3 1 54 Use of safety net
( PPE).
3 1 3 3 1 27 --
Tolerate
R D Exposure to
Bricks, Steel
Material
N Cuts &
bruise
PPE 4 3 2 3 1 72 Constant awareness
for use of PPE by 100%
workers
3 2 2 3 1 36--
Tolerate
R D Exposure to sand
/ cement Dust
N Dermatitis
/ Irritation
PPE 4 3 2 3 1 72 Constant awareness
for use of PPE by 100%
workers
3 2 2 3 1 36--
Tolerate
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will)
1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible 2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,,
Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next
scheduled working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but not
reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 2
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
03 Concreting
work by mixer
machine
R D Ergonomically
Hazard
N Sprains Employment of Medically fit
workers / Rest between job
2 2 3 3 1 36 --------------------------- 36
(Treat)
R D Tripping Hazard A Fatal Injury 1. Access must be clear from
any obstruction ( OCP)
2. PPE Provision
1 1 5 3 1 15 15 --
Treat &
Tolerate
R D Exposure to
Cement / Sand /
Dust etc
N Dermatitis /
Irritation
1 PPE Provision
2. Periodical Training to Workers
about the disease due to exposure to
cement
4 3 2 3 1 72 Constant awareness
for use of PPE by 100%
workers
3 2 2 3 1 36--
Tolerate
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status
(C)
Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will)
1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible 2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,,
Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled
working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but
not reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 3
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
04 Pilling Work R D Baler may hit
the workers
A Body Injury 1.Use of safety Helmet,
Hand gloves, shoes, Nose
Mask--PPE.
2. Periodic Training to
Workers ( Admin).
1 1 3 3 1 09 --------------------------- 09
(Treat &
Tolerate)
R D Fall from Height A Fatal Injury 1.Provision of Proper work
platform with proper Access.
( Admn))
3. Provision of PPEs.
4. Work permit System (OCP)
1 1 5 3 1 15 Constant awareness
for use of PPE by
100% workers /
Constant monitoring
of OCP effectiveness
15 --
Treat &
Tolerate
R D Winch may
loose control
A Body Injury 1. Check the wire rope
regularly.(OCP)
2. Check winch machine
condition regularly.(OCP)
3) Daily Tool Box Talk
1 1 5 3 1 15 Constant awareness
for use of PPE by
100% workers /
Constant monitoring
of OCP effectiveness
15 --
Treat &
Tolerate
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status
(C)
Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will)
1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible 2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,,
Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled
working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but
not reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 4
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
05 Structural
Erection
R D Accidental Body
contact during
stacking of
Material by
Crane
A Body
Injury
1.Competent operator. (Admin)
2.Maintain safe clearance.(OCP)
3.The route of crane movement to be
planned prior movement.(OCP)
1 1 3 3 1 09 Constant
monitoring of OCP
effectiveness
09
(Treat )
R D Nip hazard by
punching of
fingers between
sling and material.
A Fatal
Injury
During slinging the body parts should not
come within the nip portion to avoid finger
injury (OCP)
1 1 5 3 1 15 Constant
monitoring of OCP
effectiveness
15
(Treat )
R D Slip, trip & fall of
load during
slinging
A Fatal
Injury
Right persons (Rigger) must be engaged
for the slinging job. ( Admin)
Slings are to be checked visually so that
it is free from damage.(OCP)
The weight of the materials is to be
decided first and then choosing of the
lifting tools and tackles to be done.(OCP)
1 1 5 3 1 15 Constant
monitoring of OCP
effectiveness
15
(Treat )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will)
1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible 2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat
Stress , Partial Hearing Block etc )Any Non Lost Time incident ( Able to join in next
scheduled working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but not
reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 5
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
05 Structural
Erection
R D Fall of
material
A Fatal
Injury
1.Provide proper trained and experienced rigger. (Admin)
2.Use tag line for proper guidance of lifting load.(OCP)
3.Do not allow oscillation of load(OCP)
4.Person not allowed under the suspended load. (OCP)
1 1 5 3 1 15 Constant monitoring
of OCP
effectiveness
15
(Treat )
R D Fall of
person
from
height
A Fatal
Injury
1.Operation sequence to be followed as per approved
methodology.(OCP)/
2.Necessary work permit to be taken prior to starting the
job.(OCP) /
3. Trained and experienced workers / Rigger must be
engaged.(Amin)/
4. The required PPE’s are to be used by all the persons during
working at height.(PPE)
1 1 5 3 1 15 Constant monitoring
of OCP
effectiveness /
Constant awareness
for use of PPE by
100% workers
15
(Treat &
Tolerate)
R D Crane
failure
A Fatal
Injury
1.The brake, horn, swing horn, hook and wire –rope should be
checked prior to use the crane.(OCP) /
2.Only one person should give signal (Signalman) to the crane
operator.(OCP)/
3.Ground condition of the crane base should be checked prior
the job(OCP).
1 1 5 3 1 15 Constant monitoring
of OCP
effectiveness
15
(Treat )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status
(C)
Wt Noticed / Reported Period
of consequence (D)
1
Rare- (could happen but
probably never will)
1
Rare
1
Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat
Stress , Partial Hearing Block etc )Any Non Lost Time incident ( Able to join in next
scheduled working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but
not reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 6
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
06 Movement of
Crane/ Hydra
etc.
R D Person coming in
contact with crane
A Fatal
Injury
1.Pedestrian way identified and
maintained.(Admin)/
2.Helper engaged for signaling of
vehicle movement (Admin).
1 1 5 3 1 15 15
(Treat )
R D Toppling of Crane &
Accidental Body
contact due to poor
road condition
A Fatal
Injury
1.Road made with leveled, compacted
and free from pot holes and
maintained.(Admin)
1 1 5 3 1 15 15
(Treat )
R D Unauthorized
driving causing
Accidental Body
Contact
A Fatal
Injury
1.Drivers are deployed with valid
license(Admin)/
2. Helper / cleaners are not allowed to
operate the crane.(Admin)
1 1 5 3 1 15 15
(Treat )
R D Poor visibility of rear
side
A Fatal
Injury
1.Ensure reverse horn, swing horn is in
working condition prior to start the
crane.(OCP)
1 1 5 3 1 15 Constant
monitoring of OCP
effectiveness
15
(Treat )
R D Over Speed of Vehicle A Fatal
Injury
Speed control Signage(Admin) 1 1 5 3 1 15 15
(Treat )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will)
1
Rare
1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat
Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but not
reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 7
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50
& Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D /
I
Hazard N/ A/
Em
Conseq Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn.
/ Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
07 Scaffolding
Work
R D Improper manual
handling of scaffolding
materials.
A Body
Injury
The person’s are trained for the safety in Manual material
handling.(Admin)
1 1 5 3 1 15 ----------------------- 1 1 5 3 1 15
(Treat )
R D Falling of material during
lifting.
A Body
Injury
OCP
1.The scaffolding materials to be lifted at height by tested
lifting pulley by proper size PP rope.
2. Avoid Throwing of materials from height or vice versa.
1 1 5 3 1 15
Constant
monitoring of OCP
effectiveness
1 1 5 3 1 15
(Treat )
R D Slip, trip hazard upon
pipe stack.
A Body
Injury
1.All the persons must be scaffold trained and medically
fit prior start the job.
2.Ppersons are aware about the hazards of working at
height.
1 1 5 3 1 15 1 1 5 3 1 15
(Treat )
R D Fall of person from
height
A Fatal
Injury
1..Arrangements for the anchoring of Full body harness to
be fixed for working at height.
2.Proper access and egress must be provided to reach the
working level.
1 1 5 3 1 15 1 1 5 3 1 15
(Treat )
R D Collapse of scaffolding
due to poor ground
condition.
A Fatal
Injury
1.Scaffold are erected on compacted and level ground.
2.Base plate & sole board must be provided.
Tied the scaffold with the existing structures.
1 1 5 3 1 15 1 1 5 3 1 15
(Treat )
R D Working with improper
hand tools
A Body
Injury
Proper hand tools are to be used to avoid injury 1 1 5 3 1 15 1 1 5 3 1 15
(Treat )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status
(C)
Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will)
1
Rare
1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at
source.
1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem,
Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary
control.
2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat
Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift)
3 Control needs human
intervention.
3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture
etc- Any Lost Time incident (Not able to join in next scheduled working shift)
4 Mechanism in place but
not reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective
control.
5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 8
HIRA CHART
SPCL (EPC) AREA: CONSTRUCTION Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R
/
N
R
D
/
I
Hazard N/
A/
Em
Consequence Current Control Risk Level
Additional Control
/ Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
08 Gas Cutting N
R
D Explosion due to flash back-
hazard
A Fatal Injury Flash Back
Arrestor
OCP 1 1 5 1 1 05
Constant monitoring
of OCP
effectiveness /
Constant awareness
for use of PPE by
100% workers
TREAT
/
TOLERATE
05
Inhalation of Gas N Suffocation Nose Mask PPE 3 3 3 1 1 18 18
09 Gas Cylinder
Transportation
Explosion due to handling
without Hand Trolley
A Fatal Injury Hand Trolley Adm. 1 2 5 1 1 10 10
10 Welding Inhalation of fumes N Suffocation Nose mask
PPE
3 4 3 1 1 36 36
Eye Exposure to Welding flash N Arc Eyes Goggles 2 3 2 1 1 12 12
Exposure to Heat as released N Heat Stress Mask / Goggles 3 4 3 1 1 36 36
Skin Contact with spatters N Superficial Burn Gloves / Mask /
Goggles
3 3 2 1 1 18 18
Exposure to damaged cable A Elec Shock Gloves 1 2 3 1 1 06 06
11 Disposal of Debris
Material resulting from
various activities
R D Handling of Debris Material N Body Injury PPE 4 2 3 3 1 48
48 --
Tolerate
12 Various Work at Night R D Insufficient Light N Injury causing Lost
time incident
Monitoring of Illumination
level (LUX) at Night
OCP 2 2 2 4 1 32 32
( Treat)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will)
1
Rare
1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea,
Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye
Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,,
Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to
join in next scheduled working shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic
Diseases, Major Fracture etc- Any Lost Time incident (Not able to
join in next scheduled working shift)
4 Mechanism in place but not
reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 09
HIRA CHART
SPCL (EPC) AREA : Maintenance Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/ Operation R
/
N
R
D
/
I
Hazard N/
A/
Em
Consequence Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./ PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Use of Wire slings/ chain
pulley etc. during any
maintenance job
N
R
D Tearing of Wire slings
leading to Body contact with
material (Handler / Others)
N Body Injury Periodical testing of Lifting
tools & tackles (OCP)
1 3 3 1 1 09 09
(Treat )
02 Break Down
Maintenance
Exposure to moving parts ,
live wire , circuit etc due to
running of M/c by Operator,
by mistake, before taking
clearance from Maintenance
A Body Injury /
Electrical Shock
Disconnection of Main fuse &
preserved with Maintenance
Department . Under
Maintenance Board display./
OCP
1 2 3 1 1 06 06
(Treat )
03 Various Mechanical
Maintenance activities
Hand contact with machine/
parts / tools & tackles etc
N Cuts & bruise Safe Maintenance Practices
OCP
3 3 1 1 1 09 09
(Treat )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache, Temporary
Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any
Non Lost Time incident ( Able to join in next scheduled
working shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time
incident (Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 10
HIRA CHART
SPCL (EPC) AREA : Maintenance Revision No. : 01 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R
/
N
R
D
/
I
Hazard N/
A/
Em
Consequence Current
Control
Risk Level
Additional Control /
Remarks
Residual Risk
OCP /
Admin /
PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./ PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
04 Various Electrical
Maintenance job
( Lighting. Fuse
Replacement, Panel
Board, Cable
Connection –
Disconnection,
Prevmnt of Motors
etc) activities
N
R
D Exposure to live wire
Exposure to Live Circuit
Flash over due to accidental short circuit or
earth fault of live wire
Flash over at disconnecting point due to arcing
Flash over at termination point due to accidental
contact with live partFlash over due to wrong
shutdown of any bus or feeder / any Motor
A Body Injury /
Electric Shock
Safe
Maintenance
Practices-OCP
2 2 3 1 1 12 09
(Treat )
A Fatal & may lead
to Death
Safe
Maintenance
Practices-OCP
2 2 5 1 1 20 20
(Treat )
05 Grinding N
R
D Metal dust contact with Skin N Dermatitis Use of PPE 2 2 2 1 1 08 08 (Tolerate )
Metal dust contact with Eye N Eye Injury 2 2 3 1 1 12 12 (Tolerate )
Grinding Wheel Braking A Fatal Injury Proper Wheel /
Grinding OCP
1 1 5 1 1 05 05 ( Treat)
Metal contact with Eyes for out site personnel N Eye Injury Guard 2 2 3 1 1 12 12 (Tolerate )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once / Twice in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non
Lost Time incident ( Able to join in next scheduled working
shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013/
10.02.2014
Page No.: 11
HIRA CHART
SPCL (EPC) AREA : QC LABORATORY Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R
/
N
R
D
/
I
Hazard N/
A/
Em
Consequence Current
Control
Risk Level
Additional Control
/ Remarks
Residual Risk
OCP /
Admin /
PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Cube Compressive
Strength Testing
R D Accidental Body contact with broken &
scattered concrete pieces during load
application
A Body Injury Personal
Attention by
not standing in
front of the M/c
( Admin)
4 2 3 3 1 72 Provision of Guard in
front of the M/c
( Engg)—
By March 2014
2 2 3 1 1 12
( Treat)
02 Coarse Aggregate
Impact Value
Testing
R D Accidental body contact due to slipping of
apparatus during testing, as the apparatus is
being gripped by legs.
A Body Injury Personal
Attention
2 3 3 3 1 54 Rigid Fixing of
Apparatus with floor
by bolting—( Engg)—
By March 2014
1 2 3 1 1 06
( Treat)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to
the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once / Twice in a
Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non
Lost Time incident ( Able to join in next scheduled working
shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time
incident (Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 12
HIRA CHART
SPCL (EPC) AREA : Material handling activities Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/ Operation R
/
N
R
D
/
I
Hazard N/ A/
Em
Conseq Current Control Risk Level Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./ PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Manual Lifting /
Carrying of materials
during Loading /
Unloading on & from
vehicle . Manual
Lifting/Carrying of
material for any
purpose , as & where
required
R D Fall of material leading to
Body contact /
Slip / Trip during lifting /
carrying of heavy material
A Body Injury Safe Handling Practices / Use of
Helmet / Gloves / Safety Shoes
(PPE)/
Provision of Hand Trolley, as &
where appropriate/ Allowable
weight during manual handling of
material is restricted to ≤ 55 Kg as
per Factory Rule.(Admin)
1 3 3 3 1 27 27
(Treat&
Tolerate )
A Major Fracture 1 3 4 3 1 36 36
(Treat&
Tolerate )
2 2 3 3 1 36 36
(Treat )
Muscle Stress due to lifting
/ carrying of heavy material
N Back & / or Shoulder
Pain / Spasm / Injury
etc (Ergonomics
Issues)
2 2 4 3 1 48 48
(Treat&
Tolerate )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non
Lost Time incident ( Able to join in next scheduled working
shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 13
HIRA CHART
SPCL (EPC) AREA: Admin-Security Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R
/
N
R
D
/
I
Hazard N/
A/
Em
Consequence Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./ PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Vehicle entry N
R
I Human exposure to smoke from
vehicle
A Discomfort PUC License verification
( Admin)
2 3 1 3 1 18 18
(Treat )
Exposure of personnel to Vehicle due
to its Over speed
A Body Injury Speed Control Signage
(Admin)
1 3 3 1 1 09 09
(Treat )
02 Visitors (Suppliers /
Others) at worksite
for various purpose
N
R
I Exposure to Noise / Inhalation of
fumes / Dust etc
N Discomfort Mask ( PPE) / Visitor’s
Protocol(Admin)
3 3 1 1 3 27 27
(Treat &
Tolerate)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non
Lost Time incident ( Able to join in next scheduled working
shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 14
HIRA CHART
SPCL (EPC) AREA: Admin-Safety Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R
/
N
R
D
/
I
Hazard N/
A/
Em
Consequence Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./ PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Fire & Safety
Training
N
R
D Exposure to Fire Extinguishers during
use
A Superficial Burn PPE( hand gloves, safety,
goggles, nose mask,
safety shoes)
2 2 2 1 1 06 06
(Tolerate )
Exposure to flame, heat-Hazard 2 2 2 1 1 06
02 On-site Mock Drill Expose to virtual emergency situation Body Injury DO / F&S Training
( Admin)
2 2 3 1 1 12 09
(Treat &
Tolerate )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Rare Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Possible
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Likely
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Frequent
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non
Lost Time incident ( Able to join in next scheduled working
shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Continuous
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Rare 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 15
HIRA CHART
SPCL (EPC) AREA: Admin-Safety Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R
/
N
R
D
/ I
Hazard N/
A/
Em
Conseq. Current Control Risk Level
Additional Control /
Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./ PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
03 Fire Fighting Exposure to flame, heat,
radiation
Em Body Injury PPE( hand gloves, safety, goggles, nose
mask, safety shoes) / F&S Training
2 2 3 3 1 36 12
(Treat &
Tolerate )
Accidental body injury during
charging of extinguisher
Em
Body Injury
DO for PPE / Periodical checking of
extinguisher
/ Mock drill
1 1 3 3 1 09 09
(Treat &
Tolerate )
Exposure to Dust Em Discomfort Do for PPE / Mock drill 2 2 1 3 1 12 12
(Treat &
Tolerate )
Electrical Shock Em
Body Injury
Do for PPE, / Safe earthling system &
armoured cable in place
1 1 3 3 1 09 09
(Treat &
Tolerate )
Burst of fire extinguisher Em Fatal Do for PPE / Periodical Extinguishers
Inspection & test / On Site Emergency plan
1 1 5 3 1 15 15
(Treat &
Tolerate )
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains,
Breathlessness,, Skin Disease, Heat Stress , etc )Any Non
Lost Time incident ( Able to join in next scheduled working
shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 16
HIRA CHART
SPCL (EPC) AREA: Various Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
NR
D
/ I
Hazard N/
A/
Em
Conseq. Current Control Risk Level
Additional Control
/ Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Man Movement /
Vehicle
Movement
through Site
Earthen Road
R D/I Dust Generation N Discomfort Presently water spraying is
done time to time / Air quality
monitoring (OCP)
4 2 1 1 1 08 --------------------- 08
( Treat)
02 Various
Activities
R/N
R
D/I Hunan exposure to Sound / Noise N Partial
Hearing
Block
Ear Plug (PPE) for Noise
Prone Area
2 2 3 1 3 36 --------------------------- 36
( Tolerate)
03 Office Work R D Working with Computers for Long
Hours
N Eye Stress Short interruption of work
for 10-15 minutes (Admin
Control)
2 2 2 3 1 24 --------------------- 24
( Treat)
Long Hours Table Work N Head Ache /
Back Ache
4 4 1 3 1 48 --------------------- 48
( Treat)
While Opening / closing of filing
cabinets / drawers, accidental body
contact
A Body Injury Safe handling of Cabinets /
Drawers
( Admin)
2 2 3 3 1 36 --------------------- 36
( Treat)
While walking in/out ,Slip / Trip due
to wet floor / Unmindful behavior
A Body Injury Signage for “Floor under
Mopping” / Attentiveness
2 2 3 3 1 36 --------------------- 36
( Treat)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial
Hearing Block Breathlessness,, Skin Disease, Heat Stress ,
etc )Any Non Lost Time incident ( Able to join in next
scheduled working shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 17
HIRA CHART
SPCL (EPC) AREA: PURCHASE & STORING Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/ Operation R/
N
R
D
/ I
Hazard N/
A/
Em
Conseq. Current Control Risk Level
Additional Control
/ Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Receipt of Supplied
Items
( Lubricants / Oil Etc) &
storing
R D Human
Exposure to
spilled chemical
A Irritation MSDS (Admin) 3 2 2 1 1 12 12
( Treat)
02 Stacking & Handling of
Material at Store
R D Fall of Heavy
Material
leading to Body
Contact
A Body Injury Heavy Material always kept at Floor
( Admin)
1 1 3 3 1 09 09
(Treat)
R D Slip / Trip
during Handling
of Materials ,as
stacked in racks
A Body Injury Admin:-
1) Heavy Material are always kept at Floor
2) Light Materials are kept at top of the rack
2) Materials are generally stacked within easy
access.
3) Use of Suitable Ladder to bring down any
material fro racks.(OCP)
4) Good store House Keeping( Admin)
2 2 3 3 1 36 36
(Treat)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure
to the Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period
of consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/
Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,)
Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin
Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in
next scheduled working shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic
Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in
next scheduled working shift)
4 Mechanism in place but not
reliable.
4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 18
HIRA CHART
SPCL (EPC) AREA: Head Office ( Kolkata) Revision No. : 00 Doc. No. : OHSF-4.3.1-01
Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect;
Condition:-N-Normal, A-Abnormal, Em.-Emergency
Risk Priority Number (RPN) = O*E*S*C*D
Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 &
Any Score = Emergency Condition
Sl.
No
Activity/
Operation
R/
N
R
D
/
I
Hazard N/
A/
Em
Conseq. Current Control Risk Level
Additional Control
/ Remarks
Residual Risk
OCP / Admin / PPE
Likelihood
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
( OHSMP - Elmn. /
Subst. / Engg.)
/OCP / Admin./
PPE
Occurrence
(O)
Exposure
(E)
Severity
(S)
Control
(C)
Detection
(D)
RPN
&/
Treat,
Tolerate,
Terminate(O)
01 Office Work R D Working with Computers for Long Hours N Eye Stress Short interruption of work
for 10-15 minutes / Office
Gym (Admin Control)
4 4 1 3 1 48 --------------------- 48
( Treat)
Long Hours Table Work N Head Ache
/ Back Ache
4 4 1 3 1 48 --------------------- 48
( Treat)
While Opening / closing of filing
cabinets / drawers, accidental body
contact
A Body Injury Safe handling of Cabinets /
Drawers ( Admin)
2 2 3 3 1 36 --------------------- 36
( Treat)
While walking in/out ,Slip / Trip due to
wet floor / Unmindful behavior
A Body Injury Signage for “Floor under
Mopping” / Attentiveness
2 2 3 3 1 36 --------------------- 36
( Treat)
02 Consumption of
drinking water
R D Any waterborne Microbiological Hazard /
Any Chemical Hazard
A Food
Poisoning
Provision of Aqua Guard /
Routine Maintenance of Aqua
Guard ( Admin)
1 1 4 3 1 12 --------------------- 12
( Treat)
03 On-site Mock
Drill conducted
by DLF Society
NR D Slip / Trip while going down from 14th
Floor
A Body Injury Personal attention / Evacuating
training ( Admin)
1 1 3 3 1 09 --------------------- 09
( Treat)
04 Visit of SPCL
personnel to site
/ other Industries
NR D Exposure to Noise / Inhalation of fumes /
Dust etc.
N Discomfort Use of PPE during visit 2 2 1 1 3 12 12
( Tolerate)
OCCURRENCE SEVERITY CONTROL DETECTION
Wt. Likelihood of Hazard
Occurring (O)
Wt Probability of Exposure to the
Hazard (E)
Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of
consequence
1
Rare- (could happen but
probably never will) 1
Rare
1
Dizziness, Head Ache / Back Ache,
Temporary Discomfort
1 Available and effective at source. 1 Immediately.
2
Unlikely –
(Once in a Month)
2 Possible
2
(Superficial Burn, Cuts & Bruises, Nausea, Vomiting,
Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation,
Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case
2 Has inbuilt secondary control. 2 Within 01 hour.
3
Possible –
(Once in a Week)
3 Likely
3
(,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial
Hearing Block Breathlessness,, Skin Disease, Heat Stress ,
etc )Any Non Lost Time incident ( Able to join in next
scheduled working shift)
3 Control needs human intervention. 3 Within 08 hours.
4
Likely –
(Several times in a week)
4 Frequent
4
Food Poisoning ,Asthma, ,Ulceration of Digestive Tract,
Chronic Diseases, Major Fracture etc- Any Lost Time incident
(Not able to join in next scheduled working shift)
4 Mechanism in place but not reliable. 4 Within 24 hours.
5 Almost Certain-
(Several Times a Day)
5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours.
Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 19
HIRA CHART

More Related Content

What's hot

Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
ESG-Driven Safety Excellence - The Practical Guide for Safety Experts_Consul...
ESG-Driven  Safety Excellence - The Practical Guide for Safety Experts_Consul...ESG-Driven  Safety Excellence - The Practical Guide for Safety Experts_Consul...
ESG-Driven Safety Excellence - The Practical Guide for Safety Experts_Consul...Consultivo
 
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...Tarun Kumar Cheddy
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templatesDwarika Bhushan Sharma
 
Safety in confined space
Safety in confined space   Safety in confined space
Safety in confined space The Apprentiice
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safetyPrudhvi raj
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space PptDan Gauthier
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templatesDwarika Bhushan Sharma
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012ChinaHarbour
 
Confined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHAConfined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHAAtlantic Training, LLC.
 

What's hot (20)

Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Environmental impacts register
Environmental impacts registerEnvironmental impacts register
Environmental impacts register
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
ESG-Driven Safety Excellence - The Practical Guide for Safety Experts_Consul...
ESG-Driven  Safety Excellence - The Practical Guide for Safety Experts_Consul...ESG-Driven  Safety Excellence - The Practical Guide for Safety Experts_Consul...
ESG-Driven Safety Excellence - The Practical Guide for Safety Experts_Consul...
 
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templates
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Safety in confined space
Safety in confined space   Safety in confined space
Safety in confined space
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
HSE PRESENTATION
HSE PRESENTATIONHSE PRESENTATION
HSE PRESENTATION
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
Confined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHAConfined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHA
 

Similar to Hazard Identification and Risk Assessment

Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsJohn Kingsley
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptImran Khan
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptmariam113160
 
BasicRadiationSafetyTrainingAwareness5-23-06 (1).ppt
BasicRadiationSafetyTrainingAwareness5-23-06 (1).pptBasicRadiationSafetyTrainingAwareness5-23-06 (1).ppt
BasicRadiationSafetyTrainingAwareness5-23-06 (1).pptMaclenny
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBarakaFundo1
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBarakaFundo1
 
Insight workplace safety risk assessment form - example
Insight workplace safety risk assessment form - exampleInsight workplace safety risk assessment form - example
Insight workplace safety risk assessment form - exampleRyan Lloyd-Davies (CMIOSH)
 
Functional safety certification guide
Functional safety certification guideFunctional safety certification guide
Functional safety certification guideMohammed Majid Khan
 
Evaluations of Nuclear Power
Evaluations of Nuclear PowerEvaluations of Nuclear Power
Evaluations of Nuclear Powergdoyon
 
Essential Guide Preventa 2010
Essential Guide Preventa 2010Essential Guide Preventa 2010
Essential Guide Preventa 2010Gilbert Brault
 
Acute Radiation Syndrome
Acute Radiation SyndromeAcute Radiation Syndrome
Acute Radiation SyndromeSun Yai-Cheng
 
NGI-Incident Reporting
NGI-Incident ReportingNGI-Incident Reporting
NGI-Incident Reportinglifecombo
 
PLUMBING WORK MURRAY ROB.pdf
PLUMBING WORK MURRAY ROB.pdfPLUMBING WORK MURRAY ROB.pdf
PLUMBING WORK MURRAY ROB.pdfPrinceEugo
 
Radio Risk Assesment
Radio Risk AssesmentRadio Risk Assesment
Radio Risk Assesmentcaleb taylor
 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.docRavithokal2
 
Promo Risk-Assessment
Promo Risk-AssessmentPromo Risk-Assessment
Promo Risk-AssessmentTasiah01
 

Similar to Hazard Identification and Risk Assessment (20)

Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluids
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
 
BasicRadiationSafetyTrainingAwareness5-23-06 (1).ppt
BasicRadiationSafetyTrainingAwareness5-23-06 (1).pptBasicRadiationSafetyTrainingAwareness5-23-06 (1).ppt
BasicRadiationSafetyTrainingAwareness5-23-06 (1).ppt
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
 
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.pptBasicRadiationSafetyTrainingAwareness5-23-06.ppt
BasicRadiationSafetyTrainingAwareness5-23-06.ppt
 
Insight workplace safety risk assessment form - example
Insight workplace safety risk assessment form - exampleInsight workplace safety risk assessment form - example
Insight workplace safety risk assessment form - example
 
Functional safety certification guide
Functional safety certification guideFunctional safety certification guide
Functional safety certification guide
 
Industrial safety unit iii ppt
Industrial safety unit iii pptIndustrial safety unit iii ppt
Industrial safety unit iii ppt
 
Presentation1
Presentation1Presentation1
Presentation1
 
Evaluations of Nuclear Power
Evaluations of Nuclear PowerEvaluations of Nuclear Power
Evaluations of Nuclear Power
 
Essential Guide Preventa 2010
Essential Guide Preventa 2010Essential Guide Preventa 2010
Essential Guide Preventa 2010
 
6 NDT1.pptx
6 NDT1.pptx6 NDT1.pptx
6 NDT1.pptx
 
Acute Radiation Syndrome
Acute Radiation SyndromeAcute Radiation Syndrome
Acute Radiation Syndrome
 
NGI-Incident Reporting
NGI-Incident ReportingNGI-Incident Reporting
NGI-Incident Reporting
 
PLUMBING WORK MURRAY ROB.pdf
PLUMBING WORK MURRAY ROB.pdfPLUMBING WORK MURRAY ROB.pdf
PLUMBING WORK MURRAY ROB.pdf
 
Radio Risk Assesment
Radio Risk AssesmentRadio Risk Assesment
Radio Risk Assesment
 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
 
Promo Risk-Assessment
Promo Risk-AssessmentPromo Risk-Assessment
Promo Risk-Assessment
 
Introduction to oil & gas health safety environment
Introduction to oil & gas health safety environmentIntroduction to oil & gas health safety environment
Introduction to oil & gas health safety environment
 

More from Mirza Saifullah Baig (14)

HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
Fire Risk Assessment.doc
Fire Risk Assessment.docFire Risk Assessment.doc
Fire Risk Assessment.doc
 
HAZOP STUDY.docx
HAZOP STUDY.docxHAZOP STUDY.docx
HAZOP STUDY.docx
 
Medical emergency mock drill
Medical emergency mock drillMedical emergency mock drill
Medical emergency mock drill
 
Legal register
Legal registerLegal register
Legal register
 
Steel plant process flow
Steel plant process flowSteel plant process flow
Steel plant process flow
 
Contents of first aid box bocw
Contents of first aid box bocwContents of first aid box bocw
Contents of first aid box bocw
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
 
Electrical work genral safety precautions
Electrical work genral safety precautionsElectrical work genral safety precautions
Electrical work genral safety precautions
 
Hirarchy of hazard control
Hirarchy of hazard controlHirarchy of hazard control
Hirarchy of hazard control
 
Accident pyramid
Accident pyramidAccident pyramid
Accident pyramid
 
Hse ms elements
Hse ms elementsHse ms elements
Hse ms elements
 

Recently uploaded

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentationthomas851723
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentationthomas851723
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxSaujanya Jung Pandey
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607dollysharma2066
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectivesmintusiprd
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 

Recently uploaded (20)

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentation
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentation
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptx
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectives
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 

Hazard Identification and Risk Assessment

  • 1. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Site Preparation / Excavation R D Sliding of loose soil. AN Body Injury 1. Barricading of Excavated Pits, Shuttering of Loose soil wall. ( OCP) 2.Provision of PPEs. 3.Work Permit System (OCP) 4. Periodic safety awareness campaign 3 2 3 3 1 54 Constant awareness for use of PPE by 100% workers 3 1 3 3 1 27 (Treat & Tolerate) R D Fall of soil on worker. AN Body Injury 3 2 3 3 1 54 Constant awareness for use of PPE by 100% workers 3 1 3 3 1 R D Fall of Material from edge AN Body Injury 1.Provision of PPEs 2. Good House Keeping practices ( Admn) 2 2 3 3 1 36 Constant awareness for use of PPE by 100% workers 36 (Treat & Tolerate) R D Accidental exposure due to Underground utilities like Electrical Cable & Other Pipes AN Fatal Injury 1. Follow up of Proper Signalling Procedure.( OCP) 2. Careful excavation (OCP). 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 15 (Treat) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 01
  • 2. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 02 Brick work & Masonry Work R D Fall from Height A Fatal Injury 1.Provision of Proper work platform with proper Access. ( OCP 2. Provision of PPEs. 4. Work permit System (OCP) 1 1 5 3 1 15 Constant awareness for use of PPE by 100% workers / Constant monitoring of OCP effectiveness 15 (Treat & Tolerate) R D Fall of Material from height A Body Injury 1. Area Barricading use of Caution Board & safety Ribbon. ( Admn) 2. Periodic Training to Workers ( Admn). 4. Provision of PPEs. 3 2 3 3 1 54 Use of safety net ( PPE). 3 1 3 3 1 27 -- Tolerate R D Exposure to Bricks, Steel Material N Cuts & bruise PPE 4 3 2 3 1 72 Constant awareness for use of PPE by 100% workers 3 2 2 3 1 36-- Tolerate R D Exposure to sand / cement Dust N Dermatitis / Irritation PPE 4 3 2 3 1 72 Constant awareness for use of PPE by 100% workers 3 2 2 3 1 36-- Tolerate OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 2
  • 3. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 03 Concreting work by mixer machine R D Ergonomically Hazard N Sprains Employment of Medically fit workers / Rest between job 2 2 3 3 1 36 --------------------------- 36 (Treat) R D Tripping Hazard A Fatal Injury 1. Access must be clear from any obstruction ( OCP) 2. PPE Provision 1 1 5 3 1 15 15 -- Treat & Tolerate R D Exposure to Cement / Sand / Dust etc N Dermatitis / Irritation 1 PPE Provision 2. Periodical Training to Workers about the disease due to exposure to cement 4 3 2 3 1 72 Constant awareness for use of PPE by 100% workers 3 2 2 3 1 36-- Tolerate OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 3
  • 4. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 04 Pilling Work R D Baler may hit the workers A Body Injury 1.Use of safety Helmet, Hand gloves, shoes, Nose Mask--PPE. 2. Periodic Training to Workers ( Admin). 1 1 3 3 1 09 --------------------------- 09 (Treat & Tolerate) R D Fall from Height A Fatal Injury 1.Provision of Proper work platform with proper Access. ( Admn)) 3. Provision of PPEs. 4. Work permit System (OCP) 1 1 5 3 1 15 Constant awareness for use of PPE by 100% workers / Constant monitoring of OCP effectiveness 15 -- Treat & Tolerate R D Winch may loose control A Body Injury 1. Check the wire rope regularly.(OCP) 2. Check winch machine condition regularly.(OCP) 3) Daily Tool Box Talk 1 1 5 3 1 15 Constant awareness for use of PPE by 100% workers / Constant monitoring of OCP effectiveness 15 -- Treat & Tolerate OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 4
  • 5. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 05 Structural Erection R D Accidental Body contact during stacking of Material by Crane A Body Injury 1.Competent operator. (Admin) 2.Maintain safe clearance.(OCP) 3.The route of crane movement to be planned prior movement.(OCP) 1 1 3 3 1 09 Constant monitoring of OCP effectiveness 09 (Treat ) R D Nip hazard by punching of fingers between sling and material. A Fatal Injury During slinging the body parts should not come within the nip portion to avoid finger injury (OCP) 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 15 (Treat ) R D Slip, trip & fall of load during slinging A Fatal Injury Right persons (Rigger) must be engaged for the slinging job. ( Admin) Slings are to be checked visually so that it is free from damage.(OCP) The weight of the materials is to be decided first and then choosing of the lifting tools and tackles to be done.(OCP) 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 15 (Treat ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , Partial Hearing Block etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 5
  • 6. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 05 Structural Erection R D Fall of material A Fatal Injury 1.Provide proper trained and experienced rigger. (Admin) 2.Use tag line for proper guidance of lifting load.(OCP) 3.Do not allow oscillation of load(OCP) 4.Person not allowed under the suspended load. (OCP) 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 15 (Treat ) R D Fall of person from height A Fatal Injury 1.Operation sequence to be followed as per approved methodology.(OCP)/ 2.Necessary work permit to be taken prior to starting the job.(OCP) / 3. Trained and experienced workers / Rigger must be engaged.(Amin)/ 4. The required PPE’s are to be used by all the persons during working at height.(PPE) 1 1 5 3 1 15 Constant monitoring of OCP effectiveness / Constant awareness for use of PPE by 100% workers 15 (Treat & Tolerate) R D Crane failure A Fatal Injury 1.The brake, horn, swing horn, hook and wire –rope should be checked prior to use the crane.(OCP) / 2.Only one person should give signal (Signalman) to the crane operator.(OCP)/ 3.Ground condition of the crane base should be checked prior the job(OCP). 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 15 (Treat ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence (D) 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , Partial Hearing Block etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 6
  • 7. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 06 Movement of Crane/ Hydra etc. R D Person coming in contact with crane A Fatal Injury 1.Pedestrian way identified and maintained.(Admin)/ 2.Helper engaged for signaling of vehicle movement (Admin). 1 1 5 3 1 15 15 (Treat ) R D Toppling of Crane & Accidental Body contact due to poor road condition A Fatal Injury 1.Road made with leveled, compacted and free from pot holes and maintained.(Admin) 1 1 5 3 1 15 15 (Treat ) R D Unauthorized driving causing Accidental Body Contact A Fatal Injury 1.Drivers are deployed with valid license(Admin)/ 2. Helper / cleaners are not allowed to operate the crane.(Admin) 1 1 5 3 1 15 15 (Treat ) R D Poor visibility of rear side A Fatal Injury 1.Ensure reverse horn, swing horn is in working condition prior to start the crane.(OCP) 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 15 (Treat ) R D Over Speed of Vehicle A Fatal Injury Speed control Signage(Admin) 1 1 5 3 1 15 15 (Treat ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 7
  • 8. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 07 Scaffolding Work R D Improper manual handling of scaffolding materials. A Body Injury The person’s are trained for the safety in Manual material handling.(Admin) 1 1 5 3 1 15 ----------------------- 1 1 5 3 1 15 (Treat ) R D Falling of material during lifting. A Body Injury OCP 1.The scaffolding materials to be lifted at height by tested lifting pulley by proper size PP rope. 2. Avoid Throwing of materials from height or vice versa. 1 1 5 3 1 15 Constant monitoring of OCP effectiveness 1 1 5 3 1 15 (Treat ) R D Slip, trip hazard upon pipe stack. A Body Injury 1.All the persons must be scaffold trained and medically fit prior start the job. 2.Ppersons are aware about the hazards of working at height. 1 1 5 3 1 15 1 1 5 3 1 15 (Treat ) R D Fall of person from height A Fatal Injury 1..Arrangements for the anchoring of Full body harness to be fixed for working at height. 2.Proper access and egress must be provided to reach the working level. 1 1 5 3 1 15 1 1 5 3 1 15 (Treat ) R D Collapse of scaffolding due to poor ground condition. A Fatal Injury 1.Scaffold are erected on compacted and level ground. 2.Base plate & sole board must be provided. Tied the scaffold with the existing structures. 1 1 5 3 1 15 1 1 5 3 1 15 (Treat ) R D Working with improper hand tools A Body Injury Proper hand tools are to be used to avoid injury 1 1 5 3 1 15 1 1 5 3 1 15 (Treat ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 8
  • 9. HIRA CHART SPCL (EPC) AREA: CONSTRUCTION Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Consequence Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 08 Gas Cutting N R D Explosion due to flash back- hazard A Fatal Injury Flash Back Arrestor OCP 1 1 5 1 1 05 Constant monitoring of OCP effectiveness / Constant awareness for use of PPE by 100% workers TREAT / TOLERATE 05 Inhalation of Gas N Suffocation Nose Mask PPE 3 3 3 1 1 18 18 09 Gas Cylinder Transportation Explosion due to handling without Hand Trolley A Fatal Injury Hand Trolley Adm. 1 2 5 1 1 10 10 10 Welding Inhalation of fumes N Suffocation Nose mask PPE 3 4 3 1 1 36 36 Eye Exposure to Welding flash N Arc Eyes Goggles 2 3 2 1 1 12 12 Exposure to Heat as released N Heat Stress Mask / Goggles 3 4 3 1 1 36 36 Skin Contact with spatters N Superficial Burn Gloves / Mask / Goggles 3 3 2 1 1 18 18 Exposure to damaged cable A Elec Shock Gloves 1 2 3 1 1 06 06 11 Disposal of Debris Material resulting from various activities R D Handling of Debris Material N Body Injury PPE 4 2 3 3 1 48 48 -- Tolerate 12 Various Work at Night R D Insufficient Light N Injury causing Lost time incident Monitoring of Illumination level (LUX) at Night OCP 2 2 2 4 1 32 32 ( Treat) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 09
  • 10. HIRA CHART SPCL (EPC) AREA : Maintenance Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Consequence Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Use of Wire slings/ chain pulley etc. during any maintenance job N R D Tearing of Wire slings leading to Body contact with material (Handler / Others) N Body Injury Periodical testing of Lifting tools & tackles (OCP) 1 3 3 1 1 09 09 (Treat ) 02 Break Down Maintenance Exposure to moving parts , live wire , circuit etc due to running of M/c by Operator, by mistake, before taking clearance from Maintenance A Body Injury / Electrical Shock Disconnection of Main fuse & preserved with Maintenance Department . Under Maintenance Board display./ OCP 1 2 3 1 1 06 06 (Treat ) 03 Various Mechanical Maintenance activities Hand contact with machine/ parts / tools & tackles etc N Cuts & bruise Safe Maintenance Practices OCP 3 3 1 1 1 09 09 (Treat ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 10
  • 11. HIRA CHART SPCL (EPC) AREA : Maintenance Revision No. : 01 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Consequence Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 04 Various Electrical Maintenance job ( Lighting. Fuse Replacement, Panel Board, Cable Connection – Disconnection, Prevmnt of Motors etc) activities N R D Exposure to live wire Exposure to Live Circuit Flash over due to accidental short circuit or earth fault of live wire Flash over at disconnecting point due to arcing Flash over at termination point due to accidental contact with live partFlash over due to wrong shutdown of any bus or feeder / any Motor A Body Injury / Electric Shock Safe Maintenance Practices-OCP 2 2 3 1 1 12 09 (Treat ) A Fatal & may lead to Death Safe Maintenance Practices-OCP 2 2 5 1 1 20 20 (Treat ) 05 Grinding N R D Metal dust contact with Skin N Dermatitis Use of PPE 2 2 2 1 1 08 08 (Tolerate ) Metal dust contact with Eye N Eye Injury 2 2 3 1 1 12 12 (Tolerate ) Grinding Wheel Braking A Fatal Injury Proper Wheel / Grinding OCP 1 1 5 1 1 05 05 ( Treat) Metal contact with Eyes for out site personnel N Eye Injury Guard 2 2 3 1 1 12 12 (Tolerate ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013/ 10.02.2014 Page No.: 11
  • 12. HIRA CHART SPCL (EPC) AREA : QC LABORATORY Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Consequence Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Cube Compressive Strength Testing R D Accidental Body contact with broken & scattered concrete pieces during load application A Body Injury Personal Attention by not standing in front of the M/c ( Admin) 4 2 3 3 1 72 Provision of Guard in front of the M/c ( Engg)— By March 2014 2 2 3 1 1 12 ( Treat) 02 Coarse Aggregate Impact Value Testing R D Accidental body contact due to slipping of apparatus during testing, as the apparatus is being gripped by legs. A Body Injury Personal Attention 2 3 3 3 1 54 Rigid Fixing of Apparatus with floor by bolting—( Engg)— By March 2014 1 2 3 1 1 06 ( Treat) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once / Twice in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 12
  • 13. HIRA CHART SPCL (EPC) AREA : Material handling activities Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Conseq Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Manual Lifting / Carrying of materials during Loading / Unloading on & from vehicle . Manual Lifting/Carrying of material for any purpose , as & where required R D Fall of material leading to Body contact / Slip / Trip during lifting / carrying of heavy material A Body Injury Safe Handling Practices / Use of Helmet / Gloves / Safety Shoes (PPE)/ Provision of Hand Trolley, as & where appropriate/ Allowable weight during manual handling of material is restricted to ≤ 55 Kg as per Factory Rule.(Admin) 1 3 3 3 1 27 27 (Treat& Tolerate ) A Major Fracture 1 3 4 3 1 36 36 (Treat& Tolerate ) 2 2 3 3 1 36 36 (Treat ) Muscle Stress due to lifting / carrying of heavy material N Back & / or Shoulder Pain / Spasm / Injury etc (Ergonomics Issues) 2 2 4 3 1 48 48 (Treat& Tolerate ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 13
  • 14. HIRA CHART SPCL (EPC) AREA: Admin-Security Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Consequence Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Vehicle entry N R I Human exposure to smoke from vehicle A Discomfort PUC License verification ( Admin) 2 3 1 3 1 18 18 (Treat ) Exposure of personnel to Vehicle due to its Over speed A Body Injury Speed Control Signage (Admin) 1 3 3 1 1 09 09 (Treat ) 02 Visitors (Suppliers / Others) at worksite for various purpose N R I Exposure to Noise / Inhalation of fumes / Dust etc N Discomfort Mask ( PPE) / Visitor’s Protocol(Admin) 3 3 1 1 3 27 27 (Treat & Tolerate) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 14
  • 15. HIRA CHART SPCL (EPC) AREA: Admin-Safety Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Consequence Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Fire & Safety Training N R D Exposure to Fire Extinguishers during use A Superficial Burn PPE( hand gloves, safety, goggles, nose mask, safety shoes) 2 2 2 1 1 06 06 (Tolerate ) Exposure to flame, heat-Hazard 2 2 2 1 1 06 02 On-site Mock Drill Expose to virtual emergency situation Body Injury DO / F&S Training ( Admin) 2 2 3 1 1 12 09 (Treat & Tolerate ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Rare Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Possible 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Likely 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Frequent 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Continuous 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Rare 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 15
  • 16. HIRA CHART SPCL (EPC) AREA: Admin-Safety Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R / N R D / I Hazard N/ A/ Em Conseq. Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 03 Fire Fighting Exposure to flame, heat, radiation Em Body Injury PPE( hand gloves, safety, goggles, nose mask, safety shoes) / F&S Training 2 2 3 3 1 36 12 (Treat & Tolerate ) Accidental body injury during charging of extinguisher Em Body Injury DO for PPE / Periodical checking of extinguisher / Mock drill 1 1 3 3 1 09 09 (Treat & Tolerate ) Exposure to Dust Em Discomfort Do for PPE / Mock drill 2 2 1 3 1 12 12 (Treat & Tolerate ) Electrical Shock Em Body Injury Do for PPE, / Safe earthling system & armoured cable in place 1 1 3 3 1 09 09 (Treat & Tolerate ) Burst of fire extinguisher Em Fatal Do for PPE / Periodical Extinguishers Inspection & test / On Site Emergency plan 1 1 5 3 1 15 15 (Treat & Tolerate ) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 16
  • 17. HIRA CHART SPCL (EPC) AREA: Various Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ NR D / I Hazard N/ A/ Em Conseq. Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Man Movement / Vehicle Movement through Site Earthen Road R D/I Dust Generation N Discomfort Presently water spraying is done time to time / Air quality monitoring (OCP) 4 2 1 1 1 08 --------------------- 08 ( Treat) 02 Various Activities R/N R D/I Hunan exposure to Sound / Noise N Partial Hearing Block Ear Plug (PPE) for Noise Prone Area 2 2 3 1 3 36 --------------------------- 36 ( Tolerate) 03 Office Work R D Working with Computers for Long Hours N Eye Stress Short interruption of work for 10-15 minutes (Admin Control) 2 2 2 3 1 24 --------------------- 24 ( Treat) Long Hours Table Work N Head Ache / Back Ache 4 4 1 3 1 48 --------------------- 48 ( Treat) While Opening / closing of filing cabinets / drawers, accidental body contact A Body Injury Safe handling of Cabinets / Drawers ( Admin) 2 2 3 3 1 36 --------------------- 36 ( Treat) While walking in/out ,Slip / Trip due to wet floor / Unmindful behavior A Body Injury Signage for “Floor under Mopping” / Attentiveness 2 2 3 3 1 36 --------------------- 36 ( Treat) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 17
  • 18. HIRA CHART SPCL (EPC) AREA: PURCHASE & STORING Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ N R D / I Hazard N/ A/ Em Conseq. Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Receipt of Supplied Items ( Lubricants / Oil Etc) & storing R D Human Exposure to spilled chemical A Irritation MSDS (Admin) 3 2 2 1 1 12 12 ( Treat) 02 Stacking & Handling of Material at Store R D Fall of Heavy Material leading to Body Contact A Body Injury Heavy Material always kept at Floor ( Admin) 1 1 3 3 1 09 09 (Treat) R D Slip / Trip during Handling of Materials ,as stacked in racks A Body Injury Admin:- 1) Heavy Material are always kept at Floor 2) Light Materials are kept at top of the rack 2) Materials are generally stacked within easy access. 3) Use of Suitable Ladder to bring down any material fro racks.(OCP) 4) Good store House Keeping( Admin) 2 2 3 3 1 36 36 (Treat) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 18
  • 19. HIRA CHART SPCL (EPC) AREA: Head Office ( Kolkata) Revision No. : 00 Doc. No. : OHSF-4.3.1-01 Activity:- R-Routine, NR-Non-Routine, D-Direct, I-Indirect; Condition:-N-Normal, A-Abnormal, Em.-Emergency Risk Priority Number (RPN) = O*E*S*C*D Cut-off Mark (RPN- Unacceptable for OHSAS) : - ≥ 50 & Any Score = Emergency Condition Sl. No Activity/ Operation R/ N R D / I Hazard N/ A/ Em Conseq. Current Control Risk Level Additional Control / Remarks Residual Risk OCP / Admin / PPE Likelihood (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN ( OHSMP - Elmn. / Subst. / Engg.) /OCP / Admin./ PPE Occurrence (O) Exposure (E) Severity (S) Control (C) Detection (D) RPN &/ Treat, Tolerate, Terminate(O) 01 Office Work R D Working with Computers for Long Hours N Eye Stress Short interruption of work for 10-15 minutes / Office Gym (Admin Control) 4 4 1 3 1 48 --------------------- 48 ( Treat) Long Hours Table Work N Head Ache / Back Ache 4 4 1 3 1 48 --------------------- 48 ( Treat) While Opening / closing of filing cabinets / drawers, accidental body contact A Body Injury Safe handling of Cabinets / Drawers ( Admin) 2 2 3 3 1 36 --------------------- 36 ( Treat) While walking in/out ,Slip / Trip due to wet floor / Unmindful behavior A Body Injury Signage for “Floor under Mopping” / Attentiveness 2 2 3 3 1 36 --------------------- 36 ( Treat) 02 Consumption of drinking water R D Any waterborne Microbiological Hazard / Any Chemical Hazard A Food Poisoning Provision of Aqua Guard / Routine Maintenance of Aqua Guard ( Admin) 1 1 4 3 1 12 --------------------- 12 ( Treat) 03 On-site Mock Drill conducted by DLF Society NR D Slip / Trip while going down from 14th Floor A Body Injury Personal attention / Evacuating training ( Admin) 1 1 3 3 1 09 --------------------- 09 ( Treat) 04 Visit of SPCL personnel to site / other Industries NR D Exposure to Noise / Inhalation of fumes / Dust etc. N Discomfort Use of PPE during visit 2 2 1 1 3 12 12 ( Tolerate) OCCURRENCE SEVERITY CONTROL DETECTION Wt. Likelihood of Hazard Occurring (O) Wt Probability of Exposure to the Hazard (E) Wt Risk Consequence (S) Wt Existing Control Status (C) Wt Noticed / Reported Period of consequence 1 Rare- (could happen but probably never will) 1 Rare 1 Dizziness, Head Ache / Back Ache, Temporary Discomfort 1 Available and effective at source. 1 Immediately. 2 Unlikely – (Once in a Month) 2 Possible 2 (Superficial Burn, Cuts & Bruises, Nausea, Vomiting, Diarrhoea, Cough/ Throat Problem, Dermatitis / Irritation, Fatigue, Arc Eyes, Eye Stress,) Any sorts of First Aid Case 2 Has inbuilt secondary control. 2 Within 01 hour. 3 Possible – (Once in a Week) 3 Likely 3 (,Body Injury /,Eye Injury , Slight Burn, Sprains, Partial Hearing Block Breathlessness,, Skin Disease, Heat Stress , etc )Any Non Lost Time incident ( Able to join in next scheduled working shift) 3 Control needs human intervention. 3 Within 08 hours. 4 Likely – (Several times in a week) 4 Frequent 4 Food Poisoning ,Asthma, ,Ulceration of Digestive Tract, Chronic Diseases, Major Fracture etc- Any Lost Time incident (Not able to join in next scheduled working shift) 4 Mechanism in place but not reliable. 4 Within 24 hours. 5 Almost Certain- (Several Times a Day) 5 Continuous 5 Fatal Injuries ,Life Shortening Diseases 5 Absent or no effective control. 5 More than 24 hours. Approved By: HEAD-Project Issued By : MR Issue No. : 01 Date : 29.10.2013 Page No.: 19