1. HAZOP STUDY FOR SLURRY PLANT
Date: 04/02/2022, RSPL Raipur
Prepared By: Mirza Baig Page 1
Sr
.
N
o
Area/P&ID/NOD Deviation Possible Causes Consequence Protection
Provided
Action Recommended
01 Sulphuuric Acid
Storage tank
Spillage Overflow
leakage in
tank
Corrosion
Skin
burning of
employee
PPE
water shower
Hand shower
Water
Availability
Liquid level
guage not
working. Needs
to be maintained
in working
condition all the
time.
Effected person
should use water
shower
Workers handling
acid vassels
should be
trained.
Calcium
hydroxide should
be available to
neutralize any
acid spill.
2. HAZOP STUDY FOR SLURRY PLANT
Date: 04/02/2022, RSPL Raipur
Prepared By: Mirza Baig Page 2
02 Spent storage acid
tank
spillage Overflow
Leakage in
tank
Corrosion
Skin
burning of
workers
PPE
water shower
Hand shower
Water
availability
Workers handling
acid vassels
should be
trained.
Effected person
should use water
shower.
Flame proof
electrical fittings
should be
provided.
Calcium
hydroxide should
be available for
neutralizing acid
spill.
03 Linear alkyl
benzene storage
tank
spillage Tank
leakage
Leakage
from pipes,
pumps,
flages.
Overflow
Skin effect
Fire
Fire
extinguishers
provided.
Tanks are
painted.
Showers are
provided.
PPE
provided.
No smoking
should be
allowed.
Level indicators
to be provided.
Float valve
should be
provided in
tanks.
3. HAZOP STUDY FOR SLURRY PLANT
Date: 04/02/2022, RSPL Raipur
Prepared By: Mirza Baig Page 3
Foam type
fire
extinguisher
provided.
Tank is
grounded
(Earthing)
Affected person
should use water
shower.
04 Sulphonator/Reacto
r
Rise in
temperatur
e
Fast mixing of
water
Wastage of
product.
Skin
Burning.
Water jacket
provided to
vessel for
cooling.
Air vent
provided
Mixing of water
should be in a
controlled
manner.
Thermocouple
Indicator for
sulphonator to
control
temperature rise.
Pressure Guage
05 Transportation of
chemicals through
pipe & pumps
(Sulphuric Acid).
Leakage Corrosion Skin Burn
Pollution
Scheduled
Maintenance
PPE
Spillage Kit
Water
Shower
MSDS
Displayed
Collecting pit
provided
Up gradation of
piping system to
non-corrosive
pipes.
06 Transportation of Leakage Corrosion Fire Scheduled MSDS should be
4. HAZOP STUDY FOR SLURRY PLANT
Date: 04/02/2022, RSPL Raipur
Prepared By: Mirza Baig Page 4
chemicals through
pipe & pumps
(Linear alkyl
benzene).
Chemical reaction
to skin (Slow).
Maintenance
PPE
Grounding of
Tank
(Earthing)
Water
Shower
displayed at
location.
Hazop Team:
Chairman: Mirza Baig ________________________
Members: Manish Rao, EHS Officer, RSPL Limited, Raipur ________________________
Jaswinder Singh, Plant Head, RSPL Limited, Raipur ________________________