Project Highlights



McKenney’s turnkey HVAC services
and Mentor-Protégé partnership                                                                     Project Team

paint an efficient picture for                                                                     žž Prime Contractor:
                                                                                                      Willis Mechanical
Warner Robins Air Logistics Center                                                                 žž Owner: WRALC



B
            uilding 89 at the Warner Robins      Ten years prior, McKenney’s was the prime
                                                                                                   žž Engineer: McKenney’s Inc.
            Air Logistics Center (WRALC) is      contractor responsible for the design and
            used for depainting and painting     construction of the large, custom-built air       The Challenge
large military cargo aircraft. Monitoring and    handlers. As such we were called in by
regulating temperature and humidity in the       the Maintenance Wing Energy Manager               žž Identify Bldg. 89 HVAC issues
hangar is critical during the painting process   for WRALC to evaluate existing equipment
                                                                                                   žž Offer solutions and budgets to
to meet the technical order and ensure the       and controls in order to provide recommen-           repair equipment and controls

                                                                                                   žž Provide an opportunity for our
                                                                                                      protégé by offering a turnkey
                                                                                                      solution for the hanger repairs


                                                                                                   The Solution

                                                                                                   žž An initial audit under a govern-
                                                                                                      ment credit card purchase

                                                                                                   žž Offered a turnkey design/build
                                                                                                      solution that met the base’s
                                                                                                      tight schedule and budget

                                                                                                   žž Leveraged a mentor-protégé
                                                                                                      affiliation to expedite repairs

                                                                                                   žž Trained base maintenance staff
                                                                                                      to minimize future malfunctions

                                                                                                   The Results

                                                                                                   žž Returned the HVAC systems
                                                                                                      back to their original functioning
quality of the surface finish. In the winter     dations for restoring the HVAC system
                                                                                                      states, including controls
of 2009, temperatures were well below            to its original functioning state. The initial
normal. The chilled water and heating coils      evaluation was performed under a govern-          žž Allowed uninterrupted painting
in the 300,000 cfm, 100 percent outside          ment credit card purchase.                           of planes in Bldg. 89 while
air handling units serving the hanger froze                                 continued on reverse      providing optimal temperature
and burst.                                                                                            and humidity during the process

                                                                                                   žž Continued our successful
                                                                                                      protégé relationship by providing
 For more information contact McKenney’s at 404-622-5000.                                             an introduction to WRALC
 info@mckenneys.com   www.mckenneys.com
Project Highlights




                                                                                                                 “T                he project at Building
                                                                                                                                   89 highlights the
                                                                                                                           technical, execution and
                                                                                                                           contract administrative
                                                                                                                           skills that McKenney’s
                                                                                                                           can bring to the table
                                                                                                                           to support the missions
                                                                                                                           and mandates facing
                                                                                                                           government installations
                                                                                                                           across the Southeast.”




McKenney’s began by assembling a highly             done quickly to allow the building
qualified team composed of in-house engi-           to continue being productive,
neers, service personnel and controls techni-       the base negotiated directly with
cians to conduct a one-day compre­ ensive
                                      h             Willis Mechanical, a member
assessment of existing conditions, operations       of the SBA 8(a) program and
and functionality of the Building 89 HVAC           M
                                                    ­ cKenney’s official SBA-approved
s
­ ystems, including pressure testing the coils.     protégé team partner. Repair of the
It wasn’t easy. With such a short schedule and      heating and cooling system, the air handler                     WRALC to bring Building 89’s HVAC system
with so much system damage it was difficult         unit coils and controls became a turnkey                        back to acceptable operation.
to pinpoint the most likely failure scenario out    design/build project. As prime contractor,
                                                                                                                    According to the Director of Government
of all the possibilities. McKenney’s produced       our protégé performed over 50 percent
                                                                                                                    Facilities at McKenney’s, “The project at
a detailed report of the findings and made          of the work with McKenney’s performing
                                                                                                                    Building 89 highlights the technical, execu-
several recommen­ ations on equipment and
                      d                             the remainder.
                                                                                                                    tion and contract administrative skills that
control system repairs, operator training and
                                                    Not only did McKenney’s offer a turnkey                         McKenney’s can bring to the table to support
long-term maintenance strategies to ensure
                                                    s
                                                    ­ olution including analysis, recommendations,                  the missions and mandates facing govern-
system integrity over the long term. The report
                                                    budgetary cost estimates, design, controls,                     ment installations across the Southeast.
also included cost estimates for the recom-
                                                    execution, commissioning and owner training,                    Our plan is to continue to serve them from
mendations offered.
                                                    we also met our responsibilities to our protégé,                a position of expertise and knowledge.”
Time and budget constraints only complicated        Willis Mechanical. This mentor-protégé part-
things for the base. In order to get the repairs    nership provided the contract vehicle to allow

                                           The information contained here is not intended as an Air Force endorsement.


McKenney’s, Inc.    1056 Moreland Industrial Boulevard, Atlanta, Georgia 30316               Copyright © 2011 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

More Related Content

What's hot

Commercial CalGreen - Building Enery Analysis Report
Commercial CalGreen - Building Enery Analysis ReportCommercial CalGreen - Building Enery Analysis Report
Commercial CalGreen - Building Enery Analysis ReportCenter for Sustainable Energy
 
ERP Project Management Primer
ERP Project Management PrimerERP Project Management Primer
ERP Project Management Primersureshgk
 
Software measures and the capability maturity model 1992, john h. baumert (...
Software measures and the capability maturity model   1992, john h. baumert (...Software measures and the capability maturity model   1992, john h. baumert (...
Software measures and the capability maturity model 1992, john h. baumert (...Ngoc Han Truong
 
Who is GEM, Inc.
Who is GEM, Inc.Who is GEM, Inc.
Who is GEM, Inc.tstrait
 
Fujieh.maura
Fujieh.mauraFujieh.maura
Fujieh.mauraNASAPMC
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerbyNASAPMC
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsSESAR Joint Undertaking
 
OTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutionsOTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutionsLloyd's Register Energy
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paulNASAPMC
 
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...davidobama
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Digite Inc
 
Jim.free
Jim.freeJim.free
Jim.freeNASAPMC
 
An Ecological View on Process Improvement: Some Thoughts for Improving Proces...
An Ecological View on Process Improvement: Some Thoughts for Improving Proces...An Ecological View on Process Improvement: Some Thoughts for Improving Proces...
An Ecological View on Process Improvement: Some Thoughts for Improving Proces...Luigi Buglione
 
Project Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 ProcessesProject Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 Processesedtichy
 
Using itil and_prince2_together_august_2010
Using itil and_prince2_together_august_2010Using itil and_prince2_together_august_2010
Using itil and_prince2_together_august_2010Abhilash H.
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentationbtharp
 
Opportunities For Existing Buildings - Deep Cut Emissions
Opportunities For Existing Buildings - Deep Cut EmissionsOpportunities For Existing Buildings - Deep Cut Emissions
Opportunities For Existing Buildings - Deep Cut EmissionsMichael Skelton
 

What's hot (20)

Commercial CalGreen - Building Enery Analysis Report
Commercial CalGreen - Building Enery Analysis ReportCommercial CalGreen - Building Enery Analysis Report
Commercial CalGreen - Building Enery Analysis Report
 
ERP Project Management Primer
ERP Project Management PrimerERP Project Management Primer
ERP Project Management Primer
 
Software measures and the capability maturity model 1992, john h. baumert (...
Software measures and the capability maturity model   1992, john h. baumert (...Software measures and the capability maturity model   1992, john h. baumert (...
Software measures and the capability maturity model 1992, john h. baumert (...
 
Who is GEM, Inc.
Who is GEM, Inc.Who is GEM, Inc.
Who is GEM, Inc.
 
Fujieh.maura
Fujieh.mauraFujieh.maura
Fujieh.maura
 
IM UvT Iscram
IM UvT IscramIM UvT Iscram
IM UvT Iscram
 
Jerald kerby
Jerald kerbyJerald kerby
Jerald kerby
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
 
OTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutionsOTC: Asset maintenance and integrity solutions
OTC: Asset maintenance and integrity solutions
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?
 
Jim.free
Jim.freeJim.free
Jim.free
 
An Ecological View on Process Improvement: Some Thoughts for Improving Proces...
An Ecological View on Process Improvement: Some Thoughts for Improving Proces...An Ecological View on Process Improvement: Some Thoughts for Improving Proces...
An Ecological View on Process Improvement: Some Thoughts for Improving Proces...
 
Project Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 ProcessesProject Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 Processes
 
Using itil and_prince2_together_august_2010
Using itil and_prince2_together_august_2010Using itil and_prince2_together_august_2010
Using itil and_prince2_together_august_2010
 
Capa system management
Capa system managementCapa system management
Capa system management
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentation
 
Opportunities For Existing Buildings - Deep Cut Emissions
Opportunities For Existing Buildings - Deep Cut EmissionsOpportunities For Existing Buildings - Deep Cut Emissions
Opportunities For Existing Buildings - Deep Cut Emissions
 
+15 team v3
+15 team v3+15 team v3
+15 team v3
 

Viewers also liked

SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEERSathura Giri
 
Valve Placement Guidelines
Valve Placement GuidelinesValve Placement Guidelines
Valve Placement GuidelinesMartin Robb CPE
 
HVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationHVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationcccscoetc
 
process design of water chilling plant
process design of water chilling plantprocess design of water chilling plant
process design of water chilling plantDinesh Sannepally
 
Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1wacrowe
 
157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10bijumt
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance AC Repair Local
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsSynergy Airflow and Ventilation
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manualbhattbhai
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling Systempnnazz
 
Cooling load calculations
Cooling load calculationsCooling load calculations
Cooling load calculationsWaleed Alyafie
 
Refrigeration and air conditioning ppt
Refrigeration and air conditioning pptRefrigeration and air conditioning ppt
Refrigeration and air conditioning pptShubham Hadadare
 
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYHVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYNamdeo Shinde
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systemsbecoolseo
 
Refrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesRefrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesOlumide Daniel
 
Air conditioning-system ppt
Air conditioning-system pptAir conditioning-system ppt
Air conditioning-system pptIshtiaq Ahmad
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning SystemSumit Ranjan
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234KRISHAN KUMAR
 

Viewers also liked (20)

SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEER
 
Valve Placement Guidelines
Valve Placement GuidelinesValve Placement Guidelines
Valve Placement Guidelines
 
HVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentationHVAC First-Person Gaming Simulation presentation
HVAC First-Person Gaming Simulation presentation
 
process design of water chilling plant
process design of water chilling plantprocess design of water chilling plant
process design of water chilling plant
 
Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1Telecommunication HVAC Maintenance Program.1
Telecommunication HVAC Maintenance Program.1
 
157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10157882189 commissioning checklist3.11.10
157882189 commissioning checklist3.11.10
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling System
 
Cooling load calculations
Cooling load calculationsCooling load calculations
Cooling load calculations
 
Refrigeration and air conditioning ppt
Refrigeration and air conditioning pptRefrigeration and air conditioning ppt
Refrigeration and air conditioning ppt
 
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRYHVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
HVAC SYSTEM IN PHARMACEUTICAL INDUSTRY
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Refrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notesRefrigeration and-air-conditioning-notes
Refrigeration and-air-conditioning-notes
 
Air conditioning-system ppt
Air conditioning-system pptAir conditioning-system ppt
Air conditioning-system ppt
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234
 

Similar to Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at Warner Robins Air Logistics Center

Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...McKenney's Inc
 
Asset Stretch case study - Shepway DC
Asset Stretch case study - Shepway DCAsset Stretch case study - Shepway DC
Asset Stretch case study - Shepway DCPrima Service Ltd
 
A Showcase in Energy Efficiency - McKenney's Energy Services
A Showcase in Energy Efficiency - McKenney's Energy ServicesA Showcase in Energy Efficiency - McKenney's Energy Services
A Showcase in Energy Efficiency - McKenney's Energy ServicesMcKenney's Inc
 
Lime Energy Banking Brochure
Lime Energy Banking BrochureLime Energy Banking Brochure
Lime Energy Banking Brochurelimeenergysurveys
 
Capital Stretch case study - Grove Road
Capital Stretch case study - Grove RoadCapital Stretch case study - Grove Road
Capital Stretch case study - Grove RoadPrima Service Ltd
 
Rem NetApp Champion Case Study
Rem NetApp Champion Case StudyRem NetApp Champion Case Study
Rem NetApp Champion Case StudyMichael Hudak
 
Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Enyon
 
Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Enyon
 
Power Distribution Asset Management 2012
Power Distribution Asset Management 2012Power Distribution Asset Management 2012
Power Distribution Asset Management 2012Ola Odejayi
 
Engineering
EngineeringEngineering
EngineeringHaDeGo
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
 
Ron wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgsRon wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgsEllieNowels
 
Energy Performance Contracting Uk Introduction
Energy Performance Contracting Uk IntroductionEnergy Performance Contracting Uk Introduction
Energy Performance Contracting Uk Introductiondrpaulfisher
 
Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1William Garvey and Associates
 
Colliers Technology Solutions
Colliers Technology SolutionsColliers Technology Solutions
Colliers Technology SolutionsDanpcre
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
 

Similar to Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at Warner Robins Air Logistics Center (20)

Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
 
Asset Stretch case study - Shepway DC
Asset Stretch case study - Shepway DCAsset Stretch case study - Shepway DC
Asset Stretch case study - Shepway DC
 
A Showcase in Energy Efficiency - McKenney's Energy Services
A Showcase in Energy Efficiency - McKenney's Energy ServicesA Showcase in Energy Efficiency - McKenney's Energy Services
A Showcase in Energy Efficiency - McKenney's Energy Services
 
Lime Energy Banking Brochure
Lime Energy Banking BrochureLime Energy Banking Brochure
Lime Energy Banking Brochure
 
Capital Stretch case study - Grove Road
Capital Stretch case study - Grove RoadCapital Stretch case study - Grove Road
Capital Stretch case study - Grove Road
 
Rem NetApp Champion Case Study
Rem NetApp Champion Case StudyRem NetApp Champion Case Study
Rem NetApp Champion Case Study
 
Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011
 
Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011
 
Integrated Solutions
Integrated SolutionsIntegrated Solutions
Integrated Solutions
 
Power Distribution Asset Management 2012
Power Distribution Asset Management 2012Power Distribution Asset Management 2012
Power Distribution Asset Management 2012
 
Engineering
EngineeringEngineering
Engineering
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC Installation
 
Ron wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgsRon wilkinson cx for new and exist bldgs
Ron wilkinson cx for new and exist bldgs
 
Energy Performance Contracting Uk Introduction
Energy Performance Contracting Uk IntroductionEnergy Performance Contracting Uk Introduction
Energy Performance Contracting Uk Introduction
 
Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1Essentials of Validation Project Management - Part 1
Essentials of Validation Project Management - Part 1
 
BDM AtTask Case Study
BDM AtTask Case StudyBDM AtTask Case Study
BDM AtTask Case Study
 
Ppx
PpxPpx
Ppx
 
Colliers Technology Solutions
Colliers Technology SolutionsColliers Technology Solutions
Colliers Technology Solutions
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 

More from McKenney's Inc

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaMcKenney's Inc
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationMcKenney's Inc
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GAMcKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsMcKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementMcKenney's Inc
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildMcKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionMcKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationMcKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by DesignMcKenney's Inc
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionMcKenney's Inc
 

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, Georgia
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 

Recently uploaded

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Recently uploaded (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Restoration of HVAC Systems, Design/Build Solution, Commissioning and more at Warner Robins Air Logistics Center

  • 1. Project Highlights McKenney’s turnkey HVAC services and Mentor-Protégé partnership Project Team paint an efficient picture for žž Prime Contractor: Willis Mechanical Warner Robins Air Logistics Center žž Owner: WRALC B uilding 89 at the Warner Robins Ten years prior, McKenney’s was the prime žž Engineer: McKenney’s Inc. Air Logistics Center (WRALC) is contractor responsible for the design and used for depainting and painting construction of the large, custom-built air The Challenge large military cargo aircraft. Monitoring and handlers. As such we were called in by regulating temperature and humidity in the the Maintenance Wing Energy Manager žž Identify Bldg. 89 HVAC issues hangar is critical during the painting process for WRALC to evaluate existing equipment žž Offer solutions and budgets to to meet the technical order and ensure the and controls in order to provide recommen- repair equipment and controls žž Provide an opportunity for our protégé by offering a turnkey solution for the hanger repairs The Solution žž An initial audit under a govern- ment credit card purchase žž Offered a turnkey design/build solution that met the base’s tight schedule and budget žž Leveraged a mentor-protégé affiliation to expedite repairs žž Trained base maintenance staff to minimize future malfunctions The Results žž Returned the HVAC systems back to their original functioning quality of the surface finish. In the winter dations for restoring the HVAC system states, including controls of 2009, temperatures were well below to its original functioning state. The initial normal. The chilled water and heating coils evaluation was performed under a govern- žž Allowed uninterrupted painting in the 300,000 cfm, 100 percent outside ment credit card purchase. of planes in Bldg. 89 while air handling units serving the hanger froze continued on reverse providing optimal temperature and burst. and humidity during the process žž Continued our successful protégé relationship by providing For more information contact McKenney’s at 404-622-5000. an introduction to WRALC info@mckenneys.com   www.mckenneys.com
  • 2. Project Highlights “T he project at Building 89 highlights the technical, execution and contract administrative skills that McKenney’s can bring to the table to support the missions and mandates facing government installations across the Southeast.” McKenney’s began by assembling a highly done quickly to allow the building qualified team composed of in-house engi- to continue being productive, neers, service personnel and controls techni- the base negotiated directly with cians to conduct a one-day compre­ ensive h Willis Mechanical, a member assessment of existing conditions, operations of the SBA 8(a) program and and functionality of the Building 89 HVAC M ­ cKenney’s official SBA-approved s ­ ystems, including pressure testing the coils. protégé team partner. Repair of the It wasn’t easy. With such a short schedule and heating and cooling system, the air handler WRALC to bring Building 89’s HVAC system with so much system damage it was difficult unit coils and controls became a turnkey back to acceptable operation. to pinpoint the most likely failure scenario out design/build project. As prime contractor, According to the Director of Government of all the possibilities. McKenney’s produced our protégé performed over 50 percent Facilities at McKenney’s, “The project at a detailed report of the findings and made of the work with McKenney’s performing Building 89 highlights the technical, execu- several recommen­ ations on equipment and d the remainder. tion and contract administrative skills that control system repairs, operator training and Not only did McKenney’s offer a turnkey McKenney’s can bring to the table to support long-term maintenance strategies to ensure s ­ olution including analysis, recommendations, the missions and mandates facing govern- system integrity over the long term. The report budgetary cost estimates, design, controls, ment installations across the Southeast. also included cost estimates for the recom- execution, commissioning and owner training, Our plan is to continue to serve them from mendations offered. we also met our responsibilities to our protégé, a position of expertise and knowledge.” Time and budget constraints only complicated Willis Mechanical. This mentor-protégé part- things for the base. In order to get the repairs nership provided the contract vehicle to allow The information contained here is not intended as an Air Force endorsement. McKenney’s, Inc.    1056 Moreland Industrial Boulevard, Atlanta, Georgia 30316 Copyright © 2011 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.