MATERIAL REQUIREMENT PLANNING
Prepared by Mahmoud Eltaweel
1
What is MRP
■ Material requirements planning (MRP) is a production planning, scheduling, and
inventory control system used to manage manufacturing processes.
■ It is a material control system that attempts to keep adequate inventory levels
■ It is to assure that required materials are available wheen needed
2
Question 1
The following structure tree
indicates the components
needed to assemble one unit of
product “W”. Determine the
quantities of each component
needed to assemble 100 units
of W.
3
W
A (1)
9
B (2) C(4)
D(2) E
E(2) F
D (3) G(2)
D
Item Quantity per 1 Quantity per 1 Quantity per 100
W 1 1 100
A 1 1 100
B 2 2 200
C 4 4 400
D (2*1)+(4*3)+(1*2*4) 22 2200
E (1*1)+(2*2) 5 500
F (1*2) 2 200
G (2*4) 8 800
4
W 100
A 100 B (2*100) C(4*100)
D(2*100) E (1*100)
E(2*200) F(200)
D (3*400) G(2*400)
D (800)
Question 2
The following table lists the
components needed to assemble an
end item, lead times, and quantities
on hand.
■ If 20 units of the end items are to
be assembled, how many
additional units of E are needed?
■ An order for the end item is
scheduled to be shipped at the
start of week 11. What is the latest
week that an order can be started
and still be ready to ship on time
■ Draw an assembly time chart for
the process
5
Item End B C D E F G H
LT
(week)
1 2 3 3 1 2 1 2
Amount
on hand
0 10 10 25 12 30 5 0
End Items
B (2) C D
E(2) F(3)
G(2) E(2)
H(4) E(2)
(3)
6
Item Gross Requirements – On Hand = Net Requirements
End Item 20 – 0 = 20
Item Gross Requirements – On Hand = Net Requirements
B (20 * 2) = 40 – 10 = 30
C (20 * 1) = 20 – 10 = 10
D (20 * 3) = 60 – 25 = 35
Item Gross Requirements – On Hand = Net Requirements
E [(30 B * 2) + (10 C * 2) + (35 D * 2)] = 150 – 12 = 138
If 20 units of the end item are to be assembled, how many additional units of E are needed?
Step 1:
Determine the gross requirements and the net requirements for the End Item:
Step 2:
Determine the gross requirements and the net requirements for B, C, & D.
Multiply the net requirements for the end item by the usage quantities of B, C, & D to determine the gross
requirements for B, C, & D.
Step 3:
Determine the gross requirements and net requirements for E.
Multiply the net requirements for B, C, & D by the usage quantities of E to determine gross requirements for E
To solve this, we need to determine the longest sequence through the product structure tree moving
from the end item down to the lowest items. The lead time for each item is indicated in bold to the
left of each item in the product structure tree shown below.
B) An order for the end item is scheduled to be shipped at the start of week 11. What is the latest
week that an order can be started and still be ready to ship on time
End Items
B (2) C D
E(2) F(3)
G(2) E(2)
H(4) E(2)
Item End B C D E F G H
LT
(week)
1 2 3 3 1 2 1 2
The longest sequence is 6 weeks (End Item – D – H). 11 – 6 weeks = start of week 5.
1 wk
2 wk 3 wk 3 wk
1 wk 2 wk
1 wk 1 wk
1 wk2 wk
Total LT = 4 wk 5 wk 5 wk 5 wk 6 wk 5 wk
(3)
8
E
B
F
E
C END
ITEM
G
H
D
E
Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 Wk 9 Wk 10 Wk 11 Wk 12
Draw an assembly time chart for the process
Question 3
Eighty units of end item E are needed at the
beginning of week 6 . Three cases (30 units per case)
of J have been ordered and one case is scheduled to
arrive in week 3, one in week 4 and one in week
5. Note: J must be ordered by the case and B must
be produced in multiple of 120 units.
There are 60 units of B and 20 units of J now on
hand.
Lead times are two weeks for E and B, and one week
for J
a) A prepare material requirement plan for product J
9
10
MRP Schedule Item E
Item Begin
Invento
ry
Week
1
Week
2
Week
3
Week
4
Week 5 Week
6
Gross
requirement
80
Scheduled
receipts
Projected on
hand
Net
Requirements
80
Planned order
receipts
80
Planned order
release
80
Item Quantity per 1 Quantity per 80
E 1 80
B 2 160
J 3+(4*2) =11 880
F 2*2 =4 320
11
MRP Schedule Item B
Item Begin
Inventory
Week
1
Week
2
Week
3
Week
4
Week 5 Week 6
Gross
requirement
160
Scheduled
receipts
Projected on
hand
60 60 60 60
Net
Requirements
100
Planned order
receipts
120
Planned order
release
120
12
MRP Schedule Item J
Item Begin
Invento
ry
Week
1
Week
2
Week
3
Week
4
Week
5
Week
6
Gross
requirement
480 240
Scheduled
receipts
30 30 30
Projected on
hand
20 20 30 60 30
Net
Requirements
460 180
Planned order
receipts
480 180
Planned order
release
480 180
I need 80 from E at week 4 and 120 from B at week 2
One B requires 4 Js
One E requires 3 Js

More Related Content

What's hot

Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Ops management lecture 4 process design & strategy
Ops management lecture 4 process design & strategyOps management lecture 4 process design & strategy
Ops management lecture 4 process design & strategyjillmitchell8778
 
Supply chain process of Martin Dow Limited
Supply chain process of Martin Dow LimitedSupply chain process of Martin Dow Limited
Supply chain process of Martin Dow LimitedMuhammad Umer
 
Функцэн цуваа
Функцэн цувааФункцэн цуваа
Функцэн цувааBattur
 
Make to order, stock, assembly
Make to order, stock, assemblyMake to order, stock, assembly
Make to order, stock, assemblyHammaduddin
 
Mie.s3 2020 2021on - hariu
Mie.s3 2020 2021on  - hariuMie.s3 2020 2021on  - hariu
Mie.s3 2020 2021on - hariuhicheel2020
 
Production and operation management ppt @ bec doms bagalkot
Production and operation management ppt @ bec doms bagalkot Production and operation management ppt @ bec doms bagalkot
Production and operation management ppt @ bec doms bagalkot Babasab Patil
 
Scheduling
SchedulingScheduling
Schedulingjaya_22
 
Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud
Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud
Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud Anhaa8941
 
Бизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлт
Бизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлтБизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлт
Бизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлтAdilbishiin Gelegjamts
 
Basic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory TheoryBasic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory TheoryShashank Naruka
 

What's hot (20)

Lecture 7
Lecture 7Lecture 7
Lecture 7
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Lekts 2
Lekts 2Lekts 2
Lekts 2
 
Ops management lecture 4 process design & strategy
Ops management lecture 4 process design & strategyOps management lecture 4 process design & strategy
Ops management lecture 4 process design & strategy
 
БАРАА МАТЕРИАЛЫН НӨӨЦ
БАРАА МАТЕРИАЛЫН НӨӨЦБАРАА МАТЕРИАЛЫН НӨӨЦ
БАРАА МАТЕРИАЛЫН НӨӨЦ
 
Supply chain process of Martin Dow Limited
Supply chain process of Martin Dow LimitedSupply chain process of Martin Dow Limited
Supply chain process of Martin Dow Limited
 
Функцэн цуваа
Функцэн цувааФункцэн цуваа
Функцэн цуваа
 
Make to order, stock, assembly
Make to order, stock, assemblyMake to order, stock, assembly
Make to order, stock, assembly
 
Scheduling
SchedulingScheduling
Scheduling
 
Mie.s3 2020 2021on - hariu
Mie.s3 2020 2021on  - hariuMie.s3 2020 2021on  - hariu
Mie.s3 2020 2021on - hariu
 
Production and operation management ppt @ bec doms bagalkot
Production and operation management ppt @ bec doms bagalkot Production and operation management ppt @ bec doms bagalkot
Production and operation management ppt @ bec doms bagalkot
 
Lecture 1 ie211 econometrics
Lecture 1 ie211 econometricsLecture 1 ie211 econometrics
Lecture 1 ie211 econometrics
 
Лекц №9 Яг цагт нь систем
Лекц №9 Яг цагт нь системЛекц №9 Яг цагт нь систем
Лекц №9 Яг цагт нь систем
 
Scheduling
SchedulingScheduling
Scheduling
 
Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud
Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud
Lekts5 tarhaltiin tsuvaanii dundaj, helbelzliin uzuuleltuud
 
cost Inventory
cost Inventorycost Inventory
cost Inventory
 
Factors affecting customer satisfaction
Factors affecting customer satisfactionFactors affecting customer satisfaction
Factors affecting customer satisfaction
 
Бизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлт
Бизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлтБизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлт
Бизнес төлөвлөгөө; Бизнес төлөвлөгөө бичих арга зүй; Бизнес төлөвлөлт
 
Basic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory TheoryBasic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory Theory
 
Яг цагт нь систем
Яг цагт нь системЯг цагт нь систем
Яг цагт нь систем
 

Similar to Material requirement planning Q&A

(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docxmarilynnhoare
 
3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhhVipul Hingu
 
Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01Karthikeyan Palani
 
Mrp exercise nº7
Mrp exercise nº7Mrp exercise nº7
Mrp exercise nº7riglcab
 
Inventory Control-4rev32404.ppt
Inventory Control-4rev32404.pptInventory Control-4rev32404.ppt
Inventory Control-4rev32404.ppthsuyaochen1
 
BRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INCBRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INCPravin Narwade
 
Network diagram problems
Network diagram problemsNetwork diagram problems
Network diagram problemsSubhra Mishra
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semestersachin kumar sharma
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explainedSam zain
 
Problem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docxProblem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docxChantellPantoja184
 
OR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory modelOR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory modelKiranMittal7
 

Similar to Material requirement planning Q&A (20)

(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx(3 Points)1.The injection molding department of Alvec Inc. use.docx
(3 Points)1.The injection molding department of Alvec Inc. use.docx
 
3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh3351905 ecc lab_manual_prepared by vhh
3351905 ecc lab_manual_prepared by vhh
 
Mrp task 1
Mrp task 1Mrp task 1
Mrp task 1
 
Mrp task 1
Mrp task 1Mrp task 1
Mrp task 1
 
Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01Mrpexercise 150427045220-conversion-gate01
Mrpexercise 150427045220-conversion-gate01
 
Mrp exercise nº7
Mrp exercise nº7Mrp exercise nº7
Mrp exercise nº7
 
Ch03pp
Ch03ppCh03pp
Ch03pp
 
inventory control for construction
inventory control for constructioninventory control for construction
inventory control for construction
 
MRP exercises
MRP exercisesMRP exercises
MRP exercises
 
Inventory Control-4rev32404.ppt
Inventory Control-4rev32404.pptInventory Control-4rev32404.ppt
Inventory Control-4rev32404.ppt
 
BRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INCBRUSNSWICK MOTORS, INC
BRUSNSWICK MOTORS, INC
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
Network diagram problems
Network diagram problemsNetwork diagram problems
Network diagram problems
 
Assignment on MRP Calculation
Assignment on MRP CalculationAssignment on MRP Calculation
Assignment on MRP Calculation
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semester
 
Process costing explained
Process costing explainedProcess costing explained
Process costing explained
 
Problem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docxProblem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docx
 
OR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory modelOR_Presentation on muli item deterministic inventory model
OR_Presentation on muli item deterministic inventory model
 
Chapter no 8 EOQ
Chapter no 8 EOQChapter no 8 EOQ
Chapter no 8 EOQ
 

More from Mahmoud Eltaweel

Solar thermal Systems Introduction
Solar thermal Systems Introduction Solar thermal Systems Introduction
Solar thermal Systems Introduction Mahmoud Eltaweel
 
Graphical and analytical acceleration analysis Q&A
Graphical and analytical accelerationanalysis Q&AGraphical and analytical accelerationanalysis Q&A
Graphical and analytical acceleration analysis Q&AMahmoud Eltaweel
 
Velocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&AVelocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&AMahmoud Eltaweel
 
Fourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&AFourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&AMahmoud Eltaweel
 
Mechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&AMechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&AMahmoud Eltaweel
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&AMahmoud Eltaweel
 
variable non-confirming Q&A
variable non-confirming Q&Avariable non-confirming Q&A
variable non-confirming Q&AMahmoud Eltaweel
 
Double sampling quality control
Double sampling quality control Double sampling quality control
Double sampling quality control Mahmoud Eltaweel
 
Control Charts rules for quality control
Control Charts rules for quality control Control Charts rules for quality control
Control Charts rules for quality control Mahmoud Eltaweel
 

More from Mahmoud Eltaweel (13)

Solar thermal Systems Introduction
Solar thermal Systems Introduction Solar thermal Systems Introduction
Solar thermal Systems Introduction
 
Graphical and analytical acceleration analysis Q&A
Graphical and analytical accelerationanalysis Q&AGraphical and analytical accelerationanalysis Q&A
Graphical and analytical acceleration analysis Q&A
 
Velocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&AVelocity analysis graphical analytical and IC Q&A
Velocity analysis graphical analytical and IC Q&A
 
Fourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&AFourbar linkage solution methods Q&A
Fourbar linkage solution methods Q&A
 
Mechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&AMechanics of machinery graphical position analysis Q&A
Mechanics of machinery graphical position analysis Q&A
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&A
 
Process layout Q&A
Process layout Q&AProcess layout Q&A
Process layout Q&A
 
Inventory management Q&A
Inventory management Q&AInventory management Q&A
Inventory management Q&A
 
Acceptance sampling Q&A
Acceptance sampling Q&AAcceptance sampling Q&A
Acceptance sampling Q&A
 
variable non-confirming Q&A
variable non-confirming Q&Avariable non-confirming Q&A
variable non-confirming Q&A
 
S chart
S chart S chart
S chart
 
Double sampling quality control
Double sampling quality control Double sampling quality control
Double sampling quality control
 
Control Charts rules for quality control
Control Charts rules for quality control Control Charts rules for quality control
Control Charts rules for quality control
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 

Material requirement planning Q&A

  • 2. What is MRP ■ Material requirements planning (MRP) is a production planning, scheduling, and inventory control system used to manage manufacturing processes. ■ It is a material control system that attempts to keep adequate inventory levels ■ It is to assure that required materials are available wheen needed 2
  • 3. Question 1 The following structure tree indicates the components needed to assemble one unit of product “W”. Determine the quantities of each component needed to assemble 100 units of W. 3 W A (1) 9 B (2) C(4) D(2) E E(2) F D (3) G(2) D
  • 4. Item Quantity per 1 Quantity per 1 Quantity per 100 W 1 1 100 A 1 1 100 B 2 2 200 C 4 4 400 D (2*1)+(4*3)+(1*2*4) 22 2200 E (1*1)+(2*2) 5 500 F (1*2) 2 200 G (2*4) 8 800 4 W 100 A 100 B (2*100) C(4*100) D(2*100) E (1*100) E(2*200) F(200) D (3*400) G(2*400) D (800)
  • 5. Question 2 The following table lists the components needed to assemble an end item, lead times, and quantities on hand. ■ If 20 units of the end items are to be assembled, how many additional units of E are needed? ■ An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that an order can be started and still be ready to ship on time ■ Draw an assembly time chart for the process 5 Item End B C D E F G H LT (week) 1 2 3 3 1 2 1 2 Amount on hand 0 10 10 25 12 30 5 0 End Items B (2) C D E(2) F(3) G(2) E(2) H(4) E(2) (3)
  • 6. 6 Item Gross Requirements – On Hand = Net Requirements End Item 20 – 0 = 20 Item Gross Requirements – On Hand = Net Requirements B (20 * 2) = 40 – 10 = 30 C (20 * 1) = 20 – 10 = 10 D (20 * 3) = 60 – 25 = 35 Item Gross Requirements – On Hand = Net Requirements E [(30 B * 2) + (10 C * 2) + (35 D * 2)] = 150 – 12 = 138 If 20 units of the end item are to be assembled, how many additional units of E are needed? Step 1: Determine the gross requirements and the net requirements for the End Item: Step 2: Determine the gross requirements and the net requirements for B, C, & D. Multiply the net requirements for the end item by the usage quantities of B, C, & D to determine the gross requirements for B, C, & D. Step 3: Determine the gross requirements and net requirements for E. Multiply the net requirements for B, C, & D by the usage quantities of E to determine gross requirements for E
  • 7. To solve this, we need to determine the longest sequence through the product structure tree moving from the end item down to the lowest items. The lead time for each item is indicated in bold to the left of each item in the product structure tree shown below. B) An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that an order can be started and still be ready to ship on time End Items B (2) C D E(2) F(3) G(2) E(2) H(4) E(2) Item End B C D E F G H LT (week) 1 2 3 3 1 2 1 2 The longest sequence is 6 weeks (End Item – D – H). 11 – 6 weeks = start of week 5. 1 wk 2 wk 3 wk 3 wk 1 wk 2 wk 1 wk 1 wk 1 wk2 wk Total LT = 4 wk 5 wk 5 wk 5 wk 6 wk 5 wk (3)
  • 8. 8 E B F E C END ITEM G H D E Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6 Wk 7 Wk 8 Wk 9 Wk 10 Wk 11 Wk 12 Draw an assembly time chart for the process
  • 9. Question 3 Eighty units of end item E are needed at the beginning of week 6 . Three cases (30 units per case) of J have been ordered and one case is scheduled to arrive in week 3, one in week 4 and one in week 5. Note: J must be ordered by the case and B must be produced in multiple of 120 units. There are 60 units of B and 20 units of J now on hand. Lead times are two weeks for E and B, and one week for J a) A prepare material requirement plan for product J 9
  • 10. 10 MRP Schedule Item E Item Begin Invento ry Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Gross requirement 80 Scheduled receipts Projected on hand Net Requirements 80 Planned order receipts 80 Planned order release 80 Item Quantity per 1 Quantity per 80 E 1 80 B 2 160 J 3+(4*2) =11 880 F 2*2 =4 320
  • 11. 11 MRP Schedule Item B Item Begin Inventory Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Gross requirement 160 Scheduled receipts Projected on hand 60 60 60 60 Net Requirements 100 Planned order receipts 120 Planned order release 120
  • 12. 12 MRP Schedule Item J Item Begin Invento ry Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Gross requirement 480 240 Scheduled receipts 30 30 30 Projected on hand 20 20 30 60 30 Net Requirements 460 180 Planned order receipts 480 180 Planned order release 480 180 I need 80 from E at week 4 and 120 from B at week 2 One B requires 4 Js One E requires 3 Js