Practice Problem: Chapter 3, Project Management 
Problem 1: 
The following represent activities in a major construction project. Draw the network to 
represent this project. 
Activity Immediate Predecessor 
A - 
B - 
C A 
D B 
E B 
F C, E 
G D 
H F, G 
1
Problem 2: 
Given the following Time Chart and Network Diagram, find the Critical Path. 
Activity a m b t Variance 
A 2 3 4 3 1/9 
B 1 2 3 2 1/9 
C 4 5 12 6 16/9 
D 1 3 5 3 4/9 
E 1 2 3 2 1/9 
Problem 3: 
What is the variance in completion time for the critical path found in Problem 2? 
Problem 4: 
A project has an expected completion time of 40 weeks and a standard deviation of 5 
weeks. It is assumed that the project completion time is normally distributed. 
(a) What is the probability of finishing the project in 50 weeks or less? 
(b) What is the probability of finishing the project in 38 weeks or less? 
(c) The due date for the project is set so that there is a 90% chance that the project will 
be finished by this date. What is the date? 
2
Problem 5: 
Development of a new deluxe version of a particular software product is being 
considered. The activities necessary for the completion of this project are listed in the 
table below along with their costs and completion times in weeks. 
3 
Activity Normal 
Time 
Crash 
Time 
Normal 
Cost 
Crash 
Cost 
Immediate 
Predecessor 
A 4 3 2,000 2,600 - 
B 2 1 2,200 2,800 A 
C 3 3 500 500 A 
D 8 4 2,300 2,600 A 
E 6 3 900 1,200 B, D 
F 3 2 3,000 4,200 C, E 
G 4 2 1,400 2,000 F 
(a) What is the project expected completion date? 
(b) What is the total cost required for completing this project on normal time? 
(c) If you wish to reduce the time required to complete this project by 1 week, which 
activity should be crashed, and how much will this increase the total cost?
ANSWERS: 
4 
Problem 1: 
Problem 2: 
Critical path: ACDE = 14 
Problem 3: 
Total variance   variances of activities on critical path 
Total variance = 1/9 + 16/9 + 4/9 + 1/9 = 2 2/9 = 2.44 
And σ = = 1.6
5 
Problem 4: 
(a) 
50 40 
Z 2 
5 
X  
 
  
   
Therefore: P(X  50)  P(Z  2)  0.97725 
(b) 
X   
2 
Z     
0.4 
5 
 
 
Therefore: P(X  38)  P(Z  0.4)  0.34458 
(c) 90% Z 1.28  ( -) /    40/ 5 
Therefore:  1.28*5 40  46.4weeks 
Problem 5: 
(a) 
Project completion time is therefore t t t t t A D E F G      4  8 6 3 4  25 
(b) Total cost  $2,000$2200$500$2,300$900$3,000 $1,400  $12,300 
(c) Crash D 1 week at an additional cost of 
$2,600 $2,300 $300 
  
$75 
 
8  
4 4

More Related Content

What's hot

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
Rahul Dubey
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
Harinadh Karimikonda
 

What's hot (20)

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Project management case study
Project management case studyProject management case study
Project management case study
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project development cycle
Project development cycleProject development cycle
Project development cycle
 
Applications of pert
Applications of pertApplications of pert
Applications of pert
 
P E R T
P E R TP E R T
P E R T
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
BOOT, BOT, Management Contracts & Turnkey PROJECTS
BOOT, BOT, Management Contracts & Turnkey PROJECTSBOOT, BOT, Management Contracts & Turnkey PROJECTS
BOOT, BOT, Management Contracts & Turnkey PROJECTS
 
Project management
Project managementProject management
Project management
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection Methods
 
Project management structures
Project management structuresProject management structures
Project management structures
 

Similar to Network diagram problems

1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx
jackiewalcutt
 
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docxDeadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
edwardmarivel
 
Scheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docxScheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docx
kenjordan97598
 
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
drennanmicah
 
LectureProjectPlanning.ppt
LectureProjectPlanning.pptLectureProjectPlanning.ppt
LectureProjectPlanning.ppt
anhdbh
 
SchedulingPart 1. Question 1. How many of the statements are tru.docx
SchedulingPart 1.  Question 1.  How many of the statements are tru.docxSchedulingPart 1.  Question 1.  How many of the statements are tru.docx
SchedulingPart 1. Question 1. How many of the statements are tru.docx
anhlodge
 

Similar to Network diagram problems (20)

Ch03pp
Ch03ppCh03pp
Ch03pp
 
1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx
 
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docxDeadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
 
Ch 06 - CPM PERT (1).pptx
Ch 06 - CPM  PERT (1).pptxCh 06 - CPM  PERT (1).pptx
Ch 06 - CPM PERT (1).pptx
 
Scheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docxScheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docx
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
 
Chap003
Chap003Chap003
Chap003
 
LectureProjectPlanning.ppt
LectureProjectPlanning.pptLectureProjectPlanning.ppt
LectureProjectPlanning.ppt
 
Project management
Project managementProject management
Project management
 
PERT/CPM
PERT/CPMPERT/CPM
PERT/CPM
 
PROJ 586 Entire Course NEW
PROJ 586 Entire Course NEWPROJ 586 Entire Course NEW
PROJ 586 Entire Course NEW
 
CPM-PERT-Examples .pptx
CPM-PERT-Examples .pptxCPM-PERT-Examples .pptx
CPM-PERT-Examples .pptx
 
SchedulingPart 1. Question 1. How many of the statements are tru.docx
SchedulingPart 1.  Question 1.  How many of the statements are tru.docxSchedulingPart 1.  Question 1.  How many of the statements are tru.docx
SchedulingPart 1. Question 1. How many of the statements are tru.docx
 
OPM101Chapter16_001 (2).ppt
OPM101Chapter16_001 (2).pptOPM101Chapter16_001 (2).ppt
OPM101Chapter16_001 (2).ppt
 
PROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.comPROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.com
 
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.comPROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
 
PROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.comPROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.com
 
Devry proj 586 final exam set 2 new
Devry proj 586 final exam set 2 newDevry proj 586 final exam set 2 new
Devry proj 586 final exam set 2 new
 
Introduction to Project Management
Introduction to Project Management Introduction to Project Management
Introduction to Project Management
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 

Recently uploaded (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 

Network diagram problems

  • 1. Practice Problem: Chapter 3, Project Management Problem 1: The following represent activities in a major construction project. Draw the network to represent this project. Activity Immediate Predecessor A - B - C A D B E B F C, E G D H F, G 1
  • 2. Problem 2: Given the following Time Chart and Network Diagram, find the Critical Path. Activity a m b t Variance A 2 3 4 3 1/9 B 1 2 3 2 1/9 C 4 5 12 6 16/9 D 1 3 5 3 4/9 E 1 2 3 2 1/9 Problem 3: What is the variance in completion time for the critical path found in Problem 2? Problem 4: A project has an expected completion time of 40 weeks and a standard deviation of 5 weeks. It is assumed that the project completion time is normally distributed. (a) What is the probability of finishing the project in 50 weeks or less? (b) What is the probability of finishing the project in 38 weeks or less? (c) The due date for the project is set so that there is a 90% chance that the project will be finished by this date. What is the date? 2
  • 3. Problem 5: Development of a new deluxe version of a particular software product is being considered. The activities necessary for the completion of this project are listed in the table below along with their costs and completion times in weeks. 3 Activity Normal Time Crash Time Normal Cost Crash Cost Immediate Predecessor A 4 3 2,000 2,600 - B 2 1 2,200 2,800 A C 3 3 500 500 A D 8 4 2,300 2,600 A E 6 3 900 1,200 B, D F 3 2 3,000 4,200 C, E G 4 2 1,400 2,000 F (a) What is the project expected completion date? (b) What is the total cost required for completing this project on normal time? (c) If you wish to reduce the time required to complete this project by 1 week, which activity should be crashed, and how much will this increase the total cost?
  • 4. ANSWERS: 4 Problem 1: Problem 2: Critical path: ACDE = 14 Problem 3: Total variance   variances of activities on critical path Total variance = 1/9 + 16/9 + 4/9 + 1/9 = 2 2/9 = 2.44 And σ = = 1.6
  • 5. 5 Problem 4: (a) 50 40 Z 2 5 X        Therefore: P(X  50)  P(Z  2)  0.97725 (b) X   2 Z     0.4 5   Therefore: P(X  38)  P(Z  0.4)  0.34458 (c) 90% Z 1.28  ( -) /    40/ 5 Therefore:  1.28*5 40  46.4weeks Problem 5: (a) Project completion time is therefore t t t t t A D E F G      4  8 6 3 4  25 (b) Total cost  $2,000$2200$500$2,300$900$3,000 $1,400  $12,300 (c) Crash D 1 week at an additional cost of $2,600 $2,300 $300   $75  8  4 4