Commissioning and start up leader engineer
With a B.Sc. and upper gradual diploma degree in mechanical engineering and 21 years'
experience in fossil fuel power plants from testing through start up and operation, Mr.
Hussine is an expertise in this filed. He has also the complete knowledge and experience
in electrical, I&C, firefighting, HVAC and hydrogen generation systems start-up and
operation requirements. He is capable to prepare and put in order the complete turnover
packages for different systems and to execute their performance testing. He has very
high managerial and communication skills beside his technical capabilities.
PERSONAL INFORMATION: -
Name : Magdy Hussine Hammid
Date of Birth : 4th
May 1967
Marital Status : Married
Nationality : Egyptian
Religion : Moslem
Military Service : Done
Passport no : a08646632
Place of Issue : Egypt - Assiut
Date of Issue : 14/02/2013
Date of Expiry : 13/02/2020
Language : Arabic / English
Technical Qualification : Field, Control, Shift charge, and Senior Eng.
Professional Experience : Thermal Power Plant
Present Job : SAMSUNG C&T Commissioning and start-up
team leader
CURRENT ADDRESS: -
Country : Egypt
Address : Asyut
Mobile Phone : +201097498565
Email : magdyhussine109@yahoo.com
magdyhussine@gmail.com
EDUCATION: -
Freelancer 1/13 Magdy Hussine - CV
1. Post graduate Diploma of Mechanical Engineering in Thermal Power Engineering
with general grade very good in June 2001 from Assiut University.
2. B.Sc. of Mechanical Eng. In Thermal Power Engineering with General Grade Pass
in May 1993 from Assiut University.
TRAINING COURSES:
1. Advanced training of operation power station in Abu-Kerr thermal power plant.
2. Training course in North Cairo training centre.
3. In-site training in Assiut power plant.
4. M.S. project 2007course in New Horizons computer learning centre.
5. Excel 2007 course in New Horizons computer learning centre.
6. Word 2007 course in New Horizons computer learning centre.
7. Power Point course in Assiut power plant.
COMPUTER SKILLS:
1. Dos, Windows 95, 98, Me, 2000, Xp, Vista, Seven and Windows 8
2. M.S. Project
3. Microsoft office
4. Windows applications.
5. Fortran
Control Systems Experience:
1. Ovation 3.5.0
2. ALSBA 6.2.4.0
3. SPPA-T3000
4. ABB INDUSTRIAL IT- PGP version 4.1 service pack 3.
5. Yokogawa Centum CS 3000.
6. ABB INDUSTRIAL IT - 800XA SV5.1
7. Xp teleperm (TXP)
8. TLan – 90 PCV 4.3C(QNX)
9. Tosbac7/40E
LANGUAGE CAPABILITIES:
• Arabic (native language)
• English (fluent)
EXPERIENCE RECORD:
Date : 22/4/2015 – 06/9/2015
Employer : METKA
Project : SAMRA Phase 3 (SEPCO) (450 MW) PROJECT POWER PLANT IN
Jordan
Job title: Reliability and Performance/Shift Charge Engineer/Operation
Trainer
Job Description :
 Spearheaded the entire operations of 450 MW power plant.
 Making daily technical reports about the unit's abilities & efficiencies for the
commissioning manager.
 Modification, finalizing and testing the plant logic.
 Testing the one pushbutton starting up after making the required modification.
 Performing Equipment change over and tests.
Freelancer 2/13 Magdy Hussine - CV
 Successfully Participated executed plant performance test and enhance unit
efficiency.
 Successfully executed reliability test.
 Monitored plant performance regularly and recommended changes to enhance the
efficiency of the plant operations.
 Conducted field “walk-down” activity to identify & analyze corrective and
preventive action.
 Monitoring plant parameters, trouble shooting, first line maintenance activities,
isolations and de-isolations of plant equipment.
 On site operation trainer for the client stuff.
 Receive and carry out instructions from the Project management.
 Maintain files and records of instructions, memoranda, etc. in good order.
 Keep records of operations, faults, switching, forced signals conditions, etc.
 Hands over the plant from maintenance in line with the operation schedules and
requirements.
 Responding effectively to operational demands and assist in achieving safe and
efficient generation.
 Start up, synchronize, lead and shut down units as required.
 In case of system disturbance, normalization of system through safe and
accepted switching procedures.
 Perform all switching that can be done from the control room.
Plant Description:
Samra electric power company (SEPCO) 1150 MW project is approximately 35 km north
of Amman on the outskirt of Alhashmia/Zarka city in Jordan. The facility is a 2 x 2 x 1
combined cycle configuration consisting of:
 Two ALSTOM GT13E2 gas turbine
 Two ALSTOM HRSG triple pressure reheat cycle
 One ALSTOM VLB - HCY050/1 - ALM - MCG250 / NE33GA Steam Turbine 148.2 MW
two casing triple pressure reheat
 Direct air cooled condenser
______________________________________________________________________
Date : 8/6/2013 – 31/3/2015
Employer : SAMSUNG C&T
Project : QURAYYAH IPP 4100 MW PROJECT POWER PLANT IN KSA
Job title: COMMISSIONING, START-UP and OPERATION TEAM LEADER
Job Description :
 Applying the project Commissioning Plan in the execution of the work
 Lead and coordinate Commissioning activities.
 Lead and coordinate Operation activities.
 Reporting to the SAMSUNG C&T Commissioning manager.
 Conducts meeting with commissioning manager to review testing, commissioning
progress and HSE conformance on daily and occasionally more frequent basis as
well as meetings with the vendors to resolve any equipment related problems.
 Analyses and addresses critical areas of progress/delays in testing and
commissioning.
 Ensures that all safety and precautionary requirements and procedures are
followed during the commissioning process in line with the commissioning
schedule.
 Supervises logistics administration, field engineering, material approvals,
coordination with Client, planning, Progress monitoring & cost control.
 Managing and coordination with different subcontractors working at site
Freelancer 3/13 Magdy Hussine - CV
 Mobilizes manpower as per the commissioning schedule. Coordinates with other
departments/ agencies to resolve interface problems.
 Carries out a detailed assessment of the work involved in the individual group as
well as discipline with respect to the commissioning and assess the available
resources and possible constraints in the execution
 Carries out detailed analysis of plant commissioning, assessing the requirements
of special tools /temporary facilities/equipment required for pre-commissioning
and commissioning, prepare Equipment/Tools list and initiate procurement.
 Balancing between schedule, quality, cost and customer satisfaction.
 Conduct commission ability reviews of project documents
 Study the engineering / technical documents/vendor information and prepare
procedure for systematic and sequential pre-commissioning /commissioning /
startup of plant.
 Prepares commissioning schedule based on the quantum of job and duration for
each activity as well as prioritize system requirements.
 Creates elaborate commissioning plan including the scope of commissioning
activities, duration for each, scope of interlinked activities, resources available,
commissioning material requirements as well as availability of tools and
machinery
 Making commissioning procedure for condensate system, feed water system,
demine water system, closed cooling system, firefighting system, fuel oil system,
fuel gas system, chlorination system, water treatment system, desalination
system, GT inlet air chiller system, compressed air system, draining system,
HP/LP bypass systems and lube & lifting & hydraulic oil systems.
 Independently conducting construction progress inspections.
 Independently conducting commissioning inspections and execute
commissioning tests based on documented procedures
 Ensures all construction activities are completed prior to taking up the system for
commissioning.
 Participates in pre-construction Engineering reviews and project planning.
 Participates in management of change for engineering and construction of the
project.
 Follows construction progress and participates in solving construction and
installation problems.
 Supervise and perform flushing, chemical cleaning and steam bow.
 Supervise steam/water sampling system, safety (relief) valves, flue gas analyzing
system, chemical cleaning Vendors …etc.
 Review or approve implement a Testing and Commissioning Plan, Method
Statements, Testing and Commissioning Reports and/or validate or invalidate
testing and commissioning results for this discipline.
 Leading the pre commissioning the (Start-up) steam blowing.
 Arranges to prepare a check/punch list of jobs after a pre-commissioning run and
ensures their progressive clearance.
 Participate in performance test.
 Participate and leading the reliability test.
 Managing all aspects of pre-commissioning, commissioning and operation
checkout, through initial energizing, startup of the new process and associated
systems.
 Planning of 'on site' activities and allocation of available manpower on a daily
basis.
 Supervise and making CCC documents for plant handover.
 Receiving from client and managing how to clear punch items for handing over.
Plant Description:
Freelancer 4/13 Magdy Hussine - CV
The Qurayyah IPP 4000 MW project is approximately 100 km south of the Port of
Dammam on the coast in the Eastern Province of the Kingdom of Saudi Arabia. The
facility is a 2 on 1 combined cycle configuration consisting of:
 Twelve (12) Siemens SGT6-PAC 5000F gas turbine generating units (GTGs).
 Twelve (12) BHI HRSG (328T/H, 89BARS) HP, (46T/H, 8BARS) LP, Staggered,
natural circulation type with horizontal gas turbine exhaust gas flow through
vertical tube heat transfer sections heat recovery steam generators (HRSGs).
 Rotor Air Cooler Kettle Boiler (RACKB) contains a single stage Kettle Boiler.
 Six (6) Siemens SST6-4000 steam turbine generators (STGs).
 Six (6) BHI Seawater cooled condensers.
 241 x 3 M³/H Desalination plant.
 95 x 3 M³/H Demine plant
 Six (6) Bypass deaerator
 Three (3) x50% HYOSUNG Deaerator feed water pump per each module.
 Three (3) x50% TORISHIMA Feed water pump per each module.
 Two (2) x100% HYOSUNG Condensate extraction pumps per each module.
 Twelve (12) x 100% HYOSUNG GOODSPRINGS circulating pump.
 Two (2) Stellar Energy (SE) GT inlet air cooling (TIAC) 46144 TR.
Leave reason: End of Project.
______________________________________________________________________
Date : 1/10/2011 – 31/3/2013
Employer : ANSALDO CALDAIA
Project : ABU-QIR POWER PLANT IN EGYPT
Job title: COMMISSIONING, START-UP and OPERATION TEAM MANAGER
Job Description :
 Lead and coordinate Commissioning activities.
 Lead and coordinate Operation activities.
 Reporting to the Ansaldo Commissioning manager.
 Conducts meeting with contractors, consultant’s designers, and asset holder
department(s),as and when necessary, to review testing, commissioning progress
and HSE conformance on daily and occasionally more frequent basis as well as
meetings with the vendors to resolve any equipment related problems.
 Analyses and addresses critical areas of progress/delays in testing and
commissioning.
 Ensures that all safety and precautionary requirements and procedures are
followed during the commissioning process in line with the commissioning
schedule.
 Supervises logistics administration, field engineering, material approvals,
coordination with Client, planning, Progress monitoring & cost control.
 Mobilizes manpower as per the commissioning schedule. Coordinates with other
departments/ agencies to resolve interface problems.
 Carries out a detailed assessment of the work involved in the individual group as
well as discipline with respect to the commissioning and assess the available
resources and possible constraints in the execution
 Carries out detailed analysis of plant commissioning, assessing the requirements
of special tools /temporary facilities/equipments required for pre-commissioning
and commissioning, prepare Equipment/Tools list and initiate procurement.
 Study the engineering / technical documents/vendor information and prepare
procedure for systematic and sequential pre-commissioning /commissioning /
start up of plant.
 Prepares commissioning schedule based on the quantum of job and duration for
each activity as well as prioritize system requirements.
Freelancer 5/13 Magdy Hussine - CV
 Creates elaborate commissioning plan including the scope of commissioning
activities, duration for each, scope of interlinked activities, resources available,
constraints regarding the same, as well as availability of tools and machinery
 Making commissioning procedure for air and flue gas system, fuel oil system, fuel
gas system, feed-water and steam system, soot blower system and auxiliary
steam system.
 Ensures all construction activities are completed prior to taking up the system for
commissioning.
 Analyses the scope as per contract and battery limit /guarantees
 Participates in pre-construction Engineering reviews and project planning.
 Participates in management of change for engineering and construction of the
project.
 Follows construction progress and participates in solving construction and
installation problems.
 Supervise and perform flushing, chemical cleaning and pass water of piping.
 Supervise steam/water sampling system, safety (relief) valves, flue gas analyzing
system, chemical cleaning, etc Vendors.
 Pre commissioning the (Start-up) Boiler steam blowing.
 Arranges to prepare a check/punch list of jobs after a pre-commissioning run and
ensures their progressive clearance.
 Managing all aspects of pre-commissioning, commissioning and operation
checkout, through initial energizing, startup of the new process and associated
systems.
 Planning of 'on site' activities and allocation of available manpower on a daily
basis.
 Provides technical as well as manpower support to client during initial operation
Plant Description:
2x650 Mw steam power plant in EGYPT  ALEXANDRIA  ABU-QIR including:
 ANSALDO 2067 T/Hr SH flow, 1729 T/Hr RH flow, front & rear burners low NOX
burner TEA-BA dual fired (N.G./HFO) drum type, natural water circulation, reheat
boiler with 2 x 50%FD/GR fans, air heater, Soot blowers, CEMS, etc.
 MITSUBISHI STG with HP, IP and LP cylinders, H2 cooled Generator and see water
cooled Condenser with HP, LP Steam Bypass systems.
 BOP including 8 Stage regenerator feed water heaters, Circulating water, 2x 50%
TFWP and 1x 30% MFWP for start-up, Closed cooling water, Compressed air, EDG,
Fuel handling, Ball cleaning and H2 production Systems.
Leave reason: End of Project.
______________________________________________________________________
Date : 1/2/2011 – 30/9/2011
Employer : EGYPTROL
Project : HEAD OFFICE
Job title: MECHANICAL COMMISSIONING, OPERATION and START-UP
LEADER ENGINEER
Job Description :
 Support company stuff that supplied to other companies.
 Making commissioning procedure for gas turbine auxiliaries, boilers and its
auxiliaries, Desalination plant, CLOSED COOLING system, service water system
and power plants various systems
 Preparing commissioning bidders.
 Participates in getting ISO9001-2008 CERTIFICATE
______________________________________________________________________
Date : 4/12/2010 – 8/12/2010
Freelancer 6/13 Magdy Hussine - CV
Employer : ABB ENERGIETECHNIC
Project : DOHUK GAS POWER STATION
Job title: OPERATION and START-UP MANAGER ENGINEER
Job Description :
 Lead and coordinate Commissioning activities.
 Lead and coordinate Operation activities.
 Reporting to the site manager.
 Planning the various commissioning activity.
 Conducts meeting with contractors, consultant’s designers and asset holder
department(s),as and when necessary, to review testing and commissioning
progress on daily and occasionally more frequent basis.
 Analyses and addresses critical areas of progress/delays in testing and
commissioning.
 Ensure the setting up of safety and precautionary requirements.
 Participates in pre-construction Engineering reviews and project planning.
 Participates in management of change for engineering and construction of the
project.
 Arranges to prepare a check/punch list of jobs after a pre-commissioning run and
ensures their progressive clearance.
 Follows construction progress and participates in solving construction and
installation problems.
 Supervising pre operational, operational and load performance activities.
 Making on-site training for client engineers.
Plant Description:
4 x125 MW Simple cycle power project in IRAQ  KURDISTAN  DOHUK including:
 GE Gas turbine frame 9E
 Water-to-Air-Cooled 9A4 Generator with Brushless Excitation
Leave reason : Death of my son
______________________________________________________________________
Date : 20/3/2010 – 30/11/2010
Employer : NEM
Project : EL-ATF POWER STATION PROJECT
Job title: MECHANICAL COMMISSIONING TEAM LEADER, OPERATION and
START-UP MANAGER ENGINEER
Job Description :
 Lead and coordinate Commissioning activities.
 Lead and coordinate Operation activities.
 Reporting to the Commissioning manager.
 Conducts meeting with contractors, consultant’s designers and asset holder
department(s),as and when necessary, to review testing and commissioning
progress on daily and occasionally more frequent basis.
 Analyses and addresses critical areas of progress/delays in testing and
commissioning.
 Ensure the setting up of safety and precautionary requirements.
 Participates in pre-construction Engineering reviews and project planning.
 Participates in management of change for engineering and construction of the
project.
 Follows construction progress and participates in solving construction and
installation problems.
 Supervise and perform flushing, chemical cleaning and pass water of piping.
Freelancer 7/13 Magdy Hussine - CV
 Supervise chemical dosing system, steam/water sampling system, safety (relief)
valves, flue gas analyzing system vendors.
 Pre commissioning the (Start-up) Boiler steam blowing.
 Arranges to prepare a check/punch list of jobs after a pre-commissioning run and
ensures their progressive clearance.
 Inspection for de-aerator feed water tank, steam silencers, ducts, internal and
external insulation, expansion joints, bumpers, hangers, pipe support and steel
structure.
 Managing all aspects of pre-commissioning, commissioning and operation
checkout, through initial energizing, startup of the new process and associated
systems.
 Commissioning of condensate preheat recirculation pumps and putting it in
service.
 Conducting the function test for motorizing and control valves.
 Startup HRSG for Blow out and normal operation.
 Putting into service the two HRSG’s.
 Supervising pre operational, operational and load performance activities.
 Complete reliability run and performance test as per the client’s request.
 Responsible for managing Facilities Performance Test in line with design
parameters.
 Participates in tuning all controllers to get units to optimum performance.
 Trip testing and interlocks.
 Testing the set values of ERV, relief valves, automatic opening and closing for
motorizing valves and annunciation.
 Assists in setting up of necessary mechanism for prompt complaint rectification
during defects liability period
 Production and submission of all work permits relating to commissioning and
operation activities.
 Planning of 'on site' activities and allocation of available manpower on a daily
basis.
 Participates in communicates with all project stake holders in a logical,
systematic and timely manner.
 Completes necessary documentation for project turnover to client.
 Plant handover at the end of contract.
 Making on-site training for client engineers.
 Develops the Punch list Management Process with the Owner and consultant.
 Supervises witnessing and certification of system/equipment during mechanical
completion tests, guarantee runs.
 Assists in managing smooth handing-over of facilities to the Asset Holder
Plant Description:
1x750 MW combined cycle power project in EGYPT  DAMANHOUR  ATF including:
 2x250 MITSUBISHI Gas turbine, H2 Cooled generator.
 Two NEM HEAT RECOVERY natural circulating 2 x 340 T/Hr, 128 Bar, 566 C˚ each
comprising HP system, reheater system, IP system, LP system, condensate
preheat system, steam/water sample system, flue gas analyzing system (CEM),
one de-aerator including feed water storage tank, chemical dosing system, and
two condensate preheat recirculation pumps
 1x250 ANSALDO ENERGAIA Steam turbine, H2 Cooled generator.
______________________________________________________________________
Date : 11/11/2009 – UP to 1/3/2010
Employer : ABB ENERGIETECHNIC AG
Project : Barrage Cheliff M.A.O. WATER PUMPING PLANT
Freelancer 8/13 Magdy Hussine - CV
Job title: MECHANICAL COMMISSIONING TEAM LEADER AND OPERATION
MANAGER ENGINEER
Job Description :
 Lead and coordinate Commissioning activities.
 Lead and coordinate Operation activities.
 Reporting to the site manager.
 Ensure the setting up of safety and precautionary requirements.
 Making heat run test for all motors and pumps.
 Making flushing for pipelines.
 Making operation procedure for the plant to feed water treatment 5 km away and
sending water to storage 9 Km away.
 Leading 9 Km pipelines filling without auto vent valves.
Plant Description :
68400 m3/hr water pumping project at ALGERIA / MOSTAGANEM / ARZUE /ORAN
(M.A.O.) including:
 5 Flowserve pumps, 5700 m3/hr capacity and 203 m head to supply water to a
reservoir located at 5 km distance and 271 m height for providing water to Oran at
150 km distance.
 7 Flowserve pumps, 5700 m3/hr capacity and 156 m head to supply water to
Kerrada Dam located at 7 km distance and 92 m height for storage.
____________________________________________________________________________
Date : 1/7/2009 – 10/11/2009
Employer : TOSHIBA (TPSC/TTC)
Project : EL-ATF POWER STATION PROJECT
Job title: MECHANICAL COMMISSIONING TEAM LEADER AND OPERATION
MANAGER ENGINEER
Job Description :
 Lead and coordinate Commissioning activities.
 Lead and coordinate Operation activities.
 Prepare procedure and schedule for systematic and sequential pre
commissioning / commissioning / start-up/ operation of plant from the
engineering / technical documents / vendor information.
 Reporting to the site and project manager.
 Holds regular review meetings with the consultant and client.
 Supporting cp101 in reliability test for Gas turbine.
 Ensure the setting up of safety and precautionary requirements.
 Follows construction progress and participates in solving construction and
installation problems.
 Making heat run test for all motors and pumps.
 Making flushing for Potable water system, raw water system, air conditioning, fuel
oil system, circulated water system, sump pump, condensate system, feed water
system, chemical cleaning for the condensate and feed water systems.
 Complete reliability run and performance test as per the client’s request.
 Delivers Training to Operators and Maintenance team, ensures operators training
level is adequate.
 Ensures that allocated commissioning systems reach milestone targets in due
time as per schedule, and considering multi disciplines vision...
 Participates in pre-construction Engineering reviews and project planning
 Participates in management of change for engineering and construction of the
project.
 Controls and validates tests results.
 Signs Tests sheets.
Freelancer 9/13 Magdy Hussine - CV
 Planning of 'on site' activities and allocation of available manpower on a daily
basis.
 Requests and defines Permit to Work and related documentation for
commissioning activities.
 Follows project schedule targets.
 Prepares and reviews Commissioning documentation (procedures, method
statements).
 Managing all aspects of pre-commissioning, commissioning and checkout,
through initial energizing, heat-up and startup of the new process and associated
systems.
 Communicates with all project stake holders in a logical, systematic and timely
manner.
 Completes necessary documentation for project turnover to manufacturing.
Plant Description : As described before
______________________________________________________________________
Date : 3/4/2009 – 30/6/2009
Employer : EGYPTROL as subcontractor for TOSHIBA (TPSC/TTC)
Project : EL-ATF POWER STATION PROJECT
Job title : MECH. COMMISSIONING MANAGER ENGINEER
Job Description :
 Leading the commissioning team for the commissioning of combined cycle
operation with the mechanical works contract (CP-118) –Toshiba plant systems &
services Co.
 Making flushing for closed cooling system, Demi water system, service water
system, firefighting system, air compressor system, service gas system and
lubrication water system
Plant Description : As described before
______________________________________________________________________
Date : 15/1/2008 - 3/4/2009
Employer : UPPER EGYPT ELECTRICITY PRODUCTION COMPANY (UEEPC).
Project : ASSIUT THERMAL POWER STATION
Job title : OPERATION MANAGER
Job Description :
 Lead and coordinate station operation activities.
 Manage and prioritize workloads.
 Make analyses for operation trouble-shooting.
 Prepare procedure for systematic and sequential pre commissioning /
commissioning / start-up of plant after maintenance from the engineering /
technical documents / vendor information.
 Supervise work according to routine maintenance schedules for plant and
equipment.
 Ensure the setting up of safety and precautionary requirements and procedures
are followed before, during and after maintenance.
 Making daily technical reports about the unit's abilities & efficiencies for
Operation Manager.
 Team leader & coordinator of operation activities schedules with other internal
departments and with the dispatch centre.
 Provide effective support to the team to maximize the contribution made to the
plant objectives.
Freelancer 10/13 Magdy Hussine - CV
 Delegates effectively and creates a work climate where people succeed and
empowers people to take action.
 Demonstrates the ability to influence events and achieve objectives to time and
budget.
 Holds regular review meetings with the maintenance departments to resolve any
equipment related problems
 Trainer for operation engineers.
Plant Description:
2 x 312 MW steam power plant in EGYPT / ASIUT including:
 MITSUBISHI ball firing dual fired (N.G. /HFO) drum type, forced circulation, reheat
boiler with 2 x 50% FD /GR fans, air heater, Soot blowers, etc.
 ANSALDO front & rear burners dual fired (N.G./HFO) drum type, natural water
circulation, reheat boiler with 2 x 50%FD/GR fans, air heater, Soot blowers, etc.
 Toshiba STG with H, IP and LP cylinders, H2 cooled Generator and FRANCO TOSI
river water cooled Condenser with C.H. ZIKESCH GMBH. HP, SULZER LP Steam
Bypass systems.
 ANSALDO STG with H, IP and LP cylinders, H2 cooled Generator and river water
cooled Condenser with REXROTH HP/LP Steam Bypass systems.
 BOP including 7 Stage regenerator feed water heaters, Circulating water, 2x 50%
MFWP and 1x 100% TFWP, Closed cooling water, Compressed air, EDG, Fuel
handling, Ball cleaning, Aux Boiler and TELEDYNE ENERGY H2 production
Systems.
____________________________________________________________________________
Date : 14/10/2007–14/1/2008
Employer : KOCH/SIEMENS CONSORTIUM.
Project : AL-NASERRIA POWER PLANT EXTENSION
Job title : START UP /SHIFT CHARGE ENGINEER.
Job Description :
 Responsible for conducting plant start-up activities during the shift
 Maintain efficient power plant stability during performance, reliability and grantee,
tests
Plant Description :
3X115 Combined Cycle Plant in Syria  DAMASCUS comprising:
 3 Fiat Avio gas turbine, 115 Mw each
 One Siemens Steam Turbine 150 Mw with HP & LP casing.
 Siemens Air Cooled Generator.
 HP & LP bypass system,
 Direct contact jet condenser cooled by dry air cooling tower.
 NEM HRSG with HP & LP drums and forced recirculation pumps.
 BOP including: HP & LP feed water pumps, RO Demi plants, Condensate polisher,
Raw and sanitary water systems, etc.
____________________________________________________________________________
Date : Nov 2006–Oct 2007
Employer : Upper Egypt Electricity Production Company (UEEPC)
Project : Assiut Thermal Power Station
Job title : OPERATION MANAGER
Plant Description : As described before
___________________________________________________________________________
Date : March 2001–Nov 2006
Employer : Upper Egypt Electricity Production Company (UEEPC)
Project : ASSIUT THERMAL POWER STATION
Freelancer 11/13 Magdy Hussine - CV
Job title : SHIFT CHARGE ENGINEER
Job Description :
 Making daily technical reports about the unit's abilities & efficiencies for Head of
Operation department.
 Supervise and distribute work during the shift.
 Receive and carry out instructions from the power station management.
 Brief, instruct and train subordinate staff according to instructions issued.
 Issue switching instructions prior to issuing a permit to work if the Operation
Engineer does not issue them.
 Carry out/supervise and ensure that safe and proper switching is carried out.
 Issue Permit-to-Work, Sanction-for-Test and Limitation-of-Access in accordance
with regulations.
 Carry out switching as authorised by the management.
 Maintain files and records of instructions, memoranda, etc. in good order.
 Supervise personnel safety and report all hazardous events and accidents.
 Report verbally, and in writing, any faults that have occurred.
 Keep records of operations, faults, switching, hydrological conditions, etc.
 Attend to faults that have occurred in order to rectify them himself or call for
assistance as soon as possible (with due regard to instructions issued).
 At shift change, inform the next shift about the current operating situation,
orders, issued Permits-to-Work and any other matters that are necessary to know
for the operation of the power station.
 Hands over the plant from maintenance in line with the operation schedules and
requirements.
 Anticipating and responding effectively to operational demands and assist in
achieving safe and efficient generation.
 Achieve/exceed operational expectation, maintain power plant stability and assure
station’s operation efficiency.
 Connect & Disconnect Electrical Circuit.
 Administrative executive for the shift.
Plant Description : As described before
___________________________________________________________________________
Date : April1994 – March 2001
Employer : Upper Egypt Electricity Production Company (UEEPC)
Project : ASSIUT THERMAL POWER STATION
Job title : OPERATOR SHIFT ENGINEER
Job Description :
 Supervising casual labourers, entrepreneurs’ staff, etc.
 Checking round the plant according to instructions, taking readings of
instruments, gauges, etc.
 Lubricating, cleaning, adjusting and carrying out minor maintenance work on
equipment and machinery, as specified in the scheduled maintenance chart or as
instructed by the Shift Charge Engineer.
 Assisting the Shift Charge Engineer and the Control Room Technician with
operation of switching apparatus that cannot be remotely controlled from the
Control Room, trouble-shooting, etc.
 Assisting the Shift Charge Engineer in operational duties outside the Control
Room.
 Reporting abnormal observations, faults, etc. to the Shift Charge Engineer.
 Carrying out any other duties or instructions delegated.
 Making quality decisions and exercise sound judgment.
Freelancer 12/13 Magdy Hussine - CV
 Control of active and reactive power, voltage, current, temperature, etc. according
to settings.
 Start up, synchronize, lead and shut down units as required.
 In case of system disturbance, normalization of system through safe and
accepted switching procedures.
 Perform all switching that can be done from the control room.
 Monitor, control, record and report indications, alarms, trips, faults and
abnormalities observed.
Plant Description : As described before
‫ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
Additional Work:-
 In long maintenance period works as assistant maintenance engineer in parallel
with my basic work.
 Co-operating with Mitsubishi Company in internal chemical cleaning of 1085
Ton/hour water tube boiler.
 Working in external chemical cleaning of super heaters & reheaters of 1085
ton/hour steam generator.
 Working in internal chemical cleaning of condenser tube side.
References
Name Email Company Position Telephone
George Ioannou George.Ioannou@metka.gr
METKA COMMISSIONING
MANAGER
+302102709234
+306948250805
Nicole Roy
Nicol.roy@samsung.com
nroy11@gmail.com
SAMSUNG COMMISSIONING
MANAGER
+966515087805
Robert Taylor
bobandsunyang@hotmail.com
Robert.w.taylor@worleyparsons.com
Worley
parsons
COMMISSIONING
MANAGER
+966 13807 9827
+966503897540
Mathew Bird mattbird26@hotmail.com SAMSUNG
Mechanical
Commissioning
Manager
+447452370362
MR. FERDINAND
SLUPINA
ferdinand.slupina@cosinus-phi.com COSINUS
PHI
HR MANAGER +491703203142
MR. FRANK
HAENTSCHEL
frank.haentschel@de.abb.com
ABB COMMISSIONING
MANAGER
+496213818204
MR. ROBERT
PENTEN
pentenr@aol.com
NEM OPERATION
MANAGER
+441777704170
MR. THOMAS
SCHOLZ
thomas.scholz11@freenet.de
NEM COMMISSIONING
MANAGER
+306949210414
MR. KANAI
SADAMICHI
kanai.sadamichi@toshiba-tpsc.co.jp
TOSHIBA SITE MANAGER
+81455007611
Freelancer 13/13 Magdy Hussine - CV

More Related Content

What's hot

Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument SupervisorSatish Patel
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016Iain Loudon
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianJignesh P. Patel
 
Mechanical Engineer CV.1
Mechanical Engineer  CV.1Mechanical Engineer  CV.1
Mechanical Engineer CV.1Ashraf Moussa
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineerankur sood
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin Baldelovar
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERNguyen Thuc
 

What's hot (20)

Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance Technician
 
Mechanical Engineer CV.1
Mechanical Engineer  CV.1Mechanical Engineer  CV.1
Mechanical Engineer CV.1
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
CV
CVCV
CV
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
David's resume'
David's resume'David's resume'
David's resume'
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
Colin Officer - Resume
Colin Officer - ResumeColin Officer - Resume
Colin Officer - Resume
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
Ali Raza CV(Final)
Ali Raza CV(Final)Ali Raza CV(Final)
Ali Raza CV(Final)
 
parveer
parveerparveer
parveer
 
Kamal resume
Kamal resumeKamal resume
Kamal resume
 

Viewers also liked

Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updatedramy mikhail
 
Ali Khater's Resume
Ali Khater's ResumeAli Khater's Resume
Ali Khater's ResumeAli Khater
 
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERAZHAR QAZI
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cvmustafaghazy
 

Viewers also liked (6)

Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 
my_c_v__2017
my_c_v__2017my_c_v__2017
my_c_v__2017
 
Ahmed10
Ahmed10Ahmed10
Ahmed10
 
Ali Khater's Resume
Ali Khater's ResumeAli Khater's Resume
Ali Khater's Resume
 
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 

Similar to Magdy hussine cv (20)

Magdy Hussine CV
Magdy Hussine CVMagdy Hussine CV
Magdy Hussine CV
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
 
Karlo B. Reyes CV
Karlo B. Reyes CVKarlo B. Reyes CV
Karlo B. Reyes CV
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
Ahmed CV 2016
Ahmed CV 2016Ahmed CV 2016
Ahmed CV 2016
 
RESUME
RESUMERESUME
RESUME
 
sengu cv
sengu cvsengu cv
sengu cv
 
Elrique Mckay - CV 2016
Elrique Mckay - CV 2016Elrique Mckay - CV 2016
Elrique Mckay - CV 2016
 
Resume
ResumeResume
Resume
 
nsrpcv
nsrpcvnsrpcv
nsrpcv
 
REY CV
REY CVREY CV
REY CV
 
Resume
ResumeResume
Resume
 
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Hari Maintenance
Hari MaintenanceHari Maintenance
Hari Maintenance
 
Osama's_CV
Osama's_CVOsama's_CV
Osama's_CV
 
nsrpcv
nsrpcvnsrpcv
nsrpcv
 

Recently uploaded

LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 

Recently uploaded (18)

LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 

Magdy hussine cv

  • 1. Magdy Hussine Commissioning and start up leader engineer With a B.Sc. and upper gradual diploma degree in mechanical engineering and 21 years' experience in fossil fuel power plants from testing through start up and operation, Mr. Hussine is an expertise in this filed. He has also the complete knowledge and experience in electrical, I&C, firefighting, HVAC and hydrogen generation systems start-up and operation requirements. He is capable to prepare and put in order the complete turnover packages for different systems and to execute their performance testing. He has very high managerial and communication skills beside his technical capabilities. PERSONAL INFORMATION: - Name : Magdy Hussine Hammid Date of Birth : 4th May 1967 Marital Status : Married Nationality : Egyptian Religion : Moslem Military Service : Done Passport no : a08646632 Place of Issue : Egypt - Assiut Date of Issue : 14/02/2013 Date of Expiry : 13/02/2020 Language : Arabic / English Technical Qualification : Field, Control, Shift charge, and Senior Eng. Professional Experience : Thermal Power Plant Present Job : SAMSUNG C&T Commissioning and start-up team leader CURRENT ADDRESS: - Country : Egypt Address : Asyut Mobile Phone : +201097498565 Email : magdyhussine109@yahoo.com magdyhussine@gmail.com EDUCATION: - Freelancer 1/13 Magdy Hussine - CV
  • 2. 1. Post graduate Diploma of Mechanical Engineering in Thermal Power Engineering with general grade very good in June 2001 from Assiut University. 2. B.Sc. of Mechanical Eng. In Thermal Power Engineering with General Grade Pass in May 1993 from Assiut University. TRAINING COURSES: 1. Advanced training of operation power station in Abu-Kerr thermal power plant. 2. Training course in North Cairo training centre. 3. In-site training in Assiut power plant. 4. M.S. project 2007course in New Horizons computer learning centre. 5. Excel 2007 course in New Horizons computer learning centre. 6. Word 2007 course in New Horizons computer learning centre. 7. Power Point course in Assiut power plant. COMPUTER SKILLS: 1. Dos, Windows 95, 98, Me, 2000, Xp, Vista, Seven and Windows 8 2. M.S. Project 3. Microsoft office 4. Windows applications. 5. Fortran Control Systems Experience: 1. Ovation 3.5.0 2. ALSBA 6.2.4.0 3. SPPA-T3000 4. ABB INDUSTRIAL IT- PGP version 4.1 service pack 3. 5. Yokogawa Centum CS 3000. 6. ABB INDUSTRIAL IT - 800XA SV5.1 7. Xp teleperm (TXP) 8. TLan – 90 PCV 4.3C(QNX) 9. Tosbac7/40E LANGUAGE CAPABILITIES: • Arabic (native language) • English (fluent) EXPERIENCE RECORD: Date : 22/4/2015 – 06/9/2015 Employer : METKA Project : SAMRA Phase 3 (SEPCO) (450 MW) PROJECT POWER PLANT IN Jordan Job title: Reliability and Performance/Shift Charge Engineer/Operation Trainer Job Description :  Spearheaded the entire operations of 450 MW power plant.  Making daily technical reports about the unit's abilities & efficiencies for the commissioning manager.  Modification, finalizing and testing the plant logic.  Testing the one pushbutton starting up after making the required modification.  Performing Equipment change over and tests. Freelancer 2/13 Magdy Hussine - CV
  • 3.  Successfully Participated executed plant performance test and enhance unit efficiency.  Successfully executed reliability test.  Monitored plant performance regularly and recommended changes to enhance the efficiency of the plant operations.  Conducted field “walk-down” activity to identify & analyze corrective and preventive action.  Monitoring plant parameters, trouble shooting, first line maintenance activities, isolations and de-isolations of plant equipment.  On site operation trainer for the client stuff.  Receive and carry out instructions from the Project management.  Maintain files and records of instructions, memoranda, etc. in good order.  Keep records of operations, faults, switching, forced signals conditions, etc.  Hands over the plant from maintenance in line with the operation schedules and requirements.  Responding effectively to operational demands and assist in achieving safe and efficient generation.  Start up, synchronize, lead and shut down units as required.  In case of system disturbance, normalization of system through safe and accepted switching procedures.  Perform all switching that can be done from the control room. Plant Description: Samra electric power company (SEPCO) 1150 MW project is approximately 35 km north of Amman on the outskirt of Alhashmia/Zarka city in Jordan. The facility is a 2 x 2 x 1 combined cycle configuration consisting of:  Two ALSTOM GT13E2 gas turbine  Two ALSTOM HRSG triple pressure reheat cycle  One ALSTOM VLB - HCY050/1 - ALM - MCG250 / NE33GA Steam Turbine 148.2 MW two casing triple pressure reheat  Direct air cooled condenser ______________________________________________________________________ Date : 8/6/2013 – 31/3/2015 Employer : SAMSUNG C&T Project : QURAYYAH IPP 4100 MW PROJECT POWER PLANT IN KSA Job title: COMMISSIONING, START-UP and OPERATION TEAM LEADER Job Description :  Applying the project Commissioning Plan in the execution of the work  Lead and coordinate Commissioning activities.  Lead and coordinate Operation activities.  Reporting to the SAMSUNG C&T Commissioning manager.  Conducts meeting with commissioning manager to review testing, commissioning progress and HSE conformance on daily and occasionally more frequent basis as well as meetings with the vendors to resolve any equipment related problems.  Analyses and addresses critical areas of progress/delays in testing and commissioning.  Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.  Supervises logistics administration, field engineering, material approvals, coordination with Client, planning, Progress monitoring & cost control.  Managing and coordination with different subcontractors working at site Freelancer 3/13 Magdy Hussine - CV
  • 4.  Mobilizes manpower as per the commissioning schedule. Coordinates with other departments/ agencies to resolve interface problems.  Carries out a detailed assessment of the work involved in the individual group as well as discipline with respect to the commissioning and assess the available resources and possible constraints in the execution  Carries out detailed analysis of plant commissioning, assessing the requirements of special tools /temporary facilities/equipment required for pre-commissioning and commissioning, prepare Equipment/Tools list and initiate procurement.  Balancing between schedule, quality, cost and customer satisfaction.  Conduct commission ability reviews of project documents  Study the engineering / technical documents/vendor information and prepare procedure for systematic and sequential pre-commissioning /commissioning / startup of plant.  Prepares commissioning schedule based on the quantum of job and duration for each activity as well as prioritize system requirements.  Creates elaborate commissioning plan including the scope of commissioning activities, duration for each, scope of interlinked activities, resources available, commissioning material requirements as well as availability of tools and machinery  Making commissioning procedure for condensate system, feed water system, demine water system, closed cooling system, firefighting system, fuel oil system, fuel gas system, chlorination system, water treatment system, desalination system, GT inlet air chiller system, compressed air system, draining system, HP/LP bypass systems and lube & lifting & hydraulic oil systems.  Independently conducting construction progress inspections.  Independently conducting commissioning inspections and execute commissioning tests based on documented procedures  Ensures all construction activities are completed prior to taking up the system for commissioning.  Participates in pre-construction Engineering reviews and project planning.  Participates in management of change for engineering and construction of the project.  Follows construction progress and participates in solving construction and installation problems.  Supervise and perform flushing, chemical cleaning and steam bow.  Supervise steam/water sampling system, safety (relief) valves, flue gas analyzing system, chemical cleaning Vendors …etc.  Review or approve implement a Testing and Commissioning Plan, Method Statements, Testing and Commissioning Reports and/or validate or invalidate testing and commissioning results for this discipline.  Leading the pre commissioning the (Start-up) steam blowing.  Arranges to prepare a check/punch list of jobs after a pre-commissioning run and ensures their progressive clearance.  Participate in performance test.  Participate and leading the reliability test.  Managing all aspects of pre-commissioning, commissioning and operation checkout, through initial energizing, startup of the new process and associated systems.  Planning of 'on site' activities and allocation of available manpower on a daily basis.  Supervise and making CCC documents for plant handover.  Receiving from client and managing how to clear punch items for handing over. Plant Description: Freelancer 4/13 Magdy Hussine - CV
  • 5. The Qurayyah IPP 4000 MW project is approximately 100 km south of the Port of Dammam on the coast in the Eastern Province of the Kingdom of Saudi Arabia. The facility is a 2 on 1 combined cycle configuration consisting of:  Twelve (12) Siemens SGT6-PAC 5000F gas turbine generating units (GTGs).  Twelve (12) BHI HRSG (328T/H, 89BARS) HP, (46T/H, 8BARS) LP, Staggered, natural circulation type with horizontal gas turbine exhaust gas flow through vertical tube heat transfer sections heat recovery steam generators (HRSGs).  Rotor Air Cooler Kettle Boiler (RACKB) contains a single stage Kettle Boiler.  Six (6) Siemens SST6-4000 steam turbine generators (STGs).  Six (6) BHI Seawater cooled condensers.  241 x 3 M³/H Desalination plant.  95 x 3 M³/H Demine plant  Six (6) Bypass deaerator  Three (3) x50% HYOSUNG Deaerator feed water pump per each module.  Three (3) x50% TORISHIMA Feed water pump per each module.  Two (2) x100% HYOSUNG Condensate extraction pumps per each module.  Twelve (12) x 100% HYOSUNG GOODSPRINGS circulating pump.  Two (2) Stellar Energy (SE) GT inlet air cooling (TIAC) 46144 TR. Leave reason: End of Project. ______________________________________________________________________ Date : 1/10/2011 – 31/3/2013 Employer : ANSALDO CALDAIA Project : ABU-QIR POWER PLANT IN EGYPT Job title: COMMISSIONING, START-UP and OPERATION TEAM MANAGER Job Description :  Lead and coordinate Commissioning activities.  Lead and coordinate Operation activities.  Reporting to the Ansaldo Commissioning manager.  Conducts meeting with contractors, consultant’s designers, and asset holder department(s),as and when necessary, to review testing, commissioning progress and HSE conformance on daily and occasionally more frequent basis as well as meetings with the vendors to resolve any equipment related problems.  Analyses and addresses critical areas of progress/delays in testing and commissioning.  Ensures that all safety and precautionary requirements and procedures are followed during the commissioning process in line with the commissioning schedule.  Supervises logistics administration, field engineering, material approvals, coordination with Client, planning, Progress monitoring & cost control.  Mobilizes manpower as per the commissioning schedule. Coordinates with other departments/ agencies to resolve interface problems.  Carries out a detailed assessment of the work involved in the individual group as well as discipline with respect to the commissioning and assess the available resources and possible constraints in the execution  Carries out detailed analysis of plant commissioning, assessing the requirements of special tools /temporary facilities/equipments required for pre-commissioning and commissioning, prepare Equipment/Tools list and initiate procurement.  Study the engineering / technical documents/vendor information and prepare procedure for systematic and sequential pre-commissioning /commissioning / start up of plant.  Prepares commissioning schedule based on the quantum of job and duration for each activity as well as prioritize system requirements. Freelancer 5/13 Magdy Hussine - CV
  • 6.  Creates elaborate commissioning plan including the scope of commissioning activities, duration for each, scope of interlinked activities, resources available, constraints regarding the same, as well as availability of tools and machinery  Making commissioning procedure for air and flue gas system, fuel oil system, fuel gas system, feed-water and steam system, soot blower system and auxiliary steam system.  Ensures all construction activities are completed prior to taking up the system for commissioning.  Analyses the scope as per contract and battery limit /guarantees  Participates in pre-construction Engineering reviews and project planning.  Participates in management of change for engineering and construction of the project.  Follows construction progress and participates in solving construction and installation problems.  Supervise and perform flushing, chemical cleaning and pass water of piping.  Supervise steam/water sampling system, safety (relief) valves, flue gas analyzing system, chemical cleaning, etc Vendors.  Pre commissioning the (Start-up) Boiler steam blowing.  Arranges to prepare a check/punch list of jobs after a pre-commissioning run and ensures their progressive clearance.  Managing all aspects of pre-commissioning, commissioning and operation checkout, through initial energizing, startup of the new process and associated systems.  Planning of 'on site' activities and allocation of available manpower on a daily basis.  Provides technical as well as manpower support to client during initial operation Plant Description: 2x650 Mw steam power plant in EGYPT ALEXANDRIA ABU-QIR including:  ANSALDO 2067 T/Hr SH flow, 1729 T/Hr RH flow, front & rear burners low NOX burner TEA-BA dual fired (N.G./HFO) drum type, natural water circulation, reheat boiler with 2 x 50%FD/GR fans, air heater, Soot blowers, CEMS, etc.  MITSUBISHI STG with HP, IP and LP cylinders, H2 cooled Generator and see water cooled Condenser with HP, LP Steam Bypass systems.  BOP including 8 Stage regenerator feed water heaters, Circulating water, 2x 50% TFWP and 1x 30% MFWP for start-up, Closed cooling water, Compressed air, EDG, Fuel handling, Ball cleaning and H2 production Systems. Leave reason: End of Project. ______________________________________________________________________ Date : 1/2/2011 – 30/9/2011 Employer : EGYPTROL Project : HEAD OFFICE Job title: MECHANICAL COMMISSIONING, OPERATION and START-UP LEADER ENGINEER Job Description :  Support company stuff that supplied to other companies.  Making commissioning procedure for gas turbine auxiliaries, boilers and its auxiliaries, Desalination plant, CLOSED COOLING system, service water system and power plants various systems  Preparing commissioning bidders.  Participates in getting ISO9001-2008 CERTIFICATE ______________________________________________________________________ Date : 4/12/2010 – 8/12/2010 Freelancer 6/13 Magdy Hussine - CV
  • 7. Employer : ABB ENERGIETECHNIC Project : DOHUK GAS POWER STATION Job title: OPERATION and START-UP MANAGER ENGINEER Job Description :  Lead and coordinate Commissioning activities.  Lead and coordinate Operation activities.  Reporting to the site manager.  Planning the various commissioning activity.  Conducts meeting with contractors, consultant’s designers and asset holder department(s),as and when necessary, to review testing and commissioning progress on daily and occasionally more frequent basis.  Analyses and addresses critical areas of progress/delays in testing and commissioning.  Ensure the setting up of safety and precautionary requirements.  Participates in pre-construction Engineering reviews and project planning.  Participates in management of change for engineering and construction of the project.  Arranges to prepare a check/punch list of jobs after a pre-commissioning run and ensures their progressive clearance.  Follows construction progress and participates in solving construction and installation problems.  Supervising pre operational, operational and load performance activities.  Making on-site training for client engineers. Plant Description: 4 x125 MW Simple cycle power project in IRAQ KURDISTAN DOHUK including:  GE Gas turbine frame 9E  Water-to-Air-Cooled 9A4 Generator with Brushless Excitation Leave reason : Death of my son ______________________________________________________________________ Date : 20/3/2010 – 30/11/2010 Employer : NEM Project : EL-ATF POWER STATION PROJECT Job title: MECHANICAL COMMISSIONING TEAM LEADER, OPERATION and START-UP MANAGER ENGINEER Job Description :  Lead and coordinate Commissioning activities.  Lead and coordinate Operation activities.  Reporting to the Commissioning manager.  Conducts meeting with contractors, consultant’s designers and asset holder department(s),as and when necessary, to review testing and commissioning progress on daily and occasionally more frequent basis.  Analyses and addresses critical areas of progress/delays in testing and commissioning.  Ensure the setting up of safety and precautionary requirements.  Participates in pre-construction Engineering reviews and project planning.  Participates in management of change for engineering and construction of the project.  Follows construction progress and participates in solving construction and installation problems.  Supervise and perform flushing, chemical cleaning and pass water of piping. Freelancer 7/13 Magdy Hussine - CV
  • 8.  Supervise chemical dosing system, steam/water sampling system, safety (relief) valves, flue gas analyzing system vendors.  Pre commissioning the (Start-up) Boiler steam blowing.  Arranges to prepare a check/punch list of jobs after a pre-commissioning run and ensures their progressive clearance.  Inspection for de-aerator feed water tank, steam silencers, ducts, internal and external insulation, expansion joints, bumpers, hangers, pipe support and steel structure.  Managing all aspects of pre-commissioning, commissioning and operation checkout, through initial energizing, startup of the new process and associated systems.  Commissioning of condensate preheat recirculation pumps and putting it in service.  Conducting the function test for motorizing and control valves.  Startup HRSG for Blow out and normal operation.  Putting into service the two HRSG’s.  Supervising pre operational, operational and load performance activities.  Complete reliability run and performance test as per the client’s request.  Responsible for managing Facilities Performance Test in line with design parameters.  Participates in tuning all controllers to get units to optimum performance.  Trip testing and interlocks.  Testing the set values of ERV, relief valves, automatic opening and closing for motorizing valves and annunciation.  Assists in setting up of necessary mechanism for prompt complaint rectification during defects liability period  Production and submission of all work permits relating to commissioning and operation activities.  Planning of 'on site' activities and allocation of available manpower on a daily basis.  Participates in communicates with all project stake holders in a logical, systematic and timely manner.  Completes necessary documentation for project turnover to client.  Plant handover at the end of contract.  Making on-site training for client engineers.  Develops the Punch list Management Process with the Owner and consultant.  Supervises witnessing and certification of system/equipment during mechanical completion tests, guarantee runs.  Assists in managing smooth handing-over of facilities to the Asset Holder Plant Description: 1x750 MW combined cycle power project in EGYPT DAMANHOUR ATF including:  2x250 MITSUBISHI Gas turbine, H2 Cooled generator.  Two NEM HEAT RECOVERY natural circulating 2 x 340 T/Hr, 128 Bar, 566 C˚ each comprising HP system, reheater system, IP system, LP system, condensate preheat system, steam/water sample system, flue gas analyzing system (CEM), one de-aerator including feed water storage tank, chemical dosing system, and two condensate preheat recirculation pumps  1x250 ANSALDO ENERGAIA Steam turbine, H2 Cooled generator. ______________________________________________________________________ Date : 11/11/2009 – UP to 1/3/2010 Employer : ABB ENERGIETECHNIC AG Project : Barrage Cheliff M.A.O. WATER PUMPING PLANT Freelancer 8/13 Magdy Hussine - CV
  • 9. Job title: MECHANICAL COMMISSIONING TEAM LEADER AND OPERATION MANAGER ENGINEER Job Description :  Lead and coordinate Commissioning activities.  Lead and coordinate Operation activities.  Reporting to the site manager.  Ensure the setting up of safety and precautionary requirements.  Making heat run test for all motors and pumps.  Making flushing for pipelines.  Making operation procedure for the plant to feed water treatment 5 km away and sending water to storage 9 Km away.  Leading 9 Km pipelines filling without auto vent valves. Plant Description : 68400 m3/hr water pumping project at ALGERIA / MOSTAGANEM / ARZUE /ORAN (M.A.O.) including:  5 Flowserve pumps, 5700 m3/hr capacity and 203 m head to supply water to a reservoir located at 5 km distance and 271 m height for providing water to Oran at 150 km distance.  7 Flowserve pumps, 5700 m3/hr capacity and 156 m head to supply water to Kerrada Dam located at 7 km distance and 92 m height for storage. ____________________________________________________________________________ Date : 1/7/2009 – 10/11/2009 Employer : TOSHIBA (TPSC/TTC) Project : EL-ATF POWER STATION PROJECT Job title: MECHANICAL COMMISSIONING TEAM LEADER AND OPERATION MANAGER ENGINEER Job Description :  Lead and coordinate Commissioning activities.  Lead and coordinate Operation activities.  Prepare procedure and schedule for systematic and sequential pre commissioning / commissioning / start-up/ operation of plant from the engineering / technical documents / vendor information.  Reporting to the site and project manager.  Holds regular review meetings with the consultant and client.  Supporting cp101 in reliability test for Gas turbine.  Ensure the setting up of safety and precautionary requirements.  Follows construction progress and participates in solving construction and installation problems.  Making heat run test for all motors and pumps.  Making flushing for Potable water system, raw water system, air conditioning, fuel oil system, circulated water system, sump pump, condensate system, feed water system, chemical cleaning for the condensate and feed water systems.  Complete reliability run and performance test as per the client’s request.  Delivers Training to Operators and Maintenance team, ensures operators training level is adequate.  Ensures that allocated commissioning systems reach milestone targets in due time as per schedule, and considering multi disciplines vision...  Participates in pre-construction Engineering reviews and project planning  Participates in management of change for engineering and construction of the project.  Controls and validates tests results.  Signs Tests sheets. Freelancer 9/13 Magdy Hussine - CV
  • 10.  Planning of 'on site' activities and allocation of available manpower on a daily basis.  Requests and defines Permit to Work and related documentation for commissioning activities.  Follows project schedule targets.  Prepares and reviews Commissioning documentation (procedures, method statements).  Managing all aspects of pre-commissioning, commissioning and checkout, through initial energizing, heat-up and startup of the new process and associated systems.  Communicates with all project stake holders in a logical, systematic and timely manner.  Completes necessary documentation for project turnover to manufacturing. Plant Description : As described before ______________________________________________________________________ Date : 3/4/2009 – 30/6/2009 Employer : EGYPTROL as subcontractor for TOSHIBA (TPSC/TTC) Project : EL-ATF POWER STATION PROJECT Job title : MECH. COMMISSIONING MANAGER ENGINEER Job Description :  Leading the commissioning team for the commissioning of combined cycle operation with the mechanical works contract (CP-118) –Toshiba plant systems & services Co.  Making flushing for closed cooling system, Demi water system, service water system, firefighting system, air compressor system, service gas system and lubrication water system Plant Description : As described before ______________________________________________________________________ Date : 15/1/2008 - 3/4/2009 Employer : UPPER EGYPT ELECTRICITY PRODUCTION COMPANY (UEEPC). Project : ASSIUT THERMAL POWER STATION Job title : OPERATION MANAGER Job Description :  Lead and coordinate station operation activities.  Manage and prioritize workloads.  Make analyses for operation trouble-shooting.  Prepare procedure for systematic and sequential pre commissioning / commissioning / start-up of plant after maintenance from the engineering / technical documents / vendor information.  Supervise work according to routine maintenance schedules for plant and equipment.  Ensure the setting up of safety and precautionary requirements and procedures are followed before, during and after maintenance.  Making daily technical reports about the unit's abilities & efficiencies for Operation Manager.  Team leader & coordinator of operation activities schedules with other internal departments and with the dispatch centre.  Provide effective support to the team to maximize the contribution made to the plant objectives. Freelancer 10/13 Magdy Hussine - CV
  • 11.  Delegates effectively and creates a work climate where people succeed and empowers people to take action.  Demonstrates the ability to influence events and achieve objectives to time and budget.  Holds regular review meetings with the maintenance departments to resolve any equipment related problems  Trainer for operation engineers. Plant Description: 2 x 312 MW steam power plant in EGYPT / ASIUT including:  MITSUBISHI ball firing dual fired (N.G. /HFO) drum type, forced circulation, reheat boiler with 2 x 50% FD /GR fans, air heater, Soot blowers, etc.  ANSALDO front & rear burners dual fired (N.G./HFO) drum type, natural water circulation, reheat boiler with 2 x 50%FD/GR fans, air heater, Soot blowers, etc.  Toshiba STG with H, IP and LP cylinders, H2 cooled Generator and FRANCO TOSI river water cooled Condenser with C.H. ZIKESCH GMBH. HP, SULZER LP Steam Bypass systems.  ANSALDO STG with H, IP and LP cylinders, H2 cooled Generator and river water cooled Condenser with REXROTH HP/LP Steam Bypass systems.  BOP including 7 Stage regenerator feed water heaters, Circulating water, 2x 50% MFWP and 1x 100% TFWP, Closed cooling water, Compressed air, EDG, Fuel handling, Ball cleaning, Aux Boiler and TELEDYNE ENERGY H2 production Systems. ____________________________________________________________________________ Date : 14/10/2007–14/1/2008 Employer : KOCH/SIEMENS CONSORTIUM. Project : AL-NASERRIA POWER PLANT EXTENSION Job title : START UP /SHIFT CHARGE ENGINEER. Job Description :  Responsible for conducting plant start-up activities during the shift  Maintain efficient power plant stability during performance, reliability and grantee, tests Plant Description : 3X115 Combined Cycle Plant in Syria DAMASCUS comprising:  3 Fiat Avio gas turbine, 115 Mw each  One Siemens Steam Turbine 150 Mw with HP & LP casing.  Siemens Air Cooled Generator.  HP & LP bypass system,  Direct contact jet condenser cooled by dry air cooling tower.  NEM HRSG with HP & LP drums and forced recirculation pumps.  BOP including: HP & LP feed water pumps, RO Demi plants, Condensate polisher, Raw and sanitary water systems, etc. ____________________________________________________________________________ Date : Nov 2006–Oct 2007 Employer : Upper Egypt Electricity Production Company (UEEPC) Project : Assiut Thermal Power Station Job title : OPERATION MANAGER Plant Description : As described before ___________________________________________________________________________ Date : March 2001–Nov 2006 Employer : Upper Egypt Electricity Production Company (UEEPC) Project : ASSIUT THERMAL POWER STATION Freelancer 11/13 Magdy Hussine - CV
  • 12. Job title : SHIFT CHARGE ENGINEER Job Description :  Making daily technical reports about the unit's abilities & efficiencies for Head of Operation department.  Supervise and distribute work during the shift.  Receive and carry out instructions from the power station management.  Brief, instruct and train subordinate staff according to instructions issued.  Issue switching instructions prior to issuing a permit to work if the Operation Engineer does not issue them.  Carry out/supervise and ensure that safe and proper switching is carried out.  Issue Permit-to-Work, Sanction-for-Test and Limitation-of-Access in accordance with regulations.  Carry out switching as authorised by the management.  Maintain files and records of instructions, memoranda, etc. in good order.  Supervise personnel safety and report all hazardous events and accidents.  Report verbally, and in writing, any faults that have occurred.  Keep records of operations, faults, switching, hydrological conditions, etc.  Attend to faults that have occurred in order to rectify them himself or call for assistance as soon as possible (with due regard to instructions issued).  At shift change, inform the next shift about the current operating situation, orders, issued Permits-to-Work and any other matters that are necessary to know for the operation of the power station.  Hands over the plant from maintenance in line with the operation schedules and requirements.  Anticipating and responding effectively to operational demands and assist in achieving safe and efficient generation.  Achieve/exceed operational expectation, maintain power plant stability and assure station’s operation efficiency.  Connect & Disconnect Electrical Circuit.  Administrative executive for the shift. Plant Description : As described before ___________________________________________________________________________ Date : April1994 – March 2001 Employer : Upper Egypt Electricity Production Company (UEEPC) Project : ASSIUT THERMAL POWER STATION Job title : OPERATOR SHIFT ENGINEER Job Description :  Supervising casual labourers, entrepreneurs’ staff, etc.  Checking round the plant according to instructions, taking readings of instruments, gauges, etc.  Lubricating, cleaning, adjusting and carrying out minor maintenance work on equipment and machinery, as specified in the scheduled maintenance chart or as instructed by the Shift Charge Engineer.  Assisting the Shift Charge Engineer and the Control Room Technician with operation of switching apparatus that cannot be remotely controlled from the Control Room, trouble-shooting, etc.  Assisting the Shift Charge Engineer in operational duties outside the Control Room.  Reporting abnormal observations, faults, etc. to the Shift Charge Engineer.  Carrying out any other duties or instructions delegated.  Making quality decisions and exercise sound judgment. Freelancer 12/13 Magdy Hussine - CV
  • 13.  Control of active and reactive power, voltage, current, temperature, etc. according to settings.  Start up, synchronize, lead and shut down units as required.  In case of system disturbance, normalization of system through safe and accepted switching procedures.  Perform all switching that can be done from the control room.  Monitor, control, record and report indications, alarms, trips, faults and abnormalities observed. Plant Description : As described before ‫ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬ Additional Work:-  In long maintenance period works as assistant maintenance engineer in parallel with my basic work.  Co-operating with Mitsubishi Company in internal chemical cleaning of 1085 Ton/hour water tube boiler.  Working in external chemical cleaning of super heaters & reheaters of 1085 ton/hour steam generator.  Working in internal chemical cleaning of condenser tube side. References Name Email Company Position Telephone George Ioannou George.Ioannou@metka.gr METKA COMMISSIONING MANAGER +302102709234 +306948250805 Nicole Roy Nicol.roy@samsung.com nroy11@gmail.com SAMSUNG COMMISSIONING MANAGER +966515087805 Robert Taylor bobandsunyang@hotmail.com Robert.w.taylor@worleyparsons.com Worley parsons COMMISSIONING MANAGER +966 13807 9827 +966503897540 Mathew Bird mattbird26@hotmail.com SAMSUNG Mechanical Commissioning Manager +447452370362 MR. FERDINAND SLUPINA ferdinand.slupina@cosinus-phi.com COSINUS PHI HR MANAGER +491703203142 MR. FRANK HAENTSCHEL frank.haentschel@de.abb.com ABB COMMISSIONING MANAGER +496213818204 MR. ROBERT PENTEN pentenr@aol.com NEM OPERATION MANAGER +441777704170 MR. THOMAS SCHOLZ thomas.scholz11@freenet.de NEM COMMISSIONING MANAGER +306949210414 MR. KANAI SADAMICHI kanai.sadamichi@toshiba-tpsc.co.jp TOSHIBA SITE MANAGER +81455007611 Freelancer 13/13 Magdy Hussine - CV