1. KHALIL AHMED KHALIL AWWAD
+2 01284777722 (EGY ),+966 531250646 (KSA), Khalil_Awwad@yahoo.com
Looking for career enrichment opportunities in Project Management, Site Management, Field Service Operations,
Maintenance & Operations with a frontline organization
CAREER SUMMARY
A logically sound & stable professional with 22 years of experience in Planning, Project Management, Site
Management, Field Service Operations, Maintenance Operations and Team Management.
Presently working with East Delta Electricity Production Company as I&C Dept. Manager .
A keen planner, strategies & implementer with attained proficiency in project planning at given specific time, as
well as emergency basis.
Adroit at project planning, costing, budgeting, scope planning and various aspects of project management
including resource planning, resource hiring-training, scheduling, controlling (quality / process / schedule and
cost), deliverable management and direct client interface.
Strong abilities in holding review meetings to monitor progress of the project as per schedule, and ensuring timely
completion and delivery of the project to the client
Deft at conceptualizing and effecting process initiatives to enhance plant efficiency and productivity
Skilful in enhancing systems to bring greater cost efficiency levels & energy/ power reductions.
Adept at preventive and breakdown maintenance of various machineries. Skilful in enhancing systems to bring
greater cost efficiency levels & energy/ power reductions.
An effective communicator with demonstrated ease at managing/ leading team members; allocating resources and
guiding team members during project, till final delivery.
ORGANIZATIONAL EXPERIENCE
Since Oct15-present: East Delta Electricity Production Company, I&C Dept. Manager Al Arish Power Plant
Jan’10- Sept15: Emerson Arabia Inc., KSA as Field Service Engineer
Jan’05-Dec’09: Emerson Process Management (LBP) DCS Engineer – Ovation projects, Egypt
Oct’95-Dec’04: Egyptian Electricity Authority-East Delta Electricity Company as Senior I & C Engineer
(Al-Arish Power Station-Steam Turbine: 2 X 33 MW)
THE PROFESSIONAL SKILL SET
Project Management
Finalizing requirements and specifications in consultation with collaborators / promoters.
Anchoring on-site activities to ensure completion of project within the time & cost parameters and effective
resource utilization to maximize the output.
Participating in project review meetings for evaluating project progress providing technical inputs to
commissioning methodology. Liaising with consultants on determining technical/contractual matters.
Site Management/Resource Planning
Supervising all activities including providing technical inputs for methodologies & coordination with site
management activities.
Preparing and reviewing of Method Statements and Work Specific Quality Control Plans.
Visiting the site regularly &co-ordinating with other agencies for all the clearances required for site execution.
Evaluation & execution of Contracting Works.
Monitoring quality standards maintained, any deviations w.r.t approved layouts, B.O.Q, solve technical issues
if any, ensure proper documentation by site engg.
Co-ordination among consultants, contractors and clients and in house Architects.
Technical Service Operations
Planning service budgets, forecasts/operational plans & executing cost-saving measures at client end.
Supporting on technical aspects- product feedback, Presale inspections, Product demos, competitor’s products
comparison & technical discussions etc.
Ensuring immaculate service by servicing professional products at component level in the field.
Maintenance and Trouble Shooting
Planning and effecting preventive & predictive maintenance/overhauling/repair schedules of various
machineries & instruments to increase machine up time and long term equipment reliability.
Proactively identifying areas of obstruction/breakdowns and taking corrective measures/steps to rectify the
equipments through application of trouble shooting tools.
Ensuring all the machineries work efficiently by conducting timely checks & measures.
Erection & Commissioning
Preparing layouts for the project as per the process and material flow needs.
Foreseeing performance bottlenecks and taking corrective measures to avoid the same.
Site preparations, mobilization of contractors for carrying out erection activities.
Ensuring effective site management and discipline to ensure safe execution of the projects.
Erection, commissioning of equipments, providing utility services to the equipments.
Man Management
Supervising and monitoring the performance level of the staff for ensuring accomplishment of target.
Organizing regular periodic meetings & trainings to staff for discussing curreWE3nt work issues & devising
solutions for enhanced operations.
2. Noteworthy Contributions
Distinguished efforts in successful completion of various projects such as:
o Saudi Function End User System (May`15-Jun`15) as Site Manager for El Kurimat UEEPC (Upper Egypt Electricity
Production Company)-upgrade of WDPF to Ovation DCS of 1 Units 650 MW Steam Turbine.
o Saudi Function End User System (Dec`14-Mar`15) as Site Manager for Saudi Electricity Company involving Rabigh
Power Plant STG III Upgrade-MHI to Ovation 3.5.0 DCS; Brown Filed Project 2 Units X 250 MW Steam Turbine &
Common with team of 9 Emerson Engineers & 27 Sub-contractors.
o Saudi Function End User System (Nov`13-Dec`13; Mar`14-May`14) as Field Service Engineer for Yanbu II PP
Marafiq Ovation 3.5.0 DCS involving Green Filed Project 3 Units X 650 MW Steam Turbine , Demine Water
Treatment Plant & Common Marin Facilities.
o Saudi Function End User System (Feb`14-Feb`14) as Field Service Engineer for Hial PP SEC (Saudi Electricity
Company)-upgrading Ovation DCS from ver 2.2.0 to 3.5.05 Units X 50 MW Gas Turbine.
o Egypt Function End User System (Jun`14-Aug`14) as Site Manger for Ataka EDEPC (East Delta Electricity
Production Company) including Upgrade Ovation DCS from ver 2.2.0 to version 3.3.1 2 Units X 250 MW & 2 Units
X 350 MW (Steam Turbines).
o Saudi Function End User System (Sep`12-Nov`12) as Field Service Engineer for Tihama PP SEC (Saudi Electricity
Company)-upgrade Ovation DCS from ver 2.2.0 to 3.3.1 2 Units X 50 MW Gas Turbine.
o Egypt Period Function End User System (Aug`11-Nov`11) as Site Manager for Al Arish EDEPC (East Delta
Electricity Production Company) including Ovation DCS; 2 Units X 33 MW Steam Turbine & DEMIN Plant.
o Egypt Period Function End User Contractor (Jan`08-Jul`08) as DCS Senior Engineer for UEEPC (Upper Egypt
Electricity Production Company), Egypt involving SKODA / Emerson Process Management, El
o Kureimat II 750MW combined Cycle & Ovation DCS with team of 2 Engineers.
o Egypt Period Function End User Contractor (Aug`06-Nov`06) as DCS Engineer for East Delta Electricity
Production Company, Egypt Emerson Process Management-Damietta DCS Migration Project 3 Module combined
Cycle 1350 MW, ( 3 modules each 2X150MW + 1X150MW), Ovation DCS for 2 Engineers.
o Egypt Period Function End User Contractor (Jan`05-Sep`09) as DCS Engineer for EDEPC (East Delta Electricity
Production Company)-Egypt including Emerson Process Management-900 MW Steam, Plant 4 units
(2X300MW+2X150MW) replacing Siemens Control System by Ovation for Ataka power Station Modernization
project.
o Egypt Period Function End User (Oct`95-Jan`05) as Senior I & C Engineer for Al Arish Power station Steam
Turbine (2 X 33 MW).
PREVIOUS EMPLOYMENT
1994-1995 Compunics (Computer & Scientific Equipment) Company, Cairo
As Technical Support & Computer Maintenance Engineer
1994-1995 Multinational Force & Observers, North Sinai
As Production Control Specialist
EDUCATION OVERVIEW
1992 B.Sc. (Computer Engineering & Science)
Menoufia University (Faculty of Electronic Engineering in Menouf,
PROFESSIONAL ENHANCEMENT INITIATIVES
Courses:
Boiler Operation & Maintenance at BHEL India For Boiler Manufacture
Programmable Logic Control (PLC) by Nouva – Cimimontubi at El Arish Power Station
Distributed Control System (DCS ) by Nouva – Cimimontubi at El Arish Power Station
Instrument Maintenance of Thermal Cycle by Nouva – Cimimontubi at El Arish Power Station
Turbine & Generator Instrument Maintenance by Fuji Electric at El Arish Power Station
Boiler Operation & Field Instruments Maintenance by BHEL at Al Arish Power Station
OV200-WIN Building Ovation Control course at Warsaw
OV210-WIN Ovation Graphic course at Warsaw; OV240 - WIN Ovation eDB Historian course at Warsaw
2274+2275(Maintaining &Managing Microsoft Windows Server 2003)
EMA Power & water solution Service Certification Program at Warsaw
Field Service Training at EPM MEA,UEA, Dubai;
OV310 Advanced Ovation Graphic course at EPM, MEA,UAE,Dubai
Trainings Conducted at:
Saudi Al Shouqaiq SWCC for 20 Engineers (2 Weeks); Saudi Aramco Power Plant for 6 Engineers (1 Week)
Egypt Talkha MDEPC for 5 Engineers (1 Week); Egypt AL Arish EDEPC for 20 Engineers (2 Weeks)
Certificate: Certified Instructor OV010-WIN Ovation Windows Operator EPM MEA, UAE, Dubai
PERSONAL VITAE
Date of Birth: 17th
January, 1970
Address: Al Asawy St. From EL Fateh St-AlArish-North Sinai-Egypt
Nationality: Egyptian
Religion: Muslim
Linguistic Ability: Arabic & English