SlideShare a Scribd company logo
1 of 3
Ankur Sood Instrumentation & control engineer
Mobile: +919998954263 Email: ankusood@gmail.com /soodankur@rediffmail.com
I have nine+ years of experience as instrumentation and control engineer bachelor of
technology in Instrument & control engineering. I am looking to work with any one of the following position
as project engineer, commissioning engineer, instrumentation maintenance engineer, planner and instrument
Supervisor.
Job profile
Working as instrument engineer in 2 X 1.1 MMTPA PTA (Purified Terephthalic acid} plant at
petrochemical; complex of Reliance Industries Limited, Dahej Manufacturing Division with four years of
experience in Maintenance/ Operations and more than four years in execution of large scale projects
PROJECT ENGINEERING MANAGEMENT (PMT)
• HAZOP SIL review- IEC 61511/61508, Technical Bid evaluation, Vendor selection, Spec/documents review
& comments, inspection as per specs for all types of Field Instruments, DCS, ESD, F&G system, Foundation
Field bus instruments, Overall responsible for Commissioning of Control Room in co-ordination with
Civil/Electrical/Mechanical and Operations
• FAT/SAT - FACTORY TESTING for Distributed Control Systems DCS, Emergency Shutdown systems
ESD, Fire & Gas F&G detector systems, Analysers, Bently Condition monitoring system and other 3rd party
PLC packages
• Electrical installations in hazardous areas as per intrinsic safety, IP rating, ex proof, NEMA, zone, area and
group classification
• I & C CONSTRUCTION MANAGEMENT: Site Instrument Installation, Inspection & Contractors overall
monitoring , check-SMART Field Instruments viz., Transmitters-pressure, temperature, flow, level, Gauges,
I/P converters, control valves, SMART positioners,switches, nucleonic level detectors
• PRE-COMMISSIONING, COMMISSIONING, START-UP & PROJECT HAND-OVER: Loop check Test
pack Review (Instrument Index/ Loop diagram/ P&ID/ Cause & Effect/ Alarm & Trip points/ Calibration &
Inspection reports) verification & punch closing, Mechanical Completion Inspection, DCS & ESD Logic
FUNCTION test for as per cause & effect matrix to ensure process and equipment safety for critical process
equipments like compressors, turbines, expander, furnaces , boilers, distillation columns after checking of
trips and interlocks with licensor ,operations team
ENGINEERING & MAINTENANCE – OIL & GAS REFINERY/ PETROCHEMICAL
• Leading a team of engineers, executives and workers with the objective of increasing unit efficiency,
reliability, availability, and maintainability.
• Preparation and ensuring compliance of instrument calibration reports, checklists ,SMP (Standard
Maintenance Procedures Manual) and training subordinates on them
• SAP job planning, scheduling, permit request with LOTO,TBRA (cold, light hot, heavy hot, work at height,
excavation, confined space entry), risk assessment ,permit closure, maintaining job history,
• Preparation of annual maintenance budget for existing plants & new projects
• Investigating failures, reliability issues using methods like why-why, fishbone analysis, PHA and
completing their recommendations
• Involved in planning and implementation of Pre-Shutdown and Shutdown Activities.
• Analysing trips, abnormal alarms in the system from trip logs, SOE recorders, historical trends and rectifying
those faults to take back systems online
• Preparing daily, monthly reports , trip reports and presenting them to the management with learning’s to be
implemented
• Making list of critical inventory ,SAP codification ,getting quotation from various vendors analysing
technical bids and inspecting materials before final acceptance
• Implementing new technological changes, system improvements after thorough study and following standard
procedures like CAPEX, MOC (management of change), SCR (site change request), PSSR as per PSM
module Apply and
• Worked on all types of field instruments and having strong knowledge of design basis for selecting
instruments with applicable codes and standards
• Vibration: magnetic pickups, acceleration, velocity probes, proximeter, calibration using vobulator, shaker
table , Bently 1900/3300/3500 monitoring systems
• Flow/level/pressure transmitters: ultrasonic, electro-magnetic, coriolis, ultrasonic, DP type, level
transmitters radar, sealed diaphragm , bubbler ,servo type, guided wave radar type, RTD, thermocouple,
temperature gauges installation ,calibration and troubleshooting
• Valves : calibration, stroke checking, SMART positioner, valve internal checking and replacements
• Flame scanners (IR-UV type), repair, troubleshooting and maintenance
• Calibration & testing with hand held HART/FF HART calibrators, loop calibrators, temperature bath, dead
weight tester etc
• Custody transfer FLOW METERS – Periodic Calibration, Authority approval & License Requirements
Knowledge of Control systems
• HONEYWELL TDC3000, YOKOGAWA CENTUM C300 DCS, Emerson Delta-V DCS ,ESD systems
• Allen Bradley RSLOGIX PLC/5/40/SLC
• RTP make 3000D for fire & gas monitoring system
• HIMA H41/51 Burner management system for boilers
• GE MARK-V/ GE MARK-VIe gas turbine governing system
• WOODWARD NETCON 5000/ INVENSYS TRICONEX steam turbine governing system
• Bently Nevada 3300/3500/1900 vibration monitoring system
• Invensys make terminal automation system (TAS) for product transfer department
• Knowledge of Industrial communication protocols: HART/SMART, OPC, serial, foundation fieldbus
Modbus, TCP/IP communication fibre optic communications, Ethernet, TCP/IP, RS232/485 etc.
• Knowledge of surge control for centrifugal compressors
PROFFESSIONAL JOB EXPERIENCE
September 2014 till date at Reliance Industries Limited working
• Instrument lead for project execution philosophy for PTA plant which included inspection of received
instruments/Proper preservation/preparation of erection schedule/commissioning activities
• Analysing causes of failures, trips in plant and taking preventive actions to avoid repetition in future
September 2013 to September 2014 at Reliance Industries Limited
• Workings as a lead engineer in central engineer services was responsible for installation of complex vide fire
and gas detection network having fibre optic connectivity and central monitoring facility at main fire station
• Developed the philosophy for fire and gas system systems for loss prevention and implementation at site
• Attended Factory acceptance tests, design review meetings with vendors, core engineering teams to fine tune
the F&G system
• Installed central monitoring system for F&G at main fire station for central monitoring of all plants
September 2007 to September 2013 at Reliance Industries Limited
• Water purification plants with filter chains, membrane separation , raw water treatment plants, cooling towers
• Combined cycle, cogeneration power plants with gas/ steam turbines, HRSG & utility boilers, steam
desuperheating stations, fuel handling and storage systems
• Air separation plant/compressor house: Work experience on centrifugal and reciprocating type air
compressors with PLC control, expansion turbines, driers and storage bullets for oxygen
• Product transfer department: Automatic loading gantry, Terminal automation system (TAS), weigh bridges
• Maintaining following online analyzers for reliable operation of power plant & utilities
i) Steam water analysis (SWAS) room analyzers like pH, conductivity, silica, sodium, dissolved
oxygen, O2 sensors in boilers for combustion control, toxic, fire & gas detectors
ii) CEMS Erection and commissioning of analyzer (CO/SO2/NOx/O2/opacity) to monitor and control
the emission of pollutants levels through the stack as per government regulations
• Handled Emergency in CPP plant like gas turbine fire, power black out
• Prepared study report to convert total relay based panel to PLC based logic project under implementation
Sept’06 to Sept ’07 Reliance Industries Limited Field Operations & Panel Engineer
Undergone process training in CPP and process plants which included
• Study process, PFD study & PID study, boiler, furnace, distillation column controls, start up and shutdown
procedure, Interlock study
• Two months training in Mechanical department which included study of Pumps, Compressors, Heat
Exchangers, Vessels
• Two months training in Electrical department of plant which included overview of power distribution in
complex and single line diagram of plant
• Full Charge of Shift related Maintenance activities, Manpower & Job Planning & Inventory
management of CPP1 & other Utility plants
Process Safety
Totally committed towards safety at work place and following safe work practices
• Team member for completion of process hazard analysis (PHA), IMS module ISO (9001, 14001) OHSAS-
18001. HAZOP, 5S, Mechanical Integrity and Quality Assurance (MIQA), Contractor Safety Management
(CSM) BSC, Du-Pont safety standard
• Ensuring compliance to all relevant safety, quality and environmental management procedures ,reporting
near miss observations, field audits for contract supervisors and workers, sharing safe work practices with
them
Trainings attended
• Attended one week training and inspection of RTP PLC for F&G network at pompano beach Florida at
united states of America
• Attended 5 day training on GE mark-VI-e control system.
• Attended 5 days company sponsored training of Bently 3500 vibration monitoring system
• Attended 5 day training on process hazard analysis
IT Skills
Operating systems Windows XP, 7, NT, 2008 Server, Office Tools, AutoCAD
Comfortable with latest technologies and always looking to update my knowledge with changing trends
Educational Qualifications
Qualification School/college Year Subject Percentage
Matriculation St Edwards high school 1999 Maths,science,english etc 78%
Diploma Indo swiss training centre 2003 Instrument Technology 65%
B.Tech JMIT radaur,Kurukshetra university 2006 Instrumentation & control 76%
Personal Details:
Sex : Male
Marital Status : Married
Nationality/religion : Indian / Hindu
Children : Daughter 3 1/2 years old
Passport : L4233298 Approved B1 VISA for United States of America till 2023
Date of birth : 30.06.1983
Current Address Permanent Address
FLAT NO-59, Block-4 S/O Sh Arun kumar Sood
Reliance Saryu Township, Dahej Bypass road Goel Niwas, Near Fire station
Bharuch – 392001, Gujarat Boileauganj Shimla-171005, HP, INDIA

More Related Content

What's hot

Mechanical completion
Mechanical completionMechanical completion
Mechanical completionRonie Chu
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...GSE Systems, Inc.
 
Mind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioningMind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioningsakol kai
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updatedPersonal Secret
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)lateefur rahman
 
MD Preston.revision 11142015
MD Preston.revision 11142015MD Preston.revision 11142015
MD Preston.revision 11142015mark preston
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOCsaurabh singh
 
ELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCE
ELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCEELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCE
ELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCEEBRAHIM KHALIL
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 

What's hot (19)

Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
 
Mind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioningMind map the_9_key_elements_video_05_pre-commissioning
Mind map the_9_key_elements_video_05_pre-commissioning
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
dhi.resume 2017
dhi.resume 2017dhi.resume 2017
dhi.resume 2017
 
jayakumarcv
jayakumarcvjayakumarcv
jayakumarcv
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
MD Preston.revision 11142015
MD Preston.revision 11142015MD Preston.revision 11142015
MD Preston.revision 11142015
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
 
ELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCE
ELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCEELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCE
ELECTRICAL ENGINEER WITH 13 YEARS OF EXPERIENCE
 
parveer
parveerparveer
parveer
 
resume+2016+(2)
resume+2016+(2)resume+2016+(2)
resume+2016+(2)
 
venkat resume
venkat resumevenkat resume
venkat resume
 
Pre commissioning
Pre commissioningPre commissioning
Pre commissioning
 
Sankar resume
Sankar  resumeSankar  resume
Sankar resume
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 

Viewers also liked

Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 
Top 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesTop 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesgedihutes
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)PIYUSHKUMAR PRAJAPATI
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument EngineerT. Nedumaran
 
Abhay- Resume with Cover letter
Abhay- Resume with Cover letterAbhay- Resume with Cover letter
Abhay- Resume with Cover letterAbhay Sharma
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance newNoel Roque
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.guest3235c24
 

Viewers also liked (16)

SBCV2016
SBCV2016SBCV2016
SBCV2016
 
BoyleCV
BoyleCVBoyleCV
BoyleCV
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
COVER LETTER
COVER LETTERCOVER LETTER
COVER LETTER
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
Top 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesTop 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samples
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer
 
Abhay- Resume with Cover letter
Abhay- Resume with Cover letterAbhay- Resume with Cover letter
Abhay- Resume with Cover letter
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
Instrumentation Engineer.
Instrumentation Engineer.Instrumentation Engineer.
Instrumentation Engineer.
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 

Similar to Ankur Sood-Instrument engineer (20)

Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
Sr.Inst Tech
Sr.Inst TechSr.Inst Tech
Sr.Inst Tech
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Cv
CvCv
Cv
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah Resume
 
resume-4-1.docx (1)
resume-4-1.docx (1)resume-4-1.docx (1)
resume-4-1.docx (1)
 
faisal cv
faisal cvfaisal cv
faisal cv
 
Uma mahesh Resume
Uma mahesh ResumeUma mahesh Resume
Uma mahesh Resume
 
KHALIFA RESUME
KHALIFA  RESUMEKHALIFA  RESUME
KHALIFA RESUME
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
Palanikumar Resume
Palanikumar ResumePalanikumar Resume
Palanikumar Resume
 
RAMESH CV
RAMESH CVRAMESH CV
RAMESH CV
 
JAYASHANKAR.CV
JAYASHANKAR.CVJAYASHANKAR.CV
JAYASHANKAR.CV
 
Lavakumar
LavakumarLavakumar
Lavakumar
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resume
 
Iftekhar-CURRICULUM VITAE
Iftekhar-CURRICULUM VITAEIftekhar-CURRICULUM VITAE
Iftekhar-CURRICULUM VITAE
 
Resume for Metering or Instrumentation Engineer
Resume for Metering or Instrumentation EngineerResume for Metering or Instrumentation Engineer
Resume for Metering or Instrumentation Engineer
 
new_
new_new_
new_
 

Ankur Sood-Instrument engineer

  • 1. Ankur Sood Instrumentation & control engineer Mobile: +919998954263 Email: ankusood@gmail.com /soodankur@rediffmail.com I have nine+ years of experience as instrumentation and control engineer bachelor of technology in Instrument & control engineering. I am looking to work with any one of the following position as project engineer, commissioning engineer, instrumentation maintenance engineer, planner and instrument Supervisor. Job profile Working as instrument engineer in 2 X 1.1 MMTPA PTA (Purified Terephthalic acid} plant at petrochemical; complex of Reliance Industries Limited, Dahej Manufacturing Division with four years of experience in Maintenance/ Operations and more than four years in execution of large scale projects PROJECT ENGINEERING MANAGEMENT (PMT) • HAZOP SIL review- IEC 61511/61508, Technical Bid evaluation, Vendor selection, Spec/documents review & comments, inspection as per specs for all types of Field Instruments, DCS, ESD, F&G system, Foundation Field bus instruments, Overall responsible for Commissioning of Control Room in co-ordination with Civil/Electrical/Mechanical and Operations • FAT/SAT - FACTORY TESTING for Distributed Control Systems DCS, Emergency Shutdown systems ESD, Fire & Gas F&G detector systems, Analysers, Bently Condition monitoring system and other 3rd party PLC packages • Electrical installations in hazardous areas as per intrinsic safety, IP rating, ex proof, NEMA, zone, area and group classification • I & C CONSTRUCTION MANAGEMENT: Site Instrument Installation, Inspection & Contractors overall monitoring , check-SMART Field Instruments viz., Transmitters-pressure, temperature, flow, level, Gauges, I/P converters, control valves, SMART positioners,switches, nucleonic level detectors • PRE-COMMISSIONING, COMMISSIONING, START-UP & PROJECT HAND-OVER: Loop check Test pack Review (Instrument Index/ Loop diagram/ P&ID/ Cause & Effect/ Alarm & Trip points/ Calibration & Inspection reports) verification & punch closing, Mechanical Completion Inspection, DCS & ESD Logic FUNCTION test for as per cause & effect matrix to ensure process and equipment safety for critical process equipments like compressors, turbines, expander, furnaces , boilers, distillation columns after checking of trips and interlocks with licensor ,operations team ENGINEERING & MAINTENANCE – OIL & GAS REFINERY/ PETROCHEMICAL • Leading a team of engineers, executives and workers with the objective of increasing unit efficiency, reliability, availability, and maintainability. • Preparation and ensuring compliance of instrument calibration reports, checklists ,SMP (Standard Maintenance Procedures Manual) and training subordinates on them • SAP job planning, scheduling, permit request with LOTO,TBRA (cold, light hot, heavy hot, work at height, excavation, confined space entry), risk assessment ,permit closure, maintaining job history, • Preparation of annual maintenance budget for existing plants & new projects • Investigating failures, reliability issues using methods like why-why, fishbone analysis, PHA and completing their recommendations • Involved in planning and implementation of Pre-Shutdown and Shutdown Activities. • Analysing trips, abnormal alarms in the system from trip logs, SOE recorders, historical trends and rectifying those faults to take back systems online • Preparing daily, monthly reports , trip reports and presenting them to the management with learning’s to be implemented • Making list of critical inventory ,SAP codification ,getting quotation from various vendors analysing technical bids and inspecting materials before final acceptance • Implementing new technological changes, system improvements after thorough study and following standard procedures like CAPEX, MOC (management of change), SCR (site change request), PSSR as per PSM module Apply and
  • 2. • Worked on all types of field instruments and having strong knowledge of design basis for selecting instruments with applicable codes and standards • Vibration: magnetic pickups, acceleration, velocity probes, proximeter, calibration using vobulator, shaker table , Bently 1900/3300/3500 monitoring systems • Flow/level/pressure transmitters: ultrasonic, electro-magnetic, coriolis, ultrasonic, DP type, level transmitters radar, sealed diaphragm , bubbler ,servo type, guided wave radar type, RTD, thermocouple, temperature gauges installation ,calibration and troubleshooting • Valves : calibration, stroke checking, SMART positioner, valve internal checking and replacements • Flame scanners (IR-UV type), repair, troubleshooting and maintenance • Calibration & testing with hand held HART/FF HART calibrators, loop calibrators, temperature bath, dead weight tester etc • Custody transfer FLOW METERS – Periodic Calibration, Authority approval & License Requirements Knowledge of Control systems • HONEYWELL TDC3000, YOKOGAWA CENTUM C300 DCS, Emerson Delta-V DCS ,ESD systems • Allen Bradley RSLOGIX PLC/5/40/SLC • RTP make 3000D for fire & gas monitoring system • HIMA H41/51 Burner management system for boilers • GE MARK-V/ GE MARK-VIe gas turbine governing system • WOODWARD NETCON 5000/ INVENSYS TRICONEX steam turbine governing system • Bently Nevada 3300/3500/1900 vibration monitoring system • Invensys make terminal automation system (TAS) for product transfer department • Knowledge of Industrial communication protocols: HART/SMART, OPC, serial, foundation fieldbus Modbus, TCP/IP communication fibre optic communications, Ethernet, TCP/IP, RS232/485 etc. • Knowledge of surge control for centrifugal compressors PROFFESSIONAL JOB EXPERIENCE September 2014 till date at Reliance Industries Limited working • Instrument lead for project execution philosophy for PTA plant which included inspection of received instruments/Proper preservation/preparation of erection schedule/commissioning activities • Analysing causes of failures, trips in plant and taking preventive actions to avoid repetition in future September 2013 to September 2014 at Reliance Industries Limited • Workings as a lead engineer in central engineer services was responsible for installation of complex vide fire and gas detection network having fibre optic connectivity and central monitoring facility at main fire station • Developed the philosophy for fire and gas system systems for loss prevention and implementation at site • Attended Factory acceptance tests, design review meetings with vendors, core engineering teams to fine tune the F&G system • Installed central monitoring system for F&G at main fire station for central monitoring of all plants September 2007 to September 2013 at Reliance Industries Limited • Water purification plants with filter chains, membrane separation , raw water treatment plants, cooling towers • Combined cycle, cogeneration power plants with gas/ steam turbines, HRSG & utility boilers, steam desuperheating stations, fuel handling and storage systems • Air separation plant/compressor house: Work experience on centrifugal and reciprocating type air compressors with PLC control, expansion turbines, driers and storage bullets for oxygen • Product transfer department: Automatic loading gantry, Terminal automation system (TAS), weigh bridges • Maintaining following online analyzers for reliable operation of power plant & utilities i) Steam water analysis (SWAS) room analyzers like pH, conductivity, silica, sodium, dissolved oxygen, O2 sensors in boilers for combustion control, toxic, fire & gas detectors ii) CEMS Erection and commissioning of analyzer (CO/SO2/NOx/O2/opacity) to monitor and control the emission of pollutants levels through the stack as per government regulations
  • 3. • Handled Emergency in CPP plant like gas turbine fire, power black out • Prepared study report to convert total relay based panel to PLC based logic project under implementation Sept’06 to Sept ’07 Reliance Industries Limited Field Operations & Panel Engineer Undergone process training in CPP and process plants which included • Study process, PFD study & PID study, boiler, furnace, distillation column controls, start up and shutdown procedure, Interlock study • Two months training in Mechanical department which included study of Pumps, Compressors, Heat Exchangers, Vessels • Two months training in Electrical department of plant which included overview of power distribution in complex and single line diagram of plant • Full Charge of Shift related Maintenance activities, Manpower & Job Planning & Inventory management of CPP1 & other Utility plants Process Safety Totally committed towards safety at work place and following safe work practices • Team member for completion of process hazard analysis (PHA), IMS module ISO (9001, 14001) OHSAS- 18001. HAZOP, 5S, Mechanical Integrity and Quality Assurance (MIQA), Contractor Safety Management (CSM) BSC, Du-Pont safety standard • Ensuring compliance to all relevant safety, quality and environmental management procedures ,reporting near miss observations, field audits for contract supervisors and workers, sharing safe work practices with them Trainings attended • Attended one week training and inspection of RTP PLC for F&G network at pompano beach Florida at united states of America • Attended 5 day training on GE mark-VI-e control system. • Attended 5 days company sponsored training of Bently 3500 vibration monitoring system • Attended 5 day training on process hazard analysis IT Skills Operating systems Windows XP, 7, NT, 2008 Server, Office Tools, AutoCAD Comfortable with latest technologies and always looking to update my knowledge with changing trends Educational Qualifications Qualification School/college Year Subject Percentage Matriculation St Edwards high school 1999 Maths,science,english etc 78% Diploma Indo swiss training centre 2003 Instrument Technology 65% B.Tech JMIT radaur,Kurukshetra university 2006 Instrumentation & control 76% Personal Details: Sex : Male Marital Status : Married Nationality/religion : Indian / Hindu Children : Daughter 3 1/2 years old Passport : L4233298 Approved B1 VISA for United States of America till 2023 Date of birth : 30.06.1983 Current Address Permanent Address FLAT NO-59, Block-4 S/O Sh Arun kumar Sood Reliance Saryu Township, Dahej Bypass road Goel Niwas, Near Fire station Bharuch – 392001, Gujarat Boileauganj Shimla-171005, HP, INDIA