WORK EXPERIENCE
A competent professional with 9.6 years of experience in operation & maintenance, projects, revamp,
engineering, commissioning, modification in instrumentation & control field of various sector like oil &
gas exploration and production offshore, Refinery and Terminal.
Company Area Country From To Department Designation
Gulf Petrochem Terminal U.A.E 28/07/2015 Till Date Maintenance
Instrumentation
Engineer
British Gas
Exploration And
Production India
Ltd
Offshore India 21/08/2013
14/07/201
5
Maintenance
Instrumentation
Engineer
HPCL-Mittal
Energy Ltd
Refinery India 30/05/2011 05/08/2013
Projects and
Maintenance
Instrumentation
Engineer
Essar oil Ltd Refinery India 06/02/2008
25/05/201
1
Engineering
Services
Instrumentation
Engineer
RIL(Contract) Refinery India 14/07/2007
22/01/2008
Project Field Engineer
2. EDUCATIONAL PROFILE
Course Institution Board / University Year of Completion
B.E–Electronics&
Instrumentation
RVS College of Engg &
Tech .Dindigul
Anna University 2007
RESPONSIBILITIES HANDLED AT ESSAR OIL LTD- REFINERY
ENGINEERING & ERECTION
Selection and preparation of data sheets for field instruments like control valves, Pressure Safety
Valves, Flow, Level, Pressure, and Temperature Instruments.
Preparation of deliverables like Junction Box Connection schedule, I/O schedule, Cause & Effect
Diagram.
Purchase Requisition, Technical Bid Evaluation & Technical Recommendation of Control
Valves, PSV, Flow, Level, Pressure, and Temperature Instruments.
Development of location drawings for Instruments, F&G, Junction Boxes, Control Room
drawings, etc.
Preparation of Instrument Index, Instrument Cabling Layout, Instrument Hook Ups.
Selection of DCS / ESD / F&G hardwares.
Purchase Order Verification, GAD & QAP Approval of Orifice Plates & Assemblies, Pressure
Safety Valves, Instrumentation Control & Power Cables, Control Valves, Self Actuated PCV, Specialty
Flow & Level Transmitters, Temperature instruments, Level Gauges, Pressure Gauges and Junction
Boxes.
Actively participated and successfully commissioned all the instruments for shut down Plant Change
Notice in ISBL & OSBL units during shut down.
PCN Jobs (Plant Change Notices) Engineering Activities and attending HAZOP meeting.
Co-ordination with process department for solving instrument related issues.
RESPONSIBILITIES HANDLED AT HMEL- REFINERY
PROJECTS & MAINTENANCE
Units commissioned: Delayed Coker Unit, Rail and Road Gantry.
3. Coordinating with Consultants & Contractors for various constructions and commissioning activities.
a. Calibration of Various Field Instruments.
b. Erection of Cable Ducts & Trays
c. Main Cable & Branch Cable Laying.
d. Erection of Instruments including Impulse Piping, Cable Glanding and
Termination.
e. Instrument Loop Checking (HART & Foundation Fieldbus).
Successfully commissioned Wet Gas Compressor, Heaters and Coke Drum system package.
Identifying pending Engineering Issues and resolving them.
FAT/ SAT : YOKOGAWA DCS CENTUM VP/ESD PROSAFE RS SYSTEM / Deluge System
Maintaining a Track of Incoming Material with Inputs from Store and Planning Inline & Offline
Instruments, Cables.
Handling contractual issues for Purchase order / Work contracts placed on National / International
vendors and contractors.
Approval of billing break up and project cost.
Instrument Material Procurement through SAP and direct purchase from vendor to catalyze plant
commissioning
Ensure safe working practices in the team.
Commissioning and start-up of PLC and DCS panels.
Coordinating with vendors and process licensors for the commissioning of plant.
Executing installation, testing and commissioning of foundation field bus system.
Commissioned Rotork MOV actuators with PACKSCAN master station and Batch control unit for
offsite area
Having knowledge of CENTUM VP DCS, PROSAFE RS PLC and TAS Honeywell system.
RESPONSIBILITIES HANDLED AT BRITISH GAS- OFFSHORE
MAINTENANCE
Independently carrying out short term plans by effectively coordinating leading man power.
4. Responsible of taking all appropriate measures for safety related constraints to ensure safety for my
team members.
Handling of PROSAFE RS ESD & CENTUM 3000 DCS system of YOKOGAWA India Limited.
Maintenance and Troubleshooting of DCS/PLC, F&G system, Sales skid validation and maintenance
(Daniel Make).
Handling of FIRE and GAS system of DETRONICS and HONEYWELL.
Maintenance and troubleshooting of Satellite wellhead control panels – Pneumatic and Hydraulic
Experience in startup, maintenance & logic checking of Compressor
Maintenance and troubleshooting of ON/OFF valves and control valves
Loop Checking and trouble shooting of all pneumatic and electronic Instruments.
Material Spare parts review and preparation, reviews requirement of spares, creation of material master.
Maintain work history in SAP, creation of work orders, confirmation of resources, technical completion
Preparations of Risk assessments, Root cause failure analysis, work orders and the completion of the
same.Train junior staffs.
Used to conduct Tool box meeting and promote and train safety culture among the team members.
Preparation of Standard operating procedure (SOP), Review of BG Standards and Task risk assessment
(TRA) for all schedule and critical jobs.
Facilitated Preparation, planning and scheduling offshore maintenance activities with reference to
maintenance strategic planning (MSP) with BGSTEP
RESPONSIBILITIES HANDLING AT GULF PETROCHEM- TERMINAL
Successfully commissioned Tank Farm Management System (Honeywell) for al tanks.
Conducted SAT for SCADA and PLC system.
Maintenance and troubleshooting of field instruments.
Successfully commissioned air compressor and lighting system of Terminal.
5. Handling of PCS 7 Siemens system.
Preparation of all documents for final commissioning of all units.
Responsible for System handover activities of Terminal.
Commissioned Diesel Generator synchronization system and LV switch gear including VFD motors.
Loop Checking and trouble shooting of all instruments and logic checking of ESD system.
TRAININGS ATTENDED
Centum VP Fundamentals and Engineering Yokogawa India Limited
Prosafe RS Engineering Yokogawa India Limited
BOSIET and HUET Training OFFSHORE OPITO
Basic First aid with CPR &AED VIGILANT
Fire Warden Team Safety Consultants
PERSONAL INFORMATION
Father’s Name : M.A Paul
Relationship status : Married
Date of Birth : 12.05.1986
Passport No : M7130684
Date of Expiry : 11.03.2025
University : Anna University, Chennai
Discipline : Electronics and Instrumentation
Nationality : Indian
Languages Known : English, Malayalam, Hindi, & Tamil
DECLARATION
I do hereby declare that the information given in the form is true to the best of my knowledge and belief.
Yours faithfully,
[GEORGE PAUL]
6. Handling of PCS 7 Siemens system.
Preparation of all documents for final commissioning of all units.
Responsible for System handover activities of Terminal.
Commissioned Diesel Generator synchronization system and LV switch gear including VFD motors.
Loop Checking and trouble shooting of all instruments and logic checking of ESD system.
TRAININGS ATTENDED
Centum VP Fundamentals and Engineering Yokogawa India Limited
Prosafe RS Engineering Yokogawa India Limited
BOSIET and HUET Training OFFSHORE OPITO
Basic First aid with CPR &AED VIGILANT
Fire Warden Team Safety Consultants
PERSONAL INFORMATION
Father’s Name : M.A Paul
Relationship status : Married
Date of Birth : 12.05.1986
Passport No : M7130684
Date of Expiry : 11.03.2025
University : Anna University, Chennai
Discipline : Electronics and Instrumentation
Nationality : Indian
Languages Known : English, Malayalam, Hindi, & Tamil
DECLARATION
I do hereby declare that the information given in the form is true to the best of my knowledge and belief.
Yours faithfully,
[GEORGE PAUL]