SlideShare a Scribd company logo
1 of 3
Download to read offline
Louis Nicksic – Project Manager at (360) 224-7126 or lunick@comcast.net
	
LOU NICKSIC
Project Manager / Project Engineer
SUMMARY OF EXPERIENCE
Professional Credentials - Over 25 years of experience with Project Management in the Oil & Gas industry, Engineering
Services Industry, Industrial / Commercial / Residential Construction businesses, and general Business Administration.
Proven ability to succeed in challenging situations associated with projects at oil refineries, gas processing facilities,
engineering design facilities, and multi-million dollar construction & maintenance projects. Most assignments have involved
the coordination of engineering, procurement, cost administration, and construction activities as both an Owners
representative and Project Manager leading multiple teams simultaneously.
Typical project responsibilities include scope management, liaison between Owners and Contractors, cost & schedule
control, adherence to quality standards, and above all striving for zero safety incidences.
PROJECT TYPES
Engineering Design Team Leader
Refinery Turnaround Management
Tank Engineer / Specialist
API Required Storage Tank Maintenance & Engineering
Natural Gas Liquids Facility Turnaround Management
Risk Mitigation
Instrumentation Upgrade
Safety Upgrades
Engineering & Procurement of a brownfield Amine Unit
Building Construction Projects Management
Pipeline Installation
Installation of Blast Resistant, modularized Buildings
PERSONAL DATA
Healthy, high energy, detail oriented quick learner with
good communication skills.
Past member - Project Management Institute (PMI)
Past Member - Rotary International as General
Contractor classification
Business Administration - Marin College, Kentfield, CA
Project Management Professional Certification Course –
WWU Satellite Annex
Transportation Worker Identification Credential (TWIC)
Building Construction Technology - Bellingham
Vocational Technical College, Bellingham, WA
TYPES OF ACTIVITIES
Project Management / Project Engineer
Regulatory Agencies Permitting Specialist
Scope of Work development
Execution Plan Creation
Engineering Work Orders
Code Compliance Reviews
Scheduling and Performance Tracking
Bid Analysis and Negotiation
HAZOP/PHA Analysis / Reviews
Project Cost Estimation
Facility Turnaround Management
Construction Supervision & Coordination
Construction Observation and Liaison
Engineering Design and Layout
Architectural Design Coordination
Construction Bid Evaluations
COMPUTER SOFTWARE SKILLS
Microsoft Office Suite 2010,
Photoshop CC & CS5
Final Cut Pro 9
Logic Pro
Louis Nicksic – Project Manager at (360) 224-7126 or lunick@comcast.net
	
EXAMPLE PROJECTS INCLUDE THE FOLLOWING:
Chevron Richmond Refinery – April 2014 to February 2016
Tank Engineer / Tank Specialist – Responsible for the creation of Engineering Work Orders (EWO) for all tank
shutdowns & turnaround repairs per API-650/653 requirements, temporary piping design, coordination with the
Tank Maintenance department and subcontractors for the planning and repair work during tank shutdowns,
designate refinery weld specifications and procedures, secure building permits per Richmond Building & Codes,
participate in all Pre Startup Safety Review (PSSR) meetings and tank walk-through/closures, and organize
project files.
Aux Sable Liquid Products - Amine Extraction Project – 2012 - 2013
Engineering & Procurement Manager - Employed by Ambitech Engineering – Contracted by Aux Sable Liquid
Products
Aux Sable owns a gas plant near Chicago IL that has the capacity to process in excess of 2 billion scfd of
natural gas and extract more than 100,000 bpd of natural gas liquids (NGL). The project involved the addition of
a $125 million Amine Extraction Unit. The Engineering and procurement was completed in late 2013.
Project Manager role providing oversight throughout the Engineering & Procurement phase of the project.
Responsible for monitoring the design process in conformance to Aux Sable’s (Owner) specifications in terms of
safety, quality, scope, cost and schedule. Specific responsibilities involved providing a single point of contact
between Aux Sable and the CB&I Tyler, TX design team (Contractor).
Activities included; defining and disseminating the scope of work, resolving issues by liaising with multi-
discipline representatives of Aux Sable and CB&I, ensuring that the Civil, Piping, Instrumentation, and Electrical
Deliverables were released in support of construction activities, oversight of 3D Model development,
participation in 30/60/90 Model Reviews, coordination of the Procurement Management activities of the project
to ensure equipment and materials were expedited to support the Project Schedule.
BP Natural Gas Liquids Fractionation and Storage Facility, Superior, WI – Pipeline Integrity - 2011
Employed by Swift Oil & Gas – Contracted by BP Canada
Project Manager - BP owned a natural gas liquids fractionation and storage facility in Superior, Wisconsin. The
plant receives and processes NGL’s then stores the individual components (ethane, propane, butane and
condensate) for distribution.
Responsible for an $8.5 million, NGL Pipeline Integrity Upgrade project. The assignment included project
management, team leadership and coordination, monitoring & controlling, Contractor Supervision, and project
closeout documentation. As the on-site Project Manager’s the role involved ensuring safety, acting as the
Client’s Representative, running construction meetings, maneuvering around the site coordinating with the T/A
team, local operations representatives and construction superintendents. This project included the demolition of
existing underground pipelines and large bore valves and installed a new above grade pipeline system, valves,
pipe racks, and valve skids. The work was completed over a roughly six month period in late 2011.
BP Natural Gas Liquids Fractionation and Storage Facility, Superior, WI - LOPA / Liquid Overfill Implementation -
2010
Employed by Swift Oil & Gas – Contracted by BP Canada
Project Manager - BP initiated a Layer of Protection Analysis (LOPA) project to upgrade both their Superior,
Wisconsin Storage and Rapid River, Michigan Storage Facilities. The project involved installation of new Radar
Transmitter Leveling devices and associated controls.
Responsibilities for the Facility LOPA Upgrade included project management, developing the Scopes of Work
for both BP and the construction contractor, managed the interface between the BP and the contractor and
ensured the work was completed in a safe manner while meeting the cost, schedule, quality and budgetary
constraints.
Louis Nicksic – Project Manager at (360) 224-7126 or lunick@comcast.net
	
BP Natural Gas Liquids Fractionation and Storage Facility, Superior, WI– 2010 Turnaround
Employed by Swift Oil & Gas – Contracted by BP Canada
TA Project Manager - Responsibilities for a $4 million dollar Storage Tank and Pipeline Turnaround project at
BP’s Superior, Wisconsin, NGL facility. The assignment included project management, contractor supervision,
team leadership & coordination, monitoring & controlling project, and project closeout documentation.
The Project Management onsite role included acting as the BP’s representative for the turnaround overseeing
the construction contractors. The duties involved, ensuring safety, running construction meetings, maneuvering
around the site coordinating with the turnaround team, local operations reps and construction superintendents.
BP Cherry Point Refinery, Ferndale, WA. - Multiple Blast Resistant Module Installation – 2008 - 2009
Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery
Project Manager, responsible for a $4 million project to install multiple Blast Resistant Modular Structures,
foundations, and utilities within the designated Blast Zones at the refinery. Duties included project management,
client interface, preparation of Project Execution Plans & Engineering Scopes of Work, Total Installed
Construction estimates, Design Team leadership, materials procurement, safety management and supervision
of the construction contractor.
BP Cherry Point Refinery, Ferndale, WA. - Hydrocracker Backflow Prevention Project – 2008 - 2009
Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery
Project Engineer assignment with responsibility for a $5.1 million reconditioning of the Hydrocracker Unit and
installation of a Backflow Prevention system. Duties included project management, design team leadership,
preparation of a Project Execution Plan & an Engineering Scope of Work, Total Installed Construction estimate,
materials procurement, and client interface.
BP Cherry Point Refinery, Ferndale, WA - Hydrocracker Reactor Thermometry Installation – 2008 - 2009
Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery
Project Engineer responsible for a $2.7 million project involving the installation of new Internal Thermocouples
and Instrumentation in the Hydrocracker Unit. The role included project management, design team leadership,
drafting of a Project Execution Plan, detailing an Engineering Scope of Work, preparation of a detailed cost
estimate, materials procurement, close out of PHA action items, participate in daily construction meetings, and
interface with subcontractors and construction superintendents.
BP Cherry Point Refinery, Ferndale, WA - Hydrocracker Reactor Internals Installation – 2008 - 2009
Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery
Project Engineer-Responsibilities for a $2.2 million project for the installation of the Reactor Internal Screens
and Catalyst Beds in the Hydrocracker Unit. Duties included the preparation of a Project Execution Plan &
Engineering Scope of Work, design team leadership project management, development of a detailed cost
estimate, materials procurement, close out of PHA action items, project management, participate in daily
construction meetings, and interface with subcontractors and construction superintendents.
BP Cherry Point Refinery, Ferndale, WA.- 2009 Turnaround
Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery
Field coordination assignment during a $68 million refinery turnaround. Duties included management of the
Request for Information (RFI) & Change Request (CR) system, manage RFI & CR Master Log and
Documentation Filing System, Project Completion Punch-Book System, and Field verification of Project
Completion.

More Related Content

What's hot

Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project PresentationWayne Holley
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPaul Newby
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGsiavashn
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesJamie Morien
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris Perry
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Ron Roof
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
Resume of Jerry C. Hussain refer DECEMBER 2015
Resume of  Jerry C. Hussain refer   DECEMBER  2015Resume of  Jerry C. Hussain refer   DECEMBER  2015
Resume of Jerry C. Hussain refer DECEMBER 2015Jerry Hussain
 

What's hot (20)

Richard (Rik) Stuart Barnett Resume
Richard (Rik) Stuart Barnett ResumeRichard (Rik) Stuart Barnett Resume
Richard (Rik) Stuart Barnett Resume
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 May
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project Outcomes
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 
Resume of Jerry C. Hussain refer DECEMBER 2015
Resume of  Jerry C. Hussain refer   DECEMBER  2015Resume of  Jerry C. Hussain refer   DECEMBER  2015
Resume of Jerry C. Hussain refer DECEMBER 2015
 

Viewers also liked

Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010playamar
 
geologist oil & gas cv
geologist oil & gas cvgeologist oil & gas cv
geologist oil & gas cvAhmer Bilal
 
mohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infomohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infoMohamed Elshazli
 
Business Development Manager, Sales Manager (Oil & Gas)
Business Development Manager, Sales Manager (Oil & Gas)Business Development Manager, Sales Manager (Oil & Gas)
Business Development Manager, Sales Manager (Oil & Gas)Khursheed Alam
 
Sohail Shahzad Updated CV
Sohail Shahzad Updated CVSohail Shahzad Updated CV
Sohail Shahzad Updated CVSohail Shahzad
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cvS Kumar
 
Project Involved in Oil & Gas Industry
Project Involved in Oil & Gas Industry Project Involved in Oil & Gas Industry
Project Involved in Oil & Gas Industry Aminuddin Baharum
 
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015Donna Lee Cain
 
Gl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 GenericGl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 GenericGaryTauzin
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Rakesh Arora
 

Viewers also liked (18)

Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010
 
geologist oil & gas cv
geologist oil & gas cvgeologist oil & gas cv
geologist oil & gas cv
 
mohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infomohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal info
 
Business Development Manager, Sales Manager (Oil & Gas)
Business Development Manager, Sales Manager (Oil & Gas)Business Development Manager, Sales Manager (Oil & Gas)
Business Development Manager, Sales Manager (Oil & Gas)
 
Oil & Gas Resume
Oil & Gas ResumeOil & Gas Resume
Oil & Gas Resume
 
Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605
 
Imad A. Darweesh Cv
Imad A. Darweesh CvImad A. Darweesh Cv
Imad A. Darweesh Cv
 
Vinu cv august 16
Vinu cv august 16Vinu cv august 16
Vinu cv august 16
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
Sohail Shahzad Updated CV
Sohail Shahzad Updated CVSohail Shahzad Updated CV
Sohail Shahzad Updated CV
 
Cristian Marcu Resume
Cristian Marcu ResumeCristian Marcu Resume
Cristian Marcu Resume
 
Cv english
Cv englishCv english
Cv english
 
Caterina Cobino CV 2015
Caterina Cobino CV 2015Caterina Cobino CV 2015
Caterina Cobino CV 2015
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
Project Involved in Oil & Gas Industry
Project Involved in Oil & Gas Industry Project Involved in Oil & Gas Industry
Project Involved in Oil & Gas Industry
 
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
 
Gl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 GenericGl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 Generic
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
 

Similar to Louis Nicksic Project Manager Contact

Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Marcel Boutin
 
Michael E Soukup Resume 6-25-15
Michael E  Soukup Resume 6-25-15Michael E  Soukup Resume 6-25-15
Michael E Soukup Resume 6-25-15Mike E Soukup
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins ResumeBen Mullins
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx currentEdward Budney
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam Keane
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2clinton collier
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 
LinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb NathLinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb NathSumit Debnath
 
SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16Kevin Howard
 

Similar to Louis Nicksic Project Manager Contact (20)

Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 
Michael E Soukup Resume 6-25-15
Michael E  Soukup Resume 6-25-15Michael E  Soukup Resume 6-25-15
Michael E Soukup Resume 6-25-15
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins Resume
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx current
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
hudgensresume0915
hudgensresume0915hudgensresume0915
hudgensresume0915
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
LinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb NathLinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb Nath
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16
 

Louis Nicksic Project Manager Contact

  • 1. Louis Nicksic – Project Manager at (360) 224-7126 or lunick@comcast.net LOU NICKSIC Project Manager / Project Engineer SUMMARY OF EXPERIENCE Professional Credentials - Over 25 years of experience with Project Management in the Oil & Gas industry, Engineering Services Industry, Industrial / Commercial / Residential Construction businesses, and general Business Administration. Proven ability to succeed in challenging situations associated with projects at oil refineries, gas processing facilities, engineering design facilities, and multi-million dollar construction & maintenance projects. Most assignments have involved the coordination of engineering, procurement, cost administration, and construction activities as both an Owners representative and Project Manager leading multiple teams simultaneously. Typical project responsibilities include scope management, liaison between Owners and Contractors, cost & schedule control, adherence to quality standards, and above all striving for zero safety incidences. PROJECT TYPES Engineering Design Team Leader Refinery Turnaround Management Tank Engineer / Specialist API Required Storage Tank Maintenance & Engineering Natural Gas Liquids Facility Turnaround Management Risk Mitigation Instrumentation Upgrade Safety Upgrades Engineering & Procurement of a brownfield Amine Unit Building Construction Projects Management Pipeline Installation Installation of Blast Resistant, modularized Buildings PERSONAL DATA Healthy, high energy, detail oriented quick learner with good communication skills. Past member - Project Management Institute (PMI) Past Member - Rotary International as General Contractor classification Business Administration - Marin College, Kentfield, CA Project Management Professional Certification Course – WWU Satellite Annex Transportation Worker Identification Credential (TWIC) Building Construction Technology - Bellingham Vocational Technical College, Bellingham, WA TYPES OF ACTIVITIES Project Management / Project Engineer Regulatory Agencies Permitting Specialist Scope of Work development Execution Plan Creation Engineering Work Orders Code Compliance Reviews Scheduling and Performance Tracking Bid Analysis and Negotiation HAZOP/PHA Analysis / Reviews Project Cost Estimation Facility Turnaround Management Construction Supervision & Coordination Construction Observation and Liaison Engineering Design and Layout Architectural Design Coordination Construction Bid Evaluations COMPUTER SOFTWARE SKILLS Microsoft Office Suite 2010, Photoshop CC & CS5 Final Cut Pro 9 Logic Pro
  • 2. Louis Nicksic – Project Manager at (360) 224-7126 or lunick@comcast.net EXAMPLE PROJECTS INCLUDE THE FOLLOWING: Chevron Richmond Refinery – April 2014 to February 2016 Tank Engineer / Tank Specialist – Responsible for the creation of Engineering Work Orders (EWO) for all tank shutdowns & turnaround repairs per API-650/653 requirements, temporary piping design, coordination with the Tank Maintenance department and subcontractors for the planning and repair work during tank shutdowns, designate refinery weld specifications and procedures, secure building permits per Richmond Building & Codes, participate in all Pre Startup Safety Review (PSSR) meetings and tank walk-through/closures, and organize project files. Aux Sable Liquid Products - Amine Extraction Project – 2012 - 2013 Engineering & Procurement Manager - Employed by Ambitech Engineering – Contracted by Aux Sable Liquid Products Aux Sable owns a gas plant near Chicago IL that has the capacity to process in excess of 2 billion scfd of natural gas and extract more than 100,000 bpd of natural gas liquids (NGL). The project involved the addition of a $125 million Amine Extraction Unit. The Engineering and procurement was completed in late 2013. Project Manager role providing oversight throughout the Engineering & Procurement phase of the project. Responsible for monitoring the design process in conformance to Aux Sable’s (Owner) specifications in terms of safety, quality, scope, cost and schedule. Specific responsibilities involved providing a single point of contact between Aux Sable and the CB&I Tyler, TX design team (Contractor). Activities included; defining and disseminating the scope of work, resolving issues by liaising with multi- discipline representatives of Aux Sable and CB&I, ensuring that the Civil, Piping, Instrumentation, and Electrical Deliverables were released in support of construction activities, oversight of 3D Model development, participation in 30/60/90 Model Reviews, coordination of the Procurement Management activities of the project to ensure equipment and materials were expedited to support the Project Schedule. BP Natural Gas Liquids Fractionation and Storage Facility, Superior, WI – Pipeline Integrity - 2011 Employed by Swift Oil & Gas – Contracted by BP Canada Project Manager - BP owned a natural gas liquids fractionation and storage facility in Superior, Wisconsin. The plant receives and processes NGL’s then stores the individual components (ethane, propane, butane and condensate) for distribution. Responsible for an $8.5 million, NGL Pipeline Integrity Upgrade project. The assignment included project management, team leadership and coordination, monitoring & controlling, Contractor Supervision, and project closeout documentation. As the on-site Project Manager’s the role involved ensuring safety, acting as the Client’s Representative, running construction meetings, maneuvering around the site coordinating with the T/A team, local operations representatives and construction superintendents. This project included the demolition of existing underground pipelines and large bore valves and installed a new above grade pipeline system, valves, pipe racks, and valve skids. The work was completed over a roughly six month period in late 2011. BP Natural Gas Liquids Fractionation and Storage Facility, Superior, WI - LOPA / Liquid Overfill Implementation - 2010 Employed by Swift Oil & Gas – Contracted by BP Canada Project Manager - BP initiated a Layer of Protection Analysis (LOPA) project to upgrade both their Superior, Wisconsin Storage and Rapid River, Michigan Storage Facilities. The project involved installation of new Radar Transmitter Leveling devices and associated controls. Responsibilities for the Facility LOPA Upgrade included project management, developing the Scopes of Work for both BP and the construction contractor, managed the interface between the BP and the contractor and ensured the work was completed in a safe manner while meeting the cost, schedule, quality and budgetary constraints.
  • 3. Louis Nicksic – Project Manager at (360) 224-7126 or lunick@comcast.net BP Natural Gas Liquids Fractionation and Storage Facility, Superior, WI– 2010 Turnaround Employed by Swift Oil & Gas – Contracted by BP Canada TA Project Manager - Responsibilities for a $4 million dollar Storage Tank and Pipeline Turnaround project at BP’s Superior, Wisconsin, NGL facility. The assignment included project management, contractor supervision, team leadership & coordination, monitoring & controlling project, and project closeout documentation. The Project Management onsite role included acting as the BP’s representative for the turnaround overseeing the construction contractors. The duties involved, ensuring safety, running construction meetings, maneuvering around the site coordinating with the turnaround team, local operations reps and construction superintendents. BP Cherry Point Refinery, Ferndale, WA. - Multiple Blast Resistant Module Installation – 2008 - 2009 Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery Project Manager, responsible for a $4 million project to install multiple Blast Resistant Modular Structures, foundations, and utilities within the designated Blast Zones at the refinery. Duties included project management, client interface, preparation of Project Execution Plans & Engineering Scopes of Work, Total Installed Construction estimates, Design Team leadership, materials procurement, safety management and supervision of the construction contractor. BP Cherry Point Refinery, Ferndale, WA. - Hydrocracker Backflow Prevention Project – 2008 - 2009 Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery Project Engineer assignment with responsibility for a $5.1 million reconditioning of the Hydrocracker Unit and installation of a Backflow Prevention system. Duties included project management, design team leadership, preparation of a Project Execution Plan & an Engineering Scope of Work, Total Installed Construction estimate, materials procurement, and client interface. BP Cherry Point Refinery, Ferndale, WA - Hydrocracker Reactor Thermometry Installation – 2008 - 2009 Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery Project Engineer responsible for a $2.7 million project involving the installation of new Internal Thermocouples and Instrumentation in the Hydrocracker Unit. The role included project management, design team leadership, drafting of a Project Execution Plan, detailing an Engineering Scope of Work, preparation of a detailed cost estimate, materials procurement, close out of PHA action items, participate in daily construction meetings, and interface with subcontractors and construction superintendents. BP Cherry Point Refinery, Ferndale, WA - Hydrocracker Reactor Internals Installation – 2008 - 2009 Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery Project Engineer-Responsibilities for a $2.2 million project for the installation of the Reactor Internal Screens and Catalyst Beds in the Hydrocracker Unit. Duties included the preparation of a Project Execution Plan & Engineering Scope of Work, design team leadership project management, development of a detailed cost estimate, materials procurement, close out of PHA action items, project management, participate in daily construction meetings, and interface with subcontractors and construction superintendents. BP Cherry Point Refinery, Ferndale, WA.- 2009 Turnaround Employed by CH2M Hill – Contracted by BP Cherry Pt. Refinery Field coordination assignment during a $68 million refinery turnaround. Duties included management of the Request for Information (RFI) & Change Request (CR) system, manage RFI & CR Master Log and Documentation Filing System, Project Completion Punch-Book System, and Field verification of Project Completion.