PROJECT INVOLVED IN OIL & GAS INDUSTRY:
Tanjung Offshore Services Sdn Bhd:
Reporting to Project Manager. Project involves as below:
Project : Baronia Vent To Flare Project
Client : Petronas Carigali Sdn Bhd (SKO)
Platform : Baronia Alpha & Baronia Vent Alpha
Date : August 2014 till Present
Project : Fabricate & Replace Corrode Piping in Engine Room
Client : FPSO Ventures Sdn Bhd (FVSB)
Platform : FPSO Bunga Kertas
Date : December 2013 till October 2014
Project : Wellhead Upgrading, Hook Up & Commissioning
Client : Petronas Carigali Sdn Bhd (SBO)
Platform : Samarang Charlie (SMJT-C)
Date : December 2013 ti1l March 2014
Project : Wellhead Upgrading, Hook Up & Commissioning
Client : Petronas Carigali Sdn Bhd (PMO)
Platform : Dulang Alpha & Bravo
Date : April 2013 ti1l October 2013
Project : Wellhead Upgrading, Hook Up & Commissioning
Client : Petronas Carigali Sdn Bhd (SBO)
Platform : Samarang Alpha (SMDP-A)
Date : October 2013 till November 2013 (1 Month)
EPIC Mushtari Engineering Sdn Bhd:
Reporting to Project Manager . Project involves as below:
Project : Booster Compression Brownfield (BCBF)
Client : Carigali Hess Operating Company Sdn Bhd
DAYANG ENTERPRISE SDN BHD (KSB)
Provision of Interim Topside major maintenance for Petronas Carigali Sdn Bhd (PCSB)
PMO.
1. DUYONG
2. DULANG
3. ANGSI
4. RESAK
5. TCOT
6. OGT
7. PM-9 (B) (BEKOK A, B &C)
8. SMALLFIELD {ABU, MALONG, MASA & PENARA NORT LUKUT (PNL)}
9. PM-9 (NB) {PULAI, TINGGI, KEPONG, TIONG}TR
RAMUNIA FABRICATOR SDN BHD
Project Client Discipline Involved
Fabrication of F23
Substructure (2008)
Sarawak Shell Berhad (SSB) Structures, Pipe and Fitting
F13CO2 Blending Project
(2008)
Sarawak Shell Berhad (SSB)
Structures, Pipe Fitting and
Valve
Fabrication of SC (F13E) DR-
A Topsides (2006)
Sarawak Shell Berhad (SSB) Structures, Pipe and Fitting
Fabrication and HUC of
AnDP-D Platform (Angsi-D)
(2007-2008)
Petronas Carigali Sdn Bhd
(PCSB)
Structures, Pipe and Fitting
AmClyde TM model PC-42-
HVY Crane (2007-2008)
National Oilwell Varco
(NOV)
Structures, Pipe and Fitting
Fabrication (EPC) of Jacket
and (EPCC) of Topside for
East Belumut-A Platform
(2006-2007)
Newfield Peninsular Malaysia
Inc
Structure, Pipe and Fitting
Kumang Cluster KUJT-A
Jacket (KUJT-A) (2008-2009)
Petronas Carigali Sdn Bhd
(PCSB)
Structure, Pipe and Fitting
Kumang Cluster KAKG-A
Jacket (KAKG-A) (2008-
2009)
Petronas Carigali Sdn Bhd
(PCSB)
Structure, Pipe and Fitting
Tangga Barat MLDP-A Jacket
(MLDP-A) 2008-2009)
Petronas Carigali Sdn Bhd
(PCSB)
Structure, Pipe and Fitting

More Related Content

What's hot

What's hot (20)

Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
btcv2015
btcv2015btcv2015
btcv2015
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander_Pace_Resume2016
Alexander_Pace_Resume2016
 
Wael albargouthi ஃ (CV)
Wael albargouthi ஃ (CV)Wael albargouthi ஃ (CV)
Wael albargouthi ஃ (CV)
 
Shahbaz.sadiq
Shahbaz.sadiqShahbaz.sadiq
Shahbaz.sadiq
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
cv2
cv2cv2
cv2
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
 
CV Kamran Haider
CV Kamran HaiderCV Kamran Haider
CV Kamran Haider
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
Cv Update_resume
Cv Update_resumeCv Update_resume
Cv Update_resume
 
Atteeq c.v -
Atteeq c.v -Atteeq c.v -
Atteeq c.v -
 
Abbas khan resume
Abbas khan resumeAbbas khan resume
Abbas khan resume
 
MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
CV Engr Qaisar Mahmood
CV  Engr Qaisar MahmoodCV  Engr Qaisar Mahmood
CV Engr Qaisar Mahmood
 

Viewers also liked

CV_ Turci Gabriele (Apr. '16)
CV_ Turci Gabriele  (Apr. '16)CV_ Turci Gabriele  (Apr. '16)
CV_ Turci Gabriele (Apr. '16)Gabriele Turci
 
Express Centre Presentation
Express Centre PresentationExpress Centre Presentation
Express Centre PresentationSteve Barrett
 
MYERS-BRIGGS TYPE INICATOR - MBTI 1
MYERS-BRIGGS TYPE INICATOR - MBTI 1MYERS-BRIGGS TYPE INICATOR - MBTI 1
MYERS-BRIGGS TYPE INICATOR - MBTI 1Gabriele Turci
 
Free issue tel-n-sell_oct22_oct28
Free issue tel-n-sell_oct22_oct28Free issue tel-n-sell_oct22_oct28
Free issue tel-n-sell_oct22_oct28nelsonprada123
 
форма держави
форма державиформа держави
форма державиsashencszx1703
 
My future (12 17-16)
My future (12 17-16)My future (12 17-16)
My future (12 17-16)Sid Wambach
 
Tell n sell_may_07_to_may_13
Tell n sell_may_07_to_may_13Tell n sell_may_07_to_may_13
Tell n sell_may_07_to_may_13nelsonprada123
 
MYERS-BRIGGS TYPE INICATOR - MBTI 2
MYERS-BRIGGS TYPE INICATOR - MBTI 2MYERS-BRIGGS TYPE INICATOR - MBTI 2
MYERS-BRIGGS TYPE INICATOR - MBTI 2Gabriele Turci
 
Tell n-sell dec-10_to_dec_16
Tell n-sell dec-10_to_dec_16Tell n-sell dec-10_to_dec_16
Tell n-sell dec-10_to_dec_16nelsonprada123
 
Become a progrmmer taking part in #yochiyochirb
Become a progrmmer taking part in #yochiyochirbBecome a progrmmer taking part in #yochiyochirb
Become a progrmmer taking part in #yochiyochirbRie Kato
 
MERCER'S report on Gabriele Turci
MERCER'S report on Gabriele TurciMERCER'S report on Gabriele Turci
MERCER'S report on Gabriele TurciGabriele Turci
 
mohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infomohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infoMohamed Elshazli
 
Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010playamar
 

Viewers also liked (20)

WallArt
WallArtWallArt
WallArt
 
CV_ Turci Gabriele (Apr. '16)
CV_ Turci Gabriele  (Apr. '16)CV_ Turci Gabriele  (Apr. '16)
CV_ Turci Gabriele (Apr. '16)
 
Express Centre Presentation
Express Centre PresentationExpress Centre Presentation
Express Centre Presentation
 
MYERS-BRIGGS TYPE INICATOR - MBTI 1
MYERS-BRIGGS TYPE INICATOR - MBTI 1MYERS-BRIGGS TYPE INICATOR - MBTI 1
MYERS-BRIGGS TYPE INICATOR - MBTI 1
 
Free issue tel-n-sell_oct22_oct28
Free issue tel-n-sell_oct22_oct28Free issue tel-n-sell_oct22_oct28
Free issue tel-n-sell_oct22_oct28
 
VITAE
VITAEVITAE
VITAE
 
HOGAN TEST
HOGAN TESTHOGAN TEST
HOGAN TEST
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
форма держави
форма державиформа держави
форма держави
 
My future (12 17-16)
My future (12 17-16)My future (12 17-16)
My future (12 17-16)
 
Tell n sell_may_07_to_may_13
Tell n sell_may_07_to_may_13Tell n sell_may_07_to_may_13
Tell n sell_may_07_to_may_13
 
MYERS-BRIGGS TYPE INICATOR - MBTI 2
MYERS-BRIGGS TYPE INICATOR - MBTI 2MYERS-BRIGGS TYPE INICATOR - MBTI 2
MYERS-BRIGGS TYPE INICATOR - MBTI 2
 
Tell n-sell dec-10_to_dec_16
Tell n-sell dec-10_to_dec_16Tell n-sell dec-10_to_dec_16
Tell n-sell dec-10_to_dec_16
 
Kdmc
KdmcKdmc
Kdmc
 
Aurora
AuroraAurora
Aurora
 
Become a progrmmer taking part in #yochiyochirb
Become a progrmmer taking part in #yochiyochirbBecome a progrmmer taking part in #yochiyochirb
Become a progrmmer taking part in #yochiyochirb
 
MERCER'S report on Gabriele Turci
MERCER'S report on Gabriele TurciMERCER'S report on Gabriele Turci
MERCER'S report on Gabriele Turci
 
mohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal infomohamed elshazli-CV oil & gas with personal info
mohamed elshazli-CV oil & gas with personal info
 
Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010Resume   Daniel H Webb (Detailed Ver Pp) 2 25 2010
Resume Daniel H Webb (Detailed Ver Pp) 2 25 2010
 

Similar to Project Involved in Oil & Gas Industry

Similar to Project Involved in Oil & Gas Industry (20)

CV Farid
CV FaridCV Farid
CV Farid
 
Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
CV
CVCV
CV
 
NIZAM ENTERPRISE profile (1)
NIZAM ENTERPRISE profile (1)NIZAM ENTERPRISE profile (1)
NIZAM ENTERPRISE profile (1)
 
MCV
MCVMCV
MCV
 
MNFirdaus Resume
MNFirdaus ResumeMNFirdaus Resume
MNFirdaus Resume
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Updated CV for 11.11.16
Updated CV for 11.11.16 Updated CV for 11.11.16
Updated CV for 11.11.16
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016
 

Project Involved in Oil & Gas Industry

  • 1. PROJECT INVOLVED IN OIL & GAS INDUSTRY: Tanjung Offshore Services Sdn Bhd: Reporting to Project Manager. Project involves as below: Project : Baronia Vent To Flare Project Client : Petronas Carigali Sdn Bhd (SKO) Platform : Baronia Alpha & Baronia Vent Alpha Date : August 2014 till Present Project : Fabricate & Replace Corrode Piping in Engine Room Client : FPSO Ventures Sdn Bhd (FVSB) Platform : FPSO Bunga Kertas Date : December 2013 till October 2014 Project : Wellhead Upgrading, Hook Up & Commissioning Client : Petronas Carigali Sdn Bhd (SBO) Platform : Samarang Charlie (SMJT-C) Date : December 2013 ti1l March 2014 Project : Wellhead Upgrading, Hook Up & Commissioning Client : Petronas Carigali Sdn Bhd (PMO) Platform : Dulang Alpha & Bravo Date : April 2013 ti1l October 2013 Project : Wellhead Upgrading, Hook Up & Commissioning Client : Petronas Carigali Sdn Bhd (SBO) Platform : Samarang Alpha (SMDP-A) Date : October 2013 till November 2013 (1 Month) EPIC Mushtari Engineering Sdn Bhd: Reporting to Project Manager . Project involves as below: Project : Booster Compression Brownfield (BCBF) Client : Carigali Hess Operating Company Sdn Bhd
  • 2. DAYANG ENTERPRISE SDN BHD (KSB) Provision of Interim Topside major maintenance for Petronas Carigali Sdn Bhd (PCSB) PMO. 1. DUYONG 2. DULANG 3. ANGSI 4. RESAK 5. TCOT 6. OGT 7. PM-9 (B) (BEKOK A, B &C) 8. SMALLFIELD {ABU, MALONG, MASA & PENARA NORT LUKUT (PNL)} 9. PM-9 (NB) {PULAI, TINGGI, KEPONG, TIONG}TR
  • 3. RAMUNIA FABRICATOR SDN BHD Project Client Discipline Involved Fabrication of F23 Substructure (2008) Sarawak Shell Berhad (SSB) Structures, Pipe and Fitting F13CO2 Blending Project (2008) Sarawak Shell Berhad (SSB) Structures, Pipe Fitting and Valve Fabrication of SC (F13E) DR- A Topsides (2006) Sarawak Shell Berhad (SSB) Structures, Pipe and Fitting Fabrication and HUC of AnDP-D Platform (Angsi-D) (2007-2008) Petronas Carigali Sdn Bhd (PCSB) Structures, Pipe and Fitting AmClyde TM model PC-42- HVY Crane (2007-2008) National Oilwell Varco (NOV) Structures, Pipe and Fitting Fabrication (EPC) of Jacket and (EPCC) of Topside for East Belumut-A Platform (2006-2007) Newfield Peninsular Malaysia Inc Structure, Pipe and Fitting Kumang Cluster KUJT-A Jacket (KUJT-A) (2008-2009) Petronas Carigali Sdn Bhd (PCSB) Structure, Pipe and Fitting Kumang Cluster KAKG-A Jacket (KAKG-A) (2008- 2009) Petronas Carigali Sdn Bhd (PCSB) Structure, Pipe and Fitting Tangga Barat MLDP-A Jacket (MLDP-A) 2008-2009) Petronas Carigali Sdn Bhd (PCSB) Structure, Pipe and Fitting