SlideShare a Scribd company logo
1 of 3
KARL D. KELLER
980 S COIT RD. #1331, PROSPER TX 75078, 469-720-9601, goillinikarl1959@gmail.com
Summary of Qualifications
 Fifteen years of professional experience as a Senior Construction Project Manager.
 Heavy Civil, Industrial, Commercial, Wastewater/Water Treatment, Gas Station/Big Box Retail.
 Seasoned in managing all phases of multimilliondollar construction projects.
 Bachelor of Science Degree in Civil Engineering.
 Project diversification, computer software and applications, project documentation, and QA/QC
supervision.
Universityof IllinoisUrbana-Champaign 05/30/1994 B.S. in Civil Engineering
10/1/2015 – 6/1/2016 CloverleafCMInc. AlbuquerqueNM
Senior ConstructionManager– TonopahTest Range Tower RenovationProject
• ConstructionManagementof $4.2 M, five storyobservationtowerincludingequipment
removal/replacement. Installedall newboilers,chillers,airhandlingunit,VAV’s,roof topACunits
• ImplementedES&HSafetyprogramutilizing Behavioral BasedSafetyandPre-TaskPlanningmeetingsfor
SandiaNational Laboratories.ReceivedSandiaLaboratorySafetyStarsforJHA on LiftPlansfor roof units.
• Completedcommissioning/start-upwithWorkingBuildings,Elevator,Fire Protection, Electrical, Mechanical,
Plumbing,andSiemensControls contractorsandobtainedCertificate of Occupancyonfirstpass.Project
schedule was acceleratedby6monthsdue to Sandiamissioncritical testing.
12/1/2014 – 9/1/2015 Kraft Food Inc. Garland TX
Industrial/Electrical Maintenance Technician/Line Technician
• Maintained twoskilletlinesutilizing tworoboticpicking/packing unitsusedcomplexinstrumentation&controls.
• Maintainedthree differentBBQSauce lines,twoRTDdrinklines,fourpalletizers,casing/de-casingunits.
• Maintained Chemical/MaterialsStorage andTransferpumps/distributionlines forsweetenersformixing.
11/1/2013 - 11/1/2014 PPG Industries Gainesville TX
QA/QC Manager - Mechanical Mill/Extruder Technician
 Managed QA/QC standards for paint particle sizes for mills and extruders.
 Breakdown and maintain mills and extruders periodic cleaning and repairs.
8/1/2013 - 11/1/2013 Technical Associates Inc. Atlanta GA
Senior Construction Manager – Ecolab Chemical Plant Peracid Reactor Project Garland TX.
 Managed construction, installation and start-up of Peracid Reactor System containing Glacial Acetic Acid
Tank, Hydrogen Peroxide Tank, Phosphoric Acid transfer system, RO/DI water systems and a Sodium
Citrate system conversion.
3/1/2009 – 7/31/2013 Keller Consulting Dallas TX
Construction Consultant – Independent Consultant Bakken Oil Basin Projects Ray, North Dakota.
 Construction Management for Capital Construction Group constructing man camps.
 Material testing and inspection of concrete, soils, and road base for Knife River Inc.
 Pipeline pressure testing, pipeline tank testing, and surveying for Epic Engineering Inc.
10/1/2008 – 3/1/2009 Midrex Technologies Inc. Charlotte, NC
Construction Manager - $250M Mesabi Nugget Delaware ITmk3 Steel Nugget Production Plant.
 Construction management/supervision of a six building facility housing the steel nugget production plant.
 Supervised routing and installation of all utility feeds for all six steel production buildings, iron ore
concentrator, and a water purification plant.
 Developed emergency start/stop/operate sequencing for the Rotary Hearth Furnace utilizing advanced
instrumentation and controls technology.
 Directed all materials crushing, QA/QC testing for the hearth coal and the iron ore pellets used to produce
the steel nuggets.
7/8/2005 – 09/30/2008 Wal-Mart Stores Inc. Bentonville AR
Construction Manager – Wal-Mart Supercenter, Sam's Club’s and Neighborhood Markets.
 Managed Construction progress of multiple (12-18) new store, onsite relocations, gas station construction
and expansions in various phases of construction from site developmentto grand opening.
 Processed and approved submittals, pay applications, change orders, purchase orders, sub-contractor
agreements, and Storm Water Pollution and Prevention Plans.
 Implemented training of general contractors to enforce plans and specifications, storm water pollution
and prevention plans, and meeting and exceeding the project milestones on the construction schedules.
6/1/2004 – 06/01/2005 Vanir CM Inc. San Luis Obispo CA
Construction Manager – California Men's Colony Wastewater Collection/Treatment Facility Upgrade
• Constructed a 4.3 mile wastewater collection system, and wastewater treatment plant for multiple clients.
• Managed the construction contract administration for Cuesta College,California Men's Colony (CDC),
Camp San Luis Obispo National guard, and The Department of General Services for the Real Estate Division
of the State of California.
• Enforced all request made by the Bureau of Water Resources, Department of Wildlife, Fish, and Games,
Division of Air Pollution, Army Corps of Engineers, and resolved biological, cultural, and archeological
issues with the State of California Environmentalist.
6/1/2001 – 01/30/2004 Greeley and Hansen Engineers Inc. Chicago IL
Construction Resident Engineer – Moline Water Treatment Plant Improvements Moline, IL
• Provided construction management/engineering for Hydraulic Clari-cone Treatment Building, and a new
Operations and Control Building for the City of Moline to increase the water production from 10MG/day to
18MG/day.
• Installed all new Power Generation/Switching Facility to house a new Emergency Power Generator, 480V
Distribution Switchgear, MCC room for controlling upgraded power requirements.
• Installed two new Cleaver-Brooks Boilers to meet new heating and cooling demands for the new facilities
due to increased volume of office/laboratory space.
Construction Resident Engineer – Roseland Pumping Station Modifications Chicago, IL
• Demolished 2 of 3 existing boilers and all associated steam-assisted pumps converting pumping stations
from steam to electric.
• Constructed new Power Generation and Distribution Switching Station to obtain remote operation from
the Jardine Water Purification Plant.
Construction Resident Engineer – Jardine Water Purification Plant Roof Renovations Chicago, IL
• Removed and replaced the existing roof structure. Sandblasted and painted existing structural steel, and
performed lead paint and asbestos abatement procedures while maintaining operation of the water plant.
• Monitored air quality samples inside and outside of lead paint containment areas during sandblasting.
• Developed a filter disinfection plan to take filters out of service to clean and repair as needed.
01/01/2000 – 01/01/2001 ProCon Technologies Danville, IL
Director ofConstructionServices – DanvilleWater Treatment PlantImprovements
• Managed general contractor,subcontractors,andmaterialssupplierswhilecoordinatingplantmodifications
withthe engineers,architects,andplantoperationswithIllinoisConsumerWater.
• Reducedthe overall costsof this projectby18% by makingvalue engineeringdecisionsonthe frontendof the
projectbyadjustingthe proposedlayoutstoyieldmore efficientnitrate levels.
• Constructedthe SodiumIonExchange Building,NitrateWaste Vault,PACMixingBasin,andmodified the
Sludge/GritRemovalandRawWater Intake Linesformore efficientoperations.
• Utilizedgravitational methodsbyinstallingacofferdamfordewateringasectionof the Little VermilionRiverto
install the newriverintake screens.
10/01/1998 – 10/15/1999 Broeren Russo Construction Champaign,IL
Project Manager – Provena CovenantCancer Center Addition Champaign,IL
• Constructeda $7.2M Cancer CenterAdditionforthe privatelyfundedCatholicSistersrequiringthe installationof
a LinearAccelerator,Simulator,3Dimagingequipmenttocritical alignmentstandards.
• Consultedwithphysicists,doctors,andphysiciansduringall phasesof construction.Supportedall startupand
commissioningactivitiesincludingthe takeoverof the facilitybythe physicistsand staff.
• Producedmonthlyconstructionnarrativeandcostaccountingreportsto the client,A/E's,andthe CityEngineer.
PreparedestimatesonRFI's,submittals,andchange orderstonegotiate contractbidamount.
01/01/1996 – 09/30/1998 Black & Veatch LLP. Kansas City,MO
ConstructionResidentProject Representative – Hacienda Avenue/I-15Bridge Project Las Vegas,NV
• PerformedQA/QCreportingtothe NevadaDOT andthe ClarkCountyPublicWorks.Observedplacementof soils,
concrete,asphalt,reinforcingsteel,andmechanicallystabilizedearthretainingwalls.
• DocumentedInspector'sDailyReports(IDR's),and weeklyconstructionnarrative reports.
• Developedthe structural steel,MSEretainingwall deliverysequencingreportwiththe material supplier.
• Organizedthe relocationof overheadpowerlinesforinstallationinundergroundvaultstospanI-15.
ConstructionResidentProject Representative – KansasRiver Intake & Pre-SedimentationFacility
ModificationsandDistributionMeteringImprovements KansasCity, KS
 Oversee the installationof the remote telemetryforElectrical/MechanicalActuators, MagneticFlow
Meters,and PRV'sto obtaindistributionsystemdataformakingadjustmentsinwatersystempressures.
• Performedleakagetestingof slide gatesandinspectedintaketunnelsforstructural integrityandleakage.
• ObservedQA/QCforthe sandblasting,painting,andrenovationsof the existingintakebutterflyvalves.
Construction Resident Project Representative – Phase IV Expansion of the Johnson County Water
Treatment & Distribution Systems Facility KansasCity, KS
• Assistedthe ResidentEngineerwithsite construction,materialstesting,andsupervisionof all tradesduringthe
constructionof the Primary& Final SedimentationBasins,Reactor/ClarifierUnits, Sludge Control&Chemical
Feed/FilterBuildingandall associateddistributionpipingtothe 5MG reservoir.
RichlandCollege GarlandTX 3/30/2015 ContinuedEducation
 BeginningandAdvanced Mechanical MaintenanceCertificate 10 hours
 BeginningandAdvanced Electrical MaintenanceCertificate 10 hours
 ManufacturingProductivitySkills 1.2 hours
 OSHA Certificate 1.2 hours
 Chemical Hazardsand Hazard CommunicationwithGHS 4.0 hours
 Industrial MaintenanceCertificateLevel 1 120 hours
 OSHA 30 Hour CertificatethroughClickSafety Current
 CertifiedConstructionManagercourse in progressfrom CMCI Studying

More Related Content

What's hot (20)

Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
 
Resume 2013
Resume 2013Resume 2013
Resume 2013
 
Don's #2
Don's #2Don's #2
Don's #2
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
yousef_cv_mk
yousef_cv_mk yousef_cv_mk
yousef_cv_mk
 
Linkedin
LinkedinLinkedin
Linkedin
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
GIS Fabrication Web
GIS Fabrication WebGIS Fabrication Web
GIS Fabrication Web
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resume
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck Resume
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 

Viewers also liked (16)

презентацияз анлг
презентацияз анлгпрезентацияз анлг
презентацияз анлг
 
HTML 2
HTML 2HTML 2
HTML 2
 
Films in Space
Films in SpaceFilms in Space
Films in Space
 
AALAS 2015 Conference Poster
AALAS 2015 Conference PosterAALAS 2015 Conference Poster
AALAS 2015 Conference Poster
 
Trabajo 2 lupita lopez
Trabajo 2 lupita lopezTrabajo 2 lupita lopez
Trabajo 2 lupita lopez
 
Avira y mas productos
Avira y mas productosAvira y mas productos
Avira y mas productos
 
Music trail sign
Music trail signMusic trail sign
Music trail sign
 
introduccion HTML
introduccion HTMLintroduccion HTML
introduccion HTML
 
introduccion HTML
introduccion HTMLintroduccion HTML
introduccion HTML
 
Taller de repaso activida 1
Taller de repaso activida 1Taller de repaso activida 1
Taller de repaso activida 1
 
APeterson%20LOR
APeterson%20LORAPeterson%20LOR
APeterson%20LOR
 
Creativecommons
CreativecommonsCreativecommons
Creativecommons
 
ScottLobbResume
ScottLobbResumeScottLobbResume
ScottLobbResume
 
1k
1k1k
1k
 
Trabajo 1 lupita lopez
Trabajo 1 lupita lopezTrabajo 1 lupita lopez
Trabajo 1 lupita lopez
 
Trabajo Ciencia FiccióN
Trabajo Ciencia FiccióNTrabajo Ciencia FiccióN
Trabajo Ciencia FiccióN
 

Similar to KDK RES 2016 Sunoco

Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)kevin breiter
 
CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1Mark Fayle
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CVJaco Botha
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3Kevin Hill
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016Norm Miksic
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 

Similar to KDK RES 2016 Sunoco (20)

Work Experience
Work ExperienceWork Experience
Work Experience
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
wsa
wsawsa
wsa
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
wsa
wsawsa
wsa
 
wsa
wsawsa
wsa
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016
 
wsa
wsawsa
wsa
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 

KDK RES 2016 Sunoco

  • 1. KARL D. KELLER 980 S COIT RD. #1331, PROSPER TX 75078, 469-720-9601, goillinikarl1959@gmail.com Summary of Qualifications  Fifteen years of professional experience as a Senior Construction Project Manager.  Heavy Civil, Industrial, Commercial, Wastewater/Water Treatment, Gas Station/Big Box Retail.  Seasoned in managing all phases of multimilliondollar construction projects.  Bachelor of Science Degree in Civil Engineering.  Project diversification, computer software and applications, project documentation, and QA/QC supervision. Universityof IllinoisUrbana-Champaign 05/30/1994 B.S. in Civil Engineering 10/1/2015 – 6/1/2016 CloverleafCMInc. AlbuquerqueNM Senior ConstructionManager– TonopahTest Range Tower RenovationProject • ConstructionManagementof $4.2 M, five storyobservationtowerincludingequipment removal/replacement. Installedall newboilers,chillers,airhandlingunit,VAV’s,roof topACunits • ImplementedES&HSafetyprogramutilizing Behavioral BasedSafetyandPre-TaskPlanningmeetingsfor SandiaNational Laboratories.ReceivedSandiaLaboratorySafetyStarsforJHA on LiftPlansfor roof units. • Completedcommissioning/start-upwithWorkingBuildings,Elevator,Fire Protection, Electrical, Mechanical, Plumbing,andSiemensControls contractorsandobtainedCertificate of Occupancyonfirstpass.Project schedule was acceleratedby6monthsdue to Sandiamissioncritical testing. 12/1/2014 – 9/1/2015 Kraft Food Inc. Garland TX Industrial/Electrical Maintenance Technician/Line Technician • Maintained twoskilletlinesutilizing tworoboticpicking/packing unitsusedcomplexinstrumentation&controls. • Maintainedthree differentBBQSauce lines,twoRTDdrinklines,fourpalletizers,casing/de-casingunits. • Maintained Chemical/MaterialsStorage andTransferpumps/distributionlines forsweetenersformixing. 11/1/2013 - 11/1/2014 PPG Industries Gainesville TX QA/QC Manager - Mechanical Mill/Extruder Technician  Managed QA/QC standards for paint particle sizes for mills and extruders.  Breakdown and maintain mills and extruders periodic cleaning and repairs. 8/1/2013 - 11/1/2013 Technical Associates Inc. Atlanta GA Senior Construction Manager – Ecolab Chemical Plant Peracid Reactor Project Garland TX.  Managed construction, installation and start-up of Peracid Reactor System containing Glacial Acetic Acid Tank, Hydrogen Peroxide Tank, Phosphoric Acid transfer system, RO/DI water systems and a Sodium Citrate system conversion. 3/1/2009 – 7/31/2013 Keller Consulting Dallas TX Construction Consultant – Independent Consultant Bakken Oil Basin Projects Ray, North Dakota.  Construction Management for Capital Construction Group constructing man camps.  Material testing and inspection of concrete, soils, and road base for Knife River Inc.  Pipeline pressure testing, pipeline tank testing, and surveying for Epic Engineering Inc.
  • 2. 10/1/2008 – 3/1/2009 Midrex Technologies Inc. Charlotte, NC Construction Manager - $250M Mesabi Nugget Delaware ITmk3 Steel Nugget Production Plant.  Construction management/supervision of a six building facility housing the steel nugget production plant.  Supervised routing and installation of all utility feeds for all six steel production buildings, iron ore concentrator, and a water purification plant.  Developed emergency start/stop/operate sequencing for the Rotary Hearth Furnace utilizing advanced instrumentation and controls technology.  Directed all materials crushing, QA/QC testing for the hearth coal and the iron ore pellets used to produce the steel nuggets. 7/8/2005 – 09/30/2008 Wal-Mart Stores Inc. Bentonville AR Construction Manager – Wal-Mart Supercenter, Sam's Club’s and Neighborhood Markets.  Managed Construction progress of multiple (12-18) new store, onsite relocations, gas station construction and expansions in various phases of construction from site developmentto grand opening.  Processed and approved submittals, pay applications, change orders, purchase orders, sub-contractor agreements, and Storm Water Pollution and Prevention Plans.  Implemented training of general contractors to enforce plans and specifications, storm water pollution and prevention plans, and meeting and exceeding the project milestones on the construction schedules. 6/1/2004 – 06/01/2005 Vanir CM Inc. San Luis Obispo CA Construction Manager – California Men's Colony Wastewater Collection/Treatment Facility Upgrade • Constructed a 4.3 mile wastewater collection system, and wastewater treatment plant for multiple clients. • Managed the construction contract administration for Cuesta College,California Men's Colony (CDC), Camp San Luis Obispo National guard, and The Department of General Services for the Real Estate Division of the State of California. • Enforced all request made by the Bureau of Water Resources, Department of Wildlife, Fish, and Games, Division of Air Pollution, Army Corps of Engineers, and resolved biological, cultural, and archeological issues with the State of California Environmentalist. 6/1/2001 – 01/30/2004 Greeley and Hansen Engineers Inc. Chicago IL Construction Resident Engineer – Moline Water Treatment Plant Improvements Moline, IL • Provided construction management/engineering for Hydraulic Clari-cone Treatment Building, and a new Operations and Control Building for the City of Moline to increase the water production from 10MG/day to 18MG/day. • Installed all new Power Generation/Switching Facility to house a new Emergency Power Generator, 480V Distribution Switchgear, MCC room for controlling upgraded power requirements. • Installed two new Cleaver-Brooks Boilers to meet new heating and cooling demands for the new facilities due to increased volume of office/laboratory space. Construction Resident Engineer – Roseland Pumping Station Modifications Chicago, IL • Demolished 2 of 3 existing boilers and all associated steam-assisted pumps converting pumping stations from steam to electric. • Constructed new Power Generation and Distribution Switching Station to obtain remote operation from the Jardine Water Purification Plant. Construction Resident Engineer – Jardine Water Purification Plant Roof Renovations Chicago, IL • Removed and replaced the existing roof structure. Sandblasted and painted existing structural steel, and performed lead paint and asbestos abatement procedures while maintaining operation of the water plant. • Monitored air quality samples inside and outside of lead paint containment areas during sandblasting. • Developed a filter disinfection plan to take filters out of service to clean and repair as needed.
  • 3. 01/01/2000 – 01/01/2001 ProCon Technologies Danville, IL Director ofConstructionServices – DanvilleWater Treatment PlantImprovements • Managed general contractor,subcontractors,andmaterialssupplierswhilecoordinatingplantmodifications withthe engineers,architects,andplantoperationswithIllinoisConsumerWater. • Reducedthe overall costsof this projectby18% by makingvalue engineeringdecisionsonthe frontendof the projectbyadjustingthe proposedlayoutstoyieldmore efficientnitrate levels. • Constructedthe SodiumIonExchange Building,NitrateWaste Vault,PACMixingBasin,andmodified the Sludge/GritRemovalandRawWater Intake Linesformore efficientoperations. • Utilizedgravitational methodsbyinstallingacofferdamfordewateringasectionof the Little VermilionRiverto install the newriverintake screens. 10/01/1998 – 10/15/1999 Broeren Russo Construction Champaign,IL Project Manager – Provena CovenantCancer Center Addition Champaign,IL • Constructeda $7.2M Cancer CenterAdditionforthe privatelyfundedCatholicSistersrequiringthe installationof a LinearAccelerator,Simulator,3Dimagingequipmenttocritical alignmentstandards. • Consultedwithphysicists,doctors,andphysiciansduringall phasesof construction.Supportedall startupand commissioningactivitiesincludingthe takeoverof the facilitybythe physicistsand staff. • Producedmonthlyconstructionnarrativeandcostaccountingreportsto the client,A/E's,andthe CityEngineer. PreparedestimatesonRFI's,submittals,andchange orderstonegotiate contractbidamount. 01/01/1996 – 09/30/1998 Black & Veatch LLP. Kansas City,MO ConstructionResidentProject Representative – Hacienda Avenue/I-15Bridge Project Las Vegas,NV • PerformedQA/QCreportingtothe NevadaDOT andthe ClarkCountyPublicWorks.Observedplacementof soils, concrete,asphalt,reinforcingsteel,andmechanicallystabilizedearthretainingwalls. • DocumentedInspector'sDailyReports(IDR's),and weeklyconstructionnarrative reports. • Developedthe structural steel,MSEretainingwall deliverysequencingreportwiththe material supplier. • Organizedthe relocationof overheadpowerlinesforinstallationinundergroundvaultstospanI-15. ConstructionResidentProject Representative – KansasRiver Intake & Pre-SedimentationFacility ModificationsandDistributionMeteringImprovements KansasCity, KS  Oversee the installationof the remote telemetryforElectrical/MechanicalActuators, MagneticFlow Meters,and PRV'sto obtaindistributionsystemdataformakingadjustmentsinwatersystempressures. • Performedleakagetestingof slide gatesandinspectedintaketunnelsforstructural integrityandleakage. • ObservedQA/QCforthe sandblasting,painting,andrenovationsof the existingintakebutterflyvalves. Construction Resident Project Representative – Phase IV Expansion of the Johnson County Water Treatment & Distribution Systems Facility KansasCity, KS • Assistedthe ResidentEngineerwithsite construction,materialstesting,andsupervisionof all tradesduringthe constructionof the Primary& Final SedimentationBasins,Reactor/ClarifierUnits, Sludge Control&Chemical Feed/FilterBuildingandall associateddistributionpipingtothe 5MG reservoir. RichlandCollege GarlandTX 3/30/2015 ContinuedEducation  BeginningandAdvanced Mechanical MaintenanceCertificate 10 hours  BeginningandAdvanced Electrical MaintenanceCertificate 10 hours  ManufacturingProductivitySkills 1.2 hours  OSHA Certificate 1.2 hours  Chemical Hazardsand Hazard CommunicationwithGHS 4.0 hours  Industrial MaintenanceCertificateLevel 1 120 hours  OSHA 30 Hour CertificatethroughClickSafety Current  CertifiedConstructionManagercourse in progressfrom CMCI Studying