Paul Newby
83 Trillium Cr
Barrie Ontario
L4N 6H6
705-737-0792
Cell: 705-796-1835
newbs7@rogers.com
SUMMARY
With my 17 years of supervision experience and as a former Nuclear Construction
Company owner and Red Seal Steamfitter, I have proven skills and experience within
the Oil & Gas, Nuclear, and Industrial construction industries. I am currently security
cleared through criminal background checks by CSIS and the OPP.
Never afraid to take on challenging responsibilities, I was requested to complete the post
Fukushima nuclear containment filter vent piping work in South Korea, which was
completed on schedule. Using my experience of being a certified Canadian Welding
Bureau (CWB) Welding Supervisor, I have also been successful in obtaining certified
audited welding programs for both ASME, and CWB at previous employers. I am always
keen to learn new skills, and engage my own, to conquer a current challenge or mentor
others I work with.
In 2006 I created a business with successfully completed, code compliant construction
projects at Chalk River Laboratories Maple Reactor Construction Project between 2006
and 2008. Practical application of my abilities is one of my strengths, which was evident
during the start up phase of my nuclear construction company. The ability to utilize my
experience in quality assurance, pressure piping code knowledge, and estimating,
allowed for the creation of a profitable business. Creating and utilizing lessons learned
for future planning, and developing a safety conscious work environment through actions
and attitude, is how I lead a team.
Through years of high stress work environments during the managing, planning, and
execution phases of planned and forced maintenance outages at power plants, I
demonstrated excellent organizational, communication and leadership skills. Some
direct examples of leadership abilities include the positive experience as the CSAO John
M Beck Award winning B side Pickering Nuclear Joint Health and Safety Comittee
Chairman, along with the Due Diligence course I created and taught to over 500
Managers, Supervisors and Trades people at Husky Sunrise Oil Sands Project. I’ve
consistently held trades people, and my supervision accountable for their actions, to
promote due diligence. I have vast experience dealing with union jurisdictional issues,
and grievances throughout my career. Mentoring supervision and workers in the field
and monitoring for compliance to management quality and safety expectations is one of
my greatest strengths.
I have the ability and demeanor to successfully lead a team or work in a team to
complete difficult work in challenging environments.
EDUCATION
Sir Wilfrid Laurier Collegiate Institute, 1987, O.S.S.H.G Diploma
George Brown College - Trade School, 1995, and 1997
Basic Plumbing, Intermediate and Advanced Steamfitting
Red Seal Inter-Provincial Steamfitter License
CSA W47.1/W59 Canadian Welding Bureau Certified Welding Supervisor
Other Related Courses
Engineering Change Control
O.H.S.A - W.S.I.B. Safety Certified Member # A04144 Construction Sector Specific
(performed as Management Representative at Ontario Power Generation and Worker
Representative at Pearson International Airport in 1998)
Achievements
Co-winner of the CSAO John M Beck award for Exceptional Work as Management Co-
chairman of the Joint Health and Safety Committee for Pickering B Nuclear Generating
Station
Along with Partners, in 2006 created a new CSA N285.0, ISO 9001:2000, ASME B31.1,
31.3, Z299.3 -1985 Certified Nuclear Construction/Service Company – Plan Energy, and
successfully bid, managed, and completed multi discipline trades work on nuclear sites.
EXPERIENCE
Husky Sunrise – Sunrise Energy Project April 2014-Present
Husky Energy Construction Lead, Acting Construction Manager
• I was the liaison between the Construction contractors and the Husky Project team for
field activities including progress, engineering changes, contract interpretation, and
coordination with other Contractors and Husky Operations and Commissioning and Start
up personnel
• Managed 30 Mechanical/Electrical/Instrumentation/Pre Commissioning Construction
Coordinators
• Created and taught a mandatory Construction Supervisor Due Diligence Course for all
site supervision. The course was so successful that requests were made to present the
material to entire workforces of sub contractors. Over 500 attended the class throughout
the project timeline
• Signed as the Husky Energy Manager for turnover of systems to Commissioning
• Authorized Contract Change Requests for scope addition and deletion
• Project had an average workforce of 2000 workers
AECL Chalk River Laboratories April 2013-April 2014
Field Engineering- Field Installation Specialist
• Joined the Integrated Implementation Plan-IIP Hardware Group tasked to
install/replace/repair the various mechanical and civil systems and components for the
NRU Reactor to comply with CNSC Orders
• Built Code Compliant detailed Work Packages to inject into the NRU Reactor rolling 13
week maintenance schedule
• Authored Detailed Technical Scopes of work for several systems and other work
including Helium Upper Vessel Leak Repair, The NRU Concrete Facade Inspection,
Several Large Valve Replacements, and The NRU Reactor Roof Replacement Project
• Authored Detailed Work Plans and submitted them to TRAK (AECL’s Document Control
System) for Engineering, Radiation Protection, and QA Review and Comment
• Input material requests for code compliant purchases of material and equipment
• Engaged Engineering in the field to resolve challenges related to installation such as
expediting/initiating Field Changes and obtaining approvals to progress work.
• Performed surveillance of the trades to ensure the necessary approvals and signatures
were obtained and completed in the work packages each day.
• Performed the role of Construction Superintendent and Construction Sponsor which
included escorting duties, obtaining work permits, engaging Facility Management to
obtain approvals for various items such as fire clearances, laydown areas, security
camera moves, and scheduling training courses for outside Contractors
AREVA NP Canada Ltd. Jan 2009-March 2013
Mechanical Superintendent Bruce Nuclear Generating Station
Work Area Manager Bruce Nuclear Generating Station Unit 6 MOT Replacement
Field Engineer Supporting the Bruce B Chiller Replacement Project
• Canadian Welding Bureau Certified Welding Supervisor
• Initiated and Managed the CWB Certification Process for AREVA NP Canada Ltd, and
co-authored all of the General Welding Procedures,
• Worked in South Korea for AREVA NP Canada Ltd. As Lead Piping Supervisor on the
Post Fukushima Containment Filter Vent Project at Wolsong Nuclear Plant Unit 1. This
was a Nuclear Class 2 and Class 6 piping project with several Nuclear Penetrations into
the Reactor Building. This job was under extreme schedule pressure and was completed
in time to avoid the Nuclear Regulator shutting the Unit down. The language barrier was
overcome with patience and clear communication skills.
• I prepared company mark up assignments and chaired several Construction Mark Up
Meetings with Union Business Agents
• Supervised Boilermakers during the Unit1 & 2 Nuclear Class III Maintenance Cooling
Heat Exchanger Disconnect/Removal from the Bruce A Nuclear Plant.
• At Bruce B site I executed the role of Work Area Manager for the first Main Output
Transformer Replacement performed by a Contractor other than Ontario - Hydro One.
This was a replacement of a Westinghouse Transformer with an ABB Transformer.
• During the design process for the Bruce B Chiller(s) Replacement Project, I performed
daily Constructability site work to minimize future field changes. Constructability walk
downs and reviews were performed along with the installation contractor to obtain buy in
before the job started. This proved invaluable to limit the number of field changes.
Plan Energy, Owner- July 2007 – Jan 2009
Chalk River Laboratories Construction Manager
Secured the contracts at Chalk River Laboratories through estimates and negotiations
with AECL Management to complete the remaining mechanical and electrical
modifications to:
o The New Processing Facility
o Dedicated Isotope Facility
o Maple 1 Reactor
• Managed the Fabrication and installation of pressure piping for several systems
including De-Ionized Water, Closed Loop Cooling, High Pressure Steam and
Condensate, Process Water Piping, and Compressed Air,
• Managed the installation work inside the Hot Cells in NPF, which included complex
tubing installations, confined space welding, and mechanical work
• Managed the electrical work throughout the Dedicated Isotope Facility including High
Bay Lighting, Wire Remediation, Load Bank Installation, Fire alarm system
modifications, and controls for the piping systems installed
• 21 Trades on site for 2007-2008 with only 2 first aid occurrences
• Produced weekly progress reports including earned value reporting for trades, and
administration activities
• Produced multiple system turnovers to Field Engineering, History Dockets for Pressure
Boundary Piping and History Files for Electrical Systems
• Submitted multiple claim letters to the client and successfully secured all funds
requested. This was achieved due to the thorough documenting of delays and tracking
of extra scope.
• Represented management during the successful site audit to achieve ISO 9001-2000,
and CSA Z299.3 -1985 Certification
• Led the team in the successful achievement of W47.1 welding designation from the
Canadian Welding Bureau
• Secured 3 million dollars of Mechanical and Electrical work for the site through estimates
and proposal preparation and submissions
Plan Energy, May 2006 – June 2007
Owner/Construction Manager/Consultant
• Founded Plan Energy, a Nuclear Contracting Company through a partnering with Plan
Group in Toronto. and Led the management team to successfully achieve certificates of
authorization for N285:2006 Class 1,2,3,4, and 6, B31.1, B31.3 QA programs
• Successfully authored and achieved TSSA approved ASME IX weld procedures
• Directed our team in setting up a safety program for trades workers
• Successfully estimated work using Accubid estimating tool
• Management Representative for Signatory agreements to several trade unions
Black & McDonald, March 2005 - April 2006
Pickering Nuclear Site Manager
• Responsible for all B Side Pickering business including 8 office personnel and up to 300
trades.
• Responsible for site administration and supervision in areas including: Safety, Quality
and Production
• Maintenance and modifications on Units 1, 4-8
• Schedule and estimate production for Bidding
• Performance Monitoring and Tracking
• Billing
• Jobs Performed: P471, P473, P551, P561, P681 Maintenance Outages, Boiler Divider
Plate work, Boiler Open and Close, Overflow Maintenance Work, Nuclear Security
Camera Installations, Chafing Shield Modifications, and Feeder Cabinet Work
Black & McDonald, July 2004 – March 2005
Site General Superintendent, Units 1, 4-8
• Maintaining a safe work environment for 180 site workers
• Adhering to schedules
• Planning work
• Cost control reporting

PAUL NEWBY RESUME 2015 May

  • 1.
    Paul Newby 83 TrilliumCr Barrie Ontario L4N 6H6 705-737-0792 Cell: 705-796-1835 newbs7@rogers.com SUMMARY With my 17 years of supervision experience and as a former Nuclear Construction Company owner and Red Seal Steamfitter, I have proven skills and experience within the Oil & Gas, Nuclear, and Industrial construction industries. I am currently security cleared through criminal background checks by CSIS and the OPP. Never afraid to take on challenging responsibilities, I was requested to complete the post Fukushima nuclear containment filter vent piping work in South Korea, which was completed on schedule. Using my experience of being a certified Canadian Welding Bureau (CWB) Welding Supervisor, I have also been successful in obtaining certified audited welding programs for both ASME, and CWB at previous employers. I am always keen to learn new skills, and engage my own, to conquer a current challenge or mentor others I work with. In 2006 I created a business with successfully completed, code compliant construction projects at Chalk River Laboratories Maple Reactor Construction Project between 2006 and 2008. Practical application of my abilities is one of my strengths, which was evident during the start up phase of my nuclear construction company. The ability to utilize my experience in quality assurance, pressure piping code knowledge, and estimating, allowed for the creation of a profitable business. Creating and utilizing lessons learned for future planning, and developing a safety conscious work environment through actions and attitude, is how I lead a team. Through years of high stress work environments during the managing, planning, and execution phases of planned and forced maintenance outages at power plants, I demonstrated excellent organizational, communication and leadership skills. Some direct examples of leadership abilities include the positive experience as the CSAO John M Beck Award winning B side Pickering Nuclear Joint Health and Safety Comittee Chairman, along with the Due Diligence course I created and taught to over 500 Managers, Supervisors and Trades people at Husky Sunrise Oil Sands Project. I’ve consistently held trades people, and my supervision accountable for their actions, to promote due diligence. I have vast experience dealing with union jurisdictional issues, and grievances throughout my career. Mentoring supervision and workers in the field and monitoring for compliance to management quality and safety expectations is one of my greatest strengths. I have the ability and demeanor to successfully lead a team or work in a team to complete difficult work in challenging environments.
  • 2.
    EDUCATION Sir Wilfrid LaurierCollegiate Institute, 1987, O.S.S.H.G Diploma George Brown College - Trade School, 1995, and 1997 Basic Plumbing, Intermediate and Advanced Steamfitting Red Seal Inter-Provincial Steamfitter License CSA W47.1/W59 Canadian Welding Bureau Certified Welding Supervisor Other Related Courses Engineering Change Control O.H.S.A - W.S.I.B. Safety Certified Member # A04144 Construction Sector Specific (performed as Management Representative at Ontario Power Generation and Worker Representative at Pearson International Airport in 1998) Achievements Co-winner of the CSAO John M Beck award for Exceptional Work as Management Co- chairman of the Joint Health and Safety Committee for Pickering B Nuclear Generating Station Along with Partners, in 2006 created a new CSA N285.0, ISO 9001:2000, ASME B31.1, 31.3, Z299.3 -1985 Certified Nuclear Construction/Service Company – Plan Energy, and successfully bid, managed, and completed multi discipline trades work on nuclear sites. EXPERIENCE Husky Sunrise – Sunrise Energy Project April 2014-Present Husky Energy Construction Lead, Acting Construction Manager • I was the liaison between the Construction contractors and the Husky Project team for field activities including progress, engineering changes, contract interpretation, and coordination with other Contractors and Husky Operations and Commissioning and Start up personnel • Managed 30 Mechanical/Electrical/Instrumentation/Pre Commissioning Construction Coordinators • Created and taught a mandatory Construction Supervisor Due Diligence Course for all site supervision. The course was so successful that requests were made to present the material to entire workforces of sub contractors. Over 500 attended the class throughout the project timeline • Signed as the Husky Energy Manager for turnover of systems to Commissioning • Authorized Contract Change Requests for scope addition and deletion • Project had an average workforce of 2000 workers
  • 3.
    AECL Chalk RiverLaboratories April 2013-April 2014 Field Engineering- Field Installation Specialist • Joined the Integrated Implementation Plan-IIP Hardware Group tasked to install/replace/repair the various mechanical and civil systems and components for the NRU Reactor to comply with CNSC Orders • Built Code Compliant detailed Work Packages to inject into the NRU Reactor rolling 13 week maintenance schedule • Authored Detailed Technical Scopes of work for several systems and other work including Helium Upper Vessel Leak Repair, The NRU Concrete Facade Inspection, Several Large Valve Replacements, and The NRU Reactor Roof Replacement Project • Authored Detailed Work Plans and submitted them to TRAK (AECL’s Document Control System) for Engineering, Radiation Protection, and QA Review and Comment • Input material requests for code compliant purchases of material and equipment • Engaged Engineering in the field to resolve challenges related to installation such as expediting/initiating Field Changes and obtaining approvals to progress work. • Performed surveillance of the trades to ensure the necessary approvals and signatures were obtained and completed in the work packages each day. • Performed the role of Construction Superintendent and Construction Sponsor which included escorting duties, obtaining work permits, engaging Facility Management to obtain approvals for various items such as fire clearances, laydown areas, security camera moves, and scheduling training courses for outside Contractors AREVA NP Canada Ltd. Jan 2009-March 2013 Mechanical Superintendent Bruce Nuclear Generating Station Work Area Manager Bruce Nuclear Generating Station Unit 6 MOT Replacement Field Engineer Supporting the Bruce B Chiller Replacement Project • Canadian Welding Bureau Certified Welding Supervisor • Initiated and Managed the CWB Certification Process for AREVA NP Canada Ltd, and co-authored all of the General Welding Procedures, • Worked in South Korea for AREVA NP Canada Ltd. As Lead Piping Supervisor on the Post Fukushima Containment Filter Vent Project at Wolsong Nuclear Plant Unit 1. This was a Nuclear Class 2 and Class 6 piping project with several Nuclear Penetrations into the Reactor Building. This job was under extreme schedule pressure and was completed in time to avoid the Nuclear Regulator shutting the Unit down. The language barrier was overcome with patience and clear communication skills. • I prepared company mark up assignments and chaired several Construction Mark Up Meetings with Union Business Agents • Supervised Boilermakers during the Unit1 & 2 Nuclear Class III Maintenance Cooling Heat Exchanger Disconnect/Removal from the Bruce A Nuclear Plant. • At Bruce B site I executed the role of Work Area Manager for the first Main Output Transformer Replacement performed by a Contractor other than Ontario - Hydro One. This was a replacement of a Westinghouse Transformer with an ABB Transformer. • During the design process for the Bruce B Chiller(s) Replacement Project, I performed daily Constructability site work to minimize future field changes. Constructability walk downs and reviews were performed along with the installation contractor to obtain buy in before the job started. This proved invaluable to limit the number of field changes.
  • 4.
    Plan Energy, Owner-July 2007 – Jan 2009 Chalk River Laboratories Construction Manager Secured the contracts at Chalk River Laboratories through estimates and negotiations with AECL Management to complete the remaining mechanical and electrical modifications to: o The New Processing Facility o Dedicated Isotope Facility o Maple 1 Reactor • Managed the Fabrication and installation of pressure piping for several systems including De-Ionized Water, Closed Loop Cooling, High Pressure Steam and Condensate, Process Water Piping, and Compressed Air, • Managed the installation work inside the Hot Cells in NPF, which included complex tubing installations, confined space welding, and mechanical work • Managed the electrical work throughout the Dedicated Isotope Facility including High Bay Lighting, Wire Remediation, Load Bank Installation, Fire alarm system modifications, and controls for the piping systems installed • 21 Trades on site for 2007-2008 with only 2 first aid occurrences • Produced weekly progress reports including earned value reporting for trades, and administration activities • Produced multiple system turnovers to Field Engineering, History Dockets for Pressure Boundary Piping and History Files for Electrical Systems • Submitted multiple claim letters to the client and successfully secured all funds requested. This was achieved due to the thorough documenting of delays and tracking of extra scope. • Represented management during the successful site audit to achieve ISO 9001-2000, and CSA Z299.3 -1985 Certification • Led the team in the successful achievement of W47.1 welding designation from the Canadian Welding Bureau • Secured 3 million dollars of Mechanical and Electrical work for the site through estimates and proposal preparation and submissions Plan Energy, May 2006 – June 2007 Owner/Construction Manager/Consultant • Founded Plan Energy, a Nuclear Contracting Company through a partnering with Plan Group in Toronto. and Led the management team to successfully achieve certificates of authorization for N285:2006 Class 1,2,3,4, and 6, B31.1, B31.3 QA programs • Successfully authored and achieved TSSA approved ASME IX weld procedures • Directed our team in setting up a safety program for trades workers • Successfully estimated work using Accubid estimating tool • Management Representative for Signatory agreements to several trade unions
  • 5.
    Black & McDonald,March 2005 - April 2006 Pickering Nuclear Site Manager • Responsible for all B Side Pickering business including 8 office personnel and up to 300 trades. • Responsible for site administration and supervision in areas including: Safety, Quality and Production • Maintenance and modifications on Units 1, 4-8 • Schedule and estimate production for Bidding • Performance Monitoring and Tracking • Billing • Jobs Performed: P471, P473, P551, P561, P681 Maintenance Outages, Boiler Divider Plate work, Boiler Open and Close, Overflow Maintenance Work, Nuclear Security Camera Installations, Chafing Shield Modifications, and Feeder Cabinet Work Black & McDonald, July 2004 – March 2005 Site General Superintendent, Units 1, 4-8 • Maintaining a safe work environment for 180 site workers • Adhering to schedules • Planning work • Cost control reporting