                                                GARY L. TAUZIN, PE 
                    Project Director, Senior Project Manager, Construction Manager 
	
PROFILE:	

A Professional Engineer (PE) with 35 years of experience in construction & project management 
of offshore oil & gas facilities:   platforms, pipelines, marine equipment ‐ including ultra‐
deepwater, dynamically‐positioned, semi‐submersible drilling rigs, with commitment to safety 
and total quality management.   Scope has included contracts, engineering, procurement, 
fabrication, transportation, installation, hook‐up & commissioning.   Experience also includes:  
domestic & international projects; business development; liaising with various government 
agencies, certification agencies, and marine warranty surveyors; risk assessment & mitigation; 
team building; scheduling; budgets; claims resolution. 
	
PROFESSIONAL	EXPERIENCE:	

       Gary L. Tauzin, Inc   Independent Contractor                                                   1983 – Present 
        Various Worldwide Locations:  Houston, Dubai, London,  
        Singapore, Kuala Lumpur, Baku, Cheleken, Rio de Janerio 

Seconded to various clients to serve as Project Director (PD), Senior Project Manager (SPM), 
and/or Construction Manager (CM), on the following major international offshore oil & gas 
projects.  Contract values ranged from $55 million to $750 million:   
 
    Petrofac –Sr Proj Manager‐(2008‐2009) – Managed the “Appraise & Select” portion of 
       the Cendor Phase II Offshore Development Project (Malaysia) studying and costing 
       several development options; (2003‐2004)  “P‐50” FPSO ‐ Production Modules “2A,” 
       “2B,” “3A,” “3B” (New Iberia, La.) 
       Noble Drilling & Westney Consulting Group ‐ Sr Project Manager (2004‐2008) Noble 
        Danny Adkins (New Build Semi‐submersible DP‐3 rig (Houston & Singapore); Noble Paul 
        Wolfe (Drydock/Upgrade Semi‐submersible DP‐2 rig (Houston & Rio de Janerio) 
       MCCI/McDermott‐Proj Dir (2001‐2002), Caspian Sea:  AIOC “CA PDQ” Topsides (15,000 t) 
        & Pipelines (200 km/30‐inch), including SPS Yard upgrade and Laybarge upgrade. 
       International Petroleum Corp (Lundin Oil):  Proj Dir (1996‐1997) Block PM‐3 Early Oil, 
        Malaysia (Phase 1); Phase 2 Engineering;  Operations Mgr (1995) Larmag‐Cheleken Joint 
        Venture, (Turkmenistan);  CM (1992‐1994) Bukha Production Platf & Pipeline (Oman).  
       Crescent Petroleum‐Sr Proj Mgr (1986‐1988) Sharjah UAE:  Thamama Development:  
        Construction of five wellhead platforms and infield flow lines. 
       Dubai Natural Gas Company/Maritime Industrial Services‐Sr Proj Mgr (1983‐1985):   
        “ACP‐1” and “ACP‐2” Compressor Platforms, including Living Quarters; Rashid “A” 
        Platform ‐ including 110 miles offshore pipelines (Dubai, UAE). 
 
Over this same period, provided other miscellaneous consulting services based in Houston to fill 
in the gaps between major construction projects: 
 
	
  22603 Bridgehaven Dr; Katy, TX. 77494, USA      e‐mail: gltauzin@cajun.net      Tel: (713) 429‐4859; Mobile: (985) 859 5744 
                                                                
Gary L. Tauzin, PE
Page 2

       Paragon Engineering/IFC (World Bank) (2003) – Key consultant preparing Third Party 
        Project Review and Cost Certification for AIOC’s “ACG” Field Development, Caspian Sea. 
       BHP Billiton (2002) –– Prepared Contracting Strategy and Invitation to Bid documents for 
        the Angoustra Field Development for Offshore Trinidad. 
       ABB Lummus Crest (1994‐1995):   Mobil OSO NGL Recovery Project, Nigeria – Prepared 
        bid documents; conducted bid evaluation and analysis for “RX” Topsides Fabrication 
        subcontract award; conducted fabrication yard survey and evaluation.  
       Conoco, Houston (1989‐1990):   “TLWP” (Tension Leg Wellhead Platform) project.  
        Assisted Project Manager with evaluating fabrication change orders and a $20 million 
        insurance claim; served as his representative during offshore load out, transportation 
        and installation activities for TLWP in 1,760 feet water depth. 
       Interface Consulting International (1985‐1995):  Provided claims analysis; litigation 
        support; and management consulting services for the following ICI clients:   Conoco, ABB, 
        Texaco, Enron, CNG, Wellstream, Global Industries, OEDC, and Occidental Petroleum. 

       McDermott International, Inc.    Various Positions                         1974 ‐ 1983 
        New Orleans, La; Dubai, UAE ‐ including Saudi Arabia, Abu Dhabi, Iran, India 

Commenced career with McDermott Group as an Electrical/Instrumentation Design Engineer in 
the New Orleans Offshore Facilities Design Office, followed by assignment overseas to Dubai 
Operations as a Production Engineer in the fabrication yard and progressing to Offshore Hookup 
& Commissioning (HUC) Engineer; Project Manager, Area Coordinator (Iran Projects); Senior 
Operations Engineer (Fabrication), Division Engineer, Fabrication Yard Manager (Dubai Yard). 
 
Major Projects: 
 
     Dubai Petroleum (DPC) – “C‐Train” Platform and 5 Jackets 
       McDermott (In house) – New‐build Cargo Barges ‐ Intermac 267 and 268. 
       ONGC, India – “BHN” (Bombay High North) Production Platform;  “SQ,” “SS,” “ST” 
        Wellhead Platforms; “NC” & “ND” Platforms (HUC);  “NA” Platform (Fire Repair) 
       OSCO, Iran – 10 Jackets and 4 Capping Structures for Pars Field 
       LAPCO (Arco), Iran:  Sassan Field Central Production Platform & “LQ2” Living Quarters 
       ADMA, Abu Dhabi:  Umm Shaif Wellhead Platforms  
       Aramco, Saudi Arabia:  Safaniyah “GOSP 3” Platform (HUC) 
       AOC, Khafgi, Saudi Arabia:  “Y‐2” Flow Station (Fire Repair) 

ACADEMIC	QUALIFICATIONS	&	AFFILIATIONS:	
	
	
    Bachelor of Science in Electrical Engineering ‐ Louisiana State University 
       Registered Professional Engineer (Reg. No. 14295) ‐ Louisiana. 
       Post‐Graduate Studies – MBA curriculum  
 
Gary L. Tauzin, PE                                  ATTACHMENT                       Selected Major Projects
      Page 3




    Noble Danny Adkins New Semi-submersible DP-3 Rig                      Noble Paul Wolfe Dry-docking & Upgrade
   12,000 ft Water Depth, 37,000 ft Drilling Depth, 1250 ton,       10,000 ft WD, Special Survey, Add Sponsons, Deck Ext,
              Topdrive, 200-man Living Quarters                         Swgr Rm Ext, Upgrade Mud System to 7500 psi




Bukha “A” Platform, Straits of Hormuz (Offshore Oman), 300-ft        AIOC’s CA PDQ Topsides, Caspian Sea, 15,000 tons,
  Water Depth; 10,000 bopd, 6-man Emergency Shelter, Test            200 man LQ, 2000 hp drilling rig; 57 MW Power Gen;
  Separator, 2-slots plus subsea well with Coflexip flowline;      48 well slots; 460 mbopd oil processing; 1,050 mmscfd gas
                  30 km of 16-in OD pipeline                                  injection; 225 mbwpd water injection




           P-50 FPSO Production Modules 2A/2B                         P-50 FPSO Production Modules 3A/3B, Two-Trains
             Amine System/TEG Glycol System                        180,000 bopd Processing/Test Sep/Metering/Gas Compressor




       Dugas ACP-1 Compressor Platform, 1,400 tons,              Bombay High North (BHN) Production Platform; 76-man Living
     36-man Living Quarters, 5,000 hp Gas Compression;          Quarters; 10 MW Power Generation; 120,000 bopd; 400 mmscfd Gas
                      Control Room                                           Processing & Compression; MOL Pumps
       

More Related Content

What's hot

Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
resume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Aliasresume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan AliasMazlan Alias
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)Norfadzly Nordin
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
4481 4485.output
4481 4485.output4481 4485.output
4481 4485.outputj1075017
 
Etimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project InfoEtimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project InfoMazharuddin Ansari
 

What's hot (17)

Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
Marine update resume
Marine update resumeMarine update resume
Marine update resume
 
Presentation_eng
Presentation_engPresentation_eng
Presentation_eng
 
resume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Aliasresume-Sept 2016 Mazlan Alias
resume-Sept 2016 Mazlan Alias
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
Asl batam presentation 2015 v1
Asl batam   presentation 2015 v1Asl batam   presentation 2015 v1
Asl batam presentation 2015 v1
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
Cpcl
CpclCpcl
Cpcl
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
4481 4485.output
4481 4485.output4481 4485.output
4481 4485.output
 
Etimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project InfoEtimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project Info
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
WSR Resume
WSR ResumeWSR Resume
WSR Resume
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 

Viewers also liked

Sohail Shahzad Updated CV
Sohail Shahzad Updated CVSohail Shahzad Updated CV
Sohail Shahzad Updated CVSohail Shahzad
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cvS Kumar
 
Top 8 drilling supervisor resume samples
Top 8 drilling supervisor resume samplesTop 8 drilling supervisor resume samples
Top 8 drilling supervisor resume samplesevansmary938
 
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015Donna Lee Cain
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Rakesh Arora
 
Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens
 
Cv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gasCv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gasBevan Lane
 
LOU NICKSIC - Industrial - Oil and Gas Resume 041116
LOU NICKSIC - Industrial - Oil and Gas Resume  041116LOU NICKSIC - Industrial - Oil and Gas Resume  041116
LOU NICKSIC - Industrial - Oil and Gas Resume 041116Lou Nicksic
 
Ali Khosrowzadeh Ah Drilling Resume After
Ali Khosrowzadeh   Ah Drilling Resume AfterAli Khosrowzadeh   Ah Drilling Resume After
Ali Khosrowzadeh Ah Drilling Resume Afteramkhosro
 
Barrie Dennis Resume
Barrie Dennis ResumeBarrie Dennis Resume
Barrie Dennis ResumeBarrie Dennis
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 

Viewers also liked (18)

Cv english
Cv englishCv english
Cv english
 
Sohail Shahzad Updated CV
Sohail Shahzad Updated CVSohail Shahzad Updated CV
Sohail Shahzad Updated CV
 
Imad A. Darweesh Cv
Imad A. Darweesh CvImad A. Darweesh Cv
Imad A. Darweesh Cv
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
Cristian Marcu Resume
Cristian Marcu ResumeCristian Marcu Resume
Cristian Marcu Resume
 
Caterina Cobino CV 2015
Caterina Cobino CV 2015Caterina Cobino CV 2015
Caterina Cobino CV 2015
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
Vinu cv august 16
Vinu cv august 16Vinu cv august 16
Vinu cv august 16
 
Top 8 drilling supervisor resume samples
Top 8 drilling supervisor resume samplesTop 8 drilling supervisor resume samples
Top 8 drilling supervisor resume samples
 
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
 
Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016
 
Cv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gasCv bevan lane january 2014 oil and gas
Cv bevan lane january 2014 oil and gas
 
LOU NICKSIC - Industrial - Oil and Gas Resume 041116
LOU NICKSIC - Industrial - Oil and Gas Resume  041116LOU NICKSIC - Industrial - Oil and Gas Resume  041116
LOU NICKSIC - Industrial - Oil and Gas Resume 041116
 
Ali Khosrowzadeh Ah Drilling Resume After
Ali Khosrowzadeh   Ah Drilling Resume AfterAli Khosrowzadeh   Ah Drilling Resume After
Ali Khosrowzadeh Ah Drilling Resume After
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
Barrie Dennis Resume
Barrie Dennis ResumeBarrie Dennis Resume
Barrie Dennis Resume
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 

Similar to Gl Tauzin Resume 2011 Generic

Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CVRahul Shinde
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
CV LINKEDIN Kolli Ramesh Babu cv
CV LINKEDIN Kolli Ramesh Babu cvCV LINKEDIN Kolli Ramesh Babu cv
CV LINKEDIN Kolli Ramesh Babu cvRamesh Babu
 
Resume for tony_kettlewell
Resume for tony_kettlewellResume for tony_kettlewell
Resume for tony_kettlewellConfidential
 
Kolli Ramesh Babu cv
Kolli Ramesh Babu cvKolli Ramesh Babu cv
Kolli Ramesh Babu cvRamesh Babu
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_MastDoug Mast
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTj Dickey
 
# Harshad CV 2015 07
# Harshad CV 2015 07# Harshad CV 2015 07
# Harshad CV 2015 07Harshad Patel
 

Similar to Gl Tauzin Resume 2011 Generic (20)

Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CV
 
Aaron's Resume 2014 new
Aaron's Resume 2014 newAaron's Resume 2014 new
Aaron's Resume 2014 new
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
Scott Smith-CV
Scott Smith-CVScott Smith-CV
Scott Smith-CV
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
CV LINKEDIN Kolli Ramesh Babu cv
CV LINKEDIN Kolli Ramesh Babu cvCV LINKEDIN Kolli Ramesh Babu cv
CV LINKEDIN Kolli Ramesh Babu cv
 
SHAKIR RESUME-2
SHAKIR RESUME-2SHAKIR RESUME-2
SHAKIR RESUME-2
 
Resume for tony_kettlewell
Resume for tony_kettlewellResume for tony_kettlewell
Resume for tony_kettlewell
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
Kolli Ramesh Babu cv
Kolli Ramesh Babu cvKolli Ramesh Babu cv
Kolli Ramesh Babu cv
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
PQ_SEC _2014
PQ_SEC _2014PQ_SEC _2014
PQ_SEC _2014
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 
# Harshad CV 2015 07
# Harshad CV 2015 07# Harshad CV 2015 07
# Harshad CV 2015 07
 
JESEDLOPECCV042017
JESEDLOPECCV042017JESEDLOPECCV042017
JESEDLOPECCV042017
 

Gl Tauzin Resume 2011 Generic

  • 1.   GARY L. TAUZIN, PE  Project Director, Senior Project Manager, Construction Manager  PROFILE: A Professional Engineer (PE) with 35 years of experience in construction & project management  of offshore oil & gas facilities:   platforms, pipelines, marine equipment ‐ including ultra‐ deepwater, dynamically‐positioned, semi‐submersible drilling rigs, with commitment to safety  and total quality management.   Scope has included contracts, engineering, procurement,  fabrication, transportation, installation, hook‐up & commissioning.   Experience also includes:   domestic & international projects; business development; liaising with various government  agencies, certification agencies, and marine warranty surveyors; risk assessment & mitigation;  team building; scheduling; budgets; claims resolution.  PROFESSIONAL EXPERIENCE:  Gary L. Tauzin, Inc   Independent Contractor  1983 – Present  Various Worldwide Locations:  Houston, Dubai, London,   Singapore, Kuala Lumpur, Baku, Cheleken, Rio de Janerio  Seconded to various clients to serve as Project Director (PD), Senior Project Manager (SPM),  and/or Construction Manager (CM), on the following major international offshore oil & gas  projects.  Contract values ranged from $55 million to $750 million:       Petrofac –Sr Proj Manager‐(2008‐2009) – Managed the “Appraise & Select” portion of  the Cendor Phase II Offshore Development Project (Malaysia) studying and costing  several development options; (2003‐2004)  “P‐50” FPSO ‐ Production Modules “2A,”  “2B,” “3A,” “3B” (New Iberia, La.)   Noble Drilling & Westney Consulting Group ‐ Sr Project Manager (2004‐2008) Noble  Danny Adkins (New Build Semi‐submersible DP‐3 rig (Houston & Singapore); Noble Paul  Wolfe (Drydock/Upgrade Semi‐submersible DP‐2 rig (Houston & Rio de Janerio)   MCCI/McDermott‐Proj Dir (2001‐2002), Caspian Sea:  AIOC “CA PDQ” Topsides (15,000 t)  & Pipelines (200 km/30‐inch), including SPS Yard upgrade and Laybarge upgrade.   International Petroleum Corp (Lundin Oil):  Proj Dir (1996‐1997) Block PM‐3 Early Oil,  Malaysia (Phase 1); Phase 2 Engineering;  Operations Mgr (1995) Larmag‐Cheleken Joint  Venture, (Turkmenistan);  CM (1992‐1994) Bukha Production Platf & Pipeline (Oman).    Crescent Petroleum‐Sr Proj Mgr (1986‐1988) Sharjah UAE:  Thamama Development:   Construction of five wellhead platforms and infield flow lines.   Dubai Natural Gas Company/Maritime Industrial Services‐Sr Proj Mgr (1983‐1985):    “ACP‐1” and “ACP‐2” Compressor Platforms, including Living Quarters; Rashid “A”  Platform ‐ including 110 miles offshore pipelines (Dubai, UAE).    Over this same period, provided other miscellaneous consulting services based in Houston to fill  in the gaps between major construction projects:    22603 Bridgehaven Dr; Katy, TX. 77494, USA      e‐mail: gltauzin@cajun.net      Tel: (713) 429‐4859; Mobile: (985) 859 5744   
  • 2. Gary L. Tauzin, PE Page 2  Paragon Engineering/IFC (World Bank) (2003) – Key consultant preparing Third Party  Project Review and Cost Certification for AIOC’s “ACG” Field Development, Caspian Sea.   BHP Billiton (2002) –– Prepared Contracting Strategy and Invitation to Bid documents for  the Angoustra Field Development for Offshore Trinidad.   ABB Lummus Crest (1994‐1995):   Mobil OSO NGL Recovery Project, Nigeria – Prepared  bid documents; conducted bid evaluation and analysis for “RX” Topsides Fabrication  subcontract award; conducted fabrication yard survey and evaluation.    Conoco, Houston (1989‐1990):   “TLWP” (Tension Leg Wellhead Platform) project.   Assisted Project Manager with evaluating fabrication change orders and a $20 million  insurance claim; served as his representative during offshore load out, transportation  and installation activities for TLWP in 1,760 feet water depth.   Interface Consulting International (1985‐1995):  Provided claims analysis; litigation  support; and management consulting services for the following ICI clients:   Conoco, ABB,  Texaco, Enron, CNG, Wellstream, Global Industries, OEDC, and Occidental Petroleum.   McDermott International, Inc.    Various Positions                 1974 ‐ 1983    New Orleans, La; Dubai, UAE ‐ including Saudi Arabia, Abu Dhabi, Iran, India  Commenced career with McDermott Group as an Electrical/Instrumentation Design Engineer in  the New Orleans Offshore Facilities Design Office, followed by assignment overseas to Dubai  Operations as a Production Engineer in the fabrication yard and progressing to Offshore Hookup  & Commissioning (HUC) Engineer; Project Manager, Area Coordinator (Iran Projects); Senior  Operations Engineer (Fabrication), Division Engineer, Fabrication Yard Manager (Dubai Yard).    Major Projects:     Dubai Petroleum (DPC) – “C‐Train” Platform and 5 Jackets   McDermott (In house) – New‐build Cargo Barges ‐ Intermac 267 and 268.   ONGC, India – “BHN” (Bombay High North) Production Platform;  “SQ,” “SS,” “ST”  Wellhead Platforms; “NC” & “ND” Platforms (HUC);  “NA” Platform (Fire Repair)   OSCO, Iran – 10 Jackets and 4 Capping Structures for Pars Field   LAPCO (Arco), Iran:  Sassan Field Central Production Platform & “LQ2” Living Quarters   ADMA, Abu Dhabi:  Umm Shaif Wellhead Platforms    Aramco, Saudi Arabia:  Safaniyah “GOSP 3” Platform (HUC)   AOC, Khafgi, Saudi Arabia:  “Y‐2” Flow Station (Fire Repair)  ACADEMIC QUALIFICATIONS & AFFILIATIONS:   Bachelor of Science in Electrical Engineering ‐ Louisiana State University   Registered Professional Engineer (Reg. No. 14295) ‐ Louisiana.   Post‐Graduate Studies – MBA curriculum    
  • 3. Gary L. Tauzin, PE ATTACHMENT Selected Major Projects Page 3 Noble Danny Adkins New Semi-submersible DP-3 Rig Noble Paul Wolfe Dry-docking & Upgrade 12,000 ft Water Depth, 37,000 ft Drilling Depth, 1250 ton, 10,000 ft WD, Special Survey, Add Sponsons, Deck Ext, Topdrive, 200-man Living Quarters Swgr Rm Ext, Upgrade Mud System to 7500 psi Bukha “A” Platform, Straits of Hormuz (Offshore Oman), 300-ft AIOC’s CA PDQ Topsides, Caspian Sea, 15,000 tons, Water Depth; 10,000 bopd, 6-man Emergency Shelter, Test 200 man LQ, 2000 hp drilling rig; 57 MW Power Gen; Separator, 2-slots plus subsea well with Coflexip flowline; 48 well slots; 460 mbopd oil processing; 1,050 mmscfd gas 30 km of 16-in OD pipeline injection; 225 mbwpd water injection P-50 FPSO Production Modules 2A/2B P-50 FPSO Production Modules 3A/3B, Two-Trains Amine System/TEG Glycol System 180,000 bopd Processing/Test Sep/Metering/Gas Compressor Dugas ACP-1 Compressor Platform, 1,400 tons, Bombay High North (BHN) Production Platform; 76-man Living 36-man Living Quarters, 5,000 hp Gas Compression; Quarters; 10 MW Power Generation; 120,000 bopd; 400 mmscfd Gas Control Room Processing & Compression; MOL Pumps