2. PERSONAL DETAILS
SURNAME: LOCKETT
FIRST NAME; EUGENE DAVID
DATE OF BIRTH: 18 APRIL 1986
ID NO: 68 04 18 5025 086
ADRESS: 10 AACHEN ROAD
EVANDER - SOUTH AFRICA
POSTAL ADRESS: P.O.BOX 2348
EVANDER – SOUTH AFRICA
2280
PHONE NUBER: +27724325069 / +27847706412
E-MAIL: elockett@telkomsa.net
MARITAL STATUS: DIVORCED
DEPENDANTS: BIANCA (DAUGHTER)
EDUAN (SON)
HOME LANGUAGE: AFRIKAANS
SECOND LANUAGE: ENGLISH
DRIVER’S LICENCE: CODE 8
NATIONALITY: SOUTH AFRICAN
3. PERSONAL OVERVIEW
My core experience is in the Oil & Gas, Mining and Petrochemical industries with vast
experience in project execution from Initiation to implementation and completion with
commissioning assistance and handover.
I have worked outside South Africa and countries include: Saudi Arabia, Kazakhstan and
Botswana.
I have been instrumental in promoting a safety culture and control & management of a safe
and health team as well as to protect our environment.
Focusing on customer satisfaction by delivering the projects on time, within budget, safely
and to the satisfactory quality of both the client and my superiors was my ultimate goal.
Through the years of experience and exposure to International projects, cultures,
environments and expectations, I have developed my reputation to engage in challengers and
to complete them successfully.
Commercial and financial controls and management are fundamental aspects to ensure that I
do not expose the company to risks and understanding the contract agreement, terms and
conditions, enables me to proactively identify any risks and to act and mitigate them as soon
as possible.
I also comply with our company policies and procedures and produce reports as required, to
support other departmental reports and communication.
Finally, with my self-commitment and experience, although I qualified as a welder (Sweiser),
I gained tremendous experience in both Electrical and Instrumentation and I am fully
acquainted with applying drawings and client requirements and standards to execute the
projects. I believe that I would be a great asset to any company and I would like to share my
experiences with other team members in order to develop individuals and the company at
large.
4. EDUCATIONAL QUALIFICATION
School Attended: Vereeniging Technical High
South Africa
1982-1984
Grade 10 Passed
Further Education: 1989/11/14
Diploma: J6/168
NTC 1 - April 1988
(Engineering Drawings, Metal work and Mathematics)
HIGHEST FORMAL QUALIFICATION
TRADE DIPLOMA
Institute: Dorbyl Heavy Engineering
South Africa
Welder (Sweiser) Qualified – Diploma – Olifantsfontein
1985-1989 (4 Years)
COURSES
General Health & Safety Training 17/10/1995 NOSA
Installation & Maintenance of Explosion
protected electrical apparatus used in
potentially explosive atmospheres
30/08/2001 EXDUS
New Engineering Contracts (NEC) 16/11/2006 Binnington Copeland &
Associates
Incident & Injury free induction
certification Republic of Kazakhstan
23/11/2007 HF
Hazard Identification & Risk assessment 31/01/2007 Advantage a.c.t
Construction Contract Law 31/10/2007 Alusani
Training for Construction Supervisors 30/07/2008 International Risk Control
Academy
Construction regulations (2003) and draft
amendments
01/11/2011 The Conference Zone
Mines Health and Safety 20/03/2009 Agisanang
Hazard Identification & Risk assessment 17/10/2010 HDM Productions
Building Contracts Minor Works
Agreement
11/04/2012 JBCC
5. EXPERIENCE
EMPLOYMENT HISTORY:
LATEST:
Company: STEFANUTII STOCKS E&I
Position Held: SITE MANAGER E&I
Client: SASOL (Oil & Gas / Petrochemical)
Project Title: 1. BULLETS PROJECT ELECTRICAL AND
INSTRUMENTS
2. NEW COMPLETE OUTSIDE ASH SUBSTATION
INCL. EQUIPMENT AND CABLING
INFRASTRUCTURE AND CABLING
Period: 15/12/2013 TO 23/12/2014 (Contract completed)
Reported to: Mr. GEORGE WOOD
My responsibilities as an E&I Site manager was to manage and control all resources,
equipment and materials as well and to ensure that all work was executed safely, within
schedule, to the specifications and standards of the client, industry and the company.
Complying to the company policies and procedures and ensuring that personnel abide by
them. Ensure that all work performed for both Electrical and Instrumentation are performed
to the best acceptable standards and quality requirements.
Attending meetings both internally and externally with the clients and providing effective
feedback and reports as required. To ensure that all deliverables are fulfilled as per the
requirement and standards agreed. To prepare reports and attend meetings to provide
feedback on progress as well as to update reporting schedules and documents.
To ensure that proactive planning is done to prevent any delays in execution of the work and
to ensure that orders are placed correctly as per specifications and area requirements.
To provide assistance to the team to ensure timely completion of the project in a safe manner.
Company: GRINAKER-LTA M&E
Position Held: SITE MANAGER
Client: SASOL (Oil & Gas / Petrochemical)
Project Title: C3 SPLITTER PROJECT
ELECTRICAL & INSTRUMENTS
Period: 27/02/2012 TO 30/04/2013
Reported to: THEO NAICKER
Company: GRINAKER-LTA OIL&GAS
6. Position Held: SITE MANAGER
Client: SASOL TEMANE MOZAMBIQUE
Project Title: ELECTRICAL & INSTRUMENTATION
GAS WELL INSTALATION WITH SEPERATOR UNITS
Period: 01/11/2011 TO 26/2/2012
Company: GRINAKER-LTA OIL&GAS
Position Held: SUPERINDENDENT
Client: SASOL PETROCHEMICAL & EPCM’s
O&G / PETROCHEMICAL
Project Title: GENERAL PROJECTS (MULTIPLE)
ELECTRICAL / INSTRUMENTS
Period: 01/08/2009 TO 2011/10/30
Company: GRINAKER-LTA METALS & MINERALS
Position Held: SITE MANAGER
Client: ANGLO MINE WATERVAL
Project Title: NEW STEEL BULDING ELECTRICAL
POWER INSTALATION
Period: 2008/05/01 TO 2009/08/30
Reported to: S.GILLILAND
Company: SEPAM
Position Held: CRAFT INSTRUMENT SUPERVISOR
Project Title: SOUR GAS INJECTION & SECOND
GENERATION PROJECT - KAZAKHSTAN
Period: 2007/11/19 TO 2008/04/20
Company: GRINAKER-LTA M&M
Position Held: SITE MANAGER
Client: ANGLO REFREHES MINRAL MINE
Project Title: NEW MAIN ELECTRICAL POWER
INSTALATION
Period: 2006/12/01 TO 2007/11/10
Reported to: S. GILLILAND
Company: GRINAKER –LTA M&M
7. Position Held: SUPERINTENDENT
Client: SASOL TECHNOLOGY
Project Title: POLY PROPYLENE 2 PROJECT
Period: 2005/12/01 TO 2006/11/30
Reported to: W.GERMISHUIZEN
Company: GRINAKER-LTA M&M
Position Held: SUPERINTENDENT
Client: SHELL (SA)
Project Title: LION PROJECT DURBAN - NEW PETROL CHEMICAL
PLANT
Period: 2005/08/01 TO 2005/11/30
Reported to: S. GILLILAND
Company: GRINAKER-LTA - UNITED ARAB EMIRATES
Position Held: SUPERINTENDENT
Joint Venture: GRINAKER-LTA & AL JABBER
Project Title: NEW GAS & CHEMICAL PLANT
Period: 2004/04/01 TO 2005/07/31
Reported to: B. VAN WYK
Company GRINAKER-LTA
Position Held: SUPERVISOR
Project Title: ORAPA 2000 - BOTSWANA
(NEW DIAMOND MINE)
Period: 1998/01/01 TO 2004/03/01
Reported to: B. VAN WYK
Company: GRINAKER-LTA
Client: SALDANA STEEL
Position Held: ELECTRICAL /INSTRUMENT FOREMAN
Project Title: NEW STEEL FACTORY
Period: 1996/12/30 TO 1998/12/30
Reported to: B. VAN WYK / W. GERMISHUIZEN
Company: GROENEWALDS CONSTRUCTION
Client: SASOL
Position Held: FOREMAN
Project Title: MOLSIEVE PROJECT
(UPGRADED 12 OXYGEN TRAINS)
Period: 1994/01/05 TO 1996/11/30
8. Reported to: W. GERMISHUIZEN
Company: GROENEWALDS CONSTRUCTION
Client: SHELL SA
Position Held: BOILERMAKER / WELDER
Period: 1991/01/03 TO 1994/12/30
Reported to: W.GERMISHUIZEN
ROLES AND RESPONSIBILITIES (GENERAL)
ELECTRICAL INSTRUMENTATION & CONTROL SYSTEM
Manage and control, Supervise, Assist and
Execute with the team for various
ELECTRICAL works such as but not limited to:
SWITCHGEAR/PANEL:
HV/MV/LV Switchgears up to erection and
Cable termination in Substations
(Generation, Primary, Secondary and
Distribution Substation).
TRANSFORMER:
Indoor and Outdoor type Transformer
(3.3/32kV) assembly, Cable/Bus duct and bar
termination assistance with Vendor.
CABLE:
HV/MV/LV Cable laying on above ground
and in Cable trenches as per the cable
schedule and cable drum schedules.
HV/MV/LV Cable Joints. Conduct and
supervise cold loop test for cables.
Control installations as per actual vs design.
BATTERY ROOM:
Battery bank with UPS Panel Installation and
Termination. DC installations and
preservations.
CABLE TRAY & CONDUITS:
Cable ducting, Ladder/Perforated Tray, Tray
Supports, Conduits Pipes bending and
Installation.
FIELD HEAVY EQUIPMENT:
MV/LV Cable glanding, Termination on
various plant heavy equipment, jointing and
Manage and control, Supervise, Assist and
Execute with the team for various
INSTRUMENTATION & CONTROL SYSTEM
works such as but not limited to:
PANEL:
Marshalling cabinets, F&G, PAGA, Telecom,
DCS/SCADA Consoles and other
Control/Signal item Panel Erection and Cable
Termination in Instrument control
Room/Main Control Building.
TRANSMITTER:
Temperature, Pressure, Flow, Level and
Differentiate Transmitter Installation, Cable
Glanding and Termination. Installation of SS
Tubing line, Air header line & Impulse line
for require field measurement devices.
CABLE:
Intrinsically Safe/Non-Intrinsically Safe/Fiber
optical & other Control/Signal cable laying
on above ground level and in Cable trenches
as per the cable schedule. Conduct and
supervise cold loop test for cabling.
GAUGES & VALVES:
Assist with Mechanical crew for the
Installation of Temperature/Pressure
Gauges, Pressure Relief, Emergency
Shutdown, Solenoid, Shutdown, Blow down,
Choke and Control Valves. MOV’s and Level
gauges.
9. installations. Assembly as per vendor data
and testing as required and specified.
OTHERS:
HVAC/Heat tracing power Panel/JB’s
Erection, Cable laying and Termination.
Installation/Termination of control stations,
switches, Normal/Emergency Lighting
systems, Socket outlets and Lightning
Arresters. General plant safety and high
quality earthing. Distribution panel
installations with supports and levelling of
equipment.
CABLE TRAY & CONDUITS:
Cable ducts, Perforated/Ladder Tray, Tray
Supports, Conduits Pipes Fabrication and
Installation. Application of both SS and
galvanized.
OTHERS:
Heat Tracing Sensor Panel/JB’s, CCTV Packs,
H2s gas detectors, Flame detectors, Smoke
detectors, Ultrasonic detectors, Toxic gas
detectors, Humidity sensor detectors & Heat
detectors, Manual call point, Beacon Lights,
Loudspeakers, IS & NIS JB’s Installation,
Cable laying and Termination. Provide
Earthing line for required systems /
Equipment indoor and Outdoor areas.
Commissioning assistance.
References :
Mr. George Wood Project Manager Stefanutti Stocks +2782 863 1690
Mr. Theo Naicker Operations Director Grinaker LTA +2782 570 2844
Mr. Sebastiaan
Gilliland
Construction
Director Grinaker LTA +2782 553 8634
I Eugene David Lockett sincerely hope that my credentials are favorable to satisfy your
business needs and that I am consider for a position with your company. Should you require
any further clarification, please do not hesitate to contact me. I look forward to hearing from
you.