IMPROVING PRODUCTIVITY OF MANUFACTURING DIVISION USING LEAN
CONCEPTS AND DEVELOPMENT OF MATERIAL GRAVITY FEEDER
• Productivity improvement is achieved by optimizing the layout.
• Distance travelled by the material in the Proposed layout is compared with
current layout.
• Simulation of current and proposed layout is done by using Witness software to
identify the efficiency of each layout
PROJECT WORK REVIEW : Phase 2 LITERATURE REVIEW
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 2
P S G T E C H
OBJECTIVES
• To achieve reduction in material movement distance for Gilbargo’s CE Carrier
assembly by 20%.
• To identify new spaces for Drilling station and Paint touch up station in powder
coating area instead of the packing area.
• To increase the utilization of resource by availing the suitable scrap sheets for
Punching operation.
• To introduce Multi hoist-Electrically operated overhead crane to load/unload
the part into pre-treatment process to reduce the waiting time
PROJECT WORK REVIEW : Phase 2 OBJECTIVE
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 3
P S G T E C H
METHODOLOGY
PROJECT WORK REVIEW : Phase 2 METHODOLOGY
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 4
P S G T E C H
Implementation and Follow-up phase
Proposed Layout
Analysis of results
Comparison of Layouts
Estimation of Performance
Simulation study
Redesigning of Layout
Problem identification
Collection of Data and Time study
Plant study
CATIA DIAGRAM OF PRODUCT
PROJECT WORK REVIEW : Phase 2 CATIA DIAGRAM OF PRODUCT
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 5
P S G T E C H
PRODUCT DETAIL
• Product name - CE Carrier Assembly
• Customer - Gilbargo
• Demand
• Average demand - 450 products
• Lead time to delivery - 15 days
• Application - Fuel dispensing pump
PROJECT WORK REVIEW : Phase 2 PRODUCT DETAIL
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 6
P S G T E C H
S.No Product name Demand
1 Aug2014 480
1 Oct2014 400
2 Dec2014 400
3 Jan2015 520
PROCESS MAP
PROJECT WORK REVIEW : Phase 2 DETAILED PROCESS MAP
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 7
P S G T E C H
Punching Part removal Filing
DeburringWelding/
fabrication
Pre-treatment
Powder coating Drilling Assembly/packing
TIME STUDY
PROJECT WORK REVIEW : Phase 2 TIME STUDY
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 8
P S G T E C H
DETAILS OF TIME STUDY
operati
on
number
Machine type
Numbe
r of
operat
ors
Numb
er of
compo
nent
Loading
&
unloadin
g time
(s)
Value
added
time per
compone
nt
Total cycle
time per
compone
nt
(s)
setup
time
cycle time allowance inventory
Material
movemen
t distance
1 Punching 1 1 70 850 920 54000 22
2 Part removal 2 6 40 200 240 0 2550 382.5 2932.5 10
3 Filling 2 6 50 27 77 0 600 90 690 11.1
4 Deburring 2 6 80 62 142 180 480 72 732 10
5 Pressing 2 6 50 150 200 300 1110 166.5 1576.5 14.3
6 Welding 6 6 100 600 700 1200 2700 405 4305 84.1
7 Pre-Treatment 3 12 720 3000 3720 4200 5400 810 10410 54.5
8
Powder
coating
5 6 100 2000 2100 1600 6480 972 9052 81.3
9 Drilling 1 6 120 40 160 120 10500 1575 12195 35.4
10 Inspection 2 6 40 100 140 60 720 108 888 16
CURRENT LAYOUT
PROJECT WORK REVIEW : Phase 2 CURRENT LAYOUT
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 9
P S G T E C H
PROJECT WORK REVIEW : Phase 2 MATERIAL MOVEMENT
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 10
P S G T E C H
MATERIAL MOVEMENT
PROJECT WORK REVIEW : Phase 2 CSVSM
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 11
P S G T E C H
CURRENT STATE VALUE STREAM MAPPING
PROJECT WORK REVIEW : Phase 2 PROPOSED LAYOUT
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 12
P S G T E C H
PROPOSED LAYOUT
DISTANCE TRAVELED BY OPERATOR WITH MHS
S.NO Station
Distance
traveled
with MHS
(m)
Distance
traveled
without
MHS
(m)
Distance
traveled
in
conveyor
(m)
1 Punching 0.73
2 Part removal 0.6
3 Filing
4 Deburring 2.45
5 Pressing 3.75
6 Welding 23.5
7 Pre-treatment 0.23 7.32
8 Powder coating 4.54 34.88
9 Drilling 7.55
10 Inspection 0.6
11
Assembly
/packaging
0.83
DISTANCE CALCULATION FOR CURRENT LAYOUT
PROJECT WORK REVIEW : Phase 2 DISTANCE CALCULATION
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 13
P S G T E C H
DISTANCE TRAVELED BY MATERIAL
S.NO Station
Distance traveled with
MHS (ft)
Distance traveled
without MHS (ft)
1 Punching 14 8
2 Part removal 10
3 Filing 11.1
4 Deburring 3 7
5 Pressing 14.4 0
6 Welding 62.8 21.3
7 Pre-treatment 33.6 20.9
8 Powder coating 17.4 64
9 Drilling 31.9 3.5
10 Inspection 16
11 packing 3
DISTANCE CALCULATION FOR PROPOSED LAYOUT
PROJECT WORK REVIEW : Phase 2 DISTANCE CALCULATION
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 14
P S G T E C H
DISTANCE TRAVELED BY MATERIAL
S.NO Station
Distance traveled
with MHS (m)
Distance traveled
without MHS (m)
1 Punching 14 8
2 Part removal 10
3 Filing 11.1
4 Deburring 3 7
5 Pressing 14.4
6 Welding 62.8 21.3
7 Pre-treatment 7.1 20.9
8 Powder coating 21 64
9 Drilling
10 Inspection
11 packing 31.9
COMPARISON OF CURRENT WITH EXISTING LAYOUTS
PROJECT WORK REVIEW : Phase 2 COMPARISON WITH EXISTING LAYOUT
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 15
P S G T E C H
Welding Pre-treatment Powder coating Drilling paint touch up packing
Current layout 14 11.1 3 14.4 62.8 33.6 17.4 31.9 16 3
proposed layout1 14 11.1 3 14.4 62.8 7.1 21 31.9
0
10
20
30
40
50
60
70
COMPARISON OF CURRENT LAYOUT & PROPOSED LAYOUT
EXPECTED RESULTS
• Total distance travelled by a material in current layout
= 207.2 ft
• Total distance travelled by a material in the proposed layout
= 165.3 ft
PROJECT WORK REVIEW : Phase 2 EXPECTED RESULTS
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 16
P S G T E C H
FUTURE STATE VALUE STREAM MAP
PROJECT WORK REVIEW : Phase 2 FSVSM
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 17
P S G T E C H
ARENA SIMULATION MODEL
PROJECT WORK REVIEW : Phase 2 Arena Model
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 18
P S G T E C H
PROJECT WORK REVIEW : Phase 2 KAIZEN
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 19
P S G T E C H
REAL TIME DATA TRACKING SYSTEM-FRONT END
PROJECT WORK REVIEW : Phase 2 Real time Data tracking system
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 20
P S G T E C H
REAL TIME DATA TRACKING SYSTEM-BACKEND
PROJECT WORK REVIEW : Phase 2 Database
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 21
P S G T E C H
PROJECT WORK REVIEW : Phase 2 KAIZEN
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 22
P S G T E C H
PROJECT WORK REVIEW : Phase 2 KAIZEN
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 23
P S G T E C H
PROJECT WORK REVIEW : Phase 2 KAIZEN
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 24
P S G T E C H
PROJECT WORK REVIEW : Phase 2 Multi Hoist-Electrically operated overhead crane
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 25
P S G T E C H
IMPLEMENTATION
PROPOSED LAYOUT:
Investment cost = Rs. 5000
Monthly cost saving = Rs. 500
Return Of Investment = 10 months
ROI calculation
PROJECT WORK REVIEW : Phase 2 Implementation
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 26
P S G T E C H
FUTURE WORK
• Comparison of results for current and proposed layouts.
• Implementation of Visual studio application to store the necessary detail about
Scrap sheets.
• Implementation of Material Handling device to hold the material that is removed
from the conveyor.
• Design and development of Multi-Hoist Electrically operated overhead crane in
the pre-Treatment area.
PROJECT WORK REVIEW : Phase 2 FUTURE WORK
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 27
P S G T E C H
THANK YOU
PROJECT WORK REVIEW : Phase 2
Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 28
P S G T E C H

More Related Content

What's hot

Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesNuberg Engineering
 
Keangnam towers wind tunnel testing
Keangnam towers wind tunnel testingKeangnam towers wind tunnel testing
Keangnam towers wind tunnel testingNguyen Ton Viet
 
Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...
Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...
Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...ROSHAN SAH
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout Javier Siles
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1Bhushan Velis
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerNavneet Kumar Bhardwaj
 
MOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BMOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BVishak Gopi
 
Critical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMODCritical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMODRon Petersen, PhD, CCM, FASHRAE
 
Plant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantPlant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantSachin Tyagi
 
Plant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantPlant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantSachin Tyagi
 

What's hot (20)

Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & Services
 
NNP Shutdown 2014 Plans - Scurve and npt graph
NNP Shutdown 2014 Plans - Scurve and npt graphNNP Shutdown 2014 Plans - Scurve and npt graph
NNP Shutdown 2014 Plans - Scurve and npt graph
 
Mohsen CV
Mohsen CVMohsen CV
Mohsen CV
 
Keangnam towers wind tunnel testing
Keangnam towers wind tunnel testingKeangnam towers wind tunnel testing
Keangnam towers wind tunnel testing
 
kamran arif
kamran arifkamran arif
kamran arif
 
Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...
Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...
Study on Effect of Semi Circular Dimple on Aerodynamic Characteristics of NAC...
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
Lean NMR Laboratory Layout
  Lean NMR Laboratory Layout    Lean NMR Laboratory Layout
Lean NMR Laboratory Layout
 
Ares I Integration Approach
Ares I Integration ApproachAres I Integration Approach
Ares I Integration Approach
 
ind brochure
ind brochureind brochure
ind brochure
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1
 
Trebble CV 2016
Trebble CV 2016Trebble CV 2016
Trebble CV 2016
 
Nov 2015 Resume
Nov  2015 ResumeNov  2015 Resume
Nov 2015 Resume
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineer
 
MOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BMOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev B
 
Manish Engineering Works
Manish Engineering WorksManish Engineering Works
Manish Engineering Works
 
Critical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMODCritical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMOD
 
Plant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantPlant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plant
 
Plant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantPlant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plant
 

Similar to PG Thesis Presentation

EDM-MRR Improvement Part-2 (Sem-8)
EDM-MRR Improvement Part-2 (Sem-8)EDM-MRR Improvement Part-2 (Sem-8)
EDM-MRR Improvement Part-2 (Sem-8)Pavan Patel
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali
 
Dish position control using Geared Motor
Dish position control using Geared MotorDish position control using Geared Motor
Dish position control using Geared MotorLaxmikanth Kolukula
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVjignesh kadam
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017Shaukat Mahmood Khan
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneAssignment Help
 
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...Bala Balaji
 
160615 Progress Update WP1 (Laura Cordova Gonzalez)
160615 Progress Update WP1 (Laura Cordova Gonzalez)160615 Progress Update WP1 (Laura Cordova Gonzalez)
160615 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
Modelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeModelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeRohit Grandhi, EIT
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Minor project FRONT report on PN JUNCTION CHARACTERISTICS
Minor project FRONT report on PN JUNCTION CHARACTERISTICSMinor project FRONT report on PN JUNCTION CHARACTERISTICS
Minor project FRONT report on PN JUNCTION CHARACTERISTICSom prakash bishnoi
 

Similar to PG Thesis Presentation (20)

Emdrive
EmdriveEmdrive
Emdrive
 
EDM-MRR Improvement Part-2 (Sem-8)
EDM-MRR Improvement Part-2 (Sem-8)EDM-MRR Improvement Part-2 (Sem-8)
EDM-MRR Improvement Part-2 (Sem-8)
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
Dish position control using Geared Motor
Dish position control using Geared MotorDish position control using Geared Motor
Dish position control using Geared Motor
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
Swapnil Resume
Swapnil ResumeSwapnil Resume
Swapnil Resume
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
jahangir
jahangirjahangir
jahangir
 
CV-Priono_Update
CV-Priono_UpdateCV-Priono_Update
CV-Priono_Update
 
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
 
160615 Progress Update WP1 (Laura Cordova Gonzalez)
160615 Progress Update WP1 (Laura Cordova Gonzalez)160615 Progress Update WP1 (Laura Cordova Gonzalez)
160615 Progress Update WP1 (Laura Cordova Gonzalez)
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Modelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeModelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension Bridge
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Minor project FRONT report on PN JUNCTION CHARACTERISTICS
Minor project FRONT report on PN JUNCTION CHARACTERISTICSMinor project FRONT report on PN JUNCTION CHARACTERISTICS
Minor project FRONT report on PN JUNCTION CHARACTERISTICS
 
SomkiatC
SomkiatCSomkiatC
SomkiatC
 

PG Thesis Presentation

  • 1. PRODUCTIVITY IMPROVEMENT IN MANUFACTURING DIVISION OF SHEET METAL INDUSTRY Guided by : Dr. Gukan Rajaram KANNAN P Roll No : 13MM09 E-mail : Kanna1140@gmail.com Mobile No : 9500254280 PROJECT WORK REVIEW : Phase 2 TITLE Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 1 P S G T E C H
  • 2. LITERATURE REVIEW IMPROVING PRODUCTIVITY OF MANUFACTURING DIVISION USING LEAN CONCEPTS AND DEVELOPMENT OF MATERIAL GRAVITY FEEDER • Productivity improvement is achieved by optimizing the layout. • Distance travelled by the material in the Proposed layout is compared with current layout. • Simulation of current and proposed layout is done by using Witness software to identify the efficiency of each layout PROJECT WORK REVIEW : Phase 2 LITERATURE REVIEW Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 2 P S G T E C H
  • 3. OBJECTIVES • To achieve reduction in material movement distance for Gilbargo’s CE Carrier assembly by 20%. • To identify new spaces for Drilling station and Paint touch up station in powder coating area instead of the packing area. • To increase the utilization of resource by availing the suitable scrap sheets for Punching operation. • To introduce Multi hoist-Electrically operated overhead crane to load/unload the part into pre-treatment process to reduce the waiting time PROJECT WORK REVIEW : Phase 2 OBJECTIVE Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 3 P S G T E C H
  • 4. METHODOLOGY PROJECT WORK REVIEW : Phase 2 METHODOLOGY Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 4 P S G T E C H Implementation and Follow-up phase Proposed Layout Analysis of results Comparison of Layouts Estimation of Performance Simulation study Redesigning of Layout Problem identification Collection of Data and Time study Plant study
  • 5. CATIA DIAGRAM OF PRODUCT PROJECT WORK REVIEW : Phase 2 CATIA DIAGRAM OF PRODUCT Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 5 P S G T E C H
  • 6. PRODUCT DETAIL • Product name - CE Carrier Assembly • Customer - Gilbargo • Demand • Average demand - 450 products • Lead time to delivery - 15 days • Application - Fuel dispensing pump PROJECT WORK REVIEW : Phase 2 PRODUCT DETAIL Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 6 P S G T E C H S.No Product name Demand 1 Aug2014 480 1 Oct2014 400 2 Dec2014 400 3 Jan2015 520
  • 7. PROCESS MAP PROJECT WORK REVIEW : Phase 2 DETAILED PROCESS MAP Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 7 P S G T E C H Punching Part removal Filing DeburringWelding/ fabrication Pre-treatment Powder coating Drilling Assembly/packing
  • 8. TIME STUDY PROJECT WORK REVIEW : Phase 2 TIME STUDY Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 8 P S G T E C H DETAILS OF TIME STUDY operati on number Machine type Numbe r of operat ors Numb er of compo nent Loading & unloadin g time (s) Value added time per compone nt Total cycle time per compone nt (s) setup time cycle time allowance inventory Material movemen t distance 1 Punching 1 1 70 850 920 54000 22 2 Part removal 2 6 40 200 240 0 2550 382.5 2932.5 10 3 Filling 2 6 50 27 77 0 600 90 690 11.1 4 Deburring 2 6 80 62 142 180 480 72 732 10 5 Pressing 2 6 50 150 200 300 1110 166.5 1576.5 14.3 6 Welding 6 6 100 600 700 1200 2700 405 4305 84.1 7 Pre-Treatment 3 12 720 3000 3720 4200 5400 810 10410 54.5 8 Powder coating 5 6 100 2000 2100 1600 6480 972 9052 81.3 9 Drilling 1 6 120 40 160 120 10500 1575 12195 35.4 10 Inspection 2 6 40 100 140 60 720 108 888 16
  • 9. CURRENT LAYOUT PROJECT WORK REVIEW : Phase 2 CURRENT LAYOUT Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 9 P S G T E C H
  • 10. PROJECT WORK REVIEW : Phase 2 MATERIAL MOVEMENT Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 10 P S G T E C H MATERIAL MOVEMENT
  • 11. PROJECT WORK REVIEW : Phase 2 CSVSM Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 11 P S G T E C H CURRENT STATE VALUE STREAM MAPPING
  • 12. PROJECT WORK REVIEW : Phase 2 PROPOSED LAYOUT Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 12 P S G T E C H PROPOSED LAYOUT
  • 13. DISTANCE TRAVELED BY OPERATOR WITH MHS S.NO Station Distance traveled with MHS (m) Distance traveled without MHS (m) Distance traveled in conveyor (m) 1 Punching 0.73 2 Part removal 0.6 3 Filing 4 Deburring 2.45 5 Pressing 3.75 6 Welding 23.5 7 Pre-treatment 0.23 7.32 8 Powder coating 4.54 34.88 9 Drilling 7.55 10 Inspection 0.6 11 Assembly /packaging 0.83 DISTANCE CALCULATION FOR CURRENT LAYOUT PROJECT WORK REVIEW : Phase 2 DISTANCE CALCULATION Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 13 P S G T E C H DISTANCE TRAVELED BY MATERIAL S.NO Station Distance traveled with MHS (ft) Distance traveled without MHS (ft) 1 Punching 14 8 2 Part removal 10 3 Filing 11.1 4 Deburring 3 7 5 Pressing 14.4 0 6 Welding 62.8 21.3 7 Pre-treatment 33.6 20.9 8 Powder coating 17.4 64 9 Drilling 31.9 3.5 10 Inspection 16 11 packing 3
  • 14. DISTANCE CALCULATION FOR PROPOSED LAYOUT PROJECT WORK REVIEW : Phase 2 DISTANCE CALCULATION Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 14 P S G T E C H DISTANCE TRAVELED BY MATERIAL S.NO Station Distance traveled with MHS (m) Distance traveled without MHS (m) 1 Punching 14 8 2 Part removal 10 3 Filing 11.1 4 Deburring 3 7 5 Pressing 14.4 6 Welding 62.8 21.3 7 Pre-treatment 7.1 20.9 8 Powder coating 21 64 9 Drilling 10 Inspection 11 packing 31.9
  • 15. COMPARISON OF CURRENT WITH EXISTING LAYOUTS PROJECT WORK REVIEW : Phase 2 COMPARISON WITH EXISTING LAYOUT Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 15 P S G T E C H Welding Pre-treatment Powder coating Drilling paint touch up packing Current layout 14 11.1 3 14.4 62.8 33.6 17.4 31.9 16 3 proposed layout1 14 11.1 3 14.4 62.8 7.1 21 31.9 0 10 20 30 40 50 60 70 COMPARISON OF CURRENT LAYOUT & PROPOSED LAYOUT
  • 16. EXPECTED RESULTS • Total distance travelled by a material in current layout = 207.2 ft • Total distance travelled by a material in the proposed layout = 165.3 ft PROJECT WORK REVIEW : Phase 2 EXPECTED RESULTS Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 16 P S G T E C H
  • 17. FUTURE STATE VALUE STREAM MAP PROJECT WORK REVIEW : Phase 2 FSVSM Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 17 P S G T E C H
  • 18. ARENA SIMULATION MODEL PROJECT WORK REVIEW : Phase 2 Arena Model Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 18 P S G T E C H
  • 19. PROJECT WORK REVIEW : Phase 2 KAIZEN Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 19 P S G T E C H
  • 20. REAL TIME DATA TRACKING SYSTEM-FRONT END PROJECT WORK REVIEW : Phase 2 Real time Data tracking system Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 20 P S G T E C H
  • 21. REAL TIME DATA TRACKING SYSTEM-BACKEND PROJECT WORK REVIEW : Phase 2 Database Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 21 P S G T E C H
  • 22. PROJECT WORK REVIEW : Phase 2 KAIZEN Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 22 P S G T E C H
  • 23. PROJECT WORK REVIEW : Phase 2 KAIZEN Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 23 P S G T E C H
  • 24. PROJECT WORK REVIEW : Phase 2 KAIZEN Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 24 P S G T E C H
  • 25. PROJECT WORK REVIEW : Phase 2 Multi Hoist-Electrically operated overhead crane Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 25 P S G T E C H
  • 26. IMPLEMENTATION PROPOSED LAYOUT: Investment cost = Rs. 5000 Monthly cost saving = Rs. 500 Return Of Investment = 10 months ROI calculation PROJECT WORK REVIEW : Phase 2 Implementation Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 26 P S G T E C H
  • 27. FUTURE WORK • Comparison of results for current and proposed layouts. • Implementation of Visual studio application to store the necessary detail about Scrap sheets. • Implementation of Material Handling device to hold the material that is removed from the conveyor. • Design and development of Multi-Hoist Electrically operated overhead crane in the pre-Treatment area. PROJECT WORK REVIEW : Phase 2 FUTURE WORK Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 27 P S G T E C H
  • 28. THANK YOU PROJECT WORK REVIEW : Phase 2 Department of mechanical EngineeringDr.DRK- Prof.NGK- Prof.VVA ME : LM-4SEM13ML72 28 P S G T E C H