Prepared by: Vishak Gopi
vishakgopi@gmail.com
Agenda
Introduction
Scope of work
Photographs
Lessons LearnedLessons Learned
Introduction
MEASK OIL QATAR: Maersk Oil entered into an
Exploration and Production Sharing Agreement
(EPSA) with Qatar Petroleum (QP) in 1992. The EPSA( ) Q (Q )
included an oil-bearing reservoir – the Al Shaheen
field . MOQ now producing over one third of Qatar’s
daily oil production, some 300,000 barrels per day.
MOQ is in the process of installing new generators
and equipment on their AS.AD platform. MOQ decided
to extend its cellar deck and assigned ‘TECHNOMAK’g
to carry out the installation engineering and
installation of deck extension platform.
Scope of work: Engineeringp g g
• Feasibility study of the installation vessel. The installation was critical in terms of boom height / lifting 
Feasibility 
Study
radius limitation and deck space availability. 
• Technomak proposed to redesign the rigging to achieve required boom height for stab‐in
Installation 
Engineering
• Technomak carried out a detailed engineering study and a procedure was developed with proper 
control measures.
• Crane lift chart and sequential drawings were generated
Engineering
• A Task Risk Assessment (TRA) was carried out for the installation as per MOQ requirements.
• Technomak hired a specialized third‐party consultant to chair the TRA workshop which was carried
TRA
Technomak hired a specialized third party consultant to chair the TRA workshop , which was carried 
out in the MOQ office. This workshop turned out to be of great value addition Technomak has given 
to this project and the procedure and TRA report got finalized on the same day.
Scope of Work : Actual Installation
•Technomak witnessed the platform trial lift at NKOM shipyard and carried out the inspection of 
rigging and noted the tilt during lifting
Trial Lift onshore
rigging and noted the tilt during lifting 
•Technomak then carried out a check by generating 3‐D drawings and determined that the tilt 
was a positive factor to facilitate the installation 
Supervision of load‐
out
•The load‐out was carried out under the supervision of Technomak rigging supervisor and lifting 
superintendent.
•All the riggings required for the offshore lift was inspected and loaded onto the vessel
• A simulation of the final installation was carried out offshore, outside the field boundaries. The coordination 
between  crane operator, rigging team,  rigging superintendent and vessel captain was ensured and pre‐ and 
post‐tool box talks (TBT’s) were carried out to ensure that the team was well aware of the procedure and safety 
rules and consideration Time requirement for each step of the lifting was noted
Off‐shore trial lift, 
DP test and final 
installation
rules and consideration. Time requirement for each step  of the lifting  was noted.
• Vessel carried out a DP test near AS.AD platform for 15 minutes.
• A meeting was conducted  on  the AS.AD platform with supervisors , construction superintendents and other 
department heads . The final installation plan , time requirement , required work permits, weather window etc 
were discussed and agreed upon.
• Final installation carried out  in a  safe and controlled manner within the  stipulated  time framep
Project photos: Tool box talkj p
Project photos: connecting slings to the crane hookj p g g
Project photos: crane start loadingj p g
Project photos: Close monitoring and controlling with taglinej p g g g
Project photos: Crane slewing the loadj p g
Project photos: Crane boom swung 180 degj p g g
Project photos: vessel approaching the platform in DP modej p pp g p
Project photos: vessel approaching the platform in DP modej p pp g p
Project photos: Technomak Team on the AS.AD platform took control 
of the installation from Technomak team onboard the vesselof the installation from Technomak team onboard the vessel
Project photos: Crane hook lowering as well as riggers controlling 
th l tf ith t lithe platform with taglines
Project photos: Riggers on AS.AD collecting the taglinej p gg g g
Project photos: Stabbingj p g
Project photos: Stabbed in up to final 150mm by lowering the crane 
hook and final load transfer was carried out by listing the vesselhook and final load transfer was carried out by listing the vessel
Project photos: de‐riggingj p gg g
Project photos: Installed the braces and completed the 
i t ll tiinstallation
Project photos: The team behind the successj p
Lesson learnt
•Always expect the unexpected
•Site surveys have to be carried out prior to any offshore installation any constraints shall be noted.
General
y p y y
•A Filed layout showing subsea assets shall be studied and hazards identified.
•The Marine control procedure shall be referred to in order to understand the field restriction for the vessel approach or 
any other activity.
•The location and procedure for emergency load‐drop shall be identified.
•Identify the competent people and required a professional approach towards the client requirements.
•Detailed contract review enabled us to get a hike of 2.7% of contract value and mitigated the risk of project execution by General limiting the liability to the contract value.
b d f h f ll l d f l h l
Crane
•Crane be inspected for the following: Valid test certificate, emergency lowering mechanism, emergency lowering in case 
of power failure, boom creeping* , crane limitation in parallel operation [boom slew, boom up or down, hook up or 
down ] , slewing speed, efficiency  and performance of brakes etc.
•The crane hook shall be inspected to make sure that the rigging is suitable.
•Extra attention shall be given for the control over the load movement  in case of single pulley‐crane. Sudden jerks shall 
be expected  during step‐by‐step load lowering
•Hydraulic quick‐release shackles shall be used if the crane hook is determined to be unsafe to access.
Crane Hydraulic quick release shackles  shall be used if the crane hook is determined to be unsafe to access.
•Crane operator capability needs to be assessed and  the recent record for heavy lifts shall be checked.
*boom creeping is a phenomena which is quite common in electro‐hydraulic cranes where the boom 
will suddenly fall corresponding to a sudden pressure release in the hydraulic ram
Lesson learnt
•Never tie the tagline anywhere during installation
Safety
•Never tie the tagline anywhere during installation
•Never wrap the tagline on hand or body
•Never stand on top of tagline
•The length of the tagline shall be estimated and shall not extended by  adding another line  utilizing a knot
•The tagline shall be controlled in such a way that  the pull shall be always away from the sea
•Post‐ and pre‐tool box talks shall be conducted.
•The communication mode shall be explained to all the team membersSafety •The communication mode shall be explained to all the team members
•The  common words used in the communication shall be discussed [eg: slew, hold, slack etc]  in the TBT
•All teams working near platform require Parrot mask and H2S gas detectors.
•No loose items shall be kept on the load and no  personnel movement shall be allowed under the hanging load
•The responsibility shall be given to all  the rigging team  members and all of them should have the right to stop the work any time
•Load or unload the crane gradually. The preliminary movement of the load shall be closely monitored to make sure that the crane 
hook is exactly on top of  the cog. 
•Taglines shall be used only to swing the load generally and  the rest of the movements shall be controlled with the crane.
•The hanging load on a floating crane always achieves a simple harmonic motion depending on the sea state and the period of the 
movement in seconds can be determined. The final stabbing command  (or  command to pull the tag line ) shall be given 
id i th t l t f th h i l d Al b l d thi k b f ti
Installation
considering the natural movement of the hanging load. Always be calm and think before  any action.
•Once  start stabbing in , minor catch , if any, shall be neglected  and the lowering continued.
•Depending on the superintendent’s  discretion, transferring the load to the final stabbing point by listing the vessel can be 
achieved by ballast transfer.
•The sudden release of the crane load will result  in vessel movement to the opposite side. Therefore , gradual load transfer with 
parallel  ballast shall be considered.
Thank You

More Related Content

What's hot

Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 
Master präsentation pal sys-offshore
Master präsentation pal sys-offshoreMaster präsentation pal sys-offshore
Master präsentation pal sys-offshoreBenji George
 
Master präsentation pal sys-ship
Master präsentation pal sys-shipMaster präsentation pal sys-ship
Master präsentation pal sys-shipBenji George
 
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...Benji George
 
Construction of Tower Cranes
Construction of Tower CranesConstruction of Tower Cranes
Construction of Tower CranesGhusalal Patel
 
Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)AmiT```` ````KaLA``>>>
 
01 C2C lab aircraft
01 C2C lab aircraft01 C2C lab aircraft
01 C2C lab aircraftkoenkegel
 
Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)
Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)
Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)Transnet Port Terminals
 
UROP Proposal Advanced Aircraft Wing Structural Design and Fabrication
UROP Proposal Advanced Aircraft Wing Structural Design and FabricationUROP Proposal Advanced Aircraft Wing Structural Design and Fabrication
UROP Proposal Advanced Aircraft Wing Structural Design and FabricationLaliphat Kositchaimongkol
 

What's hot (17)

Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
PG Thesis Presentation
PG Thesis PresentationPG Thesis Presentation
PG Thesis Presentation
 
Master präsentation pal sys-offshore
Master präsentation pal sys-offshoreMaster präsentation pal sys-offshore
Master präsentation pal sys-offshore
 
Master präsentation pal sys-ship
Master präsentation pal sys-shipMaster präsentation pal sys-ship
Master präsentation pal sys-ship
 
CV:Resume
CV:ResumeCV:Resume
CV:Resume
 
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
 
Construction of Tower Cranes
Construction of Tower CranesConstruction of Tower Cranes
Construction of Tower Cranes
 
Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)
 
Oil refinery tank project
Oil refinery tank projectOil refinery tank project
Oil refinery tank project
 
WIRA Q1 2017 Antares Update
WIRA Q1 2017 Antares UpdateWIRA Q1 2017 Antares Update
WIRA Q1 2017 Antares Update
 
01 C2C lab aircraft
01 C2C lab aircraft01 C2C lab aircraft
01 C2C lab aircraft
 
Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)
Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)
Transnet Port Terminals Ship to-shore at Durban Container Terminal (DCT)
 
UROP Proposal Advanced Aircraft Wing Structural Design and Fabrication
UROP Proposal Advanced Aircraft Wing Structural Design and FabricationUROP Proposal Advanced Aircraft Wing Structural Design and Fabrication
UROP Proposal Advanced Aircraft Wing Structural Design and Fabrication
 
Company Profile_ANUPAM
Company Profile_ANUPAMCompany Profile_ANUPAM
Company Profile_ANUPAM
 
C V farhat_abbas
C V farhat_abbasC V farhat_abbas
C V farhat_abbas
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Antares Status, Presented by Dan Givens
Antares Status, Presented by Dan GivensAntares Status, Presented by Dan Givens
Antares Status, Presented by Dan Givens
 

Viewers also liked

EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...
EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...
EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...Ayuntamiento de Málaga
 
Joshua 15 commentary
Joshua 15 commentaryJoshua 15 commentary
Joshua 15 commentaryGLENN PEASE
 
EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...
EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...
EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...Ayuntamiento de Málaga
 
AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...
AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...
AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...Ayuntamiento de Málaga
 
El informe de investigación
El informe de investigaciónEl informe de investigación
El informe de investigaciónJosé Mendoza
 
Amazon Web Services and Interact - Workshop Giugno 2013
Amazon Web Services and Interact - Workshop Giugno 2013Amazon Web Services and Interact - Workshop Giugno 2013
Amazon Web Services and Interact - Workshop Giugno 2013Paolo latella
 
TechDay - April - Customizing VM Images
TechDay - April - Customizing VM ImagesTechDay - April - Customizing VM Images
TechDay - April - Customizing VM ImagesOpenNebula Project
 
Introduction to OpenNebula - Ignacio M. Llorente
Introduction to OpenNebula - Ignacio M. LlorenteIntroduction to OpenNebula - Ignacio M. Llorente
Introduction to OpenNebula - Ignacio M. LlorenteOpenNebula Project
 
Jacks of All Trades or Masters of One?
Jacks of All Trades or Masters of One?Jacks of All Trades or Masters of One?
Jacks of All Trades or Masters of One?M. Jackson Wilkinson
 
Using Flexbox Today (Frontend United 2016)
Using Flexbox Today (Frontend United 2016)Using Flexbox Today (Frontend United 2016)
Using Flexbox Today (Frontend United 2016)Zoe Gillenwater
 
Introduction to Continous Quality Improvement
Introduction to Continous Quality ImprovementIntroduction to Continous Quality Improvement
Introduction to Continous Quality ImprovementGina Ingrouille
 
Using mySQL in PHP
Using mySQL in PHPUsing mySQL in PHP
Using mySQL in PHPMike Crabb
 
Molecular dynamics and Simulations
Molecular dynamics and SimulationsMolecular dynamics and Simulations
Molecular dynamics and SimulationsAbhilash Kannan
 
Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...
Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...
Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...Dawn Anderson MSc DigM
 
Paint ,varnishes and distempers
Paint ,varnishes and distempersPaint ,varnishes and distempers
Paint ,varnishes and distempersShakil Ahmmad
 
Programación anual del área de arte 2016
Programación anual  del área de  arte 2016Programación anual  del área de  arte 2016
Programación anual del área de arte 2016BERTHA MUÑOZ LIMASCCA
 
Comment faire un serious game avec un stagiaire
Comment faire un serious game avec un stagiaireComment faire un serious game avec un stagiaire
Comment faire un serious game avec un stagiaireLaurent Auneau
 

Viewers also liked (18)

EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...
EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...
EL AYUNTAMIENTO REALIZA UN ESTUDIO PARA MEJORAR LA ATENCIÓN A LAS PERSONAS MA...
 
Joshua 15 commentary
Joshua 15 commentaryJoshua 15 commentary
Joshua 15 commentary
 
EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...
EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...
EL AYUNTAMIENTO ANIMA A LOS CIUDADANOS A CELEBRAR LA NOCHEVIEJA DESDE LA PLAZ...
 
My house
My houseMy house
My house
 
AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...
AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...
AYUNTAMIENTO Y CIEDES FIRMARÁN DOS CONVENIOS PARA DESARROLLAR PROYECTOS SOSTE...
 
El informe de investigación
El informe de investigaciónEl informe de investigación
El informe de investigación
 
Amazon Web Services and Interact - Workshop Giugno 2013
Amazon Web Services and Interact - Workshop Giugno 2013Amazon Web Services and Interact - Workshop Giugno 2013
Amazon Web Services and Interact - Workshop Giugno 2013
 
TechDay - April - Customizing VM Images
TechDay - April - Customizing VM ImagesTechDay - April - Customizing VM Images
TechDay - April - Customizing VM Images
 
Introduction to OpenNebula - Ignacio M. Llorente
Introduction to OpenNebula - Ignacio M. LlorenteIntroduction to OpenNebula - Ignacio M. Llorente
Introduction to OpenNebula - Ignacio M. Llorente
 
Jacks of All Trades or Masters of One?
Jacks of All Trades or Masters of One?Jacks of All Trades or Masters of One?
Jacks of All Trades or Masters of One?
 
Using Flexbox Today (Frontend United 2016)
Using Flexbox Today (Frontend United 2016)Using Flexbox Today (Frontend United 2016)
Using Flexbox Today (Frontend United 2016)
 
Introduction to Continous Quality Improvement
Introduction to Continous Quality ImprovementIntroduction to Continous Quality Improvement
Introduction to Continous Quality Improvement
 
Using mySQL in PHP
Using mySQL in PHPUsing mySQL in PHP
Using mySQL in PHP
 
Molecular dynamics and Simulations
Molecular dynamics and SimulationsMolecular dynamics and Simulations
Molecular dynamics and Simulations
 
Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...
Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...
Technical SEO Myths Facts And Theories On Crawl Budget And The Importance Of ...
 
Paint ,varnishes and distempers
Paint ,varnishes and distempersPaint ,varnishes and distempers
Paint ,varnishes and distempers
 
Programación anual del área de arte 2016
Programación anual  del área de  arte 2016Programación anual  del área de  arte 2016
Programación anual del área de arte 2016
 
Comment faire un serious game avec un stagiaire
Comment faire un serious game avec un stagiaireComment faire un serious game avec un stagiaire
Comment faire un serious game avec un stagiaire
 

Similar to MOQ Platform installation_Lesson learnt_Rev B

Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibilityguest651e92c
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study NoordzeeSander_van_oirschot
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Euro-Rigging presentation 2013
Euro-Rigging presentation 2013Euro-Rigging presentation 2013
Euro-Rigging presentation 2013wesseln
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)Aquilino Raimundo
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)Strukturas
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014Dylan Olivier
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerTheodoros Dragonas
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014Naeem Qureshi
 
Offshore Energy Limited - Project lifting management and support services pre...
Offshore Energy Limited - Project lifting management and support services pre...Offshore Energy Limited - Project lifting management and support services pre...
Offshore Energy Limited - Project lifting management and support services pre...RichardTurnbull9
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerTheodoros Dragonas
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)Norfadzly Nordin
 

Similar to MOQ Platform installation_Lesson learnt_Rev B (20)

Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
 
2018 CRW: Engineered Lift Plans From A to Z
2018 CRW: Engineered Lift Plans From A to Z2018 CRW: Engineered Lift Plans From A to Z
2018 CRW: Engineered Lift Plans From A to Z
 
Elsayed cv updated
Elsayed cv updatedElsayed cv updated
Elsayed cv updated
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Euro-Rigging presentation 2013
Euro-Rigging presentation 2013Euro-Rigging presentation 2013
Euro-Rigging presentation 2013
 
Turbine Installation Vessel
Turbine Installation VesselTurbine Installation Vessel
Turbine Installation Vessel
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
 
SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)SDI Kuwait Causeway prj.(kusc)
SDI Kuwait Causeway prj.(kusc)
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Falcon Spirit FSO
Falcon Spirit FSOFalcon Spirit FSO
Falcon Spirit FSO
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014
 
Offshore Energy Limited - Project lifting management and support services pre...
Offshore Energy Limited - Project lifting management and support services pre...Offshore Energy Limited - Project lifting management and support services pre...
Offshore Energy Limited - Project lifting management and support services pre...
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
West leda
West ledaWest leda
West leda
 
PNI - 2016
PNI - 2016PNI - 2016
PNI - 2016
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 

MOQ Platform installation_Lesson learnt_Rev B

  • 3. Introduction MEASK OIL QATAR: Maersk Oil entered into an Exploration and Production Sharing Agreement (EPSA) with Qatar Petroleum (QP) in 1992. The EPSA( ) Q (Q ) included an oil-bearing reservoir – the Al Shaheen field . MOQ now producing over one third of Qatar’s daily oil production, some 300,000 barrels per day. MOQ is in the process of installing new generators and equipment on their AS.AD platform. MOQ decided to extend its cellar deck and assigned ‘TECHNOMAK’g to carry out the installation engineering and installation of deck extension platform.
  • 4. Scope of work: Engineeringp g g • Feasibility study of the installation vessel. The installation was critical in terms of boom height / lifting  Feasibility  Study radius limitation and deck space availability.  • Technomak proposed to redesign the rigging to achieve required boom height for stab‐in Installation  Engineering • Technomak carried out a detailed engineering study and a procedure was developed with proper  control measures. • Crane lift chart and sequential drawings were generated Engineering • A Task Risk Assessment (TRA) was carried out for the installation as per MOQ requirements. • Technomak hired a specialized third‐party consultant to chair the TRA workshop which was carried TRA Technomak hired a specialized third party consultant to chair the TRA workshop , which was carried  out in the MOQ office. This workshop turned out to be of great value addition Technomak has given  to this project and the procedure and TRA report got finalized on the same day.
  • 5. Scope of Work : Actual Installation •Technomak witnessed the platform trial lift at NKOM shipyard and carried out the inspection of  rigging and noted the tilt during lifting Trial Lift onshore rigging and noted the tilt during lifting  •Technomak then carried out a check by generating 3‐D drawings and determined that the tilt  was a positive factor to facilitate the installation  Supervision of load‐ out •The load‐out was carried out under the supervision of Technomak rigging supervisor and lifting  superintendent. •All the riggings required for the offshore lift was inspected and loaded onto the vessel • A simulation of the final installation was carried out offshore, outside the field boundaries. The coordination  between  crane operator, rigging team,  rigging superintendent and vessel captain was ensured and pre‐ and  post‐tool box talks (TBT’s) were carried out to ensure that the team was well aware of the procedure and safety  rules and consideration Time requirement for each step of the lifting was noted Off‐shore trial lift,  DP test and final  installation rules and consideration. Time requirement for each step  of the lifting  was noted. • Vessel carried out a DP test near AS.AD platform for 15 minutes. • A meeting was conducted  on  the AS.AD platform with supervisors , construction superintendents and other  department heads . The final installation plan , time requirement , required work permits, weather window etc  were discussed and agreed upon. • Final installation carried out  in a  safe and controlled manner within the  stipulated  time framep
  • 14. Project photos: Technomak Team on the AS.AD platform took control  of the installation from Technomak team onboard the vesselof the installation from Technomak team onboard the vessel
  • 18. Project photos: Stabbed in up to final 150mm by lowering the crane  hook and final load transfer was carried out by listing the vesselhook and final load transfer was carried out by listing the vessel
  • 22. Lesson learnt •Always expect the unexpected •Site surveys have to be carried out prior to any offshore installation any constraints shall be noted. General y p y y •A Filed layout showing subsea assets shall be studied and hazards identified. •The Marine control procedure shall be referred to in order to understand the field restriction for the vessel approach or  any other activity. •The location and procedure for emergency load‐drop shall be identified. •Identify the competent people and required a professional approach towards the client requirements. •Detailed contract review enabled us to get a hike of 2.7% of contract value and mitigated the risk of project execution by General limiting the liability to the contract value. b d f h f ll l d f l h l Crane •Crane be inspected for the following: Valid test certificate, emergency lowering mechanism, emergency lowering in case  of power failure, boom creeping* , crane limitation in parallel operation [boom slew, boom up or down, hook up or  down ] , slewing speed, efficiency  and performance of brakes etc. •The crane hook shall be inspected to make sure that the rigging is suitable. •Extra attention shall be given for the control over the load movement  in case of single pulley‐crane. Sudden jerks shall  be expected  during step‐by‐step load lowering •Hydraulic quick‐release shackles shall be used if the crane hook is determined to be unsafe to access. Crane Hydraulic quick release shackles  shall be used if the crane hook is determined to be unsafe to access. •Crane operator capability needs to be assessed and  the recent record for heavy lifts shall be checked. *boom creeping is a phenomena which is quite common in electro‐hydraulic cranes where the boom  will suddenly fall corresponding to a sudden pressure release in the hydraulic ram
  • 23. Lesson learnt •Never tie the tagline anywhere during installation Safety •Never tie the tagline anywhere during installation •Never wrap the tagline on hand or body •Never stand on top of tagline •The length of the tagline shall be estimated and shall not extended by  adding another line  utilizing a knot •The tagline shall be controlled in such a way that  the pull shall be always away from the sea •Post‐ and pre‐tool box talks shall be conducted. •The communication mode shall be explained to all the team membersSafety •The communication mode shall be explained to all the team members •The  common words used in the communication shall be discussed [eg: slew, hold, slack etc]  in the TBT •All teams working near platform require Parrot mask and H2S gas detectors. •No loose items shall be kept on the load and no  personnel movement shall be allowed under the hanging load •The responsibility shall be given to all  the rigging team  members and all of them should have the right to stop the work any time •Load or unload the crane gradually. The preliminary movement of the load shall be closely monitored to make sure that the crane  hook is exactly on top of  the cog.  •Taglines shall be used only to swing the load generally and  the rest of the movements shall be controlled with the crane. •The hanging load on a floating crane always achieves a simple harmonic motion depending on the sea state and the period of the  movement in seconds can be determined. The final stabbing command  (or  command to pull the tag line ) shall be given  id i th t l t f th h i l d Al b l d thi k b f ti Installation considering the natural movement of the hanging load. Always be calm and think before  any action. •Once  start stabbing in , minor catch , if any, shall be neglected  and the lowering continued. •Depending on the superintendent’s  discretion, transferring the load to the final stabbing point by listing the vessel can be  achieved by ballast transfer. •The sudden release of the crane load will result  in vessel movement to the opposite side. Therefore , gradual load transfer with  parallel  ballast shall be considered.