SlideShare a Scribd company logo
1 of 5
Name : Shaun Harnden
Date of Birth : 14 January 1972
Marital Status : Married
Nationality : British
Contact Details : Mobile 07902383852
: sharnden@btinternet.com
Qualifications : BEng (Hons) Engineering Technology - The Robert Gordon
University, 1994.
Experience : 20 years in Offshore Industry
April 2013 – Sept 2015 Total E&P UK Ltd, Aberdeen
Lead Subsea Engineer – Mariner Tie-in to Vesterled Gas Pipeline Project
Prepared deliverables for Total and Gassco project gate approval process including project
execution plans, cost estimate and schedule development.
Managed Conceptual & FEED engineering contractor workscopes.
Managed the contract with AkerSolutions for the engineering, procurement and fabrication of a
Diverless Hub connector spoolpiece, clamp connector and the ROV RTS tooling required. Managed
the contract until it was novated to the EPCI.
Prepared ITT for subsea gate valves, reviewed tender submissions. Presented the recommendation
to award to management. Managed the contract until it was novated to the EPCI.
Prepared the subsea EPCI installation contractor ITT package. Reviewed tender submissions and
was heavily involved with awarding the contract. Managed the EPCI contractor after award and
reviewed and approved detailed design deliverables, attended KOM/PPMs with procurement of
GRP covers, flanges, fittings and fabrication of manifold, pipeline clamp and spoolpieces.
Managing the interfaces between the Statoil Mariner workscope and Total / Gassco workscopes.
Preparing and issuing relevant permits for field development to DECC (OGA) and HSE.
Interfacing with Total and Gassco Operations groups to handover the project.
Updated the pipeline operations and emergency documentation for handover to Operations group.
Feb 2012 – April 2013 Chevron, Aberdeen
Lead Subsea Engineer – Subsea IRM and Pipeline Operations Department
Involved with managing the integrity of the UK operated assets subsea infrastructure in accordance
with the company management system.
Reviewing upcoming integrity work and aligned resources to meet the scheduled activities.
Reviewed impact of anomalies and made recommendations for remedial works.
Updated and submitted the regulatory permits and consents.
Prepared deliverables for Chevron project gate approval process including project execution plans,
cost estimate and schedule development for integrity workscopes, including the Alba FSU Flexible
Riser Replacement Project.
Managing engineering contractor workscopes.
Managing procurement of two flexible risers/flowlines to company specifications
July 2010 – Feb 2012 ConocoPhillips, Aberdeen
Subsea Engineering Manager - Enochdhu Subsea Tie Back Project
Preparing deliverables for COP CPMS project gate approval process including project execution
plans, cost estimate and schedule development.
Managing Conceptual & FEED engineering contractor workscopes including 3rd party design
verification.
Preparing and issuing relevant permits for field development to DECC.
Prepared and issued ITT package for EPIC Contractor workscope and conducted technical and
commercial clarifications.
Mobilisation of survey vessel to conduct bathymetric survey, environmental soil sampling and
geotechnical survey along the proposed pipeline routing.
Interfacing with BOL and operations group for the subsea and topsides platform modification
requirements.
July 2009 – July 2010 BP, Aberdeen
Caisson and Topsides Module T&I Delivery Lead - Andrew Area Development Project
Involved with preparing project deliverables for the BP gate approval process including project
schedule, cost estimate and PEER review presentations.
Reviewed and approved FEED and detailed design engineering deliverables by design house
contractor.
Prepared ITT packages for all caisson riser materials, conducted clarifications meetings and
managed the contracts.
Management of caisson fabrication contract. Issued ITT package, conducted tender clarifications
and awarded contract for the fabrication of the caisson.
Prepared ITT packages for the HLV installation of the 700Te Topsides module to be installed onto
Andrew platform. Awarded HLV contract and managed the installation engineering with the topsides
engineering contractor.
Assisted with the preparation of the subsea installation contractor ITT for caisson installation
workscopes. Reviewed tender submissions and was involved with awarding contract. Involved with
managing the interfaces between the subsea contractor and the topsides engineering contractor.
Dec 2006 – July 2009 TALISMAN ENERGY, Aberdeen
Subsea Lead Engineer - SCAPA Caisson Replacement Project
Developed and presented approval for expenditure (AFE) and project schedule for the SCAPA
replacement caisson to Talisman management.
Management of Caisson design house. Progressed Caisson design from FEED into detailed
design.
Delivered presentations and prepared applications to HSE and BERR to install replacement caisson
and associated subsea tie-ins.
Management of caisson fabrication contract. Issued ITT package, conducted tender clarifications
and awarded contract to Isleburn for the fabrication of caisson clamps, 44” Caisson, subsea
spoolpieces & Gravity based protection structure.
Procurement of flexible jumpers, carbon steel linepipe, super duplex linepipe, flanges, bulkheads,
caisson linepipe, pulled bends & small bore DBB valves to Talisman specifications.
Issued ITT tender package, conducted tender clarifications and awarded contract to Acergy.
Management of DSV contract for the installation of the caisson clamps & subsea tie-in workscope.
Management of HLV contract for the installation & transportation of the 44” caisson. Issued ITT
tender package, conducted tender clarifications and awarded contract to Heerema.
Senior Subsea Engineer - REV project
Management of FMC for the design and fabrication of two wellhead protection structures,
flowbases, PLEM, PLET and ROVCON heads.
Management of NKT for the design, manufacture and supply of two 6” flexible jumpers.
Managed the interfaces between the subsea installation contractor and Company contractors.
Reviewed and approved the subsea contractor installation procedures and interfaced with the
marine warranty surveyor.
Offshore as technical client representative for the installation of;
 12” 10km insulated REV pipeline from REV to Armada.
 Installation of two WHPS using Sevenoceans vessel.
 Diverless installation and tie-in of PLEM and flexible jumpers using FMC ROVCON spread.
 Pre-Commissioning activities for handover to platform for start up.
Oct 2003 – Dec 2006 TECHNIP - Senior Project Engineer
Shell Howe 2 Field Development – Senior Project Engineer
Involved during initial tendering of project developing project schedule, cost estimate information
and project execution plans.
Responsible for award and management of contractors for design, linepipe, pulled bends, flanges,
fittings, Gate valves & small bore valves.
Caledonia - Johnston & Hunter Field Extension Projects - Senior Project Engineer
Responsible for award and management of contracts for Umbilical manufacturer and spoolpiece
fabrication.
Prepared detailed installation procedures and conducted HIRAs for project workscope;
 Installation of 3 flexible flowlines & control umbilical from diverless vessel
 DSV tie-in workscope involving barrier testing, spoolpiece installation, pre-commissioning
activities, jumper & control system installation.
Offshore as project engineer for installation campaigns
Shell Howe Field Development - Senior Project Engineer
Involved during initial tendering of project developing project schedule, cost estimate information
and project execution plans.
Responsible for award and management of subcontracts for manifold fabrication, linepipe, pulled
bends, flanges, fittings & small bore valves.
Prepared installation procedures for; manifold installation and piling, flexible jumper installation,
spoolpiece installation and pre-commissioning
Offshore as project engineer for installation campaigns.
May 1998 - Oct 2003 SUBSEA 7 (HALLIBURTON SUBSEA / ROCKWATER)
Mobil Skene Bundle (NBR) Project - Senior Project Engineer
Responsible for installation of 7.5km pipeline bundle for ExxonMobil. Prepared installation
engineering documents for bundle launch, tow and installation. Prepared detailed installation
procedures for bundle launch, tow and installation. Conducting pre launch bundle check lists at
Wick prior to bundle launch. Mobilising bundle tow fleet comprising ROV survey vessel, lead tugs
and trail tug. Offshore co-ordination of ROV survey vessel, MSV diving vessel and flooding spread
vessel. Preparing diving installation procedures including buoyancy tank recovery, spool metrology,
spool installation, flowline flooding and bundle deflection activities.
Venture Sycamore Bundle Project - Senior Project Engineer
Installation of two pipeline bundles, a 4.4km main bundle and 0.8km Satellite bundle for Venture
Production. Prepared installation engineering documents for bundle launch, tow and installation.
Preparing detailed installation procedures for bundle installation. Mobilising of ROV survey vessel
Rockwater 1. Conducting pre launch check lists prior to bundle launch.
Chevron Alba XS Bundle Project - Senior Project Engineer
Installation of 4.0km pipeline bundle for ChevronTexaco. Preparing installation engineering
documents for bundle launch, tow and installation. Preparing detailed installation procedures for
bundle installation. Offshore for bundle launch, tow and installation.
Chevron-Texaco Pipeline Support Group - Senior Pipeline/Project Engineer
Provided daily engineering support for Texaco’s main assets; Galley, Strathspey, Erskine and
Captain fields. Offshore client representative for Erskine pipeline survey and span rectification.
Writing ESDV testing procedures. Upheaval buckle assessment of Strathspey pipelines and
rockdumping. Third party verification analysis of WI spool design. Preparing annual Texaco
pipeline presentations for HSE. Conducting HIRA studies. Pipeline free span analysis and span
rectification measures for Galley.
Wintershall A6-A to F3-FB Pipeline Project - Project Engineer
This project included installation of risers / riser defences / dropped object protection / spools and
spool protection / side tap protection domes / pigging and hydrotesting of pipelines. Prepared
detailed diving installation procedures. Carried out installation and seafastening analysis of risers
and spools using Staad III. Responsible for loadout of equipment onto the Toisa Polaris and supply
vessels.
South Arne Project - Tanker Loading Facility - Project Engineer
This project consisted of installation of Piles / SAL anchor top / Mid depth buoy / flexible hose
system from the SAL unit to the tanker / spool and spool protection / hydrotesting of pipelines.
Prepared detailed diving installation procedures. Responsible for loadout of equipment onto the
DSV and supply boats. Installation analysis of tanker loading hose using Orcaflex.
Mar 1997 - May 1998 MCDERMOTTS MARINE CONSTRUCTION LTD (MMCL) / ETPM
Shell Kingfisher / Marathon West Brae - Project and Analysis Engineer
Mobilisation of project equipment and offshore for pipeline installation phase on the Norlift rigid reel
pipelay vessel. Pipeline installation analysis using Flexcom 3D and inhouse software. Preparing
onshore and offshore field data books for use offshore for pipeline installation. Writing installation
procedures. Procuring equipment for offshore pipeline installation trenching and umbilical
installation analyses.
Other Project Workscopes:
 Teal and Guillemot - umbilical repair workscope.
 Maersk – Kraka – Trenching workscope.
 Esso Jotun – Pipelay analysis workscope.
 Inhouse engineering and various bid work.
Aug 1994 - Mar 1997 MENTOR PROJECT ENGINEERING
On graduating from the Robert Gordon University was employed as a Graduate Engineer, with
Mentor Project Engineering. Gained a variety of design and analysis experience in the subsea field
of engineering.
Riser Analysis and Spoolpiece expansion analysis using Caesar II, Manifold pipe stress analysis.
Stability analysis and wall thickness calculations using Plusone, crossing design, dropped object
analysis, cathodic protection requirements.
Summer 1992 & 1993 BROWN & ROOT MARINE
Student Placement in the Mechanical Engineering Department, involved working with BP/B&R
Partnering dealing with the Forties Field engineering support.

More Related Content

What's hot

Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)kevin breiter
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2kim himel
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)Sher Zaman
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistAlanna Scott
 

What's hot (20)

Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
Roy Shilling
Roy ShillingRoy Shilling
Roy Shilling
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Cantrell Steve H
Cantrell Steve HCantrell Steve H
Cantrell Steve H
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
CV 2015 RAN
CV 2015 RANCV 2015 RAN
CV 2015 RAN
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 

Viewers also liked

Principia CV, Daniel Desautels
Principia CV, Daniel DesautelsPrincipia CV, Daniel Desautels
Principia CV, Daniel DesautelsDaniel Desautels
 
Resume 2
Resume 2Resume 2
Resume 2Jun Lin
 
√ Web designing company in mumbai
√ Web designing company in mumbai√ Web designing company in mumbai
√ Web designing company in mumbaiCss Founder
 
Dare Devil Racing
Dare Devil RacingDare Devil Racing
Dare Devil RacingDan Wiltse
 
Techbee rfid based students tracking
Techbee rfid based students trackingTechbee rfid based students tracking
Techbee rfid based students trackingmahesh kumar vs
 
Hand wrist x rays /certified fixed orthodontic courses by Indian dental aca...
Hand wrist x rays   /certified fixed orthodontic courses by Indian dental aca...Hand wrist x rays   /certified fixed orthodontic courses by Indian dental aca...
Hand wrist x rays /certified fixed orthodontic courses by Indian dental aca...Indian dental academy
 
Oral exophytic lesions
Oral exophytic lesionsOral exophytic lesions
Oral exophytic lesionsmarziye1858
 
SuperReturn Middle East 2010_EB_EMSPK_1
SuperReturn Middle East 2010_EB_EMSPK_1SuperReturn Middle East 2010_EB_EMSPK_1
SuperReturn Middle East 2010_EB_EMSPK_1Henry Owainati CFA
 
Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...
Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...
Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...SCORE Training Centre
 
infection control
 infection control infection control
infection controlSunil Hero
 

Viewers also liked (14)

Principia CV, Daniel Desautels
Principia CV, Daniel DesautelsPrincipia CV, Daniel Desautels
Principia CV, Daniel Desautels
 
Resume 2
Resume 2Resume 2
Resume 2
 
4R2012 preTest9A
4R2012 preTest9A4R2012 preTest9A
4R2012 preTest9A
 
√ Web designing company in mumbai
√ Web designing company in mumbai√ Web designing company in mumbai
√ Web designing company in mumbai
 
Dare Devil Racing
Dare Devil RacingDare Devil Racing
Dare Devil Racing
 
مهارات القص
مهارات القصمهارات القص
مهارات القص
 
Resume 2016 detailed
Resume 2016 detailedResume 2016 detailed
Resume 2016 detailed
 
Techbee rfid based students tracking
Techbee rfid based students trackingTechbee rfid based students tracking
Techbee rfid based students tracking
 
Hand wrist x rays /certified fixed orthodontic courses by Indian dental aca...
Hand wrist x rays   /certified fixed orthodontic courses by Indian dental aca...Hand wrist x rays   /certified fixed orthodontic courses by Indian dental aca...
Hand wrist x rays /certified fixed orthodontic courses by Indian dental aca...
 
Oral exophytic lesions
Oral exophytic lesionsOral exophytic lesions
Oral exophytic lesions
 
SuperReturn Middle East 2010_EB_EMSPK_1
SuperReturn Middle East 2010_EB_EMSPK_1SuperReturn Middle East 2010_EB_EMSPK_1
SuperReturn Middle East 2010_EB_EMSPK_1
 
Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...
Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...
Fellowship of the Royal Australasian College of Dental Surgeon (FRACDS) Orien...
 
infection control
 infection control infection control
infection control
 
Derechos de autor
Derechos de autorDerechos de autor
Derechos de autor
 

Similar to sharndencv

GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster WheelerGareth White
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017Peter Fitzpatrick
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000daniel cobar
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGsiavashn
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 

Similar to sharndencv (20)

GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Ronald-Smith
Ronald-SmithRonald-Smith
Ronald-Smith
 
Paul details 2014today
Paul details 2014todayPaul details 2014today
Paul details 2014today
 

sharndencv

  • 1. Name : Shaun Harnden Date of Birth : 14 January 1972 Marital Status : Married Nationality : British Contact Details : Mobile 07902383852 : sharnden@btinternet.com Qualifications : BEng (Hons) Engineering Technology - The Robert Gordon University, 1994. Experience : 20 years in Offshore Industry April 2013 – Sept 2015 Total E&P UK Ltd, Aberdeen Lead Subsea Engineer – Mariner Tie-in to Vesterled Gas Pipeline Project Prepared deliverables for Total and Gassco project gate approval process including project execution plans, cost estimate and schedule development. Managed Conceptual & FEED engineering contractor workscopes. Managed the contract with AkerSolutions for the engineering, procurement and fabrication of a Diverless Hub connector spoolpiece, clamp connector and the ROV RTS tooling required. Managed the contract until it was novated to the EPCI. Prepared ITT for subsea gate valves, reviewed tender submissions. Presented the recommendation to award to management. Managed the contract until it was novated to the EPCI. Prepared the subsea EPCI installation contractor ITT package. Reviewed tender submissions and was heavily involved with awarding the contract. Managed the EPCI contractor after award and reviewed and approved detailed design deliverables, attended KOM/PPMs with procurement of GRP covers, flanges, fittings and fabrication of manifold, pipeline clamp and spoolpieces. Managing the interfaces between the Statoil Mariner workscope and Total / Gassco workscopes. Preparing and issuing relevant permits for field development to DECC (OGA) and HSE. Interfacing with Total and Gassco Operations groups to handover the project. Updated the pipeline operations and emergency documentation for handover to Operations group. Feb 2012 – April 2013 Chevron, Aberdeen Lead Subsea Engineer – Subsea IRM and Pipeline Operations Department Involved with managing the integrity of the UK operated assets subsea infrastructure in accordance with the company management system. Reviewing upcoming integrity work and aligned resources to meet the scheduled activities.
  • 2. Reviewed impact of anomalies and made recommendations for remedial works. Updated and submitted the regulatory permits and consents. Prepared deliverables for Chevron project gate approval process including project execution plans, cost estimate and schedule development for integrity workscopes, including the Alba FSU Flexible Riser Replacement Project. Managing engineering contractor workscopes. Managing procurement of two flexible risers/flowlines to company specifications July 2010 – Feb 2012 ConocoPhillips, Aberdeen Subsea Engineering Manager - Enochdhu Subsea Tie Back Project Preparing deliverables for COP CPMS project gate approval process including project execution plans, cost estimate and schedule development. Managing Conceptual & FEED engineering contractor workscopes including 3rd party design verification. Preparing and issuing relevant permits for field development to DECC. Prepared and issued ITT package for EPIC Contractor workscope and conducted technical and commercial clarifications. Mobilisation of survey vessel to conduct bathymetric survey, environmental soil sampling and geotechnical survey along the proposed pipeline routing. Interfacing with BOL and operations group for the subsea and topsides platform modification requirements. July 2009 – July 2010 BP, Aberdeen Caisson and Topsides Module T&I Delivery Lead - Andrew Area Development Project Involved with preparing project deliverables for the BP gate approval process including project schedule, cost estimate and PEER review presentations. Reviewed and approved FEED and detailed design engineering deliverables by design house contractor. Prepared ITT packages for all caisson riser materials, conducted clarifications meetings and managed the contracts. Management of caisson fabrication contract. Issued ITT package, conducted tender clarifications and awarded contract for the fabrication of the caisson. Prepared ITT packages for the HLV installation of the 700Te Topsides module to be installed onto Andrew platform. Awarded HLV contract and managed the installation engineering with the topsides engineering contractor.
  • 3. Assisted with the preparation of the subsea installation contractor ITT for caisson installation workscopes. Reviewed tender submissions and was involved with awarding contract. Involved with managing the interfaces between the subsea contractor and the topsides engineering contractor. Dec 2006 – July 2009 TALISMAN ENERGY, Aberdeen Subsea Lead Engineer - SCAPA Caisson Replacement Project Developed and presented approval for expenditure (AFE) and project schedule for the SCAPA replacement caisson to Talisman management. Management of Caisson design house. Progressed Caisson design from FEED into detailed design. Delivered presentations and prepared applications to HSE and BERR to install replacement caisson and associated subsea tie-ins. Management of caisson fabrication contract. Issued ITT package, conducted tender clarifications and awarded contract to Isleburn for the fabrication of caisson clamps, 44” Caisson, subsea spoolpieces & Gravity based protection structure. Procurement of flexible jumpers, carbon steel linepipe, super duplex linepipe, flanges, bulkheads, caisson linepipe, pulled bends & small bore DBB valves to Talisman specifications. Issued ITT tender package, conducted tender clarifications and awarded contract to Acergy. Management of DSV contract for the installation of the caisson clamps & subsea tie-in workscope. Management of HLV contract for the installation & transportation of the 44” caisson. Issued ITT tender package, conducted tender clarifications and awarded contract to Heerema. Senior Subsea Engineer - REV project Management of FMC for the design and fabrication of two wellhead protection structures, flowbases, PLEM, PLET and ROVCON heads. Management of NKT for the design, manufacture and supply of two 6” flexible jumpers. Managed the interfaces between the subsea installation contractor and Company contractors. Reviewed and approved the subsea contractor installation procedures and interfaced with the marine warranty surveyor. Offshore as technical client representative for the installation of;  12” 10km insulated REV pipeline from REV to Armada.  Installation of two WHPS using Sevenoceans vessel.  Diverless installation and tie-in of PLEM and flexible jumpers using FMC ROVCON spread.  Pre-Commissioning activities for handover to platform for start up. Oct 2003 – Dec 2006 TECHNIP - Senior Project Engineer Shell Howe 2 Field Development – Senior Project Engineer Involved during initial tendering of project developing project schedule, cost estimate information and project execution plans.
  • 4. Responsible for award and management of contractors for design, linepipe, pulled bends, flanges, fittings, Gate valves & small bore valves. Caledonia - Johnston & Hunter Field Extension Projects - Senior Project Engineer Responsible for award and management of contracts for Umbilical manufacturer and spoolpiece fabrication. Prepared detailed installation procedures and conducted HIRAs for project workscope;  Installation of 3 flexible flowlines & control umbilical from diverless vessel  DSV tie-in workscope involving barrier testing, spoolpiece installation, pre-commissioning activities, jumper & control system installation. Offshore as project engineer for installation campaigns Shell Howe Field Development - Senior Project Engineer Involved during initial tendering of project developing project schedule, cost estimate information and project execution plans. Responsible for award and management of subcontracts for manifold fabrication, linepipe, pulled bends, flanges, fittings & small bore valves. Prepared installation procedures for; manifold installation and piling, flexible jumper installation, spoolpiece installation and pre-commissioning Offshore as project engineer for installation campaigns. May 1998 - Oct 2003 SUBSEA 7 (HALLIBURTON SUBSEA / ROCKWATER) Mobil Skene Bundle (NBR) Project - Senior Project Engineer Responsible for installation of 7.5km pipeline bundle for ExxonMobil. Prepared installation engineering documents for bundle launch, tow and installation. Prepared detailed installation procedures for bundle launch, tow and installation. Conducting pre launch bundle check lists at Wick prior to bundle launch. Mobilising bundle tow fleet comprising ROV survey vessel, lead tugs and trail tug. Offshore co-ordination of ROV survey vessel, MSV diving vessel and flooding spread vessel. Preparing diving installation procedures including buoyancy tank recovery, spool metrology, spool installation, flowline flooding and bundle deflection activities. Venture Sycamore Bundle Project - Senior Project Engineer Installation of two pipeline bundles, a 4.4km main bundle and 0.8km Satellite bundle for Venture Production. Prepared installation engineering documents for bundle launch, tow and installation. Preparing detailed installation procedures for bundle installation. Mobilising of ROV survey vessel Rockwater 1. Conducting pre launch check lists prior to bundle launch. Chevron Alba XS Bundle Project - Senior Project Engineer Installation of 4.0km pipeline bundle for ChevronTexaco. Preparing installation engineering documents for bundle launch, tow and installation. Preparing detailed installation procedures for bundle installation. Offshore for bundle launch, tow and installation. Chevron-Texaco Pipeline Support Group - Senior Pipeline/Project Engineer Provided daily engineering support for Texaco’s main assets; Galley, Strathspey, Erskine and Captain fields. Offshore client representative for Erskine pipeline survey and span rectification. Writing ESDV testing procedures. Upheaval buckle assessment of Strathspey pipelines and rockdumping. Third party verification analysis of WI spool design. Preparing annual Texaco pipeline presentations for HSE. Conducting HIRA studies. Pipeline free span analysis and span rectification measures for Galley.
  • 5. Wintershall A6-A to F3-FB Pipeline Project - Project Engineer This project included installation of risers / riser defences / dropped object protection / spools and spool protection / side tap protection domes / pigging and hydrotesting of pipelines. Prepared detailed diving installation procedures. Carried out installation and seafastening analysis of risers and spools using Staad III. Responsible for loadout of equipment onto the Toisa Polaris and supply vessels. South Arne Project - Tanker Loading Facility - Project Engineer This project consisted of installation of Piles / SAL anchor top / Mid depth buoy / flexible hose system from the SAL unit to the tanker / spool and spool protection / hydrotesting of pipelines. Prepared detailed diving installation procedures. Responsible for loadout of equipment onto the DSV and supply boats. Installation analysis of tanker loading hose using Orcaflex. Mar 1997 - May 1998 MCDERMOTTS MARINE CONSTRUCTION LTD (MMCL) / ETPM Shell Kingfisher / Marathon West Brae - Project and Analysis Engineer Mobilisation of project equipment and offshore for pipeline installation phase on the Norlift rigid reel pipelay vessel. Pipeline installation analysis using Flexcom 3D and inhouse software. Preparing onshore and offshore field data books for use offshore for pipeline installation. Writing installation procedures. Procuring equipment for offshore pipeline installation trenching and umbilical installation analyses. Other Project Workscopes:  Teal and Guillemot - umbilical repair workscope.  Maersk – Kraka – Trenching workscope.  Esso Jotun – Pipelay analysis workscope.  Inhouse engineering and various bid work. Aug 1994 - Mar 1997 MENTOR PROJECT ENGINEERING On graduating from the Robert Gordon University was employed as a Graduate Engineer, with Mentor Project Engineering. Gained a variety of design and analysis experience in the subsea field of engineering. Riser Analysis and Spoolpiece expansion analysis using Caesar II, Manifold pipe stress analysis. Stability analysis and wall thickness calculations using Plusone, crossing design, dropped object analysis, cathodic protection requirements. Summer 1992 & 1993 BROWN & ROOT MARINE Student Placement in the Mechanical Engineering Department, involved working with BP/B&R Partnering dealing with the Forties Field engineering support.