SlideShare a Scribd company logo
1 of 2
Download to read offline
ARC SURVEYING & MAPPING, INC.
PROFESSIONAL SURVEYING SOLUTIONS SINCE 1986
www.arcsurveyors.com
5567 Commander Dr., Ste 101 5202 San Juan Ave 4160 Minton Road
Arlington, TN 38002 Jacksonville, FL 32210 Melbourne, FL 32904
(901) 867-5333 (904) 384-8377 (321) 728-8688
Freeport Harbour Expansion Freeport, Grand Bahama Island
Since 2010 Arc Surveying & Mapping, Inc. (Arc) has provided Freeport Harbour Company (FHC)
with topographic and hydrographic surveying services in support of FHC port expansion
projects. Freeport Harbour is located approximately 50 miles east of West Palm Beach Florida
and is a trans-shipment facility, accepting the largest container ships in the world. The entrance
channel and container berths are approximately 65 feet deep.
Safety and coordination with the Harbour Master, pilots, contractors and vessel operations is
essential in Freeport due to constant berthing and traffic. An open berth is surveyed as soon as
available and topographic surveys are performed during times convenient to container
movement. In addition to topographic construction layout and as-built surveys, Arc has
performed all hydrographic surveys for the port including pre and post dredge surveys.
In 2014 Arc performed a bathymetric and shoreline survey of the entire harbour, adhering to
British Admiralty Charting Standards, for upgrading navigational charting and construction
purposes. A fully equipped Arc survey vessel was transported to the island via ferry from West
Palm Beach, Florida. Within 24 hours the survey vessel was offloaded, calibrated and ready to
work utilizing a Reson 7101 multibeam swath sounder, a Riegl VZ 400 terrestrial laser scanner,
an Applanix POS/MV and an RTK system for tidal measurements. Hysweep was used for
equipment configuration, data collection and processing. Horizontal datum for Freeport is
NAD83 UTM Zone 17 N. Vertical datum is MLW meters.
Freeport Harbour is a unique operation as the expansion is never ending. Bahama Rock
Company drills, blasts and excavates the expansion areas utilizing mine-type draglines, shipping
the road base quality material to the U.S. mainland. As a result of dragline excavation, the
slopes in expansion areas are extremely irregular. In order to develop construction plans for
container berth expansion, FHC contracted with Arc to survey the entire harbour including the
seafloor and shoreline with close detail to slopes. The object of the detailed multibeam slope
survey was to develop a plan to drive corrugated sheeting along the irregular slope and to grout
between the sheeting and cavity prone slope, thereby stabilizing future berths.
ARC SURVEYING & MAPPING, INC.
PROFESSIONAL SURVEYING SOLUTIONS SINCE 1986
www.arcsurveyors.com
5567 Commander Dr., Ste 101 5202 San Juan Ave 4160 Minton Road
Arlington, TN 38002 Jacksonville, FL 32210 Melbourne, FL 32904
(901) 867-5333 (904) 384-8377 (321) 728-8688

More Related Content

Similar to Port Construction

East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas Pipeline
Boudewijn Baan
 
Australia - Gorgon LNG Project - Deputy Project Manager
Australia - Gorgon LNG Project - Deputy Project ManagerAustralia - Gorgon LNG Project - Deputy Project Manager
Australia - Gorgon LNG Project - Deputy Project Manager
Niels Asjee
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-Link
Abdul Rahim
 
80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu
Marianne Molchan
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
Emeka Ngwobia
 
PortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementPortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_Statement
Debbie Kilbane Fawcett
 
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk
 
Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011
lugomarine
 
Max Sommers CV 2017
Max Sommers CV 2017Max Sommers CV 2017
Max Sommers CV 2017
Max Sommers
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
jhayman09
 

Similar to Port Construction (20)

Hydrographic construction Cairo Illinois
Hydrographic construction  Cairo IllinoisHydrographic construction  Cairo Illinois
Hydrographic construction Cairo Illinois
 
From Coast to Coast
From Coast to CoastFrom Coast to Coast
From Coast to Coast
 
2015 STS - Port Upgrades Will Change Your Operations
2015 STS - Port Upgrades Will Change Your Operations 2015 STS - Port Upgrades Will Change Your Operations
2015 STS - Port Upgrades Will Change Your Operations
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas Pipeline
 
Body corctd
Body corctdBody corctd
Body corctd
 
Australia - Gorgon LNG Project - Deputy Project Manager
Australia - Gorgon LNG Project - Deputy Project ManagerAustralia - Gorgon LNG Project - Deputy Project Manager
Australia - Gorgon LNG Project - Deputy Project Manager
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017
 
Geotechnical Engineering Services
Geotechnical Engineering ServicesGeotechnical Engineering Services
Geotechnical Engineering Services
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-Link
 
Amelia Island
Amelia IslandAmelia Island
Amelia Island
 
80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu80 2 (dragged) 2 from lulu
80 2 (dragged) 2 from lulu
 
Mayport Naval Station
Mayport Naval StationMayport Naval Station
Mayport Naval Station
 
2. PORT PLANNING (PHE) GTU 3170623
2. PORT PLANNING (PHE) GTU 31706232. PORT PLANNING (PHE) GTU 3170623
2. PORT PLANNING (PHE) GTU 3170623
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
 
PortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_StatementPortsHarborsBeaches_Capabilities_Statement
PortsHarborsBeaches_Capabilities_Statement
 
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
 
Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011
 
Max Sommers CV 2017
Max Sommers CV 2017Max Sommers CV 2017
Max Sommers CV 2017
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 
West virginia
West virginiaWest virginia
West virginia
 

More from Arc Surveying & Mapping, Inc.

More from Arc Surveying & Mapping, Inc. (20)

USACE
USACEUSACE
USACE
 
Garage Collapse
Garage CollapseGarage Collapse
Garage Collapse
 
Calumet River
Calumet RiverCalumet River
Calumet River
 
Multibeam Swat Sounding
Multibeam Swat SoundingMultibeam Swat Sounding
Multibeam Swat Sounding
 
Streambank Erosion
Streambank ErosionStreambank Erosion
Streambank Erosion
 
Levee/Dike Survey
Levee/Dike SurveyLevee/Dike Survey
Levee/Dike Survey
 
Indiana Harbor Illinois
Indiana Harbor IllinoisIndiana Harbor Illinois
Indiana Harbor Illinois
 
Bridge Scour
Bridge Scour Bridge Scour
Bridge Scour
 
Restoration & Mattress Survey
Restoration & Mattress SurveyRestoration & Mattress Survey
Restoration & Mattress Survey
 
Raleigh Springs Mall Memphis
Raleigh Springs Mall MemphisRaleigh Springs Mall Memphis
Raleigh Springs Mall Memphis
 
Lake Rowell
Lake RowellLake Rowell
Lake Rowell
 
Lake Marion
Lake MarionLake Marion
Lake Marion
 
Kissimmee River Basin Topographic
Kissimmee River Basin TopographicKissimmee River Basin Topographic
Kissimmee River Basin Topographic
 
Hydrographic Pinnacle Dredging
Hydrographic Pinnacle DredgingHydrographic Pinnacle Dredging
Hydrographic Pinnacle Dredging
 
Drainage Basin Tennessee
Drainage Basin TennesseeDrainage Basin Tennessee
Drainage Basin Tennessee
 
Dike Construction
Dike ConstructionDike Construction
Dike Construction
 
Cape Canaveral
Cape CanaveralCape Canaveral
Cape Canaveral
 
Boundary Kentucky
Boundary KentuckyBoundary Kentucky
Boundary Kentucky
 
Boundary Haywood County
Boundary Haywood CountyBoundary Haywood County
Boundary Haywood County
 
Beach monitoring
Beach monitoringBeach monitoring
Beach monitoring
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Port Construction

  • 1. ARC SURVEYING & MAPPING, INC. PROFESSIONAL SURVEYING SOLUTIONS SINCE 1986 www.arcsurveyors.com 5567 Commander Dr., Ste 101 5202 San Juan Ave 4160 Minton Road Arlington, TN 38002 Jacksonville, FL 32210 Melbourne, FL 32904 (901) 867-5333 (904) 384-8377 (321) 728-8688 Freeport Harbour Expansion Freeport, Grand Bahama Island Since 2010 Arc Surveying & Mapping, Inc. (Arc) has provided Freeport Harbour Company (FHC) with topographic and hydrographic surveying services in support of FHC port expansion projects. Freeport Harbour is located approximately 50 miles east of West Palm Beach Florida and is a trans-shipment facility, accepting the largest container ships in the world. The entrance channel and container berths are approximately 65 feet deep. Safety and coordination with the Harbour Master, pilots, contractors and vessel operations is essential in Freeport due to constant berthing and traffic. An open berth is surveyed as soon as available and topographic surveys are performed during times convenient to container movement. In addition to topographic construction layout and as-built surveys, Arc has performed all hydrographic surveys for the port including pre and post dredge surveys. In 2014 Arc performed a bathymetric and shoreline survey of the entire harbour, adhering to British Admiralty Charting Standards, for upgrading navigational charting and construction purposes. A fully equipped Arc survey vessel was transported to the island via ferry from West Palm Beach, Florida. Within 24 hours the survey vessel was offloaded, calibrated and ready to work utilizing a Reson 7101 multibeam swath sounder, a Riegl VZ 400 terrestrial laser scanner, an Applanix POS/MV and an RTK system for tidal measurements. Hysweep was used for equipment configuration, data collection and processing. Horizontal datum for Freeport is NAD83 UTM Zone 17 N. Vertical datum is MLW meters. Freeport Harbour is a unique operation as the expansion is never ending. Bahama Rock Company drills, blasts and excavates the expansion areas utilizing mine-type draglines, shipping the road base quality material to the U.S. mainland. As a result of dragline excavation, the slopes in expansion areas are extremely irregular. In order to develop construction plans for container berth expansion, FHC contracted with Arc to survey the entire harbour including the seafloor and shoreline with close detail to slopes. The object of the detailed multibeam slope survey was to develop a plan to drive corrugated sheeting along the irregular slope and to grout between the sheeting and cavity prone slope, thereby stabilizing future berths.
  • 2. ARC SURVEYING & MAPPING, INC. PROFESSIONAL SURVEYING SOLUTIONS SINCE 1986 www.arcsurveyors.com 5567 Commander Dr., Ste 101 5202 San Juan Ave 4160 Minton Road Arlington, TN 38002 Jacksonville, FL 32210 Melbourne, FL 32904 (901) 867-5333 (904) 384-8377 (321) 728-8688