I - Overview of Study:
The scope of the project methodology analyzed three sites for a
potential Cruise Terminal capable of handling in range of 2,700
passengers and docking/berthing station. . The scope of this
study evaluated environmental impacts, navigational
challenges, and compatibility with the Georgia Ports Authority
(GPA) vessel operations on the Savannah River, technical
investigations, utility/traffic coordination, site challenges,
docking requirements and identification of potential
challenges with each site. The Phase I report has taken into
consideration and evaluated the waterside / marine conditions
and general infrastructure existing at each of the three sites
and provided a tabulation of ranking ranging from Most
Desirable to Least Desirable.
4
REPORT PRESENTATION – June 25, 2013
Phase One, CRUISE SHIP STAGING AREA STUDY
Savannah Cruise Feasibility Study
I - Overview of Study (Continued)-
The report has been developed on the basis of information
gathered and developed from meetings with and / or from
information provided by: ;
 The U.S. Army Corps of Engineers,
 Savannah Pilots Association,
 United States Coast Guard,
 U.S. Fish and Wildlife Service,
 National Marine Fisheries Service,
 Georgia Department of Natural Resources,
 Colonial Oil,
 Limited contact with Georgia Ports Authority,
 Georgia Archaeological Site File
 Georgia’s Natural, Archaeological and Historic Resources GIS.
5
Cruise Vessel Development Over TimeVesselSizes
900-1050 FEET
Up To 30
20-36
26-30
26-34
1960 ‘ s
1970 ‘ s
1980 ‘ s
+1990‘ s
400-500
600
1200-2000
2600-3800
18
20
80
90-150
800 FEET
500 FEET
400 FEET
Ship
Displacement
(In Thousands Grt.)
Passengers Drafts Air Drafts
140-175
160-180
-
-
960-1250 FEET
30-343500-5000 150-250+/- 200
+2000‘ s
6
7
Carnival Vessel
Lineup
Royal Caribbean Vessel
Lineup
8
Critical Demographics and Psychographics
within a One Day Drive of Savannah and
Comparables (2009)
Source: SRDS, PSI, Google Maps, MapInfo
SAV JAX CHS MOB
mil mil mil mil
Demographics (Persons or Households)
2009 Population 56.4 46.2 44.3 42.0
2009 Population Age over 55 14.5 11.9 11.1 9.8
White Collar Workers 15.3 12.6 12.1 11.1
Households with Income $75,000 or more 5.9 4.9 4.6 4.1
Persons over 25 with Some College or More 18.8 15.5 14.6 13.0
Psychographics (Adults)
Interested in The Arts 15.4 12.6 11.9 10.8
Rely on Newspaper to Keep Me Informed 15.0 12.3 11.7 10.7
Prefer Specialty Stores because Have Best Brands 8.5 7.0 6.6 6.1
Do Some Sport/Exercise Once a Week 21.1 17.2 16.4 15.0
Typically Avoid Watching TV Commercials 18.9 15.4 14.8 13.5
2009 Departing Passengers (in 1000's) 188.2 37.4 134.6
Within a One Day Drive of:
9
REPORT PRESENTATION – June 25, 2013
Phase One , CRUISE SHIP STAGING AREA STUDY
Savannah Cruise Feasibility Study
1- General Locations of Sites A, B, and C
2- General Characteristics of Sites A, B, and C
3- Site Analysis and Comparisons:
Each of the three sites; A, B, and C were studied and the report presents the
findings for the following parameters for each of the sites,
• SITE & INFRASTRUCTURE DATA
• Location
• Site Acreage
• Distance to Major Highway
• Water and Sewer System
• Electrical Service Availability
• NAVIGATION & HYDROGRAPHIC INFORMATION
• WATER SIDE STRUCTURES
• PRELIMINARY DREDGE ANALYSIS
• UPLANDS NATURAL RESOURCES
• MARINE BIOLOGICAL HABITATS
• UNDERWATER ARCHEOLOGY
• OTHER ISSUES
10
Cruise Terminal Sites For Analysis
SITE A:
SILO TRACT
SITE B
POWELL DYFFRYN
TRACT
SITE C
SAVANNAH RIVER
LANDING
11
Site A: Silo / Atlantic Cement Tract
12
Site A: Silo / Atlantic Cement Tract
13
Site B: Powell Dufferyn Tract
14
Site B: Powell Dufferyn Tract
15
Site C: Savannah River Landing Tract
16
Site C: Savannah River Landing Tract
17
Phase I - Project Issues
 Access to Major Highways –
Level Of Service (LOS) rankings obtained from 2004 MPC traffic congestion study.
18
Site & Infrastructure - Location
SITE A:
SILO TRACT
SITE B
POWELL DYFFRYN
TRACT
SITE C
SAVANNAH RIVER
LANDING
19
Site & Infrastructure - Acreage
A
B
C
Site Area: +/- 21.5 Acres
Site Area: +/- 14.5 Acres
Site Area: +/- 55 Acres
20
Site & Infrastructure – Distance to Major
Highway
Level Of Service (LOS) rankings obtained from 2004 MPC traffic congestion study.
21
Site & Infrastructure – Water & Sewer
(costs associated with selected site for these improvements investigated in next phase of the study)
Site A-
Water:
• Existing 16 “ main @Hutchinson Island Rd.
• Need 12” main extended 650 ft.
Sewer :
• Need 6-8” main extended 650 ft.
• Existing 10” main @Hutchinson Island Rd.
Site B-
Water:
• Existing 16” water main stubbed out at Wayne Shackleford Pkwy
• Need 12” main extended 2,300 ft..
Sewer :
• Existing stubbed out 8” force main at Wayne Shackleford Pkwy
Site C-
Water:
• Existing 12” main serving site but needs 1,000 ft extension for terminal
Sewer :
• System never completed, needs completed and accepted by City
22
Site & Infrastructure – Electrical Service
Site A-
• 3 Phase - @ 25 kV available at site
• 12-14 kV required for cruise terminal service
• Do not foresee major electrical changes needed to serve site
Site B-
• 3 phase overhead available now at this site
• System modifications/maintenance needed for service
Site C-
• Does not have electrical wiring on site, but private conduits
and manhole are existing at the site
• GA Power indicated complex process to get power to
terminal site
• Site would have largest projected cost of the 3 alternative
sites
• Need electrical power study to consider alternative methods
vs. cost
23
Navigation & Hydrographic Information
Issues Applicable To All Sites-
 Ships greater than 800 ft turning to occur upriver at King’s Landing
 For maneuvering Pilots request additional 100 ft mooring area each end of ship
 Seasonality effects passage, such as in the spring when fog is common, limit
vessel operations in the river. Other ports like Tampa and New Orleans have
similar fog from time to time.
 Military Outload Division (MOD) use of the Ocean Terminal facilities and the
Naval Vessel Protection Zone (NVPZ) in place and enforced by the US Coast
Guard (CG) during the course of MOD operations (100 yard intercept zone / 500
yard escort zone).
 US Coast Guard (CG) reports that the regulations concerning LNG vessels could
cause cruise ship delay in transit due to one of these LNG vessels transiting the
area. Such operational coordination requirements common at most major ports
Site A-
 Currently only approx. 656 ft river frontage, (need 1,000 ft) therefore, additional
waterfront access to be acquired
 Shoaling reported by Pilots in vicinity of site
 Should site be selected for further consideration, the NVPZ restrictions may also
apply while the cruise ship is docked
24
Navigation & Hydrographic Information
Site B-
 Currently only approx. 602 ft river frontage, (need 1,000 ft) therefore, additional
waterfront access to be acquired
 Shoaling reported by Pilots in vicinity of site
 Concern to the Pilots, due to the site’s location within a turn in the river, there is
potential for a “suction” effect on vessels that are moored in this area caused by
passing vessels making the turn
Site C-
 Some concern of steering large vessels in vicinity of site due to curve in river
 Pilots preferred site location due to less surrounding berthing facilities which
eases maneuvering
25
Water Side Structures
Site A-
• Existing in-water structure consists of 4 mooring structures each spaced
approximately 125 feet apart. These structures are located approximately 50
feet from the shore and are connected by supported access ways that appear to
be in good condition.
• New waterside mooring/berthing structures will have to be constructed
Site B-
• Existing structure consists of center berthing area with 4 mooring
structures (2 on each side)
• Riparian boundary in relation to existing structures needs further
investigation
• Engineering analysis needed to assess potential of integration into new
cruise ship berth (new vs. modification)
Site C-
• Approx 1,984 ft of bulk head and river walk
• Not designed to berth large vessels but may be integrated into cruise berth
infrastructure
• Marine structures for berthing cruise ships needs engineering analysis
(modifications)
26
Preliminary Dredge Analysis
Site A-
 Approx 130 ft from Fed Channel to existing mooring structures
 Approx 34,800 cubic yards of dredging may be needed to achieve 34
ft draft
 Prior land use assessment needed to evaluate source
material/contributions regarding dredge spoils as contamination may
be an issue
 Existing dredge pipeline adjacent to berth area will need to be
addressed
 Sediment analysis required
 USCE need to approve a dredge disposal management plan
 (Permit) Conditional on salt marsh impact and adequate river frontage,
site has high probability of obtaining a USCE Sect 10/404 permit
Site B-
 Approx 120 ft from Fed Channel to existing mooring structures
 Approx 24,300 cubic yards of dredging may be needed to achieve
34 ft draft
 Prior land use assessment needed to evaluate source
material/contributions regarding dredge spoils as contamination may
be an issue
 Sediment analysis required
 USCE need to approve a dredge disposal management plan
27
Preliminary Dredge Analysis
Site B- (Con’t)
 (Permit) Conditional on good sediment analysis, high likelihood of
approval for initial and ongoing maintenance dredging
 (Permit) Conditional on salt marsh impact and adequate river
frontage, site has moderate probability of obtaining a USCE Sect
10/404 permit
Site C-
 Approx 150 ft from Fed Channel to existing mooring structures
 Approx 38,500 cubic yards of dredging may be needed to achieve
34 ft draft
 Prior USCE Sect 10/404 permit (2007) for Savannah Riverwalk
Extension appears to have been issued and project extended
 Prior land use assessment needed to evaluate source
material/contributions regarding dredge spoils as contamination may
be an issue
 USCE need to approve a dredge disposal management plan
 Site has high probability of obtaining a USCE Sect 10/404 permit
 Existing development at site likely to make terminal permitting much
easier
28
Uplands Natural Resources
Site A-
Site B-
Site C-
• For all three (3) sites, a review of the USFWS Chatham County list
indicated that three (3) plant species as potentially occurring in
Chatham County. Potential impacts will have to be assessed during
Phase II of the study; once a survey with tree information is available,
should any of these sites be selected.
29
Marine Biological Habitats
Site A-
Site B-
Site C-
• For all three (3) sites, a review of the USFWS Chatham County list
indicated that seventeen (17) animal species as potentially occurring
in Chatham County. Potential impacts will be further assessed during
Phase II of the study should any of these sites be selected. Although
no listed species were observed during this study, due to the presence
of potentially suitable habitat for the federally protected species, it
cannot be guaranteed that listed species would not or could not use
this site currently or in the future.
30
Underwater Archeology
Site A-
•One submerged resource (poorly preserved Twentieth Century wooden barge)
located at this site
• USACE, Savannah District confirmed this site is not of underwater archeological
concern
Site B-
• Underwater survey identified no underwater archeological resources at this site
• USACE, Savannah District confirmed this site is not of underwater archeological
concern
Site C-
• USACE issued permit in 2007 for this site. Work undertaken at that time included
an archaeological survey of the in-water and land side of the property and historic
resources (boat wreckage, portion of old wharf, bricks) were encountered at this site
• A Programmatic Agreement between the City of Savannah, USACE, Savannah
District and Georgia SHPO, was signed in January 2007 detailing the required
cultural resource studies for the Riverwalk project at this site
•Further work on additional components of the archaeological survey may be required
in order to accommodate a Cruise Terminal development at this site (use
modification may trigger revisions)
31
Other Issues:
Site A-
• This site offers approximately 6 to 10 acres for potential ancillary mix-use
development to serve cruise passengers and the general public; subject to local
parking requirements for the development of a cruise terminal facility.
• Refueling at this site will likely result in the bunker barge potentially
extending into the federal channel.
• This site is directly across Ocean Terminal site. Should this site be used for a
cruise terminal, cruise ships calling at this facility; while the Military Outload
Division (MOD) is in operation at Ocean Terminal, are subject to berthing
restrictions associated with the NVPZ 100 yard “intercept zone” restriction.
32
Other Issues:
Site B-
• This site offers approximately 4 acres for potential ancillary mix-use
development to serve cruise passengers and the general public; subject to local
parking requirements for the development of a cruise terminal facility.
• Refueling at this site will likely result in the bunker barge potentially
extending into the federal channel.
•Should this site be used for a cruise terminal, cruise ships will use the King’s
Landing turning basin. While the MOD is in operation at Ocean Terminal,
cruise ships sailing upstream to access the King’s Landing turning basin may
be subject to transiting through the NVPZ 100 yard intercept zone and 500
yard escort zone restrictions.
33
Other Issues:
Site C-
• This site offers approximately 40 to 45 acres for potential ancillary mix-
use development to serve cruise passengers and the general public; subject
to local parking requirements for the development of a cruise terminal
facility.
• Direct access for all bus and truck traffic may be achieved by routing such
traffic to a roadway running north to south along the east boundary of the
property to access President Street as well as Truman Parkway.
•Cruise vessels refueling at this site may accommodate the bunker barge
without extending into the federal channel. This site currently has more
linear distance from the existing wharf to the federal channel; final facility
design will ultimately dictate these distances.
•Should this site be used for a cruise terminal, cruise ships will use the
King’s Landing turning basin. While the MOD is in operation at Ocean
Terminal, cruise ships sailing upstream to access the King’s Landing turning
basin may be subject to transiting through the NVPZ 100 yard intercept and
500 yard escort zone restrictions.
34
SITE RANKING SCORE CARD
35
Conclusions and Recommendations
• Study identifies that each of three sites have issues and concerns
that need to be addressed should it be chosen as
the preferred site by the City of Savannah to move forward to the
next pre-development/permitting stage.
• None of the three sites identified a highly significant negative
factor that the team considered as a “fatal flaw” which would
would eliminate it from further consideration.
• Analysis was limited to the critical factors identified and studied for
the alternative sites.
• Site rankings were presented in a score card format for presentation
purposes. Using the method for comparing the three sites, the ranking
of the sites are:
First Place: THE SAVANNAH RIVER LANDING (SRL) TRACT
Second Place Tie: Powell Dufferyn Tract and Silo / Atlantic Cement
Tract
36
Questions & Discussion
Thank you.
37
Overview of Next Phase Two:
Cruise terminal Site & Landside Facilities
Planning
I- Land Side Due Diligence
II- Site Analysis (including qualitative testing)
III- Conceptual Cruise Terminal/Site Plan Design
IV- Traffic Analysis
 Final Report – Project deliverables
38
I - Land Side Due Diligence
 Assemble available information
 Historical Engineering data
 Available City and GIS data
 Zoning and development constraints
39
II - Site Analysis
 Existing infrastructure
 Soils
 Environmental
 Natural Resources
 Wetlands
 Site Contamination
 Cultural Resources
 Zoning & development permitting analysis
40
II - Site Analysis (Con’t)
Site Qualitative Analysis & Testing
 USACE Wetland Delineation / Re‐verification plan
 Georgia Department of Natural Resources Marshlands
Delineation / Re‐verification plan
 Coordination meeting with USACE pertaining to the Sediment
Testing Scope of Work definition and Sampling Analysis Plan
 Dredge Spoils Testing per USACE Sediment Testing Scope of
Work; includes preparation of a sampling and analysis plan,
dredge sediment and water sampling, and evaluation of dredge
spoil disposal options.
41
III - Conceptual Cruise Terminal/Site Plan Design
Define programmatic elements for terminal
Develop Terminal Design Concept for each site
 Ingress & egress
 Parking
 Utility infrastructure
 Location of buildings, docks, and ancillary facilities
 Ingress and egress for passenger cars, busses/public transit and
service vehicles
 Cruise vessel docking footprint and proximity to Savannah River
channel
 Open space and buffers
 Adjacent existing and proposed development
 Preliminary probable estimate of construction cost and schedule
42
IV - Traffic Analysis
 Project trips generated by terminal
 Identify routes to primary highways
 Access to public transit
 Impacts to existing roadways
 Preliminary Traffic Impact Report based on
information gathered and available from local and state
jurisdictions.
 Provide Traffic Impact Analysis that includes counts at
up to 4 intersections, exclusive of signal warrants or
timing analysis
43
Project Deliverables
Phase 1 & 2 – Provide support documentation
needed for USACE Permit applications.
 The project proponent (not mentioned in RFP); will
need to also apply for and receive a Coastal Marshlands
Protection Act Permit from the State of Georgia
Department of Natural Resources – Coastal Resource
Division
44
Questions & Discussion
Thank you.

More Related Content

What's hot

Jacobson_MuirBeach_FinalBoards
Jacobson_MuirBeach_FinalBoardsJacobson_MuirBeach_FinalBoards
Jacobson_MuirBeach_FinalBoardsAllison Jacobson
 
F041223744
F041223744F041223744
F041223744IOSR-JEN
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Fairfax County
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Fairfax County
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...
Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...
Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...David Fratantoni
 
Dirk Kassenaar Earthfx watertech 2016 presentation v1
Dirk Kassenaar Earthfx watertech 2016 presentation v1Dirk Kassenaar Earthfx watertech 2016 presentation v1
Dirk Kassenaar Earthfx watertech 2016 presentation v1john Kassenaar
 
Lake Haramaya Groundwater Recharge Report
Lake Haramaya Groundwater Recharge ReportLake Haramaya Groundwater Recharge Report
Lake Haramaya Groundwater Recharge ReportTena Alamirew
 
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...Dirk Kassenaar M.Sc. P.Eng.
 
DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...
DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...
DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...Deltares
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall
 

What's hot (20)

SPE-15101-PA
SPE-15101-PASPE-15101-PA
SPE-15101-PA
 
Jacobson_MuirBeach_FinalBoards
Jacobson_MuirBeach_FinalBoardsJacobson_MuirBeach_FinalBoards
Jacobson_MuirBeach_FinalBoards
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
F041223744
F041223744F041223744
F041223744
 
Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09
Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09
Passenger Trains For South Hampton Roads Norfolk Southern 7 17 09
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...
Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...
Environmentally Adaptive Deployment of Lagrangian Instrumentation Using a Sub...
 
Dirk Kassenaar Earthfx watertech 2016 presentation v1
Dirk Kassenaar Earthfx watertech 2016 presentation v1Dirk Kassenaar Earthfx watertech 2016 presentation v1
Dirk Kassenaar Earthfx watertech 2016 presentation v1
 
Lake Haramaya Groundwater Recharge Report
Lake Haramaya Groundwater Recharge ReportLake Haramaya Groundwater Recharge Report
Lake Haramaya Groundwater Recharge Report
 
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
 
Route surveying
Route surveyingRoute surveying
Route surveying
 
Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
 
DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...
DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...
DSD-INT 2014 - OpenMI Symposium - Integrated Environmental Modelling, Andrew ...
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project Experience
 

Similar to Savannah cruise ship study phase i report presentaion 06-24-13

T4 dr. dawoud aquifer artificial recharge abu dhabi case study
T4 dr. dawoud aquifer artificial recharge abu dhabi case study  T4 dr. dawoud aquifer artificial recharge abu dhabi case study
T4 dr. dawoud aquifer artificial recharge abu dhabi case study NENAwaterscarcity
 
Permanent Dredge Spoils Transfer Station PowerPoint
Permanent Dredge Spoils Transfer Station PowerPointPermanent Dredge Spoils Transfer Station PowerPoint
Permanent Dredge Spoils Transfer Station PowerPointsolar
 
A case study in offshore wind farm project management
A case study in offshore wind farm project managementA case study in offshore wind farm project management
A case study in offshore wind farm project managementmtingle
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentSteve Williams
 
Xaris concept study report- lng costal facility - prdw
Xaris   concept study report- lng costal facility - prdw Xaris   concept study report- lng costal facility - prdw
Xaris concept study report- lng costal facility - prdw Alvaro Barros
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkAbdul Rahim
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project listAhmad Mousa
 
HEC - RAS Final Project
HEC - RAS Final ProjectHEC - RAS Final Project
HEC - RAS Final ProjectCoral West
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelR Ray Saikus
 
The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...
The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...
The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...JAXPORT
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design designavirup naskar
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.Emeka Ngwobia
 
1976 floating breakwater performance
1976  floating breakwater performance1976  floating breakwater performance
1976 floating breakwater performanceApoorva Appi
 

Similar to Savannah cruise ship study phase i report presentaion 06-24-13 (20)

James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
ARMF 2014 USCG White Paper
ARMF 2014 USCG White PaperARMF 2014 USCG White Paper
ARMF 2014 USCG White Paper
 
T4 dr. dawoud aquifer artificial recharge abu dhabi case study
T4 dr. dawoud aquifer artificial recharge abu dhabi case study  T4 dr. dawoud aquifer artificial recharge abu dhabi case study
T4 dr. dawoud aquifer artificial recharge abu dhabi case study
 
Permanent Dredge Spoils Transfer Station PowerPoint
Permanent Dredge Spoils Transfer Station PowerPointPermanent Dredge Spoils Transfer Station PowerPoint
Permanent Dredge Spoils Transfer Station PowerPoint
 
A case study in offshore wind farm project management
A case study in offshore wind farm project managementA case study in offshore wind farm project management
A case study in offshore wind farm project management
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
Xaris concept study report- lng costal facility - prdw
Xaris   concept study report- lng costal facility - prdw Xaris   concept study report- lng costal facility - prdw
Xaris concept study report- lng costal facility - prdw
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-Link
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
HEC - RAS Final Project
HEC - RAS Final ProjectHEC - RAS Final Project
HEC - RAS Final Project
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...
The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...
The Decision to Pursue a 47 foot Channel Depth at Jacksonville's Harbor (JAXP...
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design design
 
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
DESIGN OF A MODEL HAULAGE TECHNIQUE FOR WATER FLOODING CAISSON ASSEMBLY.
 
1976 floating breakwater performance
1976  floating breakwater performance1976  floating breakwater performance
1976 floating breakwater performance
 

Recently uploaded

Genesis 1:6 || Meditate the Scripture daily verse by verse
Genesis 1:6  ||  Meditate the Scripture daily verse by verseGenesis 1:6  ||  Meditate the Scripture daily verse by verse
Genesis 1:6 || Meditate the Scripture daily verse by versemaricelcanoynuay
 
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh HaldighatiApsara Of India
 
08448380779 Call Girls In Chirag Enclave Women Seeking Men
08448380779 Call Girls In Chirag Enclave Women Seeking Men08448380779 Call Girls In Chirag Enclave Women Seeking Men
08448380779 Call Girls In Chirag Enclave Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking MenDelhi Call girls
 
Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls AgencyHire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls AgencyNitya salvi
 
BERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptxBERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptxseri bangash
 
visa consultant | 📞📞 03094429236 || Best Study Visa Consultant
visa consultant | 📞📞 03094429236 || Best Study Visa Consultantvisa consultant | 📞📞 03094429236 || Best Study Visa Consultant
visa consultant | 📞📞 03094429236 || Best Study Visa ConsultantSherazi Tours
 
🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...
🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...
🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...Apsara Of India
 
DARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda BuxDARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda BuxBeEducate
 
Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236Sherazi Tours
 
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday SafarisKibera Holiday Safaris Safaris
 
Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236Sherazi Tours
 
How to Get Unpublished Flight Deals and Discounts?
How to Get Unpublished Flight Deals and Discounts?How to Get Unpublished Flight Deals and Discounts?
How to Get Unpublished Flight Deals and Discounts?FlyFairTravels
 
Top 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxTop 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxdishha99
 
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779Delhi Call girls
 
08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Genesis 1:6 || Meditate the Scripture daily verse by verse
Genesis 1:6  ||  Meditate the Scripture daily verse by verseGenesis 1:6  ||  Meditate the Scripture daily verse by verse
Genesis 1:6 || Meditate the Scripture daily verse by verse
 
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
 
08448380779 Call Girls In Chirag Enclave Women Seeking Men
08448380779 Call Girls In Chirag Enclave Women Seeking Men08448380779 Call Girls In Chirag Enclave Women Seeking Men
08448380779 Call Girls In Chirag Enclave Women Seeking Men
 
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
08448380779 Call Girls In Bhikaji Cama Palace Women Seeking Men
 
Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls AgencyHire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
 
BERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptxBERMUDA Triangle the mystery of life.pptx
BERMUDA Triangle the mystery of life.pptx
 
Rohini Sector 18 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 18 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 18 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 18 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls Service !! Indirapuram!! @9999965857 Delhi 🫦 No Advance VVVIP 🍎 S...
Call Girls Service !! Indirapuram!! @9999965857 Delhi 🫦 No Advance  VVVIP 🍎 S...Call Girls Service !! Indirapuram!! @9999965857 Delhi 🫦 No Advance  VVVIP 🍎 S...
Call Girls Service !! Indirapuram!! @9999965857 Delhi 🫦 No Advance VVVIP 🍎 S...
 
visa consultant | 📞📞 03094429236 || Best Study Visa Consultant
visa consultant | 📞📞 03094429236 || Best Study Visa Consultantvisa consultant | 📞📞 03094429236 || Best Study Visa Consultant
visa consultant | 📞📞 03094429236 || Best Study Visa Consultant
 
Call Girls In Munirka 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Munirka 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Munirka 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Munirka 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...
🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...
🔥HOT🔥📲9602870969🔥Prostitute Service in Udaipur Call Girls in City Palace Lake...
 
DARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda BuxDARK TRAVEL AGENCY presented by Khuda Bux
DARK TRAVEL AGENCY presented by Khuda Bux
 
Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236Study Consultants in Lahore || 📞03094429236
Study Consultants in Lahore || 📞03094429236
 
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
 
Call Girls Service !! New Friends Colony!! @9999965857 Delhi 🫦 No Advance VV...
Call Girls Service !! New Friends Colony!! @9999965857 Delhi 🫦 No Advance  VV...Call Girls Service !! New Friends Colony!! @9999965857 Delhi 🫦 No Advance  VV...
Call Girls Service !! New Friends Colony!! @9999965857 Delhi 🫦 No Advance VV...
 
Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236
 
How to Get Unpublished Flight Deals and Discounts?
How to Get Unpublished Flight Deals and Discounts?How to Get Unpublished Flight Deals and Discounts?
How to Get Unpublished Flight Deals and Discounts?
 
Top 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxTop 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptx
 
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
Night 7k Call Girls Noida Sector 93 Escorts Call Me: 8448380779
 
08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men
 

Savannah cruise ship study phase i report presentaion 06-24-13

  • 1. 1 Date: October 13, 2010 June 25, 2013 Savannah Cruise Feasibility Study CRUISE SHIP STAGING AREA STUDY Phase I Report Presentation
  • 3. 3 REPORT PRESENTATION – June 25, 2013 Phase One, CRUISE SHIP STAGING AREA STUDY Savannah Cruise Feasibility Study I - Overview of Study: The scope of the project methodology analyzed three sites for a potential Cruise Terminal capable of handling in range of 2,700 passengers and docking/berthing station. . The scope of this study evaluated environmental impacts, navigational challenges, and compatibility with the Georgia Ports Authority (GPA) vessel operations on the Savannah River, technical investigations, utility/traffic coordination, site challenges, docking requirements and identification of potential challenges with each site. The Phase I report has taken into consideration and evaluated the waterside / marine conditions and general infrastructure existing at each of the three sites and provided a tabulation of ranking ranging from Most Desirable to Least Desirable.
  • 4. 4 REPORT PRESENTATION – June 25, 2013 Phase One, CRUISE SHIP STAGING AREA STUDY Savannah Cruise Feasibility Study I - Overview of Study (Continued)- The report has been developed on the basis of information gathered and developed from meetings with and / or from information provided by: ;  The U.S. Army Corps of Engineers,  Savannah Pilots Association,  United States Coast Guard,  U.S. Fish and Wildlife Service,  National Marine Fisheries Service,  Georgia Department of Natural Resources,  Colonial Oil,  Limited contact with Georgia Ports Authority,  Georgia Archaeological Site File  Georgia’s Natural, Archaeological and Historic Resources GIS.
  • 5. 5 Cruise Vessel Development Over TimeVesselSizes 900-1050 FEET Up To 30 20-36 26-30 26-34 1960 ‘ s 1970 ‘ s 1980 ‘ s +1990‘ s 400-500 600 1200-2000 2600-3800 18 20 80 90-150 800 FEET 500 FEET 400 FEET Ship Displacement (In Thousands Grt.) Passengers Drafts Air Drafts 140-175 160-180 - - 960-1250 FEET 30-343500-5000 150-250+/- 200 +2000‘ s
  • 6. 6
  • 8. 8 Critical Demographics and Psychographics within a One Day Drive of Savannah and Comparables (2009) Source: SRDS, PSI, Google Maps, MapInfo SAV JAX CHS MOB mil mil mil mil Demographics (Persons or Households) 2009 Population 56.4 46.2 44.3 42.0 2009 Population Age over 55 14.5 11.9 11.1 9.8 White Collar Workers 15.3 12.6 12.1 11.1 Households with Income $75,000 or more 5.9 4.9 4.6 4.1 Persons over 25 with Some College or More 18.8 15.5 14.6 13.0 Psychographics (Adults) Interested in The Arts 15.4 12.6 11.9 10.8 Rely on Newspaper to Keep Me Informed 15.0 12.3 11.7 10.7 Prefer Specialty Stores because Have Best Brands 8.5 7.0 6.6 6.1 Do Some Sport/Exercise Once a Week 21.1 17.2 16.4 15.0 Typically Avoid Watching TV Commercials 18.9 15.4 14.8 13.5 2009 Departing Passengers (in 1000's) 188.2 37.4 134.6 Within a One Day Drive of:
  • 9. 9 REPORT PRESENTATION – June 25, 2013 Phase One , CRUISE SHIP STAGING AREA STUDY Savannah Cruise Feasibility Study 1- General Locations of Sites A, B, and C 2- General Characteristics of Sites A, B, and C 3- Site Analysis and Comparisons: Each of the three sites; A, B, and C were studied and the report presents the findings for the following parameters for each of the sites, • SITE & INFRASTRUCTURE DATA • Location • Site Acreage • Distance to Major Highway • Water and Sewer System • Electrical Service Availability • NAVIGATION & HYDROGRAPHIC INFORMATION • WATER SIDE STRUCTURES • PRELIMINARY DREDGE ANALYSIS • UPLANDS NATURAL RESOURCES • MARINE BIOLOGICAL HABITATS • UNDERWATER ARCHEOLOGY • OTHER ISSUES
  • 10. 10 Cruise Terminal Sites For Analysis SITE A: SILO TRACT SITE B POWELL DYFFRYN TRACT SITE C SAVANNAH RIVER LANDING
  • 11. 11 Site A: Silo / Atlantic Cement Tract
  • 12. 12 Site A: Silo / Atlantic Cement Tract
  • 13. 13 Site B: Powell Dufferyn Tract
  • 14. 14 Site B: Powell Dufferyn Tract
  • 15. 15 Site C: Savannah River Landing Tract
  • 16. 16 Site C: Savannah River Landing Tract
  • 17. 17 Phase I - Project Issues  Access to Major Highways – Level Of Service (LOS) rankings obtained from 2004 MPC traffic congestion study.
  • 18. 18 Site & Infrastructure - Location SITE A: SILO TRACT SITE B POWELL DYFFRYN TRACT SITE C SAVANNAH RIVER LANDING
  • 19. 19 Site & Infrastructure - Acreage A B C Site Area: +/- 21.5 Acres Site Area: +/- 14.5 Acres Site Area: +/- 55 Acres
  • 20. 20 Site & Infrastructure – Distance to Major Highway Level Of Service (LOS) rankings obtained from 2004 MPC traffic congestion study.
  • 21. 21 Site & Infrastructure – Water & Sewer (costs associated with selected site for these improvements investigated in next phase of the study) Site A- Water: • Existing 16 “ main @Hutchinson Island Rd. • Need 12” main extended 650 ft. Sewer : • Need 6-8” main extended 650 ft. • Existing 10” main @Hutchinson Island Rd. Site B- Water: • Existing 16” water main stubbed out at Wayne Shackleford Pkwy • Need 12” main extended 2,300 ft.. Sewer : • Existing stubbed out 8” force main at Wayne Shackleford Pkwy Site C- Water: • Existing 12” main serving site but needs 1,000 ft extension for terminal Sewer : • System never completed, needs completed and accepted by City
  • 22. 22 Site & Infrastructure – Electrical Service Site A- • 3 Phase - @ 25 kV available at site • 12-14 kV required for cruise terminal service • Do not foresee major electrical changes needed to serve site Site B- • 3 phase overhead available now at this site • System modifications/maintenance needed for service Site C- • Does not have electrical wiring on site, but private conduits and manhole are existing at the site • GA Power indicated complex process to get power to terminal site • Site would have largest projected cost of the 3 alternative sites • Need electrical power study to consider alternative methods vs. cost
  • 23. 23 Navigation & Hydrographic Information Issues Applicable To All Sites-  Ships greater than 800 ft turning to occur upriver at King’s Landing  For maneuvering Pilots request additional 100 ft mooring area each end of ship  Seasonality effects passage, such as in the spring when fog is common, limit vessel operations in the river. Other ports like Tampa and New Orleans have similar fog from time to time.  Military Outload Division (MOD) use of the Ocean Terminal facilities and the Naval Vessel Protection Zone (NVPZ) in place and enforced by the US Coast Guard (CG) during the course of MOD operations (100 yard intercept zone / 500 yard escort zone).  US Coast Guard (CG) reports that the regulations concerning LNG vessels could cause cruise ship delay in transit due to one of these LNG vessels transiting the area. Such operational coordination requirements common at most major ports Site A-  Currently only approx. 656 ft river frontage, (need 1,000 ft) therefore, additional waterfront access to be acquired  Shoaling reported by Pilots in vicinity of site  Should site be selected for further consideration, the NVPZ restrictions may also apply while the cruise ship is docked
  • 24. 24 Navigation & Hydrographic Information Site B-  Currently only approx. 602 ft river frontage, (need 1,000 ft) therefore, additional waterfront access to be acquired  Shoaling reported by Pilots in vicinity of site  Concern to the Pilots, due to the site’s location within a turn in the river, there is potential for a “suction” effect on vessels that are moored in this area caused by passing vessels making the turn Site C-  Some concern of steering large vessels in vicinity of site due to curve in river  Pilots preferred site location due to less surrounding berthing facilities which eases maneuvering
  • 25. 25 Water Side Structures Site A- • Existing in-water structure consists of 4 mooring structures each spaced approximately 125 feet apart. These structures are located approximately 50 feet from the shore and are connected by supported access ways that appear to be in good condition. • New waterside mooring/berthing structures will have to be constructed Site B- • Existing structure consists of center berthing area with 4 mooring structures (2 on each side) • Riparian boundary in relation to existing structures needs further investigation • Engineering analysis needed to assess potential of integration into new cruise ship berth (new vs. modification) Site C- • Approx 1,984 ft of bulk head and river walk • Not designed to berth large vessels but may be integrated into cruise berth infrastructure • Marine structures for berthing cruise ships needs engineering analysis (modifications)
  • 26. 26 Preliminary Dredge Analysis Site A-  Approx 130 ft from Fed Channel to existing mooring structures  Approx 34,800 cubic yards of dredging may be needed to achieve 34 ft draft  Prior land use assessment needed to evaluate source material/contributions regarding dredge spoils as contamination may be an issue  Existing dredge pipeline adjacent to berth area will need to be addressed  Sediment analysis required  USCE need to approve a dredge disposal management plan  (Permit) Conditional on salt marsh impact and adequate river frontage, site has high probability of obtaining a USCE Sect 10/404 permit Site B-  Approx 120 ft from Fed Channel to existing mooring structures  Approx 24,300 cubic yards of dredging may be needed to achieve 34 ft draft  Prior land use assessment needed to evaluate source material/contributions regarding dredge spoils as contamination may be an issue  Sediment analysis required  USCE need to approve a dredge disposal management plan
  • 27. 27 Preliminary Dredge Analysis Site B- (Con’t)  (Permit) Conditional on good sediment analysis, high likelihood of approval for initial and ongoing maintenance dredging  (Permit) Conditional on salt marsh impact and adequate river frontage, site has moderate probability of obtaining a USCE Sect 10/404 permit Site C-  Approx 150 ft from Fed Channel to existing mooring structures  Approx 38,500 cubic yards of dredging may be needed to achieve 34 ft draft  Prior USCE Sect 10/404 permit (2007) for Savannah Riverwalk Extension appears to have been issued and project extended  Prior land use assessment needed to evaluate source material/contributions regarding dredge spoils as contamination may be an issue  USCE need to approve a dredge disposal management plan  Site has high probability of obtaining a USCE Sect 10/404 permit  Existing development at site likely to make terminal permitting much easier
  • 28. 28 Uplands Natural Resources Site A- Site B- Site C- • For all three (3) sites, a review of the USFWS Chatham County list indicated that three (3) plant species as potentially occurring in Chatham County. Potential impacts will have to be assessed during Phase II of the study; once a survey with tree information is available, should any of these sites be selected.
  • 29. 29 Marine Biological Habitats Site A- Site B- Site C- • For all three (3) sites, a review of the USFWS Chatham County list indicated that seventeen (17) animal species as potentially occurring in Chatham County. Potential impacts will be further assessed during Phase II of the study should any of these sites be selected. Although no listed species were observed during this study, due to the presence of potentially suitable habitat for the federally protected species, it cannot be guaranteed that listed species would not or could not use this site currently or in the future.
  • 30. 30 Underwater Archeology Site A- •One submerged resource (poorly preserved Twentieth Century wooden barge) located at this site • USACE, Savannah District confirmed this site is not of underwater archeological concern Site B- • Underwater survey identified no underwater archeological resources at this site • USACE, Savannah District confirmed this site is not of underwater archeological concern Site C- • USACE issued permit in 2007 for this site. Work undertaken at that time included an archaeological survey of the in-water and land side of the property and historic resources (boat wreckage, portion of old wharf, bricks) were encountered at this site • A Programmatic Agreement between the City of Savannah, USACE, Savannah District and Georgia SHPO, was signed in January 2007 detailing the required cultural resource studies for the Riverwalk project at this site •Further work on additional components of the archaeological survey may be required in order to accommodate a Cruise Terminal development at this site (use modification may trigger revisions)
  • 31. 31 Other Issues: Site A- • This site offers approximately 6 to 10 acres for potential ancillary mix-use development to serve cruise passengers and the general public; subject to local parking requirements for the development of a cruise terminal facility. • Refueling at this site will likely result in the bunker barge potentially extending into the federal channel. • This site is directly across Ocean Terminal site. Should this site be used for a cruise terminal, cruise ships calling at this facility; while the Military Outload Division (MOD) is in operation at Ocean Terminal, are subject to berthing restrictions associated with the NVPZ 100 yard “intercept zone” restriction.
  • 32. 32 Other Issues: Site B- • This site offers approximately 4 acres for potential ancillary mix-use development to serve cruise passengers and the general public; subject to local parking requirements for the development of a cruise terminal facility. • Refueling at this site will likely result in the bunker barge potentially extending into the federal channel. •Should this site be used for a cruise terminal, cruise ships will use the King’s Landing turning basin. While the MOD is in operation at Ocean Terminal, cruise ships sailing upstream to access the King’s Landing turning basin may be subject to transiting through the NVPZ 100 yard intercept zone and 500 yard escort zone restrictions.
  • 33. 33 Other Issues: Site C- • This site offers approximately 40 to 45 acres for potential ancillary mix- use development to serve cruise passengers and the general public; subject to local parking requirements for the development of a cruise terminal facility. • Direct access for all bus and truck traffic may be achieved by routing such traffic to a roadway running north to south along the east boundary of the property to access President Street as well as Truman Parkway. •Cruise vessels refueling at this site may accommodate the bunker barge without extending into the federal channel. This site currently has more linear distance from the existing wharf to the federal channel; final facility design will ultimately dictate these distances. •Should this site be used for a cruise terminal, cruise ships will use the King’s Landing turning basin. While the MOD is in operation at Ocean Terminal, cruise ships sailing upstream to access the King’s Landing turning basin may be subject to transiting through the NVPZ 100 yard intercept and 500 yard escort zone restrictions.
  • 35. 35 Conclusions and Recommendations • Study identifies that each of three sites have issues and concerns that need to be addressed should it be chosen as the preferred site by the City of Savannah to move forward to the next pre-development/permitting stage. • None of the three sites identified a highly significant negative factor that the team considered as a “fatal flaw” which would would eliminate it from further consideration. • Analysis was limited to the critical factors identified and studied for the alternative sites. • Site rankings were presented in a score card format for presentation purposes. Using the method for comparing the three sites, the ranking of the sites are: First Place: THE SAVANNAH RIVER LANDING (SRL) TRACT Second Place Tie: Powell Dufferyn Tract and Silo / Atlantic Cement Tract
  • 37. 37 Overview of Next Phase Two: Cruise terminal Site & Landside Facilities Planning I- Land Side Due Diligence II- Site Analysis (including qualitative testing) III- Conceptual Cruise Terminal/Site Plan Design IV- Traffic Analysis  Final Report – Project deliverables
  • 38. 38 I - Land Side Due Diligence  Assemble available information  Historical Engineering data  Available City and GIS data  Zoning and development constraints
  • 39. 39 II - Site Analysis  Existing infrastructure  Soils  Environmental  Natural Resources  Wetlands  Site Contamination  Cultural Resources  Zoning & development permitting analysis
  • 40. 40 II - Site Analysis (Con’t) Site Qualitative Analysis & Testing  USACE Wetland Delineation / Re‐verification plan  Georgia Department of Natural Resources Marshlands Delineation / Re‐verification plan  Coordination meeting with USACE pertaining to the Sediment Testing Scope of Work definition and Sampling Analysis Plan  Dredge Spoils Testing per USACE Sediment Testing Scope of Work; includes preparation of a sampling and analysis plan, dredge sediment and water sampling, and evaluation of dredge spoil disposal options.
  • 41. 41 III - Conceptual Cruise Terminal/Site Plan Design Define programmatic elements for terminal Develop Terminal Design Concept for each site  Ingress & egress  Parking  Utility infrastructure  Location of buildings, docks, and ancillary facilities  Ingress and egress for passenger cars, busses/public transit and service vehicles  Cruise vessel docking footprint and proximity to Savannah River channel  Open space and buffers  Adjacent existing and proposed development  Preliminary probable estimate of construction cost and schedule
  • 42. 42 IV - Traffic Analysis  Project trips generated by terminal  Identify routes to primary highways  Access to public transit  Impacts to existing roadways  Preliminary Traffic Impact Report based on information gathered and available from local and state jurisdictions.  Provide Traffic Impact Analysis that includes counts at up to 4 intersections, exclusive of signal warrants or timing analysis
  • 43. 43 Project Deliverables Phase 1 & 2 – Provide support documentation needed for USACE Permit applications.  The project proponent (not mentioned in RFP); will need to also apply for and receive a Coastal Marshlands Protection Act Permit from the State of Georgia Department of Natural Resources – Coastal Resource Division