SlideShare a Scribd company logo
1 of 12
Alaska Pipeline Project
Geotechnical + Engineering Services
Canada Pipeline Section
RFP 8709
Although the completion of the historic
Trans Alaska Pipeline allowed crude
oil to be shipped to market from the
North Slope, the associated natural gas
was left stranded. The Alaska Pipeline
Project (APP) proposes to solve this by
providing 2,800 km of new natural gas
pipeline from the Prudhoe Bay terminal
to an existing pre-built pipeline network
in northwestern Alberta. The proposed
route follows the existing Trans Alaska
Pipeline south from Prudhoe Bay to the
Alaska Highway, roughly following the
Highway to east of Watson Lake, then
southwest into Alberta.
Highlights of Successful Partnership
The Trans Alaska Pipeline was one
of the largest engineering projects
ever. Its design and construction were
truly ground-breaking and brought
the fields of permafrost and Northern
engineering into the mainstream. While
the Alaska Pipeline Project may not be
as revolutionary as its predecessor, it
still represents a massive, technically
challenging project that is vitally
important to Alaska, Northern Canada,
and the Arctic.
WorleyParsons and BGC understand the
difficult nature and high stakes of this
undertaking.
We have the experience to prove it.
1996 2008
2009
1997-2001
2010
BGC was first contracted by
TransCanada after a pipeline
rupture on the LaSalle River
south of Winnipeg, Manitoba,
an incident caused in part by
geotechnical issues.
BGC evaluated geotechnical
hazards on TransCanada’s
Mainline. After TransCanada’s
merger with Nova, BGC
expanded its geotechnical
work to the Alberta and BC
pipeline networks.
WorleyParsons geophysicists
completed a high resolution
2D seismic survey and found
active, near-surface faulting in
the Yukon near the White River,
where the pipeline will cross
portions of the Denali Fault.
WorleyParsons completed scope
of work for a Class IV estimate of
the APP conceptual design.
BGC began in-depth geotechnical
investigations of river crossings
and permafrost conditions in
northeastern British Columbia for
the Horn River Mainline.
We know the North.
Our corporate experience in permafrost pipeline
engineering dates back to the 1940s, when
Ralph Parsons worked as Director of Engineering
on the Canol Pipeline Project from Norman Wells
NWT to Whitehorse, YK. Since that start, we
have worked on many Northern projects, on sites
as far north as the 80th parallel. Our Northern
resume includes Canol, the original Trans Alaska
Pipeline System, facilities at Prudhoe Bay and
Norman Wells, the Dempster Lateral project, the
Mackenzie Valley Gas Pipeline, and the APP.
Our APP summer 2010 field program had up to
9 teams conducting field studies on alternative
alignments, corridor footprint, water crossings,
faults, side slopes, longitudinal slopes, acid rock
areas, fault delineation, and a sonar and mapping
program of the Kluane Lake crossing along the
APP ROW from the Alaska-BC border to the
BC-Alberta border. Work was completed on or
ahead of schedule with no major incidents and
very few near misses. Local First Nations band
members worked as wildlife monitors for ground
programs and as labourers where needed.
Logistics &
Interface
Managing subcontractors and field crews is a challenge. Thankfully, we have key personnel already doing this for
the Alaska portion of the project and segments in Canada. Our integrated team will avoid duplication of effort
by reducing the number of interfaces. In addition, locals and First Nations members on our team provide relevant
insight to reduce some of the project risks.
Execution
TransCanada-ExxonMobil have provided an
aggressive and challenging project timeline
WorleyParsons and BGC propose to meet
the schedule by using experienced, highly
skilled people on our project team and by
mobilizing up to five simultaneous field
crews to carry out field investigations. Our
partnership is crucial to this effort.
For the drilling program, Mobile Augers &
Research Ltd. will partner with Midnight Sun
Drilling Co. Ltd., ConeTec Investigations Ltd., and
First Nations communities.
Using a strategy similar to the Mackenzie Gas
Project, Midnight Sun will incorporate companies
along the line. Each company will be majority
Native-owned and provide services for all work
conducted in that Band’s region. This will
Establish viable operating companies
controlled by the Bands.
Give each Band a specified portion of
revenue from the project.
Train and employ local First Nations’ labour
wherever possible.
We believe this will maximize the success of the
drilling program. It improves access to drill sites
along the line and helps secure support from
local communities. Given the short timeline to
the start of drilling operations, access to the
sites is critical.
We understand the Earth.
We know permafrost.
We also understand water.
In the Fall of 2010, on very short notice, we completed
a $500K geophysics investigation for the APP. Despite
difficult conditions involving narrow cutlines, muskeg,
and poor weather, data processing and interpretation
was done in near real-time so that seismic cross lines
could be chosen based on previous line segments
of acquisition. We are well-prepared to pursue these
investigations for subsequent phases.
Permafrost and cold regions engineering have been
core competencies at BGC ever since the company was
founded. BGC provides geotechnical, geological, mining
and permafrost engineering services for northern and
cold regions resource extraction and infrastructure
developments. These projects have been undertaken in
various cold region terrains, including both discontinuous
and continuous permafrost, permafrost with significant
ground ice, and offshore permafrost.
WorleyParsons’ experienced in-house hydrogeological
and hydrotechnical scientists work closely with their
colleagues in other disciplines to provide a holistic view
of the many environmental and technical challenges in a
project of this scale and complexity.
Keystone XL & Horn River
The proposed Keystone XL 3,200 km, 900 mm
diameter crude oil pipeline will run from Hardisty,
Alberta to Nederland, Texas and involves
constructing about 2,700 km of new pipeline.
WorleyParsons’ geotechnical group in Calgary
reviewed geotechnical investigation work
and reports completed by contractors in the
US. WorleyParsons Calgary also served as
the complete geotechnical and geophysical
consultant on the Canadian pump stations.
BGC’s geotechnical investigation work for
TransCanada’s Horn River project supported the
design and construction application submitted
to the National Energy Board. So far, BGC has
completed over 100 geotechnical projects for
TransCanada.
Partnership for results.

More Related Content

What's hot

Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014Darren Shepherdson
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - reportzubeditufail
 
Kissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama RaniKissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama RaniTWCA
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13jhayman09
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Conexplo proppant management 2014 mendoza
Conexplo proppant management 2014 mendozaConexplo proppant management 2014 mendoza
Conexplo proppant management 2014 mendozaJuan Carlos Bonapace
 
Catherine Elder - October 6, 2011
Catherine Elder - October 6, 2011Catherine Elder - October 6, 2011
Catherine Elder - October 6, 2011p21decision
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainAdina Levin
 
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumTunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumKevin Lovell, PMP
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeTony O Neill
 
JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016Josh Kull
 
IBA Presentation Combo Updated 3-28
IBA Presentation Combo Updated 3-28IBA Presentation Combo Updated 3-28
IBA Presentation Combo Updated 3-28James Dillion Asher
 

What's hot (20)

Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 
Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - report
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
Kissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama RaniKissimmee Basin Modeling & Operations Study - Rama Rani
Kissimmee Basin Modeling & Operations Study - Rama Rani
 
Shark Bay Upgrade
Shark Bay UpgradeShark Bay Upgrade
Shark Bay Upgrade
 
Materialhandling
MaterialhandlingMaterialhandling
Materialhandling
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 
Performance testing and specifications
Performance testing and specificationsPerformance testing and specifications
Performance testing and specifications
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Conexplo proppant management 2014 mendoza
Conexplo proppant management 2014 mendozaConexplo proppant management 2014 mendoza
Conexplo proppant management 2014 mendoza
 
Catherine Elder - October 6, 2011
Catherine Elder - October 6, 2011Catherine Elder - October 6, 2011
Catherine Elder - October 6, 2011
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to Caltrain
 
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumTunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass Scheme
 
Caltrans Asphalt Specification Update
Caltrans Asphalt Specification UpdateCaltrans Asphalt Specification Update
Caltrans Asphalt Specification Update
 
JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016
 
IBA Presentation Combo Updated 3-28
IBA Presentation Combo Updated 3-28IBA Presentation Combo Updated 3-28
IBA Presentation Combo Updated 3-28
 

Viewers also liked

51 Disintegration of 12C nuclei by 700–1500 MeV photons - Nuclear Physics A,...
51 Disintegration of 12C nuclei by 700–1500 MeV photons -  Nuclear Physics A,...51 Disintegration of 12C nuclei by 700–1500 MeV photons -  Nuclear Physics A,...
51 Disintegration of 12C nuclei by 700–1500 MeV photons - Nuclear Physics A,...Cristian Randieri PhD
 
Transparent soil in Geotechnical engineering
Transparent soil in Geotechnical engineeringTransparent soil in Geotechnical engineering
Transparent soil in Geotechnical engineeringEmad Maleksaeedi
 
ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...
ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...
ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...Omid Mahabadi
 
Geometrical tolerances
Geometrical tolerancesGeometrical tolerances
Geometrical tolerancesHassan Habib
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)Zagazig University
 
Sacred geometry
Sacred geometrySacred geometry
Sacred geometryvirajoshi
 
Soil mechanics and foundations by dr. b.c. punmia ashok kumar jain- b.c. pun...
Soil mechanics and foundations by dr. b.c. punmia  ashok kumar jain- b.c. pun...Soil mechanics and foundations by dr. b.c. punmia  ashok kumar jain- b.c. pun...
Soil mechanics and foundations by dr. b.c. punmia ashok kumar jain- b.c. pun...IMALONE1
 
Lateral earth pressure
Lateral earth pressureLateral earth pressure
Lateral earth pressureJkmj Alam
 
Earthquake engineering application to design
Earthquake engineering   application to designEarthquake engineering   application to design
Earthquake engineering application to designVishvendu pandey
 
Geo technical engineering v.n.s.murthy
Geo technical engineering v.n.s.murthyGeo technical engineering v.n.s.murthy
Geo technical engineering v.n.s.murthyYeswanth Raghavendra
 
Quantum physics for dummies
Quantum physics for dummiesQuantum physics for dummies
Quantum physics for dummiesSxrxhx Sxrxbxa
 

Viewers also liked (13)

51 Disintegration of 12C nuclei by 700–1500 MeV photons - Nuclear Physics A,...
51 Disintegration of 12C nuclei by 700–1500 MeV photons -  Nuclear Physics A,...51 Disintegration of 12C nuclei by 700–1500 MeV photons -  Nuclear Physics A,...
51 Disintegration of 12C nuclei by 700–1500 MeV photons - Nuclear Physics A,...
 
Transparent soil in Geotechnical engineering
Transparent soil in Geotechnical engineeringTransparent soil in Geotechnical engineering
Transparent soil in Geotechnical engineering
 
ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...
ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...
ARMA Symposium -- Short course on Modelling Coupled HM Deformation and fractu...
 
Geometrical tolerances
Geometrical tolerancesGeometrical tolerances
Geometrical tolerances
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
 
Sacred geometry
Sacred geometrySacred geometry
Sacred geometry
 
ADVANCED NUCLEAR PHYSICS
ADVANCED NUCLEAR PHYSICSADVANCED NUCLEAR PHYSICS
ADVANCED NUCLEAR PHYSICS
 
Soil mechanics and foundations by dr. b.c. punmia ashok kumar jain- b.c. pun...
Soil mechanics and foundations by dr. b.c. punmia  ashok kumar jain- b.c. pun...Soil mechanics and foundations by dr. b.c. punmia  ashok kumar jain- b.c. pun...
Soil mechanics and foundations by dr. b.c. punmia ashok kumar jain- b.c. pun...
 
Lateral earth pressure
Lateral earth pressureLateral earth pressure
Lateral earth pressure
 
Earthquake engineering application to design
Earthquake engineering   application to designEarthquake engineering   application to design
Earthquake engineering application to design
 
Basic soil mechanics
Basic soil mechanicsBasic soil mechanics
Basic soil mechanics
 
Geo technical engineering v.n.s.murthy
Geo technical engineering v.n.s.murthyGeo technical engineering v.n.s.murthy
Geo technical engineering v.n.s.murthy
 
Quantum physics for dummies
Quantum physics for dummiesQuantum physics for dummies
Quantum physics for dummies
 

Similar to Geotechnical Engineering Services

East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas PipelineBoudewijn Baan
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...Lakeland Resources Inc. (TSXv: LK)
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower ProjectAli Sial
 
Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14sarahartis
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Dario Gnoato
 
Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05Natalia Camba
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Mike Bisland
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestPhilip Tunnah
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanSyrymbet JSC
 

Similar to Geotechnical Engineering Services (20)

East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas Pipeline
 
petrobras-cascade-chinook
petrobras-cascade-chinookpetrobras-cascade-chinook
petrobras-cascade-chinook
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report
 
Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14
 
Hydrographic construction Cairo Illinois
Hydrographic construction  Cairo IllinoisHydrographic construction  Cairo Illinois
Hydrographic construction Cairo Illinois
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016
 
Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Hbk.nr dec.1.16
Hbk.nr dec.1.16Hbk.nr dec.1.16
Hbk.nr dec.1.16
 
Petrobras cascade-chinook
Petrobras cascade-chinookPetrobras cascade-chinook
Petrobras cascade-chinook
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes Digest
 
CV-Dirk - Latest 2016
CV-Dirk - Latest 2016CV-Dirk - Latest 2016
CV-Dirk - Latest 2016
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Drainage Salvation-JRiopelle
Drainage Salvation-JRiopelleDrainage Salvation-JRiopelle
Drainage Salvation-JRiopelle
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in Kazakhstan
 

More from Victor Panlilio

Five Transitions to the Future
Five Transitions to the FutureFive Transitions to the Future
Five Transitions to the FutureVictor Panlilio
 
Getting to Employer of Choice
Getting to Employer of ChoiceGetting to Employer of Choice
Getting to Employer of ChoiceVictor Panlilio
 
Volunteer Engagement deck
Volunteer Engagement deckVolunteer Engagement deck
Volunteer Engagement deckVictor Panlilio
 

More from Victor Panlilio (6)

Five Transitions to the Future
Five Transitions to the FutureFive Transitions to the Future
Five Transitions to the Future
 
Generic Trend Report
Generic Trend ReportGeneric Trend Report
Generic Trend Report
 
Infrastructure strategy
Infrastructure strategyInfrastructure strategy
Infrastructure strategy
 
Spectra introduction
Spectra introductionSpectra introduction
Spectra introduction
 
Getting to Employer of Choice
Getting to Employer of ChoiceGetting to Employer of Choice
Getting to Employer of Choice
 
Volunteer Engagement deck
Volunteer Engagement deckVolunteer Engagement deck
Volunteer Engagement deck
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Geotechnical Engineering Services

  • 1. Alaska Pipeline Project Geotechnical + Engineering Services Canada Pipeline Section RFP 8709
  • 2. Although the completion of the historic Trans Alaska Pipeline allowed crude oil to be shipped to market from the North Slope, the associated natural gas was left stranded. The Alaska Pipeline Project (APP) proposes to solve this by providing 2,800 km of new natural gas pipeline from the Prudhoe Bay terminal to an existing pre-built pipeline network in northwestern Alberta. The proposed route follows the existing Trans Alaska Pipeline south from Prudhoe Bay to the Alaska Highway, roughly following the Highway to east of Watson Lake, then southwest into Alberta. Highlights of Successful Partnership The Trans Alaska Pipeline was one of the largest engineering projects ever. Its design and construction were truly ground-breaking and brought the fields of permafrost and Northern engineering into the mainstream. While the Alaska Pipeline Project may not be as revolutionary as its predecessor, it still represents a massive, technically challenging project that is vitally important to Alaska, Northern Canada, and the Arctic. WorleyParsons and BGC understand the difficult nature and high stakes of this undertaking. We have the experience to prove it.
  • 3. 1996 2008 2009 1997-2001 2010 BGC was first contracted by TransCanada after a pipeline rupture on the LaSalle River south of Winnipeg, Manitoba, an incident caused in part by geotechnical issues. BGC evaluated geotechnical hazards on TransCanada’s Mainline. After TransCanada’s merger with Nova, BGC expanded its geotechnical work to the Alberta and BC pipeline networks. WorleyParsons geophysicists completed a high resolution 2D seismic survey and found active, near-surface faulting in the Yukon near the White River, where the pipeline will cross portions of the Denali Fault. WorleyParsons completed scope of work for a Class IV estimate of the APP conceptual design. BGC began in-depth geotechnical investigations of river crossings and permafrost conditions in northeastern British Columbia for the Horn River Mainline.
  • 4.
  • 5. We know the North. Our corporate experience in permafrost pipeline engineering dates back to the 1940s, when Ralph Parsons worked as Director of Engineering on the Canol Pipeline Project from Norman Wells NWT to Whitehorse, YK. Since that start, we have worked on many Northern projects, on sites as far north as the 80th parallel. Our Northern resume includes Canol, the original Trans Alaska Pipeline System, facilities at Prudhoe Bay and Norman Wells, the Dempster Lateral project, the Mackenzie Valley Gas Pipeline, and the APP. Our APP summer 2010 field program had up to 9 teams conducting field studies on alternative alignments, corridor footprint, water crossings, faults, side slopes, longitudinal slopes, acid rock areas, fault delineation, and a sonar and mapping program of the Kluane Lake crossing along the APP ROW from the Alaska-BC border to the BC-Alberta border. Work was completed on or ahead of schedule with no major incidents and very few near misses. Local First Nations band members worked as wildlife monitors for ground programs and as labourers where needed.
  • 7. Managing subcontractors and field crews is a challenge. Thankfully, we have key personnel already doing this for the Alaska portion of the project and segments in Canada. Our integrated team will avoid duplication of effort by reducing the number of interfaces. In addition, locals and First Nations members on our team provide relevant insight to reduce some of the project risks.
  • 8. Execution TransCanada-ExxonMobil have provided an aggressive and challenging project timeline WorleyParsons and BGC propose to meet the schedule by using experienced, highly skilled people on our project team and by mobilizing up to five simultaneous field crews to carry out field investigations. Our partnership is crucial to this effort. For the drilling program, Mobile Augers & Research Ltd. will partner with Midnight Sun Drilling Co. Ltd., ConeTec Investigations Ltd., and First Nations communities. Using a strategy similar to the Mackenzie Gas Project, Midnight Sun will incorporate companies along the line. Each company will be majority Native-owned and provide services for all work conducted in that Band’s region. This will Establish viable operating companies controlled by the Bands. Give each Band a specified portion of revenue from the project. Train and employ local First Nations’ labour wherever possible. We believe this will maximize the success of the drilling program. It improves access to drill sites along the line and helps secure support from local communities. Given the short timeline to the start of drilling operations, access to the sites is critical.
  • 9.
  • 10. We understand the Earth. We know permafrost. We also understand water. In the Fall of 2010, on very short notice, we completed a $500K geophysics investigation for the APP. Despite difficult conditions involving narrow cutlines, muskeg, and poor weather, data processing and interpretation was done in near real-time so that seismic cross lines could be chosen based on previous line segments of acquisition. We are well-prepared to pursue these investigations for subsequent phases. Permafrost and cold regions engineering have been core competencies at BGC ever since the company was founded. BGC provides geotechnical, geological, mining and permafrost engineering services for northern and cold regions resource extraction and infrastructure developments. These projects have been undertaken in various cold region terrains, including both discontinuous and continuous permafrost, permafrost with significant ground ice, and offshore permafrost. WorleyParsons’ experienced in-house hydrogeological and hydrotechnical scientists work closely with their colleagues in other disciplines to provide a holistic view of the many environmental and technical challenges in a project of this scale and complexity.
  • 11.
  • 12. Keystone XL & Horn River The proposed Keystone XL 3,200 km, 900 mm diameter crude oil pipeline will run from Hardisty, Alberta to Nederland, Texas and involves constructing about 2,700 km of new pipeline. WorleyParsons’ geotechnical group in Calgary reviewed geotechnical investigation work and reports completed by contractors in the US. WorleyParsons Calgary also served as the complete geotechnical and geophysical consultant on the Canadian pump stations. BGC’s geotechnical investigation work for TransCanada’s Horn River project supported the design and construction application submitted to the National Energy Board. So far, BGC has completed over 100 geotechnical projects for TransCanada. Partnership for results.