SlideShare a Scribd company logo
1 of 12
Download to read offline
Selecting Steel Wire Ropes (Pemiliha/perencanaan Kawat baja)
1. Determine the ratio Dmin/d of every pulley system from the table (the values
are depending on the number of bents).
Diameter of the rope is expressed by the formula:
√ (9)
Where: δ = diameter of one wire
i = number of wires in the rope
2. The stress in a loaded rope is:
(10)
Where:
σb=ultimate breaking strength of the rope (kg/cm2
)/kekuatan
K = Factor of safety/ faktor keamanan
S = Tension of the rope (kg)/beban tali
F = Coss-section area of the rope (cm2
)
E’ = 3/8 E (Elastic modulus --- kg/cm2
)
Transforming formula (10) we obtain:
√
(11)
For ropes most frequently used in hoisting machinery are the ropes with 114,
222, and 342 wires.
For the rope with 222 wire, formula (11) becomes (E = 2.100.000 kg/cm2
)
(cm2
)
Maximum permissible tension in the rope is:
(12)
Where: S = maximum permissible tension (kg)
P = actual breaking strength of the rope (kg)
K = factor of safety
Maximum working tension in the rope parts (Sw) is obtained from the formula:
Where: Q = Load being raised (kg)
n = number of rope parts
η = pulley efficiency (Tabel 8)
η1 = rope stiffness efficiency ( 0.98)
Determination the number of bends (jumlah belokan tali):
1. Number of bends in a pulley system with one movable pulley
One bends is assumed to mean the transition of the rope from its
straight position into a bent one, or from a bent position into a straight
one. Reverse bending is count double.
2. Number of bends in a pulley system with multiple pulley
Number of bends = 3
In determining the number of bends for multiple pulleys, the
compensating pulley is not considered since it remains stationery when
the load is being raised or lowered.
I. Design of Rope Sheaves (Perancangan Alur Puli)
Rope sheaves (alur pulli) for steel wire ropes for various rope diameters is
illustrated in tabel 16 bellows:
Rope sheaves is illustrated in figure bellow. Figure 54 (a) Large sheaves with ribs
or holes, (b) welded rope sheaves (alur pulli yang dilas)
For compensating sheaves (Figure 55), its diameter may be taken 40 percent
smaller than the diameter of the sheaves carrying the load (diameter puli kecil
adalah 40 persen lebih kecil dari puli beban).
The ratio between the hub length and the diameter of the axle is usually taken
within the range (l/d = 1,5 to 1,8).
The unit pressure in the sheaves is:
Where: l = length of the bussing (lebar puli)
D = diameter of the sheave axle (diameter poros puli)
Q = load (beban)
Unit pressure should not exceed the following values:
v (m/s) 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0 1,1 1,2 1,3 1,4 1,5
p (kg/cm2
) 75 70 66 62 60 57 55 54 53 52 51 50 49 48 47
II. Design of Rope Drums
Drums for steel wire rope are made of cast iron. The drum diameter depens on
the diameter of the rope. With a power drive the drum should always be provided
with helical grooves (alur ulir) so that the rope winds up uniformly (melengkung
secara merata) and is less subject to wear (tidak cepat aus) (Fig 57a).
The radius of the helical grooves should be selected so as to prevent jamming of
the rope (the standard of the deep grooves for drums is listed in tabel 17).
There are 2 types of drum:
1. Drums with one coiling rope have only one helix (right hand)
2. Drums designed for two rope member are provided with two helices (right
hand and left hand).
The number of turn (jumlah lilitan) for one rope member is:
Where: i = transmission ratio of pulley system
D = drum diameter
H = height of the load rise
Length of the helix on the drum (panjang lilitan/alur ulir) is:
l = z s
Full length of the drum:
1. For one coiling rope is: ( )
2. For two coiling rope is: ( )
Maximum compressive stress at the inner surface of the drum is:
Where: S = rope load
w = wall thickness of the drum (tebal drum) = 0,02D + (0,6 ÷ 1 ) cm
s = pitch length (lebar pich/lebar antar alur)
l1 = jarak antara ujung alur kiri dan kanan pada drum (l1 = 0,25÷0,5 D)
Example problem:
Sebuah electric overhead crane seperti gambar bekerja pada level medium duty
dipakai mengangkat beban total Q = 10.000 kg (beban angkat + berat alat kait)
dengan tinggi angkat H = 8 m. Jumlah tali penahan beban (rope parts) z = 6,
efiseinsi total dari sistem puli adalah η =0,94. Bila tali yang dipilih adalah tipe
Cross lay rope dengan jumlah kawat 222 buah, faktor keamanan K = 4 , kekuatan
putus tali σb = 15.000 kg/cm2
dan E = 210 MPa. Tentukan:
a. Diameter minimum tali kawat baja yang digunakan.
b. Diameter drum, puli utama ,dan puli pembantu (compensating pulley).
c. Jari-jari alur drum dan besarnya pitch alur drum.
d. Jumlah lilitan/alur pada drum.
e. Panjang total drum
Jawab:
Beban pada setiap tali (tension in the rope) adalah:
Jumlah belokan pada sistem puli adalah n = 5. Dari tabel 7 untuk n = 5 didapat
Dmin/d = 26,5
a. Luas penampang tali minimum (dari rumus 13) didapat:
Diameter tali minimum adalah:
√
b. Diameter minimal drum dan puli utama adalah:
D = 26,5 d = 26,5 x 10 mm = 265 mm (Bisa dipilih D = 300 mm)
Diameter puli pembantu (compensating pulley) adalah:
D1 = 0,6 x D = 0,6 x 300 mm = 180 mm (Bisa dipilih D1 = 200 mm)
c. Jari-jari alur drum dan besarnya pitch (dari tabel 17) adalah:
r1 = 7 mm (dipilih dari besarnya diameter tali d = 11 mm)
s1 = 13 mm
d. Jumlah lilitan/alur pada pada masing-masing sisi drum:
e. Panjang total drum
( ) ( )
Materi pesawat kerja 1

More Related Content

What's hot

Basic lifting rigging module 03
Basic lifting rigging module 03Basic lifting rigging module 03
Basic lifting rigging module 03dafit43424
 
Bab 2 turbin uap
Bab 2 turbin uapBab 2 turbin uap
Bab 2 turbin uapRina rina
 
Materi pelatihan teori api 2
Materi pelatihan teori api 2Materi pelatihan teori api 2
Materi pelatihan teori api 2Eko Kiswanto
 
Motor diesel Presentation
Motor diesel PresentationMotor diesel Presentation
Motor diesel PresentationDimas Setyawan
 
Load capacity dan load center, hal penting yang sering diabaikan saat mengope...
Load capacity dan load center, hal penting yang sering diabaikan saat mengope...Load capacity dan load center, hal penting yang sering diabaikan saat mengope...
Load capacity dan load center, hal penting yang sering diabaikan saat mengope...PT Safety Sign Indonesia
 
PowerPoint Sistem Transmisi
PowerPoint Sistem TransmisiPowerPoint Sistem Transmisi
PowerPoint Sistem TransmisiFirdika Arini
 
Materi PPT Kopling.ppt
Materi PPT Kopling.pptMateri PPT Kopling.ppt
Materi PPT Kopling.pptNaufalfaris16
 
PPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptx
PPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptxPPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptx
PPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptxGklrty
 
Pemeriksaan motor starter
Pemeriksaan motor starterPemeriksaan motor starter
Pemeriksaan motor starterZainal Abidin
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Fitri Ifony
 
K3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiK3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiAl Marson
 
K3 DALAM PENGELASAN
K3 DALAM PENGELASANK3 DALAM PENGELASAN
K3 DALAM PENGELASANerdiyan
 
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaKeselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaAhmad Aidil Nasir
 
13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.pptArieOtong1
 
Jobsheet Overhaule Motor Starter Mobil
Jobsheet Overhaule Motor Starter MobilJobsheet Overhaule Motor Starter Mobil
Jobsheet Overhaule Motor Starter MobilCharis Muhammad
 
Uu 17 2008 pelayaran
Uu 17 2008 pelayaranUu 17 2008 pelayaran
Uu 17 2008 pelayaranSei Enim
 
Fire drill - Latihan pemadam kebakaran
Fire drill - Latihan pemadam kebakaranFire drill - Latihan pemadam kebakaran
Fire drill - Latihan pemadam kebakaranRiyanto Simbardjojo
 

What's hot (20)

Basic lifting rigging module 03
Basic lifting rigging module 03Basic lifting rigging module 03
Basic lifting rigging module 03
 
Bab 2 turbin uap
Bab 2 turbin uapBab 2 turbin uap
Bab 2 turbin uap
 
Materi pelatihan teori api 2
Materi pelatihan teori api 2Materi pelatihan teori api 2
Materi pelatihan teori api 2
 
Motor diesel Presentation
Motor diesel PresentationMotor diesel Presentation
Motor diesel Presentation
 
Load capacity dan load center, hal penting yang sering diabaikan saat mengope...
Load capacity dan load center, hal penting yang sering diabaikan saat mengope...Load capacity dan load center, hal penting yang sering diabaikan saat mengope...
Load capacity dan load center, hal penting yang sering diabaikan saat mengope...
 
PowerPoint Sistem Transmisi
PowerPoint Sistem TransmisiPowerPoint Sistem Transmisi
PowerPoint Sistem Transmisi
 
Materi PPT Kopling.ppt
Materi PPT Kopling.pptMateri PPT Kopling.ppt
Materi PPT Kopling.ppt
 
PPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptx
PPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptxPPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptx
PPT BAB IV (AIR INTAKE DAN EXHAUST SYSTEM).pptx
 
Pertemuan 1 pesawat angkat
Pertemuan 1 pesawat angkatPertemuan 1 pesawat angkat
Pertemuan 1 pesawat angkat
 
Pemeriksaan motor starter
Pemeriksaan motor starterPemeriksaan motor starter
Pemeriksaan motor starter
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
K3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiK3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan Produksi
 
K3 DALAM PENGELASAN
K3 DALAM PENGELASANK3 DALAM PENGELASAN
K3 DALAM PENGELASAN
 
Bab 10-pengapian-elektronik
Bab 10-pengapian-elektronikBab 10-pengapian-elektronik
Bab 10-pengapian-elektronik
 
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia BerbahayaKeselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
Keselamatan Semasa Mengendalikan Bahan Kimia Berbahaya
 
13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt
 
Jobsheet Overhaule Motor Starter Mobil
Jobsheet Overhaule Motor Starter MobilJobsheet Overhaule Motor Starter Mobil
Jobsheet Overhaule Motor Starter Mobil
 
MAINTENANCE PEMELIHARAAN
MAINTENANCE PEMELIHARAANMAINTENANCE PEMELIHARAAN
MAINTENANCE PEMELIHARAAN
 
Uu 17 2008 pelayaran
Uu 17 2008 pelayaranUu 17 2008 pelayaran
Uu 17 2008 pelayaran
 
Fire drill - Latihan pemadam kebakaran
Fire drill - Latihan pemadam kebakaranFire drill - Latihan pemadam kebakaran
Fire drill - Latihan pemadam kebakaran
 

Viewers also liked

Why kait is the cumberqueen
Why kait is the cumberqueenWhy kait is the cumberqueen
Why kait is the cumberqueentomsprite
 
Perhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50m
Perhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50mPerhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50m
Perhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50mYABES HULU
 
PESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran Hidrolik
PESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran HidrolikPESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran Hidrolik
PESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran HidrolikRizqiana Yogi Cahyaningtyas
 
OVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABAD
OVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABADOVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABAD
OVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABADAJIT HOODA
 
studi kasus Perhitungan tower crane
studi kasus Perhitungan tower cranestudi kasus Perhitungan tower crane
studi kasus Perhitungan tower craneBung HaFied
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manualscojetinc
 
Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]ルクマン 福島
 
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271supri yatna
 
Presentasi dan studi kasus perhitungan tower crane
Presentasi dan studi kasus perhitungan tower cranePresentasi dan studi kasus perhitungan tower crane
Presentasi dan studi kasus perhitungan tower craneBung HaFied
 

Viewers also liked (12)

Why kait is the cumberqueen
Why kait is the cumberqueenWhy kait is the cumberqueen
Why kait is the cumberqueen
 
Perhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50m
Perhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50mPerhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50m
Perhitungan PPh badan untuk peredaran bruto diatas Rp4,8 s/d Rp50m
 
PESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran Hidrolik
PESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran HidrolikPESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran Hidrolik
PESAWAT ANGKAT : Derek Uap, Alat Pengangkat Mobil, dan Kran Hidrolik
 
OVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABAD
OVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABADOVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABAD
OVERHEAD CRANES: EOT & GANTRY -RBS CRANES & ENGINEERING FARIDABAD
 
studi kasus Perhitungan tower crane
studi kasus Perhitungan tower cranestudi kasus Perhitungan tower crane
studi kasus Perhitungan tower crane
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manual
 
Tower crane
Tower craneTower crane
Tower crane
 
Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]
 
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271
 
Presentasi dan studi kasus perhitungan tower crane
Presentasi dan studi kasus perhitungan tower cranePresentasi dan studi kasus perhitungan tower crane
Presentasi dan studi kasus perhitungan tower crane
 
Keselamatan crane
Keselamatan crane Keselamatan crane
Keselamatan crane
 
Mesin Angkat
Mesin AngkatMesin Angkat
Mesin Angkat
 

Similar to Materi pesawat kerja 1

Similar to Materi pesawat kerja 1 (20)

lacing and battening .pptx
lacing and battening .pptxlacing and battening .pptx
lacing and battening .pptx
 
Design of springs and levers
Design of springs and leversDesign of springs and levers
Design of springs and levers
 
Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
 
3 shaft stress in shafts
3 shaft   stress in shafts3 shaft   stress in shafts
3 shaft stress in shafts
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
unit 3.4.pdf
unit 3.4.pdfunit 3.4.pdf
unit 3.4.pdf
 
SPRING Design & Design parameters details
SPRING Design & Design parameters detailsSPRING Design & Design parameters details
SPRING Design & Design parameters details
 
Flat belt pulleys
Flat belt pulleysFlat belt pulleys
Flat belt pulleys
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system
 
X10703 (me8593)
X10703 (me8593)X10703 (me8593)
X10703 (me8593)
 
Assignment shear and bending
Assignment shear and bendingAssignment shear and bending
Assignment shear and bending
 
U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...
U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...
U3 design of connecting rod-(i section, big&small eng, bolt, whipping str...
 
Poros
PorosPoros
Poros
 
Ppt springs
Ppt springsPpt springs
Ppt springs
 
Levers
LeversLevers
Levers
 
Module 5.pdf
Module 5.pdfModule 5.pdf
Module 5.pdf
 
DESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptx
 
Structural analysis 2 lab manual
Structural analysis 2 lab manualStructural analysis 2 lab manual
Structural analysis 2 lab manual
 
Trebutchet Report
Trebutchet ReportTrebutchet Report
Trebutchet Report
 
Design of Machine Elements - Unit 4 Procedures
 Design of Machine Elements - Unit 4 Procedures Design of Machine Elements - Unit 4 Procedures
Design of Machine Elements - Unit 4 Procedures
 

Recently uploaded

How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answersdalebeck957
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111GangaMaiya1
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 

Recently uploaded (20)

How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

Materi pesawat kerja 1

  • 1. Selecting Steel Wire Ropes (Pemiliha/perencanaan Kawat baja) 1. Determine the ratio Dmin/d of every pulley system from the table (the values are depending on the number of bents). Diameter of the rope is expressed by the formula: √ (9) Where: δ = diameter of one wire i = number of wires in the rope 2. The stress in a loaded rope is: (10) Where: σb=ultimate breaking strength of the rope (kg/cm2 )/kekuatan K = Factor of safety/ faktor keamanan S = Tension of the rope (kg)/beban tali F = Coss-section area of the rope (cm2 ) E’ = 3/8 E (Elastic modulus --- kg/cm2 ) Transforming formula (10) we obtain: √ (11) For ropes most frequently used in hoisting machinery are the ropes with 114, 222, and 342 wires. For the rope with 222 wire, formula (11) becomes (E = 2.100.000 kg/cm2 ) (cm2 )
  • 2. Maximum permissible tension in the rope is: (12) Where: S = maximum permissible tension (kg) P = actual breaking strength of the rope (kg) K = factor of safety Maximum working tension in the rope parts (Sw) is obtained from the formula: Where: Q = Load being raised (kg) n = number of rope parts η = pulley efficiency (Tabel 8) η1 = rope stiffness efficiency ( 0.98)
  • 3. Determination the number of bends (jumlah belokan tali): 1. Number of bends in a pulley system with one movable pulley One bends is assumed to mean the transition of the rope from its straight position into a bent one, or from a bent position into a straight one. Reverse bending is count double.
  • 4. 2. Number of bends in a pulley system with multiple pulley Number of bends = 3 In determining the number of bends for multiple pulleys, the compensating pulley is not considered since it remains stationery when the load is being raised or lowered.
  • 5.
  • 6. I. Design of Rope Sheaves (Perancangan Alur Puli) Rope sheaves (alur pulli) for steel wire ropes for various rope diameters is illustrated in tabel 16 bellows: Rope sheaves is illustrated in figure bellow. Figure 54 (a) Large sheaves with ribs or holes, (b) welded rope sheaves (alur pulli yang dilas)
  • 7. For compensating sheaves (Figure 55), its diameter may be taken 40 percent smaller than the diameter of the sheaves carrying the load (diameter puli kecil adalah 40 persen lebih kecil dari puli beban). The ratio between the hub length and the diameter of the axle is usually taken within the range (l/d = 1,5 to 1,8). The unit pressure in the sheaves is: Where: l = length of the bussing (lebar puli) D = diameter of the sheave axle (diameter poros puli) Q = load (beban) Unit pressure should not exceed the following values: v (m/s) 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0 1,1 1,2 1,3 1,4 1,5 p (kg/cm2 ) 75 70 66 62 60 57 55 54 53 52 51 50 49 48 47
  • 8. II. Design of Rope Drums Drums for steel wire rope are made of cast iron. The drum diameter depens on the diameter of the rope. With a power drive the drum should always be provided with helical grooves (alur ulir) so that the rope winds up uniformly (melengkung secara merata) and is less subject to wear (tidak cepat aus) (Fig 57a). The radius of the helical grooves should be selected so as to prevent jamming of the rope (the standard of the deep grooves for drums is listed in tabel 17).
  • 9. There are 2 types of drum: 1. Drums with one coiling rope have only one helix (right hand) 2. Drums designed for two rope member are provided with two helices (right hand and left hand). The number of turn (jumlah lilitan) for one rope member is: Where: i = transmission ratio of pulley system D = drum diameter H = height of the load rise Length of the helix on the drum (panjang lilitan/alur ulir) is: l = z s Full length of the drum: 1. For one coiling rope is: ( ) 2. For two coiling rope is: ( ) Maximum compressive stress at the inner surface of the drum is: Where: S = rope load w = wall thickness of the drum (tebal drum) = 0,02D + (0,6 ÷ 1 ) cm s = pitch length (lebar pich/lebar antar alur) l1 = jarak antara ujung alur kiri dan kanan pada drum (l1 = 0,25÷0,5 D)
  • 10. Example problem: Sebuah electric overhead crane seperti gambar bekerja pada level medium duty dipakai mengangkat beban total Q = 10.000 kg (beban angkat + berat alat kait) dengan tinggi angkat H = 8 m. Jumlah tali penahan beban (rope parts) z = 6, efiseinsi total dari sistem puli adalah η =0,94. Bila tali yang dipilih adalah tipe Cross lay rope dengan jumlah kawat 222 buah, faktor keamanan K = 4 , kekuatan putus tali σb = 15.000 kg/cm2 dan E = 210 MPa. Tentukan: a. Diameter minimum tali kawat baja yang digunakan. b. Diameter drum, puli utama ,dan puli pembantu (compensating pulley). c. Jari-jari alur drum dan besarnya pitch alur drum. d. Jumlah lilitan/alur pada drum. e. Panjang total drum Jawab: Beban pada setiap tali (tension in the rope) adalah: Jumlah belokan pada sistem puli adalah n = 5. Dari tabel 7 untuk n = 5 didapat
  • 11. Dmin/d = 26,5 a. Luas penampang tali minimum (dari rumus 13) didapat: Diameter tali minimum adalah: √ b. Diameter minimal drum dan puli utama adalah: D = 26,5 d = 26,5 x 10 mm = 265 mm (Bisa dipilih D = 300 mm) Diameter puli pembantu (compensating pulley) adalah: D1 = 0,6 x D = 0,6 x 300 mm = 180 mm (Bisa dipilih D1 = 200 mm) c. Jari-jari alur drum dan besarnya pitch (dari tabel 17) adalah: r1 = 7 mm (dipilih dari besarnya diameter tali d = 11 mm) s1 = 13 mm d. Jumlah lilitan/alur pada pada masing-masing sisi drum: e. Panjang total drum ( ) ( )