Scopes of Work For Windmill Components              Design & Engineering                  Railcar Layout      Installation...
Railcar Layout & Installation of Blade         Container Supports
Railcar Layout & Installation of Nacelle Bracket                    Systems
Loading and securing of Nacelles
Loading And Securing of Blade Containers
Single Blade Railcar Setup
Direct Discharge and Loading of Windmill    Hubs From Ship To Railcar.
Direct Discharge and Loading ofWindmill Hubs From Ship To Railcar.
For Rate Inquiries, Please Contact:- Norbert Lugo  Managing Director-Operations & Engineering  nlugo@lugointernational.com...
Upcoming SlideShare
Loading in …5
×

Lugo Marine Wind Cargo Presentation 2011

537 views

Published on

Lugo Marine Wind Cargo Presentation 2011

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
537
On SlideShare
0
From Embeds
0
Number of Embeds
8
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Lugo Marine Wind Cargo Presentation 2011

  1. 1. Scopes of Work For Windmill Components Design & Engineering Railcar Layout Installation of Tiedown Components Loading of ComponentsSecuring of Components as per AAR Regulations Maintenance of Components While In Storage Set Up of Railcar for Power Generation to Nacelles While in Transit
  2. 2. Railcar Layout & Installation of Blade Container Supports
  3. 3. Railcar Layout & Installation of Nacelle Bracket Systems
  4. 4. Loading and securing of Nacelles
  5. 5. Loading And Securing of Blade Containers
  6. 6. Single Blade Railcar Setup
  7. 7. Direct Discharge and Loading of Windmill Hubs From Ship To Railcar.
  8. 8. Direct Discharge and Loading ofWindmill Hubs From Ship To Railcar.
  9. 9. For Rate Inquiries, Please Contact:- Norbert Lugo Managing Director-Operations & Engineering nlugo@lugointernational.com Cell (832) 349 - 5251- Robert Lugo, Jr. Managing Director jrlugo@lugointernational.com Cell (832) 423 - 4281

×