SlideShare a Scribd company logo
1 of 26
Download to read offline
GKM Green Tower 10th Floor
Jl. TB. Simatupang Kav. 89 G, Jakarta Selatan 12530
Phone : +62 21 27878099, Fax: +62 21 27878090
www.sinerco.co.id
PT SIGMA ENERGY COMPRESSINDO
PT SIGMA
ENERGY
COMPRESSINDO
• Berdiri sejak 3 April 2007
• 100% Perusahaan Domestik
• Kantor Pusat : GKM Green Tower 10th Floor
Jl. TB. Simatupang, Jakarta Selatan
• Workshop :
 Kandang haur , Main Workshop (JaBar)
 Muara Badak (KalTim)
 Lingkar Selatan (Jambi)
• Jumlah karyawan: 143 orang
COMPANY INFORMATION
PT SIGMA
ENERGY
COMPRESSINDO
INTEGRATED ISO 9001, 14001, OHSAS 18001
(CERTIFIED 2014)
PT SIGMA
ENERGY
COMPRESSINDO
PT. SIGMA ENERGY COMPRESSINDO
AUTHORIZED SOLE AGENT
INDONESIAPT SIGMA
ENERGY
COMPRESSINDO
OKLAHOMA - USA
PT SIGMA
ENERGY
COMPRESSINDO
TYPE Integrated Reciprocating, Single stage, C1D2
Package model Portable, optional: Wheel, enclosure
Power Draw 50 HP
BHP 46 HP
Speed 1,200 - 2,200 RPM
Noise Level < 85 dBA
COMPRESSOR RATIO Wide range ratio, up to 18
Suction Pressure minus 26” H20 till plus 50 psig
Discharge Pressure Up to 400 psig
Discharge Temperature 90 – 110 F (after cooler)
Flow Rate 100 - 750 MSCFD (depend on gas characteristic)
BLOW CASE 50 bbl/day
Dimension and Weight
L-W-H (cm): 375 x 198 x 265
Weight : 3 Tons
Fuel consumption 6-9 MSCFD
Fuel Specs > 800-1300 BTU, CO2 < 15%, H2S < 50 ppm
Technical Specification
PT SIGMA
ENERGY
COMPRESSINDO
• WELL NOT FLOWING / LOW PRESSURE
• WELL GAS LOCK / Potentially restricting flow
• WELL PARAFFIN & WAXY / Potentially restricting flow
• GAS FLARING
• GAS BOOSTER
• GAS LIFT
• LIMITED SPACE
• BIG COMPRESSOR INFLEXIBILITY, INEFICIENCY
Solution For :
PT SIGMA
ENERGY
COMPRESSINDO
INTERNATIONAL EXPERIENCE LIST – GASJACK RENTAL
NO CUTOMER UNITS LOCATION Years Notes
NAME of Service
1 BP 475 Texas, New Mexico 8 Solved Loading Problems,
Oklahoma, Louisina, Inactive Wells
Colorado (USA)
Alberta (Canada)
2 Devon Energy 250 Texas, New Mexico 8 Solved Loading Problems
Oklahoma, Montana
3 Chesapeake/Mid-Con 700 Texas, Oklahoma, 9 Solved Loading Problems,
Kansas Plunger Lift
4 ConocoPhillips 100 Texas, New Mexico, 9 Solved Loading Problems
Wyoming
5 Marathon 60 Texas, Oklahoma, 5 Solved Loading Problems
6 Anadarko 50 Texas 5 Solved Loading Problems
7 Pemex 60 Mexico 5 Solved Loading Problems,
(National Oil Company inactive wells
of Mexico)
8 Santos Australia 50 Australia 4 WHC - CBM
9 Indonesia* 48 Java, Borneo, Sumatra 7 WHC, BC, FRU,GS
10 China* 40 North China 2 Wellhead Compressor
PT SIGMA
ENERGY
COMPRESSINDO
Experience List GasJack Compressor in Indonesia
No . CUSTOMER LOCATION UNIT QTY YEARS APPLICATION
1 VICO Badak , Semberah 7 2 WHC , FRU
2
VICO Oil & Gas and
CBM
Mutiara , Kaltim
9 1 WHC
3 KBT - Pertamina Bunyu Bunyu Island 1 4 Fuel Booster
4 Lapindo Brantas Wunut , Sidoarjo 4 6 WHC, Booster
5 Lapindo Brantas Wunut , Sidoarjo 7 2 Booster
6 Perusda Benuotaka Penajam 2 4 Fuel Booster
7 EMP Semberah Semberah 6 4 FRU , Gaslift
8 JOBP – EMP Gebang Pangkalan Susu 2 4 WHC, Manifold
9 Medco Rimau Kaji , Semoga 9 3 FRU, WHC
10 Medco Tarakan Tarakan Island 4 3 FRU
11 Medco SSE Soka 3 1 WHC, FRU
12
Pertamina UBEP
Tanjung
Tanjung
2 3 WHC
13
PNR – Pertamina
Cemara
Kandanghaur Timur
1 1 WHC
14 EMP Gelam Jambi 4 4 FRU
15 Chevron Pacific Duri 2 1 WHC
16 Pertamina Asset 1 Rantau , Ramba 3 1 WHC , Gaslift
17 Pertamina Asset 2 Pendopo Field Jirak 1 1 Booster
18 Pertamina Asset 3
Tambun, Subang,
Jatibarang Field 12 2 Flare Recovery
PT SIGMA
ENERGY
COMPRESSINDO
• Wellhead Compressor
GASJACK COMPRESSOR
APPLICATION
PT SIGMA
ENERGY
COMPRESSINDO
Well Head Application – USA
PT SIGMA
ENERGY
COMPRESSINDO
GJC at Tanjung (Kalsel) solved Gaslock problem, increase oil production up to 50%, reduce wax
resistance in flowline and better fuel feeding for power plant & boilers
Well Head Application – TANJUNG
PT SIGMA
ENERGY
COMPRESSINDO
Before GJC
FTHP = 60 psig
October 3rd, 2008
Semberah Well
Flowing intermittent @
286 MSCFD, 5 BOPD
Well Head Application
SEMBERAH
After GJC in service October
3rd, 2008
FTHP : 45 psig
P suction : 40 psig
P discharge: 145 psig
Semberah Well
2 GJC: 1,330 MSCFD
3 GJC: 1,760 MSCFD,
60-70 BOPD
PT SIGMA
ENERGY
COMPRESSINDO
CBM Application
FIRST IN INDONESIA
M-205 CBM Well
Before
FTHP = 15 psig
After GJC service
FTHP = 11 psig
P. Suction = 9 psig
P. Disch = 175 psig
Flowrate = 215 MSCFD
After 5 months GJC
released,
Natural Flow = 175 psig
Flowrate = 200MSCFD
PT SIGMA
ENERGY
COMPRESSINDO
Booster Application
Kaltim, Panajam
Before GJC : The demand of gas supply for power plant was very high while existing
electricity supply was shortage with frequent scheduled downtime. However, 6
producing strings kept declining to approximately 700 MSCFD by end of 2009.
After GJC : In March 2010, 2 units GJC were located at the gas station to enable each
well flowing with less tubing head pressure. Production increased to 1400 MSCFD
PT SIGMA
ENERGY
COMPRESSINDO
Booster Compressor
In Semoga Station
MEDCO – KAJI
Menaikkan pressure
dari 30 psi  125 psi
Gas Rate : 1100-1200 mscfd
PT SIGMA
ENERGY
COMPRESSINDO
Medco – Kaji
Booster Compressor
In Matra Station
Menaikkan pressure
dari 10 psi  90 psi
Gas rate : 1100-1200 mscfd
PT SIGMA
ENERGY
COMPRESSINDO
Flare Recovery Aplication
SINDANG
750 - 800 MSCFD
Before
After
VOLUME RATE :
PT SIGMA
ENERGY
COMPRESSINDO
1,16 MMSCFD
Before : 1,2 MMSCFD
Flare Recovery Aplication
Subang, West Java
After : 0,04 MMSCFD
PT SIGMA
ENERGY
COMPRESSINDO
-800 MSCD
Flare Recovery Application
NORTH KALIMANTAN
PT SIGMA
ENERGY
COMPRESSINDO
• GASJACK COMPRESSOR
• SIMPLE AND MORE PRACTICAL : Kecil , Ringan, Mudah di
Mobilisasi, Pemasangan sangat mudah .
• GO GREEN : Api suar padam dan bisa di manfaatkan , Ramah
lingkungan
• INCREASE PRODUCTION : Dapat meningkatkan produksi Oil &
Gas dengan optimasi well yang tidak produktif menjadi produktif.
• MINIMUM INVESTMENT COST : Biaya pemasangan tidak rumit
, Biaya penyambungan sangat minim .
• CONTRACT : Contract bisa dilaksanakan dengan - direct award , 2
tahun , 1 tahun atau Sesuai kebutuhan di lapangan.
PT SIGMA
ENERGY
COMPRESSINDO
PT SIGMA
ENERGY
COMPRESSINDO
PT SIGMA
ENERGY
COMPRESSINDO
PT SIGMA
ENERGY
COMPRESSINDO
DISCUSSION
PT SIGMA
ENERGY
COMPRESSINDO
CONTACT FOR MORE INFO
THANK YOU FOR ATTENTION!
Looking forward to serve you!
GKM Green Tower 10th Floor
Jl. TB. Simatupang Kav. 89 G, Jakarta Selatan 12530
Phone : +62 21 27878099, Fax: +62 21 27878090
www.sinerco.co.id
PT SIGMA ENERGY COMPRESSINDO
HOTLAN SITORUS
VP MARKETING & BIZDEV
hotlan@sinerco.co.id
+6281314525253
PT SIGMA
ENERGY
COMPRESSINDO

More Related Content

What's hot

Casing of oil well
Casing of oil wellCasing of oil well
Casing of oil wellRakesh Kumar
 
Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper DesignSAJJAD KHUDHUR ABBAS
 
Horizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptHorizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptAmar Gaikwad
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and typesElsayed Amer
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down TestMubarik Rao
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdfssuserfec9d8
 
Overview of artificial lift technology and introduction to esp system
Overview of artificial lift technology and introduction to esp systemOverview of artificial lift technology and introduction to esp system
Overview of artificial lift technology and introduction to esp systemGiuseppe Moricca
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsLatif Hyder Wadho
 
Q922+re2+l07 v1
Q922+re2+l07 v1Q922+re2+l07 v1
Q922+re2+l07 v1AFATous
 
Special core analysis
Special core analysisSpecial core analysis
Special core analysisWajid09
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)danperth
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
Reservoir dive mechanisms
Reservoir dive mechanismsReservoir dive mechanisms
Reservoir dive mechanismsumar umar
 

What's hot (20)

Casing of oil well
Casing of oil wellCasing of oil well
Casing of oil well
 
Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
 
Horizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptHorizontal vertical christmas tree ppt
Horizontal vertical christmas tree ppt
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and types
 
Well completion
Well completionWell completion
Well completion
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
 
BOP
BOPBOP
BOP
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdf
 
Oil and Gas Reservoir Engineering
Oil and Gas Reservoir EngineeringOil and Gas Reservoir Engineering
Oil and Gas Reservoir Engineering
 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppe
 
Overview of artificial lift technology and introduction to esp system
Overview of artificial lift technology and introduction to esp systemOverview of artificial lift technology and introduction to esp system
Overview of artificial lift technology and introduction to esp system
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - Definitions
 
Riser Design Overview
Riser Design  OverviewRiser Design  Overview
Riser Design Overview
 
Q922+re2+l07 v1
Q922+re2+l07 v1Q922+re2+l07 v1
Q922+re2+l07 v1
 
Special core analysis
Special core analysisSpecial core analysis
Special core analysis
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Casing
CasingCasing
Casing
 
Reservoir dive mechanisms
Reservoir dive mechanismsReservoir dive mechanisms
Reservoir dive mechanisms
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 

Viewers also liked

Bab vi mengelola perusahaan bisnis oleh stephanie tepp
Bab vi mengelola perusahaan bisnis oleh stephanie teppBab vi mengelola perusahaan bisnis oleh stephanie tepp
Bab vi mengelola perusahaan bisnis oleh stephanie teppstephaniejessey
 
Gugus Kendali Mutu Industri Kecil Menengah
Gugus Kendali Mutu Industri Kecil MenengahGugus Kendali Mutu Industri Kecil Menengah
Gugus Kendali Mutu Industri Kecil MenengahDede Firmansah
 
Teknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo PrimanandaTeknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo PrimanandaDivo Primananda
 
Sample project-Quality Circle
Sample project-Quality CircleSample project-Quality Circle
Sample project-Quality CircleMohamed Yusuff
 
Contoh QCC Presentation
Contoh QCC PresentationContoh QCC Presentation
Contoh QCC PresentationAdhi Hermawan
 
QCC (Quality Control Circle)
QCC (Quality Control Circle)QCC (Quality Control Circle)
QCC (Quality Control Circle)Sri Sulastri
 
SM Lecture Six : Corporate Strategy and Diversification
SM Lecture Six : Corporate Strategy and DiversificationSM Lecture Six : Corporate Strategy and Diversification
SM Lecture Six : Corporate Strategy and DiversificationStratMgt Advisor
 
Electronic banking presentation
Electronic banking presentationElectronic banking presentation
Electronic banking presentationxabi951
 
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...Duraisamy R
 
Internet Banking PPT
Internet Banking PPTInternet Banking PPT
Internet Banking PPTayush goyal
 
Quality control circle presentation
Quality control circle presentationQuality control circle presentation
Quality control circle presentationGanesh Murugan
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbingLiguidliguid
 

Viewers also liked (19)

Che 214 lecture 03
Che 214 lecture 03Che 214 lecture 03
Che 214 lecture 03
 
Bab vi mengelola perusahaan bisnis oleh stephanie tepp
Bab vi mengelola perusahaan bisnis oleh stephanie teppBab vi mengelola perusahaan bisnis oleh stephanie tepp
Bab vi mengelola perusahaan bisnis oleh stephanie tepp
 
Corporate Strategy
Corporate StrategyCorporate Strategy
Corporate Strategy
 
Gugus Kendali Mutu Industri Kecil Menengah
Gugus Kendali Mutu Industri Kecil MenengahGugus Kendali Mutu Industri Kecil Menengah
Gugus Kendali Mutu Industri Kecil Menengah
 
Teknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo PrimanandaTeknik Presentasi QCC By Divo Primananda
Teknik Presentasi QCC By Divo Primananda
 
Sample project-Quality Circle
Sample project-Quality CircleSample project-Quality Circle
Sample project-Quality Circle
 
Contoh QCC Presentation
Contoh QCC PresentationContoh QCC Presentation
Contoh QCC Presentation
 
Quality circle
Quality circle Quality circle
Quality circle
 
QCC (Quality Control Circle)
QCC (Quality Control Circle)QCC (Quality Control Circle)
QCC (Quality Control Circle)
 
SM Lecture Six : Corporate Strategy and Diversification
SM Lecture Six : Corporate Strategy and DiversificationSM Lecture Six : Corporate Strategy and Diversification
SM Lecture Six : Corporate Strategy and Diversification
 
E banking
E bankingE banking
E banking
 
Electronic banking presentation
Electronic banking presentationElectronic banking presentation
Electronic banking presentation
 
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
TQM QCC / SGA BY DURAISAMY R - M/s SHRISHTI CONSULTANTS CHENNAI ( www.shrisht...
 
E banking
E bankingE banking
E banking
 
Internet Banking PPT
Internet Banking PPTInternet Banking PPT
Internet Banking PPT
 
E Banking
E BankingE Banking
E Banking
 
Quality control circle presentation
Quality control circle presentationQuality control circle presentation
Quality control circle presentation
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 
Internet banking
Internet bankingInternet banking
Internet banking
 

Similar to WELLHEAD COMPRESSOR Contoh Presentasi 2016

5.21 contoh presentasi 2017 pdf
5.21 contoh presentasi 2017 pdf5.21 contoh presentasi 2017 pdf
5.21 contoh presentasi 2017 pdfHotlan Sitorus
 
Enmas o_&_m_presentation
Enmas  o_&_m_presentationEnmas  o_&_m_presentation
Enmas o_&_m_presentationlvsamy
 
Company profile 2016
Company profile 2016Company profile 2016
Company profile 2016andy purnama
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAtul Kumar Singh
 
Corporate presentation 2
Corporate presentation 2Corporate presentation 2
Corporate presentation 2lvsamy
 
CV Tulus Widianto Update
CV Tulus Widianto UpdateCV Tulus Widianto Update
CV Tulus Widianto UpdateTulus Widianto
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)wooilindo
 
Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.tigernyh
 
Maintenance and Utility Engineer
Maintenance and Utility EngineerMaintenance and Utility Engineer
Maintenance and Utility EngineerAshish Sojaliya
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)Amit Mukherjee
 

Similar to WELLHEAD COMPRESSOR Contoh Presentasi 2016 (20)

5.21 contoh presentasi 2017 pdf
5.21 contoh presentasi 2017 pdf5.21 contoh presentasi 2017 pdf
5.21 contoh presentasi 2017 pdf
 
Enmas o_&_m_presentation
Enmas  o_&_m_presentationEnmas  o_&_m_presentation
Enmas o_&_m_presentation
 
Company profile 2016
Company profile 2016Company profile 2016
Company profile 2016
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
new C.v.update_antonio2
new C.v.update_antonio2new C.v.update_antonio2
new C.v.update_antonio2
 
mumbai-150
mumbai-150mumbai-150
mumbai-150
 
gopi recent
gopi recentgopi recent
gopi recent
 
Corporate presentation 2
Corporate presentation 2Corporate presentation 2
Corporate presentation 2
 
CV Tulus Widianto Update
CV Tulus Widianto UpdateCV Tulus Widianto Update
CV Tulus Widianto Update
 
my resume
my resumemy resume
my resume
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
 
Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.Qingdao Jieneng Power Station Engineering Co., Ltd.
Qingdao Jieneng Power Station Engineering Co., Ltd.
 
Maintenance and Utility Engineer
Maintenance and Utility EngineerMaintenance and Utility Engineer
Maintenance and Utility Engineer
 
CV OF TARIQ MEHMOOD
CV OF TARIQ MEHMOODCV OF TARIQ MEHMOOD
CV OF TARIQ MEHMOOD
 
Sanjeev mehrotra resume
Sanjeev mehrotra resumeSanjeev mehrotra resume
Sanjeev mehrotra resume
 
cv-imtiaz ahmed
cv-imtiaz ahmedcv-imtiaz ahmed
cv-imtiaz ahmed
 
Shyam Powertech
Shyam PowertechShyam Powertech
Shyam Powertech
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)
 
CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)
 
Company profile pt axia multi sarana
Company profile pt axia multi saranaCompany profile pt axia multi sarana
Company profile pt axia multi sarana
 

WELLHEAD COMPRESSOR Contoh Presentasi 2016

  • 1. GKM Green Tower 10th Floor Jl. TB. Simatupang Kav. 89 G, Jakarta Selatan 12530 Phone : +62 21 27878099, Fax: +62 21 27878090 www.sinerco.co.id PT SIGMA ENERGY COMPRESSINDO PT SIGMA ENERGY COMPRESSINDO
  • 2. • Berdiri sejak 3 April 2007 • 100% Perusahaan Domestik • Kantor Pusat : GKM Green Tower 10th Floor Jl. TB. Simatupang, Jakarta Selatan • Workshop :  Kandang haur , Main Workshop (JaBar)  Muara Badak (KalTim)  Lingkar Selatan (Jambi) • Jumlah karyawan: 143 orang COMPANY INFORMATION PT SIGMA ENERGY COMPRESSINDO
  • 3. INTEGRATED ISO 9001, 14001, OHSAS 18001 (CERTIFIED 2014) PT SIGMA ENERGY COMPRESSINDO
  • 4. PT. SIGMA ENERGY COMPRESSINDO AUTHORIZED SOLE AGENT INDONESIAPT SIGMA ENERGY COMPRESSINDO
  • 5. OKLAHOMA - USA PT SIGMA ENERGY COMPRESSINDO
  • 6. TYPE Integrated Reciprocating, Single stage, C1D2 Package model Portable, optional: Wheel, enclosure Power Draw 50 HP BHP 46 HP Speed 1,200 - 2,200 RPM Noise Level < 85 dBA COMPRESSOR RATIO Wide range ratio, up to 18 Suction Pressure minus 26” H20 till plus 50 psig Discharge Pressure Up to 400 psig Discharge Temperature 90 – 110 F (after cooler) Flow Rate 100 - 750 MSCFD (depend on gas characteristic) BLOW CASE 50 bbl/day Dimension and Weight L-W-H (cm): 375 x 198 x 265 Weight : 3 Tons Fuel consumption 6-9 MSCFD Fuel Specs > 800-1300 BTU, CO2 < 15%, H2S < 50 ppm Technical Specification PT SIGMA ENERGY COMPRESSINDO
  • 7. • WELL NOT FLOWING / LOW PRESSURE • WELL GAS LOCK / Potentially restricting flow • WELL PARAFFIN & WAXY / Potentially restricting flow • GAS FLARING • GAS BOOSTER • GAS LIFT • LIMITED SPACE • BIG COMPRESSOR INFLEXIBILITY, INEFICIENCY Solution For : PT SIGMA ENERGY COMPRESSINDO
  • 8. INTERNATIONAL EXPERIENCE LIST – GASJACK RENTAL NO CUTOMER UNITS LOCATION Years Notes NAME of Service 1 BP 475 Texas, New Mexico 8 Solved Loading Problems, Oklahoma, Louisina, Inactive Wells Colorado (USA) Alberta (Canada) 2 Devon Energy 250 Texas, New Mexico 8 Solved Loading Problems Oklahoma, Montana 3 Chesapeake/Mid-Con 700 Texas, Oklahoma, 9 Solved Loading Problems, Kansas Plunger Lift 4 ConocoPhillips 100 Texas, New Mexico, 9 Solved Loading Problems Wyoming 5 Marathon 60 Texas, Oklahoma, 5 Solved Loading Problems 6 Anadarko 50 Texas 5 Solved Loading Problems 7 Pemex 60 Mexico 5 Solved Loading Problems, (National Oil Company inactive wells of Mexico) 8 Santos Australia 50 Australia 4 WHC - CBM 9 Indonesia* 48 Java, Borneo, Sumatra 7 WHC, BC, FRU,GS 10 China* 40 North China 2 Wellhead Compressor PT SIGMA ENERGY COMPRESSINDO
  • 9. Experience List GasJack Compressor in Indonesia No . CUSTOMER LOCATION UNIT QTY YEARS APPLICATION 1 VICO Badak , Semberah 7 2 WHC , FRU 2 VICO Oil & Gas and CBM Mutiara , Kaltim 9 1 WHC 3 KBT - Pertamina Bunyu Bunyu Island 1 4 Fuel Booster 4 Lapindo Brantas Wunut , Sidoarjo 4 6 WHC, Booster 5 Lapindo Brantas Wunut , Sidoarjo 7 2 Booster 6 Perusda Benuotaka Penajam 2 4 Fuel Booster 7 EMP Semberah Semberah 6 4 FRU , Gaslift 8 JOBP – EMP Gebang Pangkalan Susu 2 4 WHC, Manifold 9 Medco Rimau Kaji , Semoga 9 3 FRU, WHC 10 Medco Tarakan Tarakan Island 4 3 FRU 11 Medco SSE Soka 3 1 WHC, FRU 12 Pertamina UBEP Tanjung Tanjung 2 3 WHC 13 PNR – Pertamina Cemara Kandanghaur Timur 1 1 WHC 14 EMP Gelam Jambi 4 4 FRU 15 Chevron Pacific Duri 2 1 WHC 16 Pertamina Asset 1 Rantau , Ramba 3 1 WHC , Gaslift 17 Pertamina Asset 2 Pendopo Field Jirak 1 1 Booster 18 Pertamina Asset 3 Tambun, Subang, Jatibarang Field 12 2 Flare Recovery PT SIGMA ENERGY COMPRESSINDO
  • 10. • Wellhead Compressor GASJACK COMPRESSOR APPLICATION PT SIGMA ENERGY COMPRESSINDO
  • 11. Well Head Application – USA PT SIGMA ENERGY COMPRESSINDO
  • 12. GJC at Tanjung (Kalsel) solved Gaslock problem, increase oil production up to 50%, reduce wax resistance in flowline and better fuel feeding for power plant & boilers Well Head Application – TANJUNG PT SIGMA ENERGY COMPRESSINDO
  • 13. Before GJC FTHP = 60 psig October 3rd, 2008 Semberah Well Flowing intermittent @ 286 MSCFD, 5 BOPD Well Head Application SEMBERAH After GJC in service October 3rd, 2008 FTHP : 45 psig P suction : 40 psig P discharge: 145 psig Semberah Well 2 GJC: 1,330 MSCFD 3 GJC: 1,760 MSCFD, 60-70 BOPD PT SIGMA ENERGY COMPRESSINDO
  • 14. CBM Application FIRST IN INDONESIA M-205 CBM Well Before FTHP = 15 psig After GJC service FTHP = 11 psig P. Suction = 9 psig P. Disch = 175 psig Flowrate = 215 MSCFD After 5 months GJC released, Natural Flow = 175 psig Flowrate = 200MSCFD PT SIGMA ENERGY COMPRESSINDO
  • 15. Booster Application Kaltim, Panajam Before GJC : The demand of gas supply for power plant was very high while existing electricity supply was shortage with frequent scheduled downtime. However, 6 producing strings kept declining to approximately 700 MSCFD by end of 2009. After GJC : In March 2010, 2 units GJC were located at the gas station to enable each well flowing with less tubing head pressure. Production increased to 1400 MSCFD PT SIGMA ENERGY COMPRESSINDO
  • 16. Booster Compressor In Semoga Station MEDCO – KAJI Menaikkan pressure dari 30 psi  125 psi Gas Rate : 1100-1200 mscfd PT SIGMA ENERGY COMPRESSINDO
  • 17. Medco – Kaji Booster Compressor In Matra Station Menaikkan pressure dari 10 psi  90 psi Gas rate : 1100-1200 mscfd PT SIGMA ENERGY COMPRESSINDO
  • 18. Flare Recovery Aplication SINDANG 750 - 800 MSCFD Before After VOLUME RATE : PT SIGMA ENERGY COMPRESSINDO
  • 19. 1,16 MMSCFD Before : 1,2 MMSCFD Flare Recovery Aplication Subang, West Java After : 0,04 MMSCFD PT SIGMA ENERGY COMPRESSINDO
  • 20. -800 MSCD Flare Recovery Application NORTH KALIMANTAN PT SIGMA ENERGY COMPRESSINDO
  • 21. • GASJACK COMPRESSOR • SIMPLE AND MORE PRACTICAL : Kecil , Ringan, Mudah di Mobilisasi, Pemasangan sangat mudah . • GO GREEN : Api suar padam dan bisa di manfaatkan , Ramah lingkungan • INCREASE PRODUCTION : Dapat meningkatkan produksi Oil & Gas dengan optimasi well yang tidak produktif menjadi produktif. • MINIMUM INVESTMENT COST : Biaya pemasangan tidak rumit , Biaya penyambungan sangat minim . • CONTRACT : Contract bisa dilaksanakan dengan - direct award , 2 tahun , 1 tahun atau Sesuai kebutuhan di lapangan. PT SIGMA ENERGY COMPRESSINDO
  • 26. CONTACT FOR MORE INFO THANK YOU FOR ATTENTION! Looking forward to serve you! GKM Green Tower 10th Floor Jl. TB. Simatupang Kav. 89 G, Jakarta Selatan 12530 Phone : +62 21 27878099, Fax: +62 21 27878090 www.sinerco.co.id PT SIGMA ENERGY COMPRESSINDO HOTLAN SITORUS VP MARKETING & BIZDEV hotlan@sinerco.co.id +6281314525253 PT SIGMA ENERGY COMPRESSINDO