SlideShare a Scribd company logo
1 of 3
CURRICULUM VITAE
VIRALKUMAR CHANDRASHANKAR SHUKLA
AT &POST: SAJOD, STREET: ZAWER KHADKI
TA: ANKLESHWAR, DIST: BHARUCH
GUJARAT- 393020
(Rajasthan M.No. 09460564574, 07877787824),
E -mail: viral_shukla@yahoo.co.in viralshukla9125@gmail.com
Post Applied for: - 1st
Class BOILER OPERATOR /ENGINEER
Total Experience: - 15+ Years
Objective:
To become member of successful team of a research oriented and to contributed my best effort
towards the success and future growth of the organization.
Personal Profile:
* Birth Date : 30/04/1981 Marital Status : Married
* Languages : Gujarati, Hindi, English Citizenship : India
Education:
N
O.
EXAM BOARD/UNIVERCITY YEAR OF
PASSING
PERS.
%
1.
S.S.C. G.S.E.B. Gandhinagar March-1996 50.47%
2.
H.S.C. G.S.E.B. Gandhinagar March-2000 40.00%
3.
S.Y.B.A. S.G. University, Surat April-2002 45.00%
Additional Certification:
1. 2nd
Class Boiler Attendant NCTVT Gandhinagar Dec.-1999 70.00%
2. 1st Class Boiler Attendant Govt. Of Gujarat, Ahem. Feb-2003 -
3. DME IME(India), Mumbai 2014 Runnin
g
Job Description:
 Knowledge of DCS system.
 Knowledge about Project, commissioning & Continues with Safe, & efficient Operation
of various type of water tube high pressure boiler & power plant Auxiliaries & fuel handling
system.
 Having knowledge about performance monitoring, fault finding & trouble shutting,
including start up /shut up & on line change over of boiler & power plant auxiliary. With safety
environment standards.
 Observation of field parameter and logging the same.
 Communication & Coordination with related department.
 Safe isolation of equipment for preventive/ routine/ break down/ shut down Maintenance.
 Participating in the general routine maintenance work .Maintained proper safety
environment & house keeping at working place.
Work Experience:
Present Experience.
1. Shree cement ltd, Beawar(Ras), Ajmer.
Post: - Foreman (Power Plant Operation).
Duration: - 01/08/2009 to till date.
Responsibility: - Operation (Field & DCS) of following equipments.
* CVPL make AFBC & CFBC coal fired Boiler 85TPH *4 with a working pressure of 105
kg/cm2 (2*50MW Power Plant) st. temp:525`C.
* CVPL make AFBC & CFBC coal fired Boiler 85TPH *3 with a working pressure of 105
kg/cm2 (3*18MW Power Plant) st. temp:525`C.
* CVPL make CFBC system high pressure water tube Boiler 495TPH*2nos, Wr. Pr. 147
kg/cm2(2*150MW Power plant) & st. temp:540` C.
* 150MW*2nos. Tandem compounding two stage reheater with double cylinder electro
hydraulic throttle governing STEAM TURBINE, of Dongfang Energy Ltd CHAINA.
* Also company exporting power to Rajasthan electricity power Grid.
* All equipments are highly atomized with the DCS of TATA HONEYWELL Company Ltd.
* Knowledge of Coal Handling Plant.
Past Experience:
2. Meghmani Finechem Ltd., G.I.D.C. Dahej, Bharuch.
Post: - 1st
Class Boiler Attendant.
1) Duration: - 24/01/2009 to 24/07/2009 (6 months).
Responsibility: - Operation of following equipments.
* CVPL make AFBC coal fired Boiler 90TPH *2 with a working pressure of 105 kg/cm2
(2*20MW Power Plant) & knowledge of Coal Handling Plant.
3. Nitrex Chemicals India Ltd, G.I.D.C. Jhagadia.
Post: - 1st
Class Boiler Officer.
Duration: - 01/06/2006 to 23/01/2009 (2 Years & 8 months).
Responsibility: - Operation & Maintenance of following equipments.
* Thermax Ltd make Gas fired Boiler 8TPH with a working pressure of 10.54 kg/cm2.
* Ion-Exchange ltd make Soft Water Plant its capacity 700Kl/Regenration.
4. MTZ Polyfilms Ltd, G.I.D.C. Jhagadia.
Post: - 1st
Class Boiler Attendant.
Duration: - 25/12/2002 to 31/05/2006(3 Years & 5 months).
Responsibility: - Operation & Maintenance of following equipments.
* Nestler & Maxima Ltd make Gas & F. Oil fired Boiler 4TPH & 12TPH with a working
pressure of 10.54 kg/cm2.
* Undine Ltd make Thermic Fluid Heater its capacity 15 Lacks k cal/hr (*03).
* Factor Ltd make Soft Water Plant its capacity 900kl/Regeneration.
5. Artek Organic Industries Ltd., G.I.D.C. Panoli.
Post: - 2nd
Class Boiler Attendant.
Duration: - 01/03/2000 to 23/12/2002(2 Years & 9 months).
Responsibility: - Operation & Maintenance following equipments.
* I.A.E.C. Ltd make F. Oil fired Boiler 3TPH with a working pressure of 10.54 kg/cm2.
* Ion-Exchange Ltd make Soft Water Plant its capacity 40Kl/Regenration.
Thanking You,
Viral Shukla

More Related Content

What's hot

What's hot (8)

reseume ccr
reseume ccrreseume ccr
reseume ccr
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
BKS 19.03.16
BKS 19.03.16BKS 19.03.16
BKS 19.03.16
 
MUTHURAJ-CV
MUTHURAJ-CVMUTHURAJ-CV
MUTHURAJ-CV
 
GOPALSAMY-Updated resume
GOPALSAMY-Updated resumeGOPALSAMY-Updated resume
GOPALSAMY-Updated resume
 
New Microsoft Office Word Document (4) - Copy
New Microsoft Office Word Document (4) - CopyNew Microsoft Office Word Document (4) - Copy
New Microsoft Office Word Document (4) - Copy
 
manojcv
manojcvmanojcv
manojcv
 
Sarbjit singh c.v
Sarbjit singh c.vSarbjit singh c.v
Sarbjit singh c.v
 

Similar to mumbai-150

Similar to mumbai-150 (20)

RESUME - Elumalai (2)
RESUME - Elumalai (2)RESUME - Elumalai (2)
RESUME - Elumalai (2)
 
Muhammad Imran Mugha1
Muhammad Imran Mugha1Muhammad Imran Mugha1
Muhammad Imran Mugha1
 
Sanjeev mehrotra resume
Sanjeev mehrotra resumeSanjeev mehrotra resume
Sanjeev mehrotra resume
 
Bitu.word
Bitu.wordBitu.word
Bitu.word
 
CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)
 
Bharat New Resume May16
Bharat New Resume May16Bharat New Resume May16
Bharat New Resume May16
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
TENZEL
TENZELTENZEL
TENZEL
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
vijay resume QEC
vijay resume  QECvijay resume  QEC
vijay resume QEC
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
Gtg_resume
Gtg_resumeGtg_resume
Gtg_resume
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
TENZEL.doc
TENZEL.docTENZEL.doc
TENZEL.doc
 
Resume1
Resume1Resume1
Resume1
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
 
Resume Manish Shukla
Resume Manish ShuklaResume Manish Shukla
Resume Manish Shukla
 

mumbai-150

  • 1. CURRICULUM VITAE VIRALKUMAR CHANDRASHANKAR SHUKLA AT &POST: SAJOD, STREET: ZAWER KHADKI TA: ANKLESHWAR, DIST: BHARUCH GUJARAT- 393020 (Rajasthan M.No. 09460564574, 07877787824), E -mail: viral_shukla@yahoo.co.in viralshukla9125@gmail.com Post Applied for: - 1st Class BOILER OPERATOR /ENGINEER Total Experience: - 15+ Years Objective: To become member of successful team of a research oriented and to contributed my best effort towards the success and future growth of the organization. Personal Profile: * Birth Date : 30/04/1981 Marital Status : Married * Languages : Gujarati, Hindi, English Citizenship : India Education: N O. EXAM BOARD/UNIVERCITY YEAR OF PASSING PERS. % 1. S.S.C. G.S.E.B. Gandhinagar March-1996 50.47% 2. H.S.C. G.S.E.B. Gandhinagar March-2000 40.00% 3. S.Y.B.A. S.G. University, Surat April-2002 45.00% Additional Certification: 1. 2nd Class Boiler Attendant NCTVT Gandhinagar Dec.-1999 70.00% 2. 1st Class Boiler Attendant Govt. Of Gujarat, Ahem. Feb-2003 - 3. DME IME(India), Mumbai 2014 Runnin g
  • 2. Job Description:  Knowledge of DCS system.  Knowledge about Project, commissioning & Continues with Safe, & efficient Operation of various type of water tube high pressure boiler & power plant Auxiliaries & fuel handling system.  Having knowledge about performance monitoring, fault finding & trouble shutting, including start up /shut up & on line change over of boiler & power plant auxiliary. With safety environment standards.  Observation of field parameter and logging the same.  Communication & Coordination with related department.  Safe isolation of equipment for preventive/ routine/ break down/ shut down Maintenance.  Participating in the general routine maintenance work .Maintained proper safety environment & house keeping at working place. Work Experience: Present Experience. 1. Shree cement ltd, Beawar(Ras), Ajmer. Post: - Foreman (Power Plant Operation). Duration: - 01/08/2009 to till date. Responsibility: - Operation (Field & DCS) of following equipments. * CVPL make AFBC & CFBC coal fired Boiler 85TPH *4 with a working pressure of 105 kg/cm2 (2*50MW Power Plant) st. temp:525`C. * CVPL make AFBC & CFBC coal fired Boiler 85TPH *3 with a working pressure of 105 kg/cm2 (3*18MW Power Plant) st. temp:525`C. * CVPL make CFBC system high pressure water tube Boiler 495TPH*2nos, Wr. Pr. 147 kg/cm2(2*150MW Power plant) & st. temp:540` C. * 150MW*2nos. Tandem compounding two stage reheater with double cylinder electro hydraulic throttle governing STEAM TURBINE, of Dongfang Energy Ltd CHAINA. * Also company exporting power to Rajasthan electricity power Grid. * All equipments are highly atomized with the DCS of TATA HONEYWELL Company Ltd. * Knowledge of Coal Handling Plant. Past Experience: 2. Meghmani Finechem Ltd., G.I.D.C. Dahej, Bharuch. Post: - 1st Class Boiler Attendant. 1) Duration: - 24/01/2009 to 24/07/2009 (6 months).
  • 3. Responsibility: - Operation of following equipments. * CVPL make AFBC coal fired Boiler 90TPH *2 with a working pressure of 105 kg/cm2 (2*20MW Power Plant) & knowledge of Coal Handling Plant. 3. Nitrex Chemicals India Ltd, G.I.D.C. Jhagadia. Post: - 1st Class Boiler Officer. Duration: - 01/06/2006 to 23/01/2009 (2 Years & 8 months). Responsibility: - Operation & Maintenance of following equipments. * Thermax Ltd make Gas fired Boiler 8TPH with a working pressure of 10.54 kg/cm2. * Ion-Exchange ltd make Soft Water Plant its capacity 700Kl/Regenration. 4. MTZ Polyfilms Ltd, G.I.D.C. Jhagadia. Post: - 1st Class Boiler Attendant. Duration: - 25/12/2002 to 31/05/2006(3 Years & 5 months). Responsibility: - Operation & Maintenance of following equipments. * Nestler & Maxima Ltd make Gas & F. Oil fired Boiler 4TPH & 12TPH with a working pressure of 10.54 kg/cm2. * Undine Ltd make Thermic Fluid Heater its capacity 15 Lacks k cal/hr (*03). * Factor Ltd make Soft Water Plant its capacity 900kl/Regeneration. 5. Artek Organic Industries Ltd., G.I.D.C. Panoli. Post: - 2nd Class Boiler Attendant. Duration: - 01/03/2000 to 23/12/2002(2 Years & 9 months). Responsibility: - Operation & Maintenance following equipments. * I.A.E.C. Ltd make F. Oil fired Boiler 3TPH with a working pressure of 10.54 kg/cm2. * Ion-Exchange Ltd make Soft Water Plant its capacity 40Kl/Regenration. Thanking You, Viral Shukla