1. CURRICULUM VITAE
VIRALKUMAR CHANDRASHANKAR SHUKLA
AT &POST: SAJOD, STREET: ZAWER KHADKI
TA: ANKLESHWAR, DIST: BHARUCH
GUJARAT- 393020
(Rajasthan M.No. 09460564574, 07877787824),
E -mail: viral_shukla@yahoo.co.in viralshukla9125@gmail.com
Post Applied for: - 1st
Class BOILER OPERATOR /ENGINEER
Total Experience: - 15+ Years
Objective:
To become member of successful team of a research oriented and to contributed my best effort
towards the success and future growth of the organization.
Personal Profile:
* Birth Date : 30/04/1981 Marital Status : Married
* Languages : Gujarati, Hindi, English Citizenship : India
Education:
N
O.
EXAM BOARD/UNIVERCITY YEAR OF
PASSING
PERS.
%
1.
S.S.C. G.S.E.B. Gandhinagar March-1996 50.47%
2.
H.S.C. G.S.E.B. Gandhinagar March-2000 40.00%
3.
S.Y.B.A. S.G. University, Surat April-2002 45.00%
Additional Certification:
1. 2nd
Class Boiler Attendant NCTVT Gandhinagar Dec.-1999 70.00%
2. 1st Class Boiler Attendant Govt. Of Gujarat, Ahem. Feb-2003 -
3. DME IME(India), Mumbai 2014 Runnin
g
2. Job Description:
Knowledge of DCS system.
Knowledge about Project, commissioning & Continues with Safe, & efficient Operation
of various type of water tube high pressure boiler & power plant Auxiliaries & fuel handling
system.
Having knowledge about performance monitoring, fault finding & trouble shutting,
including start up /shut up & on line change over of boiler & power plant auxiliary. With safety
environment standards.
Observation of field parameter and logging the same.
Communication & Coordination with related department.
Safe isolation of equipment for preventive/ routine/ break down/ shut down Maintenance.
Participating in the general routine maintenance work .Maintained proper safety
environment & house keeping at working place.
Work Experience:
Present Experience.
1. Shree cement ltd, Beawar(Ras), Ajmer.
Post: - Foreman (Power Plant Operation).
Duration: - 01/08/2009 to till date.
Responsibility: - Operation (Field & DCS) of following equipments.
* CVPL make AFBC & CFBC coal fired Boiler 85TPH *4 with a working pressure of 105
kg/cm2 (2*50MW Power Plant) st. temp:525`C.
* CVPL make AFBC & CFBC coal fired Boiler 85TPH *3 with a working pressure of 105
kg/cm2 (3*18MW Power Plant) st. temp:525`C.
* CVPL make CFBC system high pressure water tube Boiler 495TPH*2nos, Wr. Pr. 147
kg/cm2(2*150MW Power plant) & st. temp:540` C.
* 150MW*2nos. Tandem compounding two stage reheater with double cylinder electro
hydraulic throttle governing STEAM TURBINE, of Dongfang Energy Ltd CHAINA.
* Also company exporting power to Rajasthan electricity power Grid.
* All equipments are highly atomized with the DCS of TATA HONEYWELL Company Ltd.
* Knowledge of Coal Handling Plant.
Past Experience:
2. Meghmani Finechem Ltd., G.I.D.C. Dahej, Bharuch.
Post: - 1st
Class Boiler Attendant.
1) Duration: - 24/01/2009 to 24/07/2009 (6 months).
3. Responsibility: - Operation of following equipments.
* CVPL make AFBC coal fired Boiler 90TPH *2 with a working pressure of 105 kg/cm2
(2*20MW Power Plant) & knowledge of Coal Handling Plant.
3. Nitrex Chemicals India Ltd, G.I.D.C. Jhagadia.
Post: - 1st
Class Boiler Officer.
Duration: - 01/06/2006 to 23/01/2009 (2 Years & 8 months).
Responsibility: - Operation & Maintenance of following equipments.
* Thermax Ltd make Gas fired Boiler 8TPH with a working pressure of 10.54 kg/cm2.
* Ion-Exchange ltd make Soft Water Plant its capacity 700Kl/Regenration.
4. MTZ Polyfilms Ltd, G.I.D.C. Jhagadia.
Post: - 1st
Class Boiler Attendant.
Duration: - 25/12/2002 to 31/05/2006(3 Years & 5 months).
Responsibility: - Operation & Maintenance of following equipments.
* Nestler & Maxima Ltd make Gas & F. Oil fired Boiler 4TPH & 12TPH with a working
pressure of 10.54 kg/cm2.
* Undine Ltd make Thermic Fluid Heater its capacity 15 Lacks k cal/hr (*03).
* Factor Ltd make Soft Water Plant its capacity 900kl/Regeneration.
5. Artek Organic Industries Ltd., G.I.D.C. Panoli.
Post: - 2nd
Class Boiler Attendant.
Duration: - 01/03/2000 to 23/12/2002(2 Years & 9 months).
Responsibility: - Operation & Maintenance following equipments.
* I.A.E.C. Ltd make F. Oil fired Boiler 3TPH with a working pressure of 10.54 kg/cm2.
* Ion-Exchange Ltd make Soft Water Plant its capacity 40Kl/Regenration.