SlideShare a Scribd company logo
1 of 6
CURRICULUM VITAE
R.GOPINATH E-mail: rsgopinath14@gmail.com
Mobile no: +91-9600206056
OBJECTIVE:
To work and serve in a technical environment with challenging tasks, where
can I learn, research and develop my technical expertise and work for the organization’s
enhancement.
EDUCATIONAL QUALIFICATION :
Examination /
Degree
Institute Board
Year of
Graduation
Class Obtained
BE(EEE)
RANIPET
ENGINEERING
COLLEGE.
ANNA
UNIVERSITY
2006 FIRST
PROFESSIONAL EXPERIENCE:
> Accomplish around 10 + years of industry experience in Operation and
Maintenance of high pressure boiler, steam turbine.
> Commissioning activities of boiler and turbine.
WORKING EXEPERIENCE:
S.NO.: DESIGNATION ORGANISATION
DURATION
FROM TO
1. PANNEL ENGINEER Base power Pvt Ltd. Raichur. JUNE-2006 MAY-2007
2. PANNEL ENGINEER
Enmas Operation and
Maintenance Services Pvt Ltd.
JUNE-2007 JUNE-2010
3.
SENIOR ENGINEER-
COMMISSIONING
Greenesol Power Systems Pvt.
Ltd., Bangalore, India.
JUNE-2010 MAR-2013
4. SHIFT INCHARGE ENMAS O& M Services Pvt Ltd. MAR-2013 JAN-2014
5. CCR ENGINEER
STEAG Energy Services Pvt.
Ltd(Botswana,Africa).
FEB-2014 DEC-2015
6. SHIFT INCHARGE KEPCO KPS JAN-2016 TILL DATE
JOB PROFILE :
• Experience in handling Erection & Commissioning of mechanical packages such;
Boiler, BOP Packages.
• Experience of handling CFBC, AFBC, WHRB equipment; bio-mass based projects
Knowledge of all relevant Engineering Standards and Codes.
• Set-up meetings between engineering and commissioning groups as and when
required and assign responsibilities to these groups.
• Analyzing P&ID drawings and taking punch list for the commissioning
• Preparing protocols for all the equipment’s and for every milestones
• Commissioning of Fans, Pumps , Blowers Lead daily startup/commissioning meetings
with client/consultants.
• Inspection of the boilers, air/gas path flow mapping; cold air velocity test (CAVT),
thickness mapping of boiler tubes/sections and drum internal inspections.
• Coordinate, prepare, inspect, and maintain records of request for inspection of
materials, construction works and pre-commissioning works.
• Issuing work permits and supervising Isolation/Lockout/Tagout of systems for safe
working.
PRESENT ASSIGNMENT:
 KEPCO Kps Pvt Ltd.
(M/s BECL,Bhavnagar,Gujrath .)
Period : JAN 2016 to TILL DATE.
Designation : Shift in charge.
2*250 MW Thermal power plant . CFBC BHEL boiler,
BHEL Turbine, surface cooling condensing turbine
PREVIOUS ASSIGNMENTS:
 Steag energy Services Pvt Ltd.
(M/s Botswana Power Corporation,Botswana , Africa.)
Period : FEB-2014 to DEC 2015.
Designation : Control room engineer.
4*150 MW Thermal power plant . 2*527Tph(CFBC) Wuxi boiler,
double-casing and double-exhaust, direct air-cooling condensing turbine
 Tulsiyan NEC Ltd, Gumudipoondi, Chennai.
Period : MAR-2013 to JAN-2014
Designation : Shift in charge.
2*35 MW Captive power plant . 2*150Tph(CFBC) ENMAS GB boiler,
SIEMENS TURBINE of 2*35 MW
 Greenesol power systems Pvt Ltd.
Period : JUNE-2010 to JUNE-2013
Designation : Sr- Engineer (Commissioning).
Site 1 : Cavery power ,Gumudi poondi Chennai.
Commissioning of 1x265 TPH CFBC boiler TPH .
HANGZHOU BOILER GROUPS. CHINA.
Site 2 : BMMIspat Ltd, Hospet, Bellary.
Commissioning of 2x265 TPH CFBCboiler TPH .
HANGZHOU BOILER GROUPS. CHINA.
Site 3 : S.V Power, Renki village. Korba
1x265 TPH CFBCboiler, Wuzhi Boiler. (China) make70 MW
CaptivePower plant.
Site 4 : Sanghi cements pvt ltd,Gujrat. 70 MW Captive
Power plant.1x70 MW Steam turbine, Hanzhou
(China)make.1x265 TPH CFBCboiler, Wuzhi Boiler.
Site 5 : BMMIspat Ltd, Hospet, Bellary.
Erection & Commissioning of 2x60 TPH WHRB and 1x130
TPH CFBC.
 Enmas Operation and Maintenance Services Pvt Ltd.
Period : JUNE-2007 to JUNE-2010
Designation : Pannel engineer.
Site 1 : Jagadambal Power And Alloys, Raipur.
25 MW Captive Power plant.
1x105 TPH AFBC boiler, Thermax Babcock Wilcox make.
Double extraction condensing Steamturbine, Hanzhou (China).
Site 2 : JK Paper Ltd, Songadh, DistTapi , Gujarat.Commissioning
and Stabilization of 12 MW Co-Gen Power plant.
1x70 TPH CFBC boiler,88 Kg/cm2
,510 +/- 5 degC.Jinan
boiler Groups(China)make.
1x12 MW Double extraction condensing Steam turbine,
Qingda-Jieneng (China) make.
Site 3 : AdhunikMetaliksLtd, Rourkela, Orissa.
Worked as Shift Inchargefor operation & Maintenance.
SIEMENS.Commissioning and Stabilization of 2X17 MW
Captive Power plant.1x130 TPH CFBC boiler,66 Kg/cm2
,
485 +/- 5 deg C.2x17 MW Single extraction condensing
Steam turbine, Chinamake.5x10 TPH WHRB boiler,
66 Kg/cm2
,485 +/- 5 Thermal System Pvt Ltd.
Site 4 : Finolex Industries Pvt Ltd, Rathanagiri, Maharastra.
Worked as Shift Incharge for operation & Maintenance
Commissioning and Stabilizationof 1 x 43 captive
Powerplant,DCS YAKOGAVA CENTUM 3000,2 x 110 TPH
CVPL AFBC BOILER. 88 Kg/cm2
,510 +/- 5 deg C
1 x 43 MW BHEL TURBINE OF. 88 Kg/cm2
,510 +/- 5 deg C
Site 5 : SKS ISPAT power ltd.Siltara, Raipur,
Worked as Shift Incharge for operation&Maintenance.
Stabilization of plant,1x175
TPH CFBC boiler,68 Kg/cm2
,485 +/- 5 deg C.
 Base power Pvt Ltd. Raichur.
Period : June 2006 to May 2007.
Designation : Pannel Engineer
1*11 MW BIOMASS PLANT,1*40 TPH AFBC BOILER, 66 Kg/cm2
, 485 +/- 5 deg.CVPL
Single extraction condensing Steam turbine, GalugaTurbine, China Make.
PERSONAL DETAILS:
Father’s Name : K.Rajamanickam.
Mather’s Name : R.Shakunthala.
Date of Birth : 14/10/1983.
Languages Known : Tamil , English , Hindi .
Passport : M0538622
Nationality : Indian
Permanent Address : 27s/7, Prakashamnager ,Ulundurpet ,
Villupuram (dist) ,Tamilnadu.
DECLARATION:
I hereby declare that the above-furnished details are true and correct to the
best of my knowledge.
Date : (R.GOPINATH)
Place :
PERSONAL DETAILS:
Father’s Name : K.Rajamanickam.
Mather’s Name : R.Shakunthala.
Date of Birth : 14/10/1983.
Languages Known : Tamil , English , Hindi .
Passport : M0538622
Nationality : Indian
Permanent Address : 27s/7, Prakashamnager ,Ulundurpet ,
Villupuram (dist) ,Tamilnadu.
DECLARATION:
I hereby declare that the above-furnished details are true and correct to the
best of my knowledge.
Date : (R.GOPINATH)
Place :

More Related Content

What's hot (18)

Kstps ppt niet alwer
Kstps  ppt  niet alwerKstps  ppt  niet alwer
Kstps ppt niet alwer
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
PKB_CV1
PKB_CV1PKB_CV1
PKB_CV1
 
my resume
my resumemy resume
my resume
 
Eco Turbines profile
Eco Turbines   profileEco Turbines   profile
Eco Turbines profile
 
manojcv
manojcvmanojcv
manojcv
 
Kstps ppt niet
Kstps  ppt  nietKstps  ppt  niet
Kstps ppt niet
 
Sanjeev mehrotra resume
Sanjeev mehrotra resumeSanjeev mehrotra resume
Sanjeev mehrotra resume
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
Power Generation by speed breakers.
Power Generation by speed breakers.Power Generation by speed breakers.
Power Generation by speed breakers.
 
Harishkumar
HarishkumarHarishkumar
Harishkumar
 
Resume spsoni 1965
Resume spsoni 1965Resume spsoni 1965
Resume spsoni 1965
 
Resume_Dipak-linkedin
Resume_Dipak-linkedinResume_Dipak-linkedin
Resume_Dipak-linkedin
 
MAPS TG
MAPS TGMAPS TG
MAPS TG
 
Company profile MAPS TG
Company profile MAPS TGCompany profile MAPS TG
Company profile MAPS TG
 
Power plant part 1
Power plant part 1Power plant part 1
Power plant part 1
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
Training chp
Training chpTraining chp
Training chp
 

Viewers also liked

SAP PENGANTAR MANAJEMEN
SAP PENGANTAR MANAJEMENSAP PENGANTAR MANAJEMEN
SAP PENGANTAR MANAJEMENria septiani
 
Elementos y estructura de un sistema económico
Elementos y estructura de un sistema económicoElementos y estructura de un sistema económico
Elementos y estructura de un sistema económicoJazel Rios
 
Wi-Fiがどのくらい飛んでいるか
Wi-Fiがどのくらい飛んでいるかWi-Fiがどのくらい飛んでいるか
Wi-Fiがどのくらい飛んでいるかFuminori Hoshian
 
Food chain story
Food chain storyFood chain story
Food chain storyjabernethy
 
Pengenal frekuensi counter dan oscilloscope
Pengenal frekuensi counter dan oscilloscopePengenal frekuensi counter dan oscilloscope
Pengenal frekuensi counter dan oscilloscopeRahmad Deni
 
Jessica Lewis Consulting_Corporate and Commercial Law Capabilities
Jessica Lewis Consulting_Corporate and Commercial Law CapabilitiesJessica Lewis Consulting_Corporate and Commercial Law Capabilities
Jessica Lewis Consulting_Corporate and Commercial Law CapabilitiesJessica Lewis (CITF)
 
1.introduction to Solar Energy
1.introduction to Solar Energy1.introduction to Solar Energy
1.introduction to Solar EnergyPrateek Yadav
 
Cellular industry
Cellular industryCellular industry
Cellular industry915738
 
HTML_CSS_Portfolio
HTML_CSS_PortfolioHTML_CSS_Portfolio
HTML_CSS_PortfolioAlex Wang
 
портфолио голубович
портфолио голубовичпортфолио голубович
портфолио голубовичgolubovicholga
 
Conferência: Influência da Gestão Participativa nas lideranças institucionais...
Conferência: Influência da Gestão Participativa nas lideranças institucionais...Conferência: Influência da Gestão Participativa nas lideranças institucionais...
Conferência: Influência da Gestão Participativa nas lideranças institucionais...CBA Consórcio Brasileiro de Acreditação
 

Viewers also liked (17)

SAP PENGANTAR MANAJEMEN
SAP PENGANTAR MANAJEMENSAP PENGANTAR MANAJEMEN
SAP PENGANTAR MANAJEMEN
 
Study in singapore
Study in singaporeStudy in singapore
Study in singapore
 
Elementos y estructura de un sistema económico
Elementos y estructura de un sistema económicoElementos y estructura de un sistema económico
Elementos y estructura de un sistema económico
 
SURYA_3.6
SURYA_3.6SURYA_3.6
SURYA_3.6
 
Closest pizza
Closest pizzaClosest pizza
Closest pizza
 
Wi-Fiがどのくらい飛んでいるか
Wi-Fiがどのくらい飛んでいるかWi-Fiがどのくらい飛んでいるか
Wi-Fiがどのくらい飛んでいるか
 
Food chain story
Food chain storyFood chain story
Food chain story
 
Pengenal frekuensi counter dan oscilloscope
Pengenal frekuensi counter dan oscilloscopePengenal frekuensi counter dan oscilloscope
Pengenal frekuensi counter dan oscilloscope
 
Jessica Lewis Consulting_Corporate and Commercial Law Capabilities
Jessica Lewis Consulting_Corporate and Commercial Law CapabilitiesJessica Lewis Consulting_Corporate and Commercial Law Capabilities
Jessica Lewis Consulting_Corporate and Commercial Law Capabilities
 
Faircrete w (spl)
Faircrete w (spl)Faircrete w (spl)
Faircrete w (spl)
 
1.introduction to Solar Energy
1.introduction to Solar Energy1.introduction to Solar Energy
1.introduction to Solar Energy
 
Cellular industry
Cellular industryCellular industry
Cellular industry
 
yousef-shaheen-cv
yousef-shaheen-cvyousef-shaheen-cv
yousef-shaheen-cv
 
HTML_CSS_Portfolio
HTML_CSS_PortfolioHTML_CSS_Portfolio
HTML_CSS_Portfolio
 
Apache_Maven
Apache_MavenApache_Maven
Apache_Maven
 
портфолио голубович
портфолио голубовичпортфолио голубович
портфолио голубович
 
Conferência: Influência da Gestão Participativa nas lideranças institucionais...
Conferência: Influência da Gestão Participativa nas lideranças institucionais...Conferência: Influência da Gestão Participativa nas lideranças institucionais...
Conferência: Influência da Gestão Participativa nas lideranças institucionais...
 

Similar to gopi recent

CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerKazi Ferdousul Karim
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Steam & Power Engineers Company Brouchure (spe)
Steam & Power Engineers Company Brouchure (spe)Steam & Power Engineers Company Brouchure (spe)
Steam & Power Engineers Company Brouchure (spe)sachindesai055
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil Singh
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...Umer Azeem
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 

Similar to gopi recent (20)

Bitu.word
Bitu.wordBitu.word
Bitu.word
 
Resume
ResumeResume
Resume
 
RESUME - Elumalai (2)
RESUME - Elumalai (2)RESUME - Elumalai (2)
RESUME - Elumalai (2)
 
CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation Engineer
 
reseume ccr
reseume ccrreseume ccr
reseume ccr
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
vijay resume QEC
vijay resume  QECvijay resume  QEC
vijay resume QEC
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Steam & Power Engineers Company Brouchure (spe)
Steam & Power Engineers Company Brouchure (spe)Steam & Power Engineers Company Brouchure (spe)
Steam & Power Engineers Company Brouchure (spe)
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
CV Bhatti
CV BhattiCV Bhatti
CV Bhatti
 
RVK 2016 RESUME
RVK 2016 RESUMERVK 2016 RESUME
RVK 2016 RESUME
 
Resume
ResumeResume
Resume
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 
PTPS
PTPSPTPS
PTPS
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 

gopi recent

  • 1. CURRICULUM VITAE R.GOPINATH E-mail: rsgopinath14@gmail.com Mobile no: +91-9600206056 OBJECTIVE: To work and serve in a technical environment with challenging tasks, where can I learn, research and develop my technical expertise and work for the organization’s enhancement. EDUCATIONAL QUALIFICATION : Examination / Degree Institute Board Year of Graduation Class Obtained BE(EEE) RANIPET ENGINEERING COLLEGE. ANNA UNIVERSITY 2006 FIRST PROFESSIONAL EXPERIENCE: > Accomplish around 10 + years of industry experience in Operation and Maintenance of high pressure boiler, steam turbine. > Commissioning activities of boiler and turbine. WORKING EXEPERIENCE: S.NO.: DESIGNATION ORGANISATION DURATION FROM TO 1. PANNEL ENGINEER Base power Pvt Ltd. Raichur. JUNE-2006 MAY-2007 2. PANNEL ENGINEER Enmas Operation and Maintenance Services Pvt Ltd. JUNE-2007 JUNE-2010 3. SENIOR ENGINEER- COMMISSIONING Greenesol Power Systems Pvt. Ltd., Bangalore, India. JUNE-2010 MAR-2013 4. SHIFT INCHARGE ENMAS O& M Services Pvt Ltd. MAR-2013 JAN-2014 5. CCR ENGINEER STEAG Energy Services Pvt. Ltd(Botswana,Africa). FEB-2014 DEC-2015 6. SHIFT INCHARGE KEPCO KPS JAN-2016 TILL DATE
  • 2. JOB PROFILE : • Experience in handling Erection & Commissioning of mechanical packages such; Boiler, BOP Packages. • Experience of handling CFBC, AFBC, WHRB equipment; bio-mass based projects Knowledge of all relevant Engineering Standards and Codes. • Set-up meetings between engineering and commissioning groups as and when required and assign responsibilities to these groups. • Analyzing P&ID drawings and taking punch list for the commissioning • Preparing protocols for all the equipment’s and for every milestones • Commissioning of Fans, Pumps , Blowers Lead daily startup/commissioning meetings with client/consultants. • Inspection of the boilers, air/gas path flow mapping; cold air velocity test (CAVT), thickness mapping of boiler tubes/sections and drum internal inspections. • Coordinate, prepare, inspect, and maintain records of request for inspection of materials, construction works and pre-commissioning works. • Issuing work permits and supervising Isolation/Lockout/Tagout of systems for safe working. PRESENT ASSIGNMENT:  KEPCO Kps Pvt Ltd. (M/s BECL,Bhavnagar,Gujrath .) Period : JAN 2016 to TILL DATE. Designation : Shift in charge. 2*250 MW Thermal power plant . CFBC BHEL boiler, BHEL Turbine, surface cooling condensing turbine PREVIOUS ASSIGNMENTS:  Steag energy Services Pvt Ltd. (M/s Botswana Power Corporation,Botswana , Africa.) Period : FEB-2014 to DEC 2015. Designation : Control room engineer. 4*150 MW Thermal power plant . 2*527Tph(CFBC) Wuxi boiler, double-casing and double-exhaust, direct air-cooling condensing turbine
  • 3.  Tulsiyan NEC Ltd, Gumudipoondi, Chennai. Period : MAR-2013 to JAN-2014 Designation : Shift in charge. 2*35 MW Captive power plant . 2*150Tph(CFBC) ENMAS GB boiler, SIEMENS TURBINE of 2*35 MW  Greenesol power systems Pvt Ltd. Period : JUNE-2010 to JUNE-2013 Designation : Sr- Engineer (Commissioning). Site 1 : Cavery power ,Gumudi poondi Chennai. Commissioning of 1x265 TPH CFBC boiler TPH . HANGZHOU BOILER GROUPS. CHINA. Site 2 : BMMIspat Ltd, Hospet, Bellary. Commissioning of 2x265 TPH CFBCboiler TPH . HANGZHOU BOILER GROUPS. CHINA. Site 3 : S.V Power, Renki village. Korba 1x265 TPH CFBCboiler, Wuzhi Boiler. (China) make70 MW CaptivePower plant. Site 4 : Sanghi cements pvt ltd,Gujrat. 70 MW Captive Power plant.1x70 MW Steam turbine, Hanzhou (China)make.1x265 TPH CFBCboiler, Wuzhi Boiler. Site 5 : BMMIspat Ltd, Hospet, Bellary. Erection & Commissioning of 2x60 TPH WHRB and 1x130 TPH CFBC.  Enmas Operation and Maintenance Services Pvt Ltd.
  • 4. Period : JUNE-2007 to JUNE-2010 Designation : Pannel engineer. Site 1 : Jagadambal Power And Alloys, Raipur. 25 MW Captive Power plant. 1x105 TPH AFBC boiler, Thermax Babcock Wilcox make. Double extraction condensing Steamturbine, Hanzhou (China). Site 2 : JK Paper Ltd, Songadh, DistTapi , Gujarat.Commissioning and Stabilization of 12 MW Co-Gen Power plant. 1x70 TPH CFBC boiler,88 Kg/cm2 ,510 +/- 5 degC.Jinan boiler Groups(China)make. 1x12 MW Double extraction condensing Steam turbine, Qingda-Jieneng (China) make. Site 3 : AdhunikMetaliksLtd, Rourkela, Orissa. Worked as Shift Inchargefor operation & Maintenance. SIEMENS.Commissioning and Stabilization of 2X17 MW Captive Power plant.1x130 TPH CFBC boiler,66 Kg/cm2 , 485 +/- 5 deg C.2x17 MW Single extraction condensing Steam turbine, Chinamake.5x10 TPH WHRB boiler, 66 Kg/cm2 ,485 +/- 5 Thermal System Pvt Ltd. Site 4 : Finolex Industries Pvt Ltd, Rathanagiri, Maharastra. Worked as Shift Incharge for operation & Maintenance Commissioning and Stabilizationof 1 x 43 captive Powerplant,DCS YAKOGAVA CENTUM 3000,2 x 110 TPH CVPL AFBC BOILER. 88 Kg/cm2 ,510 +/- 5 deg C 1 x 43 MW BHEL TURBINE OF. 88 Kg/cm2 ,510 +/- 5 deg C Site 5 : SKS ISPAT power ltd.Siltara, Raipur, Worked as Shift Incharge for operation&Maintenance. Stabilization of plant,1x175 TPH CFBC boiler,68 Kg/cm2 ,485 +/- 5 deg C.  Base power Pvt Ltd. Raichur. Period : June 2006 to May 2007. Designation : Pannel Engineer 1*11 MW BIOMASS PLANT,1*40 TPH AFBC BOILER, 66 Kg/cm2 , 485 +/- 5 deg.CVPL Single extraction condensing Steam turbine, GalugaTurbine, China Make.
  • 5. PERSONAL DETAILS: Father’s Name : K.Rajamanickam. Mather’s Name : R.Shakunthala. Date of Birth : 14/10/1983. Languages Known : Tamil , English , Hindi . Passport : M0538622 Nationality : Indian Permanent Address : 27s/7, Prakashamnager ,Ulundurpet , Villupuram (dist) ,Tamilnadu. DECLARATION: I hereby declare that the above-furnished details are true and correct to the best of my knowledge. Date : (R.GOPINATH) Place :
  • 6. PERSONAL DETAILS: Father’s Name : K.Rajamanickam. Mather’s Name : R.Shakunthala. Date of Birth : 14/10/1983. Languages Known : Tamil , English , Hindi . Passport : M0538622 Nationality : Indian Permanent Address : 27s/7, Prakashamnager ,Ulundurpet , Villupuram (dist) ,Tamilnadu. DECLARATION: I hereby declare that the above-furnished details are true and correct to the best of my knowledge. Date : (R.GOPINATH) Place :