SlideShare a Scribd company logo
1 of 3
CURRICULUM VITAE
AMIT MUKHERJEE
Monohartala,Sonamukhi
Contact No: 7804999789 Bankura,West Bengal
Email: amitmukherjee.58@gmail.com Pin-722207
OBJECTIVE:
To contribute my educational, technical skills and hard work for the benefit of the
company and also learn new technologies which will provide me a better platform to add
values to my organization along with my personal growth.
PROFESSIONAL DETAILS:
Presently working as Assistant Manager (Desk Operation) with Reliance Power ltd
(6*660MW Supercritical Thermal Power Plant) from 10th
August 2015.
• BOILER: SHANGHAI BOILERS Made supercritical intermediate reheat with max
steam generating capacity of 2134 T/hr , Working Pr. 254 kg/cm², working Temp.
571°C.
• TURBINE: SHANGHAI made steam turbine (Combined HP & IP, 2 LP double
flow) with 242 kg/cm² working pressure, water cooled condenser.
WORK RESPONSIBILITIES:
• Desk operation with best operational parameters.
• Safe light up, safe shutdown of unit.
• Emergency handling.
• Reduce APC, SCC, SOC, DM CONSUMPTION.
• DSM optimization.
• DM Water parameter monitoring.
PREVIOUS EXPERIENCE:
worked as Desk Operation Engineer with DBPL (2*600MW Thermal Power Plant) from
8th
nov,2013 to 27th
July 2015 , Designated as Senior Engineer.
• BOILER: BHEL Made subcritical single reheat with max steam generating
capacity of 1975t/hr , Working Pr. 175 kg/cm², working Temp. 541 +/-5°C.
• TURBINE:BHEL made steam turbine with 17Mpa working pressure,water cooled
condenser.
WORK RESPONSIBILITY:
• Commissioning activities as GDT,CAT,DAT,CAVT,FLOOD TEST,OIL
FLUSHING,ALIGNMENT CHECKING,GEN ATT,BOILER ATT,HYDROTEST OF
VARIOUS EQUIPMENT etc.
• Desk operation and all commissioning checking.
• Preparation of SOP.
• Optimization of DSM to maximize gain.
PREVIOUS EXPERIENCE:
Page 1 of 3
CURRICULUM VITAE
Worked as an desk operation Engineer for Sterlite Energy ltd., Vedanta aluminum
IPP projects, Jharsuguda,Orissa, (Capacity 4 X 600 MW) thermal power plant(IPP) with
STEAG Energy Services (India) Pvt. Ltd. since OCT 2010 to 1st nov 2013 with
• Boiler: Harbin Boiler-HG-2060/17.5-YM9 Coal Fired Pulverized Boiler, Sub
critical 2060 TPH ,Forced Circulation, Working Pr. 175 kg/cm², working Temp.
541 +/-5°C, Make Harbin Boiler Company Limited (China).
• Turbine: Steam Turbine, Water Cooled Condenser, Electro Hydraulic Governor,
and Make: Dongfang Turbine Factory (China).
WORK RESPONSIBILITIES:
• Desk operation with best operational parameters.
• Safe light up, safe shutdown of unit. Organization
• Emergency handling.
• Reduce APC, SCC, SOC, DM CONSUMPTION.
• Shutdown coordination for various tests-(cavt, flood test, air tightening test etc).
• ABT optimization.
• DM Water parameter monitoring.
STRONG HANDS:
• Safe Boiler light up.
• Turbine rolling and unit synchronization.
• Emergency handling (House load, AC Failure, DC Failure, Blackout condition, Drum
level hi and low )
• UI Optimization and maintaining ABT.
• Maintenance coordination in shutdown, Proper isolation of equipment.
• Maintenance coordination for various tests like GDT, , CAVT, FLOOD TEST,GEN
ATT,BOILER ATT,HYDROTEST.
ACADEMIC DETAILS:
• B.TECH From W.B.U.T in EE with 7.23 DGPA in 2010.
• HIGHER SECONDARY From W.B.C.H.S.E with 53.5% marks in 2005.
• SECONDARY From W.B.B.S.E with 83% marks in 2003.
TRAINING & PLANT VISIT:
• 2 Weeks 600 MW (Chinese) Thermal Power Plant Simulator Training at Steag
Simulator Training at Jharsuguda,Orissa.
• 2 Weeks 600 MW (BHEL) Thermal Power Plant Simulator Training at JPL
TAMNAR(JIPT).
• 2 months plant visit with operation and maintenance training in CCPP
(GUJRAT STATE ENERGY GENERATION).
• 3 days tube mill operation training in kaniha NTPC LTD.
PERSONAL DETAILS:
Page 2 of 3
CURRICULUM VITAE
FATHER’S NAME : D.P.MUKHERJEE
D.O.B : 04 /01/1988.
SEX : MALE.
MARITAL STATUS : UNMARRIED.
NATIONALITY : INDIAN.
STRENGTHS:
• Good communication skills.
• Hard Working and committed towards my work..
• Ready to take initiatives & challenges.
DECLARATION:
I hereby, declare that the above mentioned information is correct to the best of my
knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
Date:
Place: AMIT MUKHERJEE
Page 3 of 3

More Related Content

What's hot

Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
Resume Manish Shukla
Resume Manish ShuklaResume Manish Shukla
Resume Manish Shuklamanish shukla
 
NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivankshivank Kumar
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016Bill Satek
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav garg
 
Onion Harvester presesntation 2
Onion Harvester presesntation 2Onion Harvester presesntation 2
Onion Harvester presesntation 2SANDIP THORAT
 
An analysis of beta type stirling engine with rhombic drive mechanism
An analysis of beta type stirling engine with rhombic drive mechanismAn analysis of beta type stirling engine with rhombic drive mechanism
An analysis of beta type stirling engine with rhombic drive mechanismgargashrut91
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
SOLAR STIRLING ENGINE seminar report
SOLAR STIRLING ENGINE seminar reportSOLAR STIRLING ENGINE seminar report
SOLAR STIRLING ENGINE seminar reportEagle .
 
AUTOMATIC FERTILIZER SPREADER
AUTOMATIC FERTILIZER SPREADERAUTOMATIC FERTILIZER SPREADER
AUTOMATIC FERTILIZER SPREADERSANDIP THORAT
 

What's hot (20)

Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
CV_Aniket_Gandhi-2[1] (1)
CV_Aniket_Gandhi-2[1] (1)CV_Aniket_Gandhi-2[1] (1)
CV_Aniket_Gandhi-2[1] (1)
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Resume Manish Shukla
Resume Manish ShuklaResume Manish Shukla
Resume Manish Shukla
 
NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivank
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpc
 
Onion Harvester presesntation 2
Onion Harvester presesntation 2Onion Harvester presesntation 2
Onion Harvester presesntation 2
 
Solar demo plant
Solar demo plantSolar demo plant
Solar demo plant
 
An analysis of beta type stirling engine with rhombic drive mechanism
An analysis of beta type stirling engine with rhombic drive mechanismAn analysis of beta type stirling engine with rhombic drive mechanism
An analysis of beta type stirling engine with rhombic drive mechanism
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Renewable power revamped
Renewable power revampedRenewable power revamped
Renewable power revamped
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
SOLAR STIRLING ENGINE seminar report
SOLAR STIRLING ENGINE seminar reportSOLAR STIRLING ENGINE seminar report
SOLAR STIRLING ENGINE seminar report
 
Jaisalmer wind park rajasthan
Jaisalmer wind park rajasthanJaisalmer wind park rajasthan
Jaisalmer wind park rajasthan
 
AUTOMATIC FERTILIZER SPREADER
AUTOMATIC FERTILIZER SPREADERAUTOMATIC FERTILIZER SPREADER
AUTOMATIC FERTILIZER SPREADER
 

Viewers also liked

Partners Benefits
Partners BenefitsPartners Benefits
Partners BenefitsBmall
 
The Story of Romeo and Juliet
The Story of Romeo and JulietThe Story of Romeo and Juliet
The Story of Romeo and Juliet210200
 
How to Interpret the Contents of Stored Memory Data
How to Interpret the Contents of Stored Memory DataHow to Interpret the Contents of Stored Memory Data
How to Interpret the Contents of Stored Memory Dataadil raja
 
Paradigms of Project Management
Paradigms of Project ManagementParadigms of Project Management
Paradigms of Project ManagementChris Green
 

Viewers also liked (9)

Partners Benefits
Partners BenefitsPartners Benefits
Partners Benefits
 
CIVICS
CIVICSCIVICS
CIVICS
 
The Story of Romeo and Juliet
The Story of Romeo and JulietThe Story of Romeo and Juliet
The Story of Romeo and Juliet
 
El higado
El higadoEl higado
El higado
 
Ur 03 fataawa islamia
Ur 03 fataawa islamiaUr 03 fataawa islamia
Ur 03 fataawa islamia
 
Dibujo en ing. bertoline
Dibujo en ing. bertolineDibujo en ing. bertoline
Dibujo en ing. bertoline
 
How to Interpret the Contents of Stored Memory Data
How to Interpret the Contents of Stored Memory DataHow to Interpret the Contents of Stored Memory Data
How to Interpret the Contents of Stored Memory Data
 
CURSOS Y DIPLOMAS 2001-2006
CURSOS Y DIPLOMAS 2001-2006CURSOS Y DIPLOMAS 2001-2006
CURSOS Y DIPLOMAS 2001-2006
 
Paradigms of Project Management
Paradigms of Project ManagementParadigms of Project Management
Paradigms of Project Management
 

Similar to AMIT MUKHERJEE (2) (1)

Similar to AMIT MUKHERJEE (2) (1) (20)

Bitu.word
Bitu.wordBitu.word
Bitu.word
 
Resume_Dipak-linkedin
Resume_Dipak-linkedinResume_Dipak-linkedin
Resume_Dipak-linkedin
 
CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation Engineer
 
vijay resume QEC
vijay resume  QECvijay resume  QEC
vijay resume QEC
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Koneru_Raj_kumar_2
Koneru_Raj_kumar_2
 
ncb
ncbncb
ncb
 
BASKAR-CV
BASKAR-CVBASKAR-CV
BASKAR-CV
 
mumbai-150
mumbai-150mumbai-150
mumbai-150
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
gopi chandra sahu, Resume
gopi  chandra sahu,  Resumegopi  chandra sahu,  Resume
gopi chandra sahu, Resume
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
reseume ccr
reseume ccrreseume ccr
reseume ccr
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
HareshPattani
HareshPattaniHareshPattani
HareshPattani
 
Resume
ResumeResume
Resume
 
Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).
 

AMIT MUKHERJEE (2) (1)

  • 1. CURRICULUM VITAE AMIT MUKHERJEE Monohartala,Sonamukhi Contact No: 7804999789 Bankura,West Bengal Email: amitmukherjee.58@gmail.com Pin-722207 OBJECTIVE: To contribute my educational, technical skills and hard work for the benefit of the company and also learn new technologies which will provide me a better platform to add values to my organization along with my personal growth. PROFESSIONAL DETAILS: Presently working as Assistant Manager (Desk Operation) with Reliance Power ltd (6*660MW Supercritical Thermal Power Plant) from 10th August 2015. • BOILER: SHANGHAI BOILERS Made supercritical intermediate reheat with max steam generating capacity of 2134 T/hr , Working Pr. 254 kg/cm², working Temp. 571°C. • TURBINE: SHANGHAI made steam turbine (Combined HP & IP, 2 LP double flow) with 242 kg/cm² working pressure, water cooled condenser. WORK RESPONSIBILITIES: • Desk operation with best operational parameters. • Safe light up, safe shutdown of unit. • Emergency handling. • Reduce APC, SCC, SOC, DM CONSUMPTION. • DSM optimization. • DM Water parameter monitoring. PREVIOUS EXPERIENCE: worked as Desk Operation Engineer with DBPL (2*600MW Thermal Power Plant) from 8th nov,2013 to 27th July 2015 , Designated as Senior Engineer. • BOILER: BHEL Made subcritical single reheat with max steam generating capacity of 1975t/hr , Working Pr. 175 kg/cm², working Temp. 541 +/-5°C. • TURBINE:BHEL made steam turbine with 17Mpa working pressure,water cooled condenser. WORK RESPONSIBILITY: • Commissioning activities as GDT,CAT,DAT,CAVT,FLOOD TEST,OIL FLUSHING,ALIGNMENT CHECKING,GEN ATT,BOILER ATT,HYDROTEST OF VARIOUS EQUIPMENT etc. • Desk operation and all commissioning checking. • Preparation of SOP. • Optimization of DSM to maximize gain. PREVIOUS EXPERIENCE: Page 1 of 3
  • 2. CURRICULUM VITAE Worked as an desk operation Engineer for Sterlite Energy ltd., Vedanta aluminum IPP projects, Jharsuguda,Orissa, (Capacity 4 X 600 MW) thermal power plant(IPP) with STEAG Energy Services (India) Pvt. Ltd. since OCT 2010 to 1st nov 2013 with • Boiler: Harbin Boiler-HG-2060/17.5-YM9 Coal Fired Pulverized Boiler, Sub critical 2060 TPH ,Forced Circulation, Working Pr. 175 kg/cm², working Temp. 541 +/-5°C, Make Harbin Boiler Company Limited (China). • Turbine: Steam Turbine, Water Cooled Condenser, Electro Hydraulic Governor, and Make: Dongfang Turbine Factory (China). WORK RESPONSIBILITIES: • Desk operation with best operational parameters. • Safe light up, safe shutdown of unit. Organization • Emergency handling. • Reduce APC, SCC, SOC, DM CONSUMPTION. • Shutdown coordination for various tests-(cavt, flood test, air tightening test etc). • ABT optimization. • DM Water parameter monitoring. STRONG HANDS: • Safe Boiler light up. • Turbine rolling and unit synchronization. • Emergency handling (House load, AC Failure, DC Failure, Blackout condition, Drum level hi and low ) • UI Optimization and maintaining ABT. • Maintenance coordination in shutdown, Proper isolation of equipment. • Maintenance coordination for various tests like GDT, , CAVT, FLOOD TEST,GEN ATT,BOILER ATT,HYDROTEST. ACADEMIC DETAILS: • B.TECH From W.B.U.T in EE with 7.23 DGPA in 2010. • HIGHER SECONDARY From W.B.C.H.S.E with 53.5% marks in 2005. • SECONDARY From W.B.B.S.E with 83% marks in 2003. TRAINING & PLANT VISIT: • 2 Weeks 600 MW (Chinese) Thermal Power Plant Simulator Training at Steag Simulator Training at Jharsuguda,Orissa. • 2 Weeks 600 MW (BHEL) Thermal Power Plant Simulator Training at JPL TAMNAR(JIPT). • 2 months plant visit with operation and maintenance training in CCPP (GUJRAT STATE ENERGY GENERATION). • 3 days tube mill operation training in kaniha NTPC LTD. PERSONAL DETAILS: Page 2 of 3
  • 3. CURRICULUM VITAE FATHER’S NAME : D.P.MUKHERJEE D.O.B : 04 /01/1988. SEX : MALE. MARITAL STATUS : UNMARRIED. NATIONALITY : INDIAN. STRENGTHS: • Good communication skills. • Hard Working and committed towards my work.. • Ready to take initiatives & challenges. DECLARATION: I hereby, declare that the above mentioned information is correct to the best of my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Date: Place: AMIT MUKHERJEE Page 3 of 3