ANTONIO F. MENDOZA 
Contact no. /+639279557428 
Mobile no: + 639193811100 
E-mail adds: anthoniomedoza@yahoo.com or antoniomendoza28@gmail.com 
Position applied for: Mechanical field engineer/mechanical inspector 
Mechanical supervisor 
Employment History : 
 Brunel international south east Asia PTE LTD 
Position :FSE mechanical by GE oil and gas LNG plant 
Nov 08,2013 up to MARCH 30 2014 
Location port Moresby Papua New Guinea 
Project: CJJV PNG LNG ECP3 project train 1 and train 2 installation and commissioning mechanical works 
Oil flushing corrective punch list of mechanical machineries 
GEoil and gas PGT 25+ DLE LM 2500+G4+ and compressor MCL +BCL 
 Granite services international Inc. GSII Affiliated GE energy 
June 25, 2007 to Oct 01,2013 
Location: General Electric Bonifacio Global City 1634 Philippines 
Position: FIELD SERVICE ENGINEER (mechanical) TECHNICAL ADVISOR 
Work GE GasTurbine Frame3, 5, 6,7, 9, 
And LM 2500+G4, PGT 25, LM6000 Aero gas turbine installation and commissioning 
And compressor MCL1402, BCL1003, 3MCL1403, MCL1805, 2BCL10, PCL 803 
Have knowledge in H2S environment hands-on experience in high toxicity (H2S) gas environment, Sulphur/Sulfur 
granulation & Processing experience, safety & operating environment, zoning principals, permit to work, task 
assessment. Training with Qatar gas LNG plant and Karachaganak LNG plant AGIP AND BP JV 
 Keppel Sing marine Shipbuilding Inc. 
February 16,2007 up to May 26,2007 
Location: brgy san Miguel bauan batangas 
Position: Mechanical engineer (ROTATING MACHINERY) 
 Nigerian Agip Oil Company Limited (NAOC) 
Liquefied Natural Gas Recycling Plant 
July 02, 2002 to October 30 2006 
Land Area Base Location 
Obiafu, Obrikom, Omoku 
River, State Nigeria 
Position: Field Mechanical Engineer. (Team Leader)Rotating equipment machinery 
 Ministry of Municipal and Rural Affairs Water and Sewage Authority Qassim Region, Kingdom of 
Saudi Arabia 
(June 23, 2000 up to August 16, 2001) 
Al-Rass/Badaya Water Treatment Plant 
Badaya ─Al ─ Olya 
Al ─ Qassim, Kingdom of Saudi Arabia 
6.7 MW Diesel Power Plant- 7 units of MAK Diesel Engine 
2 Units Ruston TA 2500 turbine generators 
Position: Plant Supervisor Mechanical 
 Rolls - Royce Power Ventures Phils. (ORCA Energy Inc) 
(Sept. 15, 1999 to June 20, 2000) 
Inside Coca-Cola Bottlers Co. Sta. Rosa, Laguna 
12.1 MW Power Plant and 2000 Kg/ HC02 Plant 
4- Unit of 4008 Allen Diesel engine and 
I
3-Unit of KTTA50-G2 Cummins Diesel engine 
1 unit of Rolls-Royce Avon generators 
Cochran Thermal Steam Boiler -2 x 1000, Kg/hr 
Positions. Senior Plant Operator/ Sr. Plant Mechanic 
 PARAGUA power Company Phil’s. Inc. 
(Feb. 01, 1997 to Sept. 10, 1999) 
Km. 13, Brgy. Sta. Lourdes Puerto Princesa City, Palawan Phil’s 
16 MW Diesel Power Plants -4units of 16V 280 Stork Wartsila Diesel Engine 
Position: Shift Engineer (Power Generation plant) 
 KEPPEL FELS Energy Inc. 
(Sept. 01, 1993 to Jan. 26, 1997) 
3x30 MW Floating Power Plant Barges 
OPERATION AND MAINTENANCE 25 UNITS WARTSILA ENGINE VAASA 
Napocor Compound, Brgy. San Rafael, Calaca, Batangas 
Position: Maintenance Engineer (Power Generation Plant ,Marine engine) 
 National Power Corporation (BCFTPP) 
(August 01, 1990 to August 30, 1993) 
300 MW Batangas Coal- Fired Thermal Plant 
Brgy. San Rafael, Calaca, Batangas 
Position: Senior Plant Operator/ Senior Plant Mechanic 
Seminars and Training Attended: 
 H2S competency certificate 
Conduct :Karachaganak LNG plant Feb 02 2009 Expires May 26,2012 
 H2S training & Breathing apparatus familiarization course 
Conduct QATAR GAS april 20,2008 expires april 20,2010 
 Operation and maintenance GE Gas turbine procedure and inspection 
Conducted by: GE training director MR.William Wall 
 Optn and maint of QSV91G,QSK60-64,QST30,64 and Genset control system 
(Cummins Wartsila CwP91Gas engine 18V) 
Conducted by: Green Combined Power Limited 
(Netharhall Road Roy don, Harlow Essex CM19 5JP ENGLAND) 
 CMMS MP2 (Computerized Maintenance Management System) 
Maintenance Program 2 
Conducted by: Data stream’s training services and (NAOC) Nigerian Agip Oil Company limited 
 HSE Training Program 
Conducted by: Precision drilling corp. 
 Marine Diesel Engine Course Stork Wartsila 28, Wartsila 25, 
Wartsila 46 and PROPAC (Propulsion) 
Conducted By: Mr. Reidar Steen slid (General Manager) 
 Water Treatment Training Program 
Conducted by Keppel ─ Fels Energy 
Calaca, Batangas Phils. 
 Oil Analysis And Proactive Maintenance Seminar 
Conducted by: Jess C. Gregorio (Instructor) 
Anselmo V. Escano (Fulltech Inc. General Manager) 
 Allen Diesel Engine Course (Rolls - Royce Power Ventures Phil’s) 
Conducted By: Norwegian Training Center ─ Manila (NMYC/TESDA) 
Jan Braaksma ─ Training Manager (WARTSILA NSD Phils Inc) 
 Fire Prevention and Fire Fighting Seminar 
Conducted By: Bureau of fire Protection 
 WARTSILA Vasaa 32 Operation and Maintenance Training Program 
Conducted By: C.G. Evars and Markku Aspholm (Superintendent Engineer) 
II
Wartsila Diesel Oy, Vaasa Finland (Marine Gas, Diesel Engine Services) 
 Mobil EM/PA Program 
Conducted By: Mobil oil Phil’s. Inc. 
 Work Attitude and Values Seminar Towards Achieving Corporate Excellence 
Conducted By: Tomas Quintin D. Andres 
 Marine Engines, Fuel And Lubricant Seminar 
Conducted By: Petron oil Corporation 
 Basic Lubrication 
Conducted By: Petron oil Corporation (Manila, Philippines) 
 Engine Indicator Diagram Presentation 
Conducted By: Petron Corporation (Manila, Philippines) 
 Stork Wartsila Diesel B.V. (16SW280) 
Operation and Maintenance Diesel Power -Cogen Plant 
Conducted By: Mr. Jan Braaksma ─ Training Executive Wartsila NSD Phil’s 
 National Power Corporation 
300-mw coal- fired Operation &Maintenance Program 
Coal ─ Fired Thermal Power Plant (BCFTPP) Batangas, Philippines 
Conducted By: Mr. Albert E.A. Macalintal (Vice-Pres. H.R.) Napocor 
 Fundamental Service For Diesel Engine 
Power Train, Hydraulic System 
Personal Data: 
Date of Birth: November 26, 1967 
Place of Birth: Manila 
Civil Status: Married 
Name of Spouse: Violeta T. Mendoza 
Name/Birth date: 1.) Mark Hendrix T. Mendoza ─ November 16, 1992 
2.) Roxanne T. Mendoza ─ May 08, 1995 
Others : 
SSS: 03-8640771-2 
TIN: 143-734-317 
Pag-ibig: 0009-009820-10 
Pass Port No: EB7093895 
Date Issue: JANUARY 08,2013 
Date Expired: JANUARY 07,2018 
Persons to be Contact In Case of Emergency : 
Mrs. Violeta T. Mendoza 
Pantay, Calaca, Batangas 
Tel no. (+63)9493426006 
Mobile no. (+63) 9163276001 
Educational Attainment: 
Primary: Rosario Elementary School 
Rosario, Pasig City 
1974 ─1980 
Secondary: Dacanlao Gregorio Agoncillo National High School 
Dacanlao, Calaca, Batangas 
1981 ─ 1984 
III
College: Technological institute of the Phil. (TIP) 
(BSME) Bachelor of Science in Mechanical Engineering 
1985 ─ 1989 
Knowledge/Skills 
Have twenty three years backgrounds and work experience on the various fields/area of operation and 
maintenance at power generation plant, CO2 processing plant, water treatment plant, LNG Gas plant. 
With general process control field automation. Also known in CMMS Mp2, SAP, MAXIMO 
(Computerized Maintenance Management System) and RCM (Reliability Centered Maintenance) and 
also known DCS, PLC, control system with Allen Bradley controllogix, digiconcontrol flatform, GE 
Fanuc 90/70 control platform 
Resume of work: 
Brunel international south east Asia PTE LTD 
Position: mechanical team leader 
Nov 08, 2013 up to MARCH 20 2014 
Location port Moresby Papua New Guinea 
Project: CJJV PNG LNG ECP3 project train 1 and train 2 installation and commissioning mechanical works 
Oil flushing corrective punch list of mechanical machineries 
Function of the Position 
Responsible all rotating machineries and auxiliary of GE PGT 25+DLE gas turbine10 units installation and commissioning 
Coordination to chiyoda for any alternation and mark-up drawing changes modification 
installation of 10 PGT 25+ Aeroderevatives rotating machinery 
ExxonMobil PNG LNG: 10no PGT25+G4 + Compressor Skids 
ExxonMobil PNG HGCP: 3no PGT25+G4 + Compressor Skids 
Alignment of BCL and MCL compressor to foundation. 
· Unloading and Inspection of the gas turbine major auxiliaries at the installation site and their placement 
on the foundation 
· Geometric dimensional check of foundation, equipment and auxiliaries skids positioning, levelling (ensure 
levelness and elevations of sub sole plates and perform contact checks between sub sole plates and 
package supports) and alignment 
· Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500 
SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT 
· Advise on interpretation of GE drawings for installation optimization 
· Gas Generator assembly and disassembly activities 
· Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air 
system, interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc. 
· Clearances check, especially on power turbine PGT25 
· Perform lube oil and cooling water systems flushes as per GE recommended procedures 
· Install inlet and exhaust systems per GE / Vendor specifications 
· Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system 
· perform all gas piping and orifices are correctly installed for each piping system 
· Mark-up all piping drawings to show piping modifications Piping Instruments (P&I) Marked-up 
· perform packages/rotors are aligned to GE Aero specifications 
· Work closely with Instrument Engineer during the installation, calibration and set-up electrical 
instrumentation (such as vibration probes, temperature elements, servo actuators calibration, etc.) 
· Inlet Duct Pre-Start-up checks 
· Pre-start-up & Start-up checks 
Management competences include: 
IV
· Good attitude to manage relationships with customer and Oil & Gas HQ, concerning technical 
and contractual aspects 
· Follow up all quality aspects according to Six Sigma approach and GE Oil &Gas QA manual 
and procedures 
· Working knowledge and application of EHS rules 
· Coordination and management of GE 
Resume of work: Company: G.E energy oil and gas 
Location: General Electric Bonifacio Global City 1634 Philippines 
Position: Field Service Engineer (Mechanical TA FSR) 
Period: June 25, 2007 up to October 31,2013 
Function of the Position 
The Technical Advisor FSE will be in charge of the management of site activities including planning, organizing, integrating 
and monitoring of resources such as labor, tools and technical assistants as required to complete the work scope according to 
contractual requirements. 
Field experience in heavy gas turbine engines installation and commissioning such as General Electric different model (GE 
frame 5, 6, 7,9Ee).and PGT25 LM 2500+DLE Aero gas turbines. The shop floor experience should include assembly, 
disassembly, diagnosing, and capability to read and understand engineering drawings and use the original equipment 
manufacturer manuals. Should be able to troubleshoot, analyze and write technical reports. The candidate should be capable 
of preparing work scopes, and provide recommendations to carry out repairs, modifications and changes as necessary and 
capable of carrying out commissioning of gas turbines and be familiar with international standards governing the different 
aspects of the gas turbine engines. Have an possess excellent interpersonal and communication skills, and capable of problem 
solving and failure analysis. 
Duties and Responsibilities 
Provide technical advice on disassembly and assembly of various types and sizes of mechanical equipment and related 
components (Pumps, Compressors, Gas Turbines, Air Blowers, Gearboxes, etc.) Provide guidance and advice on diagnosis of 
parts, sizes and clearance of mechanical equipment and its related components. Help shop craftsmen in the analyzing and 
troubleshooting of failed equipment and rework jobs. Provide proper guidance and occasional training to shop craftsmen on 
the use of OEM technical manuals, industry standards and company procedures. Provide necessary technical work scopes and 
recommendations for equipment machining, welding, balancing, modification, testing and other repair related activities. 
Provide assistance and support by conducting field visits for repaired equipment commissioning and start-ups. Should have 
excellent problem solving skills and broad knowledge of Root Cause Analysis techniques with the ability to understand 
priorities and work with limited supervision. Prepare technical repair work scopes for equipment machining, balancing, 
welding, testing and/or modification in line with OEM recommended practices, 
Project done: 
Tepco power plant Yokosuka japan 
Jan 2013 up to june 2013 
Operation and maintenance 10 unit TM 2500 + driven brush generator 
Installation and commissioning of the units 
Level 1 Overhaul activities: 
Baroscopic inspection, water wash, high-pressure recoup check and setting, variable stator vane rigging and 
calibration, replacement of variable vane actuator, replacement of variable stator feedback cable, replacement of 
variable stator vane control, replacement of fuel nozzle, replacement of scavenge pump, replacement of 
instrumentation (thermocouple, Thermo resistance, vibration sensor, etc), replacement of pneumatic/hydraulic 
starter, replacement of outside piping and flexible hoses connected with Gas Generator (GG), replacement of 
air/oil separator, replacement of fuel manifold, replacement of accessory gear box carbon seal, replacement of 
bleed valve, replacement of acoustic sensors, replacement of fuel gas valves. 
Level 2 Overhaul activities: 
In addition to Level 1 activities as per par 5.1): Hot Gas Path Inspection on Power Turbine (PT) on LM 2500+- 
HSPTequipments, Gas Generator mid frame replacement, Combustion Chamber replacement, inlet duct 
replacement, center body replacement, accessory gear box replacement, radial drive shaft replacement, inlet gear 
box replacement, Variable Stator Vane (VSV) actuating mechanism replacement, compressor front frame 
replacement, compressor stator case replacement, compressor VSV removal/installation, VSV position indicator 
removal/installation, compressor stator variable vane shroud removal/installation, compressor stator fixed vanes 
removal/installation, power turbine and gas generator separation and reassembly, miscellaneous sump 
components inspection and replacement, compressor rotor blades replacement, power turbine casing 
V
removal/reinstalling, power turbine inspection, removal and reassembly of power turbine transition piece, power 
turbine shaft removal and installation, etc. 
Do routine inspection and check of all units running LM2500+ 
Do the level 1 maintenance of the unit and do baroscopic inspection of all units 
Daily check of daily maintenance routine and operation. 
Check all the parameters of the unit 
Project done: 
SonalGaz Marsat TG power plant arsew Oran unit no # 7 and #6 S/n 281771 ,281770 
June 26, 2011 to up to Dec 2012 
Scope of work 
Do major inspection combustion inspection and FMI outages 
On unit no #6 check the vibration with Bentley Nevada vibration probe test 
On unit #7 major inspection and casing alignment of the turbine 
Do the outages inspection and overhauling gas turbine frame 5PA 
Project done: 
SonalGaz boufarik power plant Unit 51PA S/N 244559 
Feb 19, 2011 to March 06, 2011 
Scope of work 
Forced outages shutdown due high vibration turbine rotor replacement 
MAJOR INSPECTION and upgrading and modification frame 5001 
Do the installation and commissioning of 2x units of frame 9001 e gas turbine 
Project done: 
OG-WEPP - Project ASIA GAS PIPELINE SOUTH KAZAKHSTAN 
Lugavoy station 704506 code 7107 
June 2010 – Oct 30 2010 
Scope of work 
Installation and commissioning of 4X PGT 25+ DLE aero gas turbine and 4 X PCL803 gas compressors 
Supervision of all auxiliary equipment installation booster pump, inlet duct exhaust duct, fuel treatment skid 
Boiler and anti-icing skid firefighting Co2 skid. Unloading and Inspection of the gas turbine major auxiliaries at 
the installation site and their placement on the foundation 
 Perform Geometric dimensional check of foundation, equipment and auxiliaries skids positioning, levelling 
(ensure levelness and elevations of sub sole plates and perform contact checks between sub sole plates and 
package supports) and alignment 
 Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500 
SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT 
 Advise on interpretation of GE drawings for installation optimization 
 Perform Gas Generator assembly and disassembly activities 
 Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air system, 
interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc. 
 Clearances check, especially on power turbine PGT25 
 Perform lube oil and cooling water systems flushes as per GE recommended procedures 
 Install inlet and exhaust systems per GE / Vendor specifications 
 Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system 
 Perform all gas piping and orifices are correctly installed for each piping system 
 Mark-up all piping drawings to show piping modifications piping Instruments (P&I) Marked-up 
 Perform packages/rotors are aligned to GE Aero specifications 
 Work closely with Instrument Engineer during the installation, calibration and set-up electrical instrumentation 
(such as vibration probes, temperature elements, servo actuators calibration, etc.) 
 Inlet Duct Pre-Start-up checks 
 Pre-start-up & Start-up checks 
VI
Project done: 
Karachaganak petroleum operating B.V.418440 
Western Kazakhstan oblast, burlingsky region aksai 2 
Kazakhstan 
05-18-09 /april 2010 
Scope of work 
Operation and maintenance contract with Ge oil and gas maintaining of gas turbine frame 5002 power crystal and 
BCL 304Ccentrifugal compressor Knox western/2HM/2 Reciprocating compressor, GHH Borsig dry screw pump. 
Gas compressor 
Flash gas compressor driven of 3 units of Waukesha engine L5790Gas engine 
Gas re-injection compressor driven of 3 units of 3 Units of MS 5004D/power crystals DLN 1 combustion system. 
With knowledge in H2S environment. Training H2S feb 06,2009 expires may 26,2012 
Project done: 
Oman /SHELL LNG LLC plant (sur) 
Qalhat Oman p.o box 888 rc 411 
04-03-09 until 04-24-09 
Scope of work 
Turbine frame MS6001B, and frame MS 7001B HGPI hot gas path inspection also included auxiliaries 
Calibration of DLN1 combustion system, overhaul/inspection of BHS gear box 
Overhaul inspection of 2BCL 806, 3MCL 1004, AN 200 compressor. 
Auxiliaries activities for inspection: main lube oil pump aux pump jacking oil pump emergency lube oil pump ,oil 
vapor extraction fans, casing cooling air fan, air inlet duct ,silencer elbows, ventilation fan ,turning gear, 
emergency turning gear 
Project done: 
Chiyoda Technip joint venture QCS NLG onshore facilities project 
Qatar Liquefied gas development company (QCS) Qatar gas 2 
Raslaffan Qatar Gas 11 train no.6&7 
Raslaffan industrial city, Qatar 
05-30-08 until 03-13- 
With training H2S & breating apparatus famililiarizatin course April 2008-expires april 20 2010 
Scope of work: 
Installation and commissioning of 6 unit of Fr 9001Ee Gas turbine, 4 units BCL1003, 4units MCL1402 for N2, 
C3 train 6&7 
2units MCL1805, 2units 2BCL1006 for MR Train 6&7 also included 6 units of ANSALDO generators 
Installation & maintenance on Gas Turbine, Steam Turbine and Centrifugal Compressor control systems 
Trouble shooting and diagnostics on Gas Turbine, Steam Turbine, and Centrifugal Compressor control systems 
and Auxiliary System 
Ensure the correct GE installation practices are followed 
Calibrate and test any type of field instrument 
Provide technical expertise to customers, service support, and field contractors 
Provide external and internal timely and accurate professional reports 
Monitor events and equipments to meet or exceed the requirements 
Ensure contractual obligations are met 
Interface with all involved functions in GE O&G 
Attend the daily technical meetings with Customers regarding the scope of work 
VII
Ensure all in-field activities carried out safely complying with company environmental health & Safety (EHS) 
guidelines and procedures. 
Project done: 
Qatar Liquefied gas development company (QCS) Qatar gas 1 
Raslaffan Qatar Gas 1 train no.1 
Raslaffan industrial city, Qatar 
04-13-08 until 05-18-08 
Scope of work: 
Modular replacement of 5units of MS5002 CtoD turbines train 1 
Turbine enclosure removal/assembly 
Removal exhausts plenum extensor/assembly 
Turbine module removal/installation new upgrade MS5002D turbine 
Removal/installation of aux gear box, lube oil pump, hydraulic pump, hydraulic manifold 
Installation stop/ratio gas control valve, 2nd stage nozzle hydraulic oil vapor seperatorRemoval/installation of 
ventilation system, dampers, ventilation duct. 
Responsible for the observance of safe work practices in the Field and workshop areas, and ensures that 
applicable safety procedures and regulations are followed by the personnel under his jurisdiction. 
Ensures that all installation and repair work is carried out according to the applicable standards and codes of 
practice and that the workforce under his command is aware of such standards. 
Undertakes and directs others in the fault finding, dismantling, inspection, refurbishment, repair, overhaul, re-build 
and testing of gas generators, free turbines and their associated component assemblies 
Assists in the maintenance of files and records pertaining to the installed equipment. 
Carries out efficient remedial action to correct turbine malfunction or failure on a 24-hour basis. 
Works closely with local trainees and monitors training progress. 
Analyses equipment or system faults and recommends corrective action. 
Understands the Company's warehousing system and stock control methods. Prepares stock withdrawal orders on 
a routine basis. 
Has a high standard of housekeeping, both within the workshop area and on site. Educates trainees in suitable 
methods. 
Uses a wide variety of test and calibration equipment and knows the limits and capabilities such equipment. 
Should have a responsible attitude to the Company's needs and requirements. 
Project done: 
Gasco UAE LNG Plant onshore project 
Abu Dhabi Asab Plant 1&2 gas development. (Gasco) 
AG2 Re-injection Compressor Revamping 
01-08-07 until 02-20-07 
Scope of work: 
Modular replacement of 4units of MS5002 C to D Turbines 
Installation and commissioning of the 5002 gas turbine 
Re-bundle of 4units of BCL l405 C gas compressor, filter house and ventilation duct 
Replacement of turbines auxiliaries, modification 
Turbine clutch assembly, auxiliary gear assembly, turbine auxiliary 
Modification of base plate for starting motor torque converter 
Modification existing gas control valve. 
Installation of splitter valve and fuel gas piping modification 
VIII
Resume of work 
Company: Keppel Philippines Marine Shipbuilding. 
Location: Brgy.san Miguel bauan Batangas philippines 
Position: Mechanical Engineer 
Period: Jan 16, 2007 up to may 26, 2007 
Function of the Position 
Responsible for the accomplishment of all maintenance servicing overhauling and repair job on all existing 
plant mechanical equipment, machinery and accessories of new installation projects, revisions, alteration, 
modification. And commissioning .Also responsible for maintaining an adequate supply of spare parts, tools, 
and other maintenance material necessary for the continuous and efficient operation of shipyard facilities 
Duties and Responsibilities 
1.Service Diesel Engine Marine Mitsui B&W, Daihatsu, Caterpillar, Rolls Royce, Yanmar, Wartsila, Stork 
Wartsila, Cummins, Mak.caterpillar (Overhauling, faultfinding, commissioning & maintenance). 
2.To overhaul, repair & installation of Marine Propulsion diesel engine (Cylinder head removal, cleaning, 
pressure test, piston removal, change piston ring, removal of main bearing, big end bearing, cam shaft, crank 
shaft, connecting rod dismantle, fault finding & troubleshooting 
3. To overhaul & repair of Main Engine Generator and Auxiliary Diesel Engine (Cylinder head removal, 
cleaning, pressure test, piston removal, change piston ring, removal of main bearing, big end bearing, cam 
shaft, crank shaft, connecting rod dismantle, fault finding & troubleshooting 
4.To overhaul various types of Marine application pump & Valves (Fuel pump, Lube oil pump, Fresh water 
pump, Seawater pump, Cooling pump, Fire pump, General service pump. Glove valve, gate valve, ball valve, 
safety valve, check valve, relief valves etc 
5.To overhaul Propeller & Rudder including CPP (Control pitch propeller, Oil seal box, Control rod, control 
tube, Oil distribution box, Propeller polishing, Propeller dye check, Propeller pumping, Measure rudder 
clearance, Rudder stock renewal, renewal of rudder pintle bush & bearings & stern tube seal renewal) 
6. To overhaul Deck & Auxiliary machineries (Winch gear box, clutch, brake lining, mooring roller, 
Anchor windlass, brake holding test, Hose handling & Deck provision crane 
7.Troubleshoot & rectify common faults in Hydraulic & Pneumatic systems (Hydraulic cylinder, Hydraulic 
motor, hydraulic pump & gear etc) 8) To overhaul various types of Compressor, Cooler & Heaters Single 
acting, double acting & other compressors, luboil, fuel oil, & fresh water heater & cooler. 
Additional: 
I). To attend vessel safety meeting 
ii) To Co-operation between the Yard maintenance and Ship chief officer & Engineer. 
iii). To supply Shore power, cooling water upon ship over comes to shipyard. 
iv). To provide ventilation for gas free. 
v). Preparing the work done list for the jobs carried out during the repair period of the Vessel and making sea 
trial. 
IX
Resume of Work 
Company: (NAOC) Nigerian AGIP Oil Company Limited 
Location:Land Area Base 
Obiafu, Obrikom, Omoku 
Rivers State Nigeria 
Position:Field Mechanical Engineer (Team Leader) 
Period:July 02, 2002 up to Oct 30,2006 
Function of the Position 
Carrying out the day-to-day maintenance of the onshore/offshore mechanical systems installation and 
commissioning rotating equipment. Ensuring that the facilities integrity, reliability, availability and 
maintainability of the relevant mechanical and rotating equipment are optimized, so that production targets 
can be achieved. Integrating maintenance change and control communicated by the Lead Mechanical 
Technician and Maintenance Supervisor in conjunction with Onshore/offshore Support Engineers through 
pre-defined condition monitoring practices and procedures. Provide first line onshore/offshore presence for 
the execution of the maintenance strategy to include planned and corrective maintenance. Attend to all 
equipment breakdowns and plan maintenance work using the Computerized Maintenance Management 
System. (CMMS Mp2 Program.) And SAP, Maximo 
Duties and Responsibilities 
1.Responsible of commissioning and installation of gas and diesel equipment including full engine overhauls 
and subsequent testing operational fault finding trouble shooting and defect repair knowledge of low emission 
engine and control system hydraulic and Woodward electric governors, ignition system EIS system, 
turbotronic controller 
2. Implementation of plan CMMS Mp2 maintenance program. 
3. Responsible for planning, coordinating, monitoring, and recording the short term plans. Such as daily 
weekly monthly preventive maintenance activities plan. 
4. Perform operational check of caterpillar gas engine such as G399 SI, D399 PC, G3408, G3512 SI, G3512 
EIS, D3508 DITA, D3616 DITA gas and diesel engine in field location with total of 36 units of Caterpillar 
genset engine. And also assist work maintenance such turbines PGT10, PGT5, MS1001, MS1002, MS5001 
Nuovo Pignone and Centaur 40 turbine and gas compression units such BCL 406 and BCL 306 and PGT 10 
MW gas turbine driven ansaldo generator and other control mechanism HMI power system generator, Speed-tronic 
MARK V tmr gas/de-tronics 
5. Checking of all equipment to check of their performance using special tools. 
6. Perform the overall execution of the permit to work system and ensuring the require precaution are 
stipulated and applied as per operating procedures and good practice. 
7.Monitor and Supervision of daily operations, including safety briefing, Planning activities maintaining good 
house keeping at the job site, ensuring availability of materials and consumable. 
8.Attend to all equipment breakdowns and Planned Maintenance work with minimum direction and 
Supervision. 
9.Monitor any repeated breakdown takes proper modification to resolve the problem 
Experience in the field of condition. Monitoring working under permit to work system 
10.Performs other duties as maybe assigned by management in furtherance of the company’s goal and 
Objective: 
X
Resume of Work 
Company: Ministry of Municipal and Rural Affairs Water and Sewage Authority Qassim Region 
(Kingdom of Saudi Arabia) 
Location: Badaya-Al-Olya Al-Qassim (Kingdom of Saudi Arabia) 
Position: Plant Supervisor/Mechanical 
Period: June 23, 2000 to August 16, 2001 
Function of the Position 
Establishing and maintaining the overall Plant Maintenance Strategy/Plan including preventive, Predictive & 
Corrective Maintenance/Repair; Troubleshooting Plant Performance Issues; Client liaison/management and 
relationship development, On-Site experience in the Maintenance and Operations of Instrumentation and 
Controls systems with particular application to installation and commissioning Rotating Plant such as Gas 
Turbines, Compressors, Pumps, and Mechanical Drive Sets etc. Reporting to maintenance engineers monitors 
and maintains a variety of mechanical equipment. Operates various machine tools and techniques. 
Interrogates condition-monitoring data to determine remedial action. 
Duties and Responsibilities 
1.Reporting to the maintenance manger, responsible for the Planning, directing, execution. 
Monitoring and evaluation for the plants, mechanical strategies, Program and system with Objective 
of operational continuity and Maximum Plant efficiency. 
2Responsible of maintenance of various auxiliaries of reverse osmosis plant and 7 units of MAK 
Motoren In – Line Engine (Engine Type MAK 6m82 In line) and 2 units Ruston T2500 Gas Turbine 
3.Provide daily technical support to activities related to utilities maintenance including operation of 
water treatment plant and electrical distribution system. Ensure that established safety procedures 
and adhered to in the area of maintenance work. 
4.Performs preventive maintenance using applicable maintenance requirements card for each item of 
support equipment to include replacement of consumable parts and structural inspection. 
5.Perform operational check and all other required repair actions on assigned equipment. 
6..Prepare servicing schedule of plant mechanical equipment and machinery; determine necessity of 
maintenance inspection to correct early stages of defect so as to prevent the occurrence of major 
breakdowns. 
7.Work ─ with/support the superintendent in the general supervision of the maintenance men during 
emergency repairs, unit shutdown and major overhauls. 
8.Direct and coordinate the activities of subordinates, sees to it that the machinery and equipment to 
be repaired re properly clear and tagged off. 
9.Keep complete records of maintenance manual, reports, brochures and memos pertaining to 
maintenance. 
10.Observe, comply and enforce the existing rules and regulation, code of disciplines, corporate 
policies and guidelines and special instructors or orders. 
XI
Resume of Work 
Company: Rolls - Royce Power Ventures Phils. (Orca Energy Inc.) 
Location:Inside Coca-Cola Bottling Co. Sta. Rosa, Laguna 
1.8 MW Power Co-Generation and 2000 kg/H. CO2 Plant 
25 MW Rolls-Royce Avon 1534 Generators 
Position: Senior Plant Operator/ Senior Plant Mechanic 
Period:Sept. 15, 1999 up to June 20, 2000 
Function of Position 
 Assist in the operation of assigned utilities areas of the processing plant by monitoring the operation of all 
utility equipment including water, air, system, CO2 power generation and fuel systems and make adjustments 
as instructed. Continuously monitors the functioning of assigned equipment by reading gauges, levels, and 
amperages and records findings on daily log sheet. Informs shift supervisor or maintenance engineer of 
unusual observations such as noise, critical designated area and report any malfunction to shift supervisor. 
Also known in RCM (Reliability Centered Maintenance) and Allen Bradley controllogix, siemens, ABB 
control system. With also DCS, PLC, SCADA control system. 
Duties and Responsibilities 
1.Operates the different production machinery and equipment auxiliaries, monitors and maintains the 
operational parameters in accordance to specified standard 
2.Supervises and directs a group of plant operator to ensure a continuous production workflow. 
3.Plans, schedules workload distribution and shifts of subordinates to achieve production workflow. 
4.Ensuring that the routine maintenance tasks are completed according to planning and scheduled 
procedure of maintenance 
5.Maintain detailed maintenance records in respect of the plant assist the maintenance supervisor 
with short and long term of planning 
6.Weekly implementation of maintenance PM and CM work activities 
7.Ensuring that all site maintenance activities and operation are executed in a safe,timely and cost 
effective manner 
8.Coordinates with maintenance as required promoting productivity and quality improvement. 
9.Coordinates with quality assurance with respect to production and operational standards and 
specification to ensure quality output.10. 
10.Prepare, submit daily and periodic production reports to immediate superior and discuss 
recommended solutions to problems encountered and or to improve production operations. 
11.Observe safety rules, corporate policies and regulations; observe proper turnover of 
responsibilities 12.performs good housekeeping, performs other related tasks that may be assigned. 
13.Performs communication jobs; coordinates with operation and other support group. 
14.Responsible for maintaining the plant equipment and auxiliaries in good operating condition, 
15.monitoring plant parameters & analyzing any abnormality, iniating corrective actions or 
performing minor trouble-shooting, and complying with all safety & quality policies and quality 
policies and procedures. 
16.Performs other duties as may be assigned by the superiors in furtherance of the company’s 
goals and objectives. 
XII
Resume of Work 
Company: Paragua Power Company Phils. Inc. 
Location: Km. 13, Brgy. Sta. Lourdes Puerto Princesa City, Palawan, Philippines 
4 units of 16 SW 280 vee Engine stork Wartsila 280 w/ cap of 4.1 MW each 
Position: Shift Engineer (Power Generation Plant Operation) 
Period: February 01, 1997 to September 10, 1999 
Function of the Position: 
 Under the general supervision of the operation manager, is held responsible for the generation of steam 
and electrical power during my shift, ensuring minimal work stoppages and interruptions, tasked with 
planning, leading, directing, supervising, coordinating and controlling the resources as well as the technical 
and administrative activities within my shift, with the ultimate objective of contributing to the company’s 
trusts of profitably and growth. Also known in SiemensDCS, PLC Control system. Topec engineering 
 Supervise the technical activities of personne l 
4 ─ control room operator 
8 ─ plant electrician 
11─ plant technician (mech’l) 
15 ─ general labor (helper) 
Duties and Responsibilities 
1.Plan, directs, controls, coordinates and services activities in my shift to ensure a steady supply of 
air, steam fuel and electrical power to different points of utilization in the plant. 
2.Daily routine of plant status of generating sets, and auxiliaries’ ─ perform record, data and 
performance of the plant. and assist for supervision of overhauling and other maintenance jobs. 
3.Assist immediate superior and associates in planning and scheduling over all operations of the 
department and conduct proper use of equipment tools and measurement. 
4.Coordinates with other work units to ensure a smooth and uninterrupted operation. 
5.Decide and implements appropriate disciplinary measures against department personnel for 
infractions committed or violation of company rules and regulations. 
6.Plans and implements strategies to ensure the target parameters for steam, fuel, and power achieve. 
7.Ensures proper turnover of work before and after assigned shift schedule to ensure safety and 
continuity of unfinished/ongoing work. 
8.Performs other duties as may be assigned by management in furtherance of the company’s goals 
and objectives. 
XIII
Resume Of Work 
Company:KEPPEL FELS Energy and Shipbuilding Inc. 
Location:Inside of National Power Corporation, Brgy. San Rafael, Calaca, Batangas 
90 Mw floating power barges / With 25 units WARTSILA DIESEL ENGINE 
Position:Maintenance Engineer MECHANICAL(Power Generation Plant) 
Period:September 01, 1993 to January 30, 1997 
Function of the Position: 
 Responsible for the accomplishment of all maintenance servicing overhauling and repair job on 
all existing plant mechanical equipment, machinery and accessories of new installation projects, 
revisions, alteration and modification. Also responsible for maintaining an adequate supply of spare 
parts, tools, and other maintenance material necessary for the continuous and efficient operation on 
an electric generating diesel power Generation plant with total of 25 units of Wartsila diesel Genset. 
And knowledge in DCS and PLC control system, with Topec engineering, Siemens PLC Control 
System, Vaasa PLC engineering control System, ABB control system and switchgear 
Duties and Responsibilities 
1.Check daily maintenance work orders; assign job to maintenance personnel through the chief 
maintenance engineer giving specific instruction regarding trouble analysis, repair procedures, 
materials to be used and priority of the job. 
2.Supervise the plant mechanic and auxiliary mechanic on the performance of the day-to-day 
schedule and unscheduled maintenance. 
3.Performs preventive maintenance using applicable maintenance requirements cards for each item 
of support equipment to include replacement of consumable parts and structural inspection. 
4.Coordinates with the shift engineer, system maintenance and electrical department to ensure that 
maintenance work on the engineering set is carried-out smoothly without hindering the output of the 
power plant. 
5.Performs troubleshoot and rectifies generating sets problems that are beyond the capability of the 
shift on duty from time to time. 
6.To direct and supervised the installation, maintenance, repair, troubleshooting, and modification 
activities carried out on a wide range of mechanical static and rotating equipment in the plant, 
including turbo machinery, compressor, heat exchangers, diesel generator. 
7.Scrutinize and study operation logbook and daily operational and alarm record in order to identify 
potential problems and take necessary actions to rectify them. 
8.Prepare performance evaluation report of subordinate’s recommended training need and conduct 
lectures and on-the-job training to subordinates to improve their skills and to promote effectively 
flexibility among them. 
XIV
Resume of Work 
Company: National Power Corporation 300 MW Coal Fired Thermal Power Plant (300 MW 
BCFTPP) w/W501 Westinghouse Steam Turbine 
Location: Brgy. San. Rafael, Calaca, Batangas 
Position: Senior Plant Operator / Senior Plant Mechanic 
Period: May 01, 1990 to August 31, 1993 
Function of the Position 
 Reports to maintenance head. Responsible for operating and maintenance, control and optimization of 
pulverized coal fired steam generation equipment and its auxiliary equipment including coal handling, flue-gas 
cleaning, etc. Assists in undertaking major/complete engine overhaul at motor pool mechanical and power 
generation plant section. 
Duties and Responsibilities 
1.Responsible for maintaining the plant equipment and auxiliaries in good operating condition, 
monitoring plant parameters and analyzing any abnormality, iniating any corrective actions or 
performing minor trouble-shooting, and complying with all safety and quality policies and 
procedures. 
2.Responsible for performing all preventive and corrective maintenance of large 
automotive maintenance facilities equipment. 
3.Assist and troubleshoot and diagnose various types of hydraulic and pneumatic problems of the 
above equipment; utilizing the appropriate test equipment. 
4.Responsible for engine inspection and troubleshooting repair, and replace defective parts, 
preventive maintenance, and adjustment of engine components. 
5.Assist also mechanical maintenance repair and overhauling of reciprocating, dozing, and 
centrifugal (single and multistage) and vacuum pumps, screw type compressor, maintenance of 
different valves and electrical chain hoist. 
6.Undertakes thorough and proper turnover of work at the start and end my shift schedule to ensure 
safety and continuity of unfinished/ongoing work. 
7.Attends to daily care, cleaning and, maintenance of machines/ equipment/ devices/ tools operates 
duly schedules maintenance works/jobs needed to ensure that these are kept in optimum operating 
condition at all times. 
8.Performs other duties as may be assigned by superiors in furtherance of the company’s goals and 
objectives. 
9.Observe safety rules, corporate policies and regulations; observes proper turnover of 
responsibilities, performs good housekeeping, performs other related task that may be assigned. 
10.And with good interpersonal relations and computer literate. Have leadership ability and can 
motivate people at work towards a common goal. 
XV
Job Dimension: 
1. Having logical, hardworking, and committed to work. And be alert and have a presence of 
mind. 
2. Have a reliable, productive and proactive, have a positive work attitude and able to 
effectively communicate with my superiors, peers and subordinates. Also posses the necessary 
leadership traits of self-discipline and creative thinking and be stable under stress. 
3. Have a sense of urgency, hardworking and initiative. 
4. Team player, with degree of adaptability and ability to work independently, with minimum 
supervision. 
5. And computer literate Microsoft word, power point, excel, sap, maximo, cmms mp2 
Character References: 
Mr. William Wall 
Training director 
General electric 
Schenectady new York 
Mr.Vincenzo Mauro 
Land Area manager 
(NAOC) Nigerian AGIP Oil Company Limited 
Land Area Base LNG Gas Plant 
Obiafu, Obrikom, Omoku 
Rivers State Nigeria 
Mr. Erick Pepper 
President 
Rolls-Royce Power Ventures Phil. Inc. 
31/F LKG Tower, 6801-6803 Ayala Avenue 
Makati City 1226, Philippines 
Mr. Henry Alcalde 
Sr. Manager 
National Power Corporation 
300-mw Batangas Coal Fired 
Thermal Power Plant. (BCFTPP) 
Brgy.San Rafael Calaca, Batangas 
Philippines 
Mr. Antonio F. Mendoza 
XVI

More Related Content

What's hot

Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resumeLaxmi Narayan
 
Resume graceson cv solar pdf
Resume graceson cv solar pdfResume graceson cv solar pdf
Resume graceson cv solar pdfGRACESON JACOB
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning EngineerKumaresanT7
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Dipak Kumar Banerjee
 
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Gensol Engineering Limited
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERjongguanzon
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and InstalltionEli Israeli
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer VIVEK PANDEY
 
CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerKazi Ferdousul Karim
 
Resume of Selvapathy - Senior Rig Mechanic
Resume of Selvapathy - Senior Rig MechanicResume of Selvapathy - Senior Rig Mechanic
Resume of Selvapathy - Senior Rig Mechanicpalanivel selvapathy
 
Resume technician
Resume technicianResume technician
Resume technicianRaja paul
 
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)Albert Aivan Laguador
 
Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation EngineerAkash Patel
 

What's hot (20)

Rabeesh CV 2014
Rabeesh CV  2014Rabeesh CV  2014
Rabeesh CV 2014
 
Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resume
 
Resume graceson cv solar pdf
Resume graceson cv solar pdfResume graceson cv solar pdf
Resume graceson cv solar pdf
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
hari_new resume
hari_new resumehari_new resume
hari_new resume
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).
 
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation Engineer
 
Resume of Selvapathy - Senior Rig Mechanic
Resume of Selvapathy - Senior Rig MechanicResume of Selvapathy - Senior Rig Mechanic
Resume of Selvapathy - Senior Rig Mechanic
 
Resume technician
Resume technicianResume technician
Resume technician
 
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
 
Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation Engineer
 

Viewers also liked

Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 
Kemp todd resume 3
Kemp todd resume 3Kemp todd resume 3
Kemp todd resume 3Todd Kemp
 
Wärtsilä - pitkäjänteinen työ vie voittoon
Wärtsilä - pitkäjänteinen työ vie voittoonWärtsilä - pitkäjänteinen työ vie voittoon
Wärtsilä - pitkäjänteinen työ vie voittoonBusiness Finland
 
Curriculum Vitae 15.07.14
Curriculum Vitae 15.07.14Curriculum Vitae 15.07.14
Curriculum Vitae 15.07.14Kaoser Hossain
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16Vishwesh Patel
 
Odessa s. ruiz cv
Odessa s. ruiz cvOdessa s. ruiz cv
Odessa s. ruiz cvDhess Ruiz
 
Top 8 power plant engineer resume samples
Top 8 power plant engineer resume samplesTop 8 power plant engineer resume samples
Top 8 power plant engineer resume samplestonychoper2305
 
Resume May 9, 2012
Resume May 9, 2012Resume May 9, 2012
Resume May 9, 2012Daniel Ruest
 
Jay Rao Resume
Jay Rao ResumeJay Rao Resume
Jay Rao ResumeJay Rao
 
Floating power plant 25 03-11
Floating power plant 25 03-11Floating power plant 25 03-11
Floating power plant 25 03-11Navin Chandra
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plantSURAJ PRASAD
 

Viewers also liked (18)

Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
Kemp todd resume 3
Kemp todd resume 3Kemp todd resume 3
Kemp todd resume 3
 
Wärtsilä - pitkäjänteinen työ vie voittoon
Wärtsilä - pitkäjänteinen työ vie voittoonWärtsilä - pitkäjänteinen työ vie voittoon
Wärtsilä - pitkäjänteinen työ vie voittoon
 
SIVA RESUME JAN 2014
SIVA RESUME JAN 2014SIVA RESUME JAN 2014
SIVA RESUME JAN 2014
 
Curriculum Vitae 15.07.14
Curriculum Vitae 15.07.14Curriculum Vitae 15.07.14
Curriculum Vitae 15.07.14
 
Suman kr dawn cv
Suman kr dawn cvSuman kr dawn cv
Suman kr dawn cv
 
RESUME
RESUMERESUME
RESUME
 
CV Roushon Jamal
CV Roushon JamalCV Roushon Jamal
CV Roushon Jamal
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
 
Odessa s. ruiz cv
Odessa s. ruiz cvOdessa s. ruiz cv
Odessa s. ruiz cv
 
Top 8 power plant engineer resume samples
Top 8 power plant engineer resume samplesTop 8 power plant engineer resume samples
Top 8 power plant engineer resume samples
 
Resume May 9, 2012
Resume May 9, 2012Resume May 9, 2012
Resume May 9, 2012
 
CV-RC.-2015
CV-RC.-2015CV-RC.-2015
CV-RC.-2015
 
Jay Rao Resume
Jay Rao ResumeJay Rao Resume
Jay Rao Resume
 
Floating power plant 25 03-11
Floating power plant 25 03-11Floating power plant 25 03-11
Floating power plant 25 03-11
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plant
 
1216webskbaexp
1216webskbaexp1216webskbaexp
1216webskbaexp
 

Similar to new C.v.update_antonio2 (20)

Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3
 
CV_Purwadi
CV_PurwadiCV_Purwadi
CV_Purwadi
 
CURRICULUM VITAE. AL SIBUG - 2016
CURRICULUM VITAE. AL  SIBUG - 2016CURRICULUM VITAE. AL  SIBUG - 2016
CURRICULUM VITAE. AL SIBUG - 2016
 
CURRICULUM VITAE. AL SIBUG - 2016
CURRICULUM VITAE. AL  SIBUG - 2016CURRICULUM VITAE. AL  SIBUG - 2016
CURRICULUM VITAE. AL SIBUG - 2016
 
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 20162015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
 
CV karim convert[1] (2)
CV karim convert[1] (2)CV karim convert[1] (2)
CV karim convert[1] (2)
 
ramkumar.doc
ramkumar.docramkumar.doc
ramkumar.doc
 
GE ADGT Products
GE ADGT ProductsGE ADGT Products
GE ADGT Products
 
MY CV 09 May . 2016
MY CV 09 May . 2016MY CV 09 May . 2016
MY CV 09 May . 2016
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Arsalan 1
Arsalan 1Arsalan 1
Arsalan 1
 
chris's CV
chris's CVchris's CV
chris's CV
 
Anandakrishnan-resume s
Anandakrishnan-resume  sAnandakrishnan-resume  s
Anandakrishnan-resume s
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
Resume - Herman Waminan 25 Jan 2014
Resume - Herman Waminan  25 Jan 2014Resume - Herman Waminan  25 Jan 2014
Resume - Herman Waminan 25 Jan 2014
 
Kannan resume
Kannan resumeKannan resume
Kannan resume
 
CV Sada
CV SadaCV Sada
CV Sada
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 

new C.v.update_antonio2

  • 1. CURRICULUM VITAE ANTONIO F. MENDOZA Contact no. /+639279557428 Mobile no: + 639193811100 E-mail adds: anthoniomedoza@yahoo.com or antoniomendoza28@gmail.com Position applied for: Mechanical field engineer/mechanical inspector Mechanical supervisor Employment History :  Brunel international south east Asia PTE LTD Position :FSE mechanical by GE oil and gas LNG plant Nov 08,2013 up to MARCH 30 2014 Location port Moresby Papua New Guinea Project: CJJV PNG LNG ECP3 project train 1 and train 2 installation and commissioning mechanical works Oil flushing corrective punch list of mechanical machineries GEoil and gas PGT 25+ DLE LM 2500+G4+ and compressor MCL +BCL  Granite services international Inc. GSII Affiliated GE energy June 25, 2007 to Oct 01,2013 Location: General Electric Bonifacio Global City 1634 Philippines Position: FIELD SERVICE ENGINEER (mechanical) TECHNICAL ADVISOR Work GE GasTurbine Frame3, 5, 6,7, 9, And LM 2500+G4, PGT 25, LM6000 Aero gas turbine installation and commissioning And compressor MCL1402, BCL1003, 3MCL1403, MCL1805, 2BCL10, PCL 803 Have knowledge in H2S environment hands-on experience in high toxicity (H2S) gas environment, Sulphur/Sulfur granulation & Processing experience, safety & operating environment, zoning principals, permit to work, task assessment. Training with Qatar gas LNG plant and Karachaganak LNG plant AGIP AND BP JV  Keppel Sing marine Shipbuilding Inc. February 16,2007 up to May 26,2007 Location: brgy san Miguel bauan batangas Position: Mechanical engineer (ROTATING MACHINERY)  Nigerian Agip Oil Company Limited (NAOC) Liquefied Natural Gas Recycling Plant July 02, 2002 to October 30 2006 Land Area Base Location Obiafu, Obrikom, Omoku River, State Nigeria Position: Field Mechanical Engineer. (Team Leader)Rotating equipment machinery  Ministry of Municipal and Rural Affairs Water and Sewage Authority Qassim Region, Kingdom of Saudi Arabia (June 23, 2000 up to August 16, 2001) Al-Rass/Badaya Water Treatment Plant Badaya ─Al ─ Olya Al ─ Qassim, Kingdom of Saudi Arabia 6.7 MW Diesel Power Plant- 7 units of MAK Diesel Engine 2 Units Ruston TA 2500 turbine generators Position: Plant Supervisor Mechanical  Rolls - Royce Power Ventures Phils. (ORCA Energy Inc) (Sept. 15, 1999 to June 20, 2000) Inside Coca-Cola Bottlers Co. Sta. Rosa, Laguna 12.1 MW Power Plant and 2000 Kg/ HC02 Plant 4- Unit of 4008 Allen Diesel engine and I
  • 2. 3-Unit of KTTA50-G2 Cummins Diesel engine 1 unit of Rolls-Royce Avon generators Cochran Thermal Steam Boiler -2 x 1000, Kg/hr Positions. Senior Plant Operator/ Sr. Plant Mechanic  PARAGUA power Company Phil’s. Inc. (Feb. 01, 1997 to Sept. 10, 1999) Km. 13, Brgy. Sta. Lourdes Puerto Princesa City, Palawan Phil’s 16 MW Diesel Power Plants -4units of 16V 280 Stork Wartsila Diesel Engine Position: Shift Engineer (Power Generation plant)  KEPPEL FELS Energy Inc. (Sept. 01, 1993 to Jan. 26, 1997) 3x30 MW Floating Power Plant Barges OPERATION AND MAINTENANCE 25 UNITS WARTSILA ENGINE VAASA Napocor Compound, Brgy. San Rafael, Calaca, Batangas Position: Maintenance Engineer (Power Generation Plant ,Marine engine)  National Power Corporation (BCFTPP) (August 01, 1990 to August 30, 1993) 300 MW Batangas Coal- Fired Thermal Plant Brgy. San Rafael, Calaca, Batangas Position: Senior Plant Operator/ Senior Plant Mechanic Seminars and Training Attended:  H2S competency certificate Conduct :Karachaganak LNG plant Feb 02 2009 Expires May 26,2012  H2S training & Breathing apparatus familiarization course Conduct QATAR GAS april 20,2008 expires april 20,2010  Operation and maintenance GE Gas turbine procedure and inspection Conducted by: GE training director MR.William Wall  Optn and maint of QSV91G,QSK60-64,QST30,64 and Genset control system (Cummins Wartsila CwP91Gas engine 18V) Conducted by: Green Combined Power Limited (Netharhall Road Roy don, Harlow Essex CM19 5JP ENGLAND)  CMMS MP2 (Computerized Maintenance Management System) Maintenance Program 2 Conducted by: Data stream’s training services and (NAOC) Nigerian Agip Oil Company limited  HSE Training Program Conducted by: Precision drilling corp.  Marine Diesel Engine Course Stork Wartsila 28, Wartsila 25, Wartsila 46 and PROPAC (Propulsion) Conducted By: Mr. Reidar Steen slid (General Manager)  Water Treatment Training Program Conducted by Keppel ─ Fels Energy Calaca, Batangas Phils.  Oil Analysis And Proactive Maintenance Seminar Conducted by: Jess C. Gregorio (Instructor) Anselmo V. Escano (Fulltech Inc. General Manager)  Allen Diesel Engine Course (Rolls - Royce Power Ventures Phil’s) Conducted By: Norwegian Training Center ─ Manila (NMYC/TESDA) Jan Braaksma ─ Training Manager (WARTSILA NSD Phils Inc)  Fire Prevention and Fire Fighting Seminar Conducted By: Bureau of fire Protection  WARTSILA Vasaa 32 Operation and Maintenance Training Program Conducted By: C.G. Evars and Markku Aspholm (Superintendent Engineer) II
  • 3. Wartsila Diesel Oy, Vaasa Finland (Marine Gas, Diesel Engine Services)  Mobil EM/PA Program Conducted By: Mobil oil Phil’s. Inc.  Work Attitude and Values Seminar Towards Achieving Corporate Excellence Conducted By: Tomas Quintin D. Andres  Marine Engines, Fuel And Lubricant Seminar Conducted By: Petron oil Corporation  Basic Lubrication Conducted By: Petron oil Corporation (Manila, Philippines)  Engine Indicator Diagram Presentation Conducted By: Petron Corporation (Manila, Philippines)  Stork Wartsila Diesel B.V. (16SW280) Operation and Maintenance Diesel Power -Cogen Plant Conducted By: Mr. Jan Braaksma ─ Training Executive Wartsila NSD Phil’s  National Power Corporation 300-mw coal- fired Operation &Maintenance Program Coal ─ Fired Thermal Power Plant (BCFTPP) Batangas, Philippines Conducted By: Mr. Albert E.A. Macalintal (Vice-Pres. H.R.) Napocor  Fundamental Service For Diesel Engine Power Train, Hydraulic System Personal Data: Date of Birth: November 26, 1967 Place of Birth: Manila Civil Status: Married Name of Spouse: Violeta T. Mendoza Name/Birth date: 1.) Mark Hendrix T. Mendoza ─ November 16, 1992 2.) Roxanne T. Mendoza ─ May 08, 1995 Others : SSS: 03-8640771-2 TIN: 143-734-317 Pag-ibig: 0009-009820-10 Pass Port No: EB7093895 Date Issue: JANUARY 08,2013 Date Expired: JANUARY 07,2018 Persons to be Contact In Case of Emergency : Mrs. Violeta T. Mendoza Pantay, Calaca, Batangas Tel no. (+63)9493426006 Mobile no. (+63) 9163276001 Educational Attainment: Primary: Rosario Elementary School Rosario, Pasig City 1974 ─1980 Secondary: Dacanlao Gregorio Agoncillo National High School Dacanlao, Calaca, Batangas 1981 ─ 1984 III
  • 4. College: Technological institute of the Phil. (TIP) (BSME) Bachelor of Science in Mechanical Engineering 1985 ─ 1989 Knowledge/Skills Have twenty three years backgrounds and work experience on the various fields/area of operation and maintenance at power generation plant, CO2 processing plant, water treatment plant, LNG Gas plant. With general process control field automation. Also known in CMMS Mp2, SAP, MAXIMO (Computerized Maintenance Management System) and RCM (Reliability Centered Maintenance) and also known DCS, PLC, control system with Allen Bradley controllogix, digiconcontrol flatform, GE Fanuc 90/70 control platform Resume of work: Brunel international south east Asia PTE LTD Position: mechanical team leader Nov 08, 2013 up to MARCH 20 2014 Location port Moresby Papua New Guinea Project: CJJV PNG LNG ECP3 project train 1 and train 2 installation and commissioning mechanical works Oil flushing corrective punch list of mechanical machineries Function of the Position Responsible all rotating machineries and auxiliary of GE PGT 25+DLE gas turbine10 units installation and commissioning Coordination to chiyoda for any alternation and mark-up drawing changes modification installation of 10 PGT 25+ Aeroderevatives rotating machinery ExxonMobil PNG LNG: 10no PGT25+G4 + Compressor Skids ExxonMobil PNG HGCP: 3no PGT25+G4 + Compressor Skids Alignment of BCL and MCL compressor to foundation. · Unloading and Inspection of the gas turbine major auxiliaries at the installation site and their placement on the foundation · Geometric dimensional check of foundation, equipment and auxiliaries skids positioning, levelling (ensure levelness and elevations of sub sole plates and perform contact checks between sub sole plates and package supports) and alignment · Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500 SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT · Advise on interpretation of GE drawings for installation optimization · Gas Generator assembly and disassembly activities · Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air system, interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc. · Clearances check, especially on power turbine PGT25 · Perform lube oil and cooling water systems flushes as per GE recommended procedures · Install inlet and exhaust systems per GE / Vendor specifications · Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system · perform all gas piping and orifices are correctly installed for each piping system · Mark-up all piping drawings to show piping modifications Piping Instruments (P&I) Marked-up · perform packages/rotors are aligned to GE Aero specifications · Work closely with Instrument Engineer during the installation, calibration and set-up electrical instrumentation (such as vibration probes, temperature elements, servo actuators calibration, etc.) · Inlet Duct Pre-Start-up checks · Pre-start-up & Start-up checks Management competences include: IV
  • 5. · Good attitude to manage relationships with customer and Oil & Gas HQ, concerning technical and contractual aspects · Follow up all quality aspects according to Six Sigma approach and GE Oil &Gas QA manual and procedures · Working knowledge and application of EHS rules · Coordination and management of GE Resume of work: Company: G.E energy oil and gas Location: General Electric Bonifacio Global City 1634 Philippines Position: Field Service Engineer (Mechanical TA FSR) Period: June 25, 2007 up to October 31,2013 Function of the Position The Technical Advisor FSE will be in charge of the management of site activities including planning, organizing, integrating and monitoring of resources such as labor, tools and technical assistants as required to complete the work scope according to contractual requirements. Field experience in heavy gas turbine engines installation and commissioning such as General Electric different model (GE frame 5, 6, 7,9Ee).and PGT25 LM 2500+DLE Aero gas turbines. The shop floor experience should include assembly, disassembly, diagnosing, and capability to read and understand engineering drawings and use the original equipment manufacturer manuals. Should be able to troubleshoot, analyze and write technical reports. The candidate should be capable of preparing work scopes, and provide recommendations to carry out repairs, modifications and changes as necessary and capable of carrying out commissioning of gas turbines and be familiar with international standards governing the different aspects of the gas turbine engines. Have an possess excellent interpersonal and communication skills, and capable of problem solving and failure analysis. Duties and Responsibilities Provide technical advice on disassembly and assembly of various types and sizes of mechanical equipment and related components (Pumps, Compressors, Gas Turbines, Air Blowers, Gearboxes, etc.) Provide guidance and advice on diagnosis of parts, sizes and clearance of mechanical equipment and its related components. Help shop craftsmen in the analyzing and troubleshooting of failed equipment and rework jobs. Provide proper guidance and occasional training to shop craftsmen on the use of OEM technical manuals, industry standards and company procedures. Provide necessary technical work scopes and recommendations for equipment machining, welding, balancing, modification, testing and other repair related activities. Provide assistance and support by conducting field visits for repaired equipment commissioning and start-ups. Should have excellent problem solving skills and broad knowledge of Root Cause Analysis techniques with the ability to understand priorities and work with limited supervision. Prepare technical repair work scopes for equipment machining, balancing, welding, testing and/or modification in line with OEM recommended practices, Project done: Tepco power plant Yokosuka japan Jan 2013 up to june 2013 Operation and maintenance 10 unit TM 2500 + driven brush generator Installation and commissioning of the units Level 1 Overhaul activities: Baroscopic inspection, water wash, high-pressure recoup check and setting, variable stator vane rigging and calibration, replacement of variable vane actuator, replacement of variable stator feedback cable, replacement of variable stator vane control, replacement of fuel nozzle, replacement of scavenge pump, replacement of instrumentation (thermocouple, Thermo resistance, vibration sensor, etc), replacement of pneumatic/hydraulic starter, replacement of outside piping and flexible hoses connected with Gas Generator (GG), replacement of air/oil separator, replacement of fuel manifold, replacement of accessory gear box carbon seal, replacement of bleed valve, replacement of acoustic sensors, replacement of fuel gas valves. Level 2 Overhaul activities: In addition to Level 1 activities as per par 5.1): Hot Gas Path Inspection on Power Turbine (PT) on LM 2500+- HSPTequipments, Gas Generator mid frame replacement, Combustion Chamber replacement, inlet duct replacement, center body replacement, accessory gear box replacement, radial drive shaft replacement, inlet gear box replacement, Variable Stator Vane (VSV) actuating mechanism replacement, compressor front frame replacement, compressor stator case replacement, compressor VSV removal/installation, VSV position indicator removal/installation, compressor stator variable vane shroud removal/installation, compressor stator fixed vanes removal/installation, power turbine and gas generator separation and reassembly, miscellaneous sump components inspection and replacement, compressor rotor blades replacement, power turbine casing V
  • 6. removal/reinstalling, power turbine inspection, removal and reassembly of power turbine transition piece, power turbine shaft removal and installation, etc. Do routine inspection and check of all units running LM2500+ Do the level 1 maintenance of the unit and do baroscopic inspection of all units Daily check of daily maintenance routine and operation. Check all the parameters of the unit Project done: SonalGaz Marsat TG power plant arsew Oran unit no # 7 and #6 S/n 281771 ,281770 June 26, 2011 to up to Dec 2012 Scope of work Do major inspection combustion inspection and FMI outages On unit no #6 check the vibration with Bentley Nevada vibration probe test On unit #7 major inspection and casing alignment of the turbine Do the outages inspection and overhauling gas turbine frame 5PA Project done: SonalGaz boufarik power plant Unit 51PA S/N 244559 Feb 19, 2011 to March 06, 2011 Scope of work Forced outages shutdown due high vibration turbine rotor replacement MAJOR INSPECTION and upgrading and modification frame 5001 Do the installation and commissioning of 2x units of frame 9001 e gas turbine Project done: OG-WEPP - Project ASIA GAS PIPELINE SOUTH KAZAKHSTAN Lugavoy station 704506 code 7107 June 2010 – Oct 30 2010 Scope of work Installation and commissioning of 4X PGT 25+ DLE aero gas turbine and 4 X PCL803 gas compressors Supervision of all auxiliary equipment installation booster pump, inlet duct exhaust duct, fuel treatment skid Boiler and anti-icing skid firefighting Co2 skid. Unloading and Inspection of the gas turbine major auxiliaries at the installation site and their placement on the foundation  Perform Geometric dimensional check of foundation, equipment and auxiliaries skids positioning, levelling (ensure levelness and elevations of sub sole plates and perform contact checks between sub sole plates and package supports) and alignment  Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500 SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT  Advise on interpretation of GE drawings for installation optimization  Perform Gas Generator assembly and disassembly activities  Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air system, interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc.  Clearances check, especially on power turbine PGT25  Perform lube oil and cooling water systems flushes as per GE recommended procedures  Install inlet and exhaust systems per GE / Vendor specifications  Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system  Perform all gas piping and orifices are correctly installed for each piping system  Mark-up all piping drawings to show piping modifications piping Instruments (P&I) Marked-up  Perform packages/rotors are aligned to GE Aero specifications  Work closely with Instrument Engineer during the installation, calibration and set-up electrical instrumentation (such as vibration probes, temperature elements, servo actuators calibration, etc.)  Inlet Duct Pre-Start-up checks  Pre-start-up & Start-up checks VI
  • 7. Project done: Karachaganak petroleum operating B.V.418440 Western Kazakhstan oblast, burlingsky region aksai 2 Kazakhstan 05-18-09 /april 2010 Scope of work Operation and maintenance contract with Ge oil and gas maintaining of gas turbine frame 5002 power crystal and BCL 304Ccentrifugal compressor Knox western/2HM/2 Reciprocating compressor, GHH Borsig dry screw pump. Gas compressor Flash gas compressor driven of 3 units of Waukesha engine L5790Gas engine Gas re-injection compressor driven of 3 units of 3 Units of MS 5004D/power crystals DLN 1 combustion system. With knowledge in H2S environment. Training H2S feb 06,2009 expires may 26,2012 Project done: Oman /SHELL LNG LLC plant (sur) Qalhat Oman p.o box 888 rc 411 04-03-09 until 04-24-09 Scope of work Turbine frame MS6001B, and frame MS 7001B HGPI hot gas path inspection also included auxiliaries Calibration of DLN1 combustion system, overhaul/inspection of BHS gear box Overhaul inspection of 2BCL 806, 3MCL 1004, AN 200 compressor. Auxiliaries activities for inspection: main lube oil pump aux pump jacking oil pump emergency lube oil pump ,oil vapor extraction fans, casing cooling air fan, air inlet duct ,silencer elbows, ventilation fan ,turning gear, emergency turning gear Project done: Chiyoda Technip joint venture QCS NLG onshore facilities project Qatar Liquefied gas development company (QCS) Qatar gas 2 Raslaffan Qatar Gas 11 train no.6&7 Raslaffan industrial city, Qatar 05-30-08 until 03-13- With training H2S & breating apparatus famililiarizatin course April 2008-expires april 20 2010 Scope of work: Installation and commissioning of 6 unit of Fr 9001Ee Gas turbine, 4 units BCL1003, 4units MCL1402 for N2, C3 train 6&7 2units MCL1805, 2units 2BCL1006 for MR Train 6&7 also included 6 units of ANSALDO generators Installation & maintenance on Gas Turbine, Steam Turbine and Centrifugal Compressor control systems Trouble shooting and diagnostics on Gas Turbine, Steam Turbine, and Centrifugal Compressor control systems and Auxiliary System Ensure the correct GE installation practices are followed Calibrate and test any type of field instrument Provide technical expertise to customers, service support, and field contractors Provide external and internal timely and accurate professional reports Monitor events and equipments to meet or exceed the requirements Ensure contractual obligations are met Interface with all involved functions in GE O&G Attend the daily technical meetings with Customers regarding the scope of work VII
  • 8. Ensure all in-field activities carried out safely complying with company environmental health & Safety (EHS) guidelines and procedures. Project done: Qatar Liquefied gas development company (QCS) Qatar gas 1 Raslaffan Qatar Gas 1 train no.1 Raslaffan industrial city, Qatar 04-13-08 until 05-18-08 Scope of work: Modular replacement of 5units of MS5002 CtoD turbines train 1 Turbine enclosure removal/assembly Removal exhausts plenum extensor/assembly Turbine module removal/installation new upgrade MS5002D turbine Removal/installation of aux gear box, lube oil pump, hydraulic pump, hydraulic manifold Installation stop/ratio gas control valve, 2nd stage nozzle hydraulic oil vapor seperatorRemoval/installation of ventilation system, dampers, ventilation duct. Responsible for the observance of safe work practices in the Field and workshop areas, and ensures that applicable safety procedures and regulations are followed by the personnel under his jurisdiction. Ensures that all installation and repair work is carried out according to the applicable standards and codes of practice and that the workforce under his command is aware of such standards. Undertakes and directs others in the fault finding, dismantling, inspection, refurbishment, repair, overhaul, re-build and testing of gas generators, free turbines and their associated component assemblies Assists in the maintenance of files and records pertaining to the installed equipment. Carries out efficient remedial action to correct turbine malfunction or failure on a 24-hour basis. Works closely with local trainees and monitors training progress. Analyses equipment or system faults and recommends corrective action. Understands the Company's warehousing system and stock control methods. Prepares stock withdrawal orders on a routine basis. Has a high standard of housekeeping, both within the workshop area and on site. Educates trainees in suitable methods. Uses a wide variety of test and calibration equipment and knows the limits and capabilities such equipment. Should have a responsible attitude to the Company's needs and requirements. Project done: Gasco UAE LNG Plant onshore project Abu Dhabi Asab Plant 1&2 gas development. (Gasco) AG2 Re-injection Compressor Revamping 01-08-07 until 02-20-07 Scope of work: Modular replacement of 4units of MS5002 C to D Turbines Installation and commissioning of the 5002 gas turbine Re-bundle of 4units of BCL l405 C gas compressor, filter house and ventilation duct Replacement of turbines auxiliaries, modification Turbine clutch assembly, auxiliary gear assembly, turbine auxiliary Modification of base plate for starting motor torque converter Modification existing gas control valve. Installation of splitter valve and fuel gas piping modification VIII
  • 9. Resume of work Company: Keppel Philippines Marine Shipbuilding. Location: Brgy.san Miguel bauan Batangas philippines Position: Mechanical Engineer Period: Jan 16, 2007 up to may 26, 2007 Function of the Position Responsible for the accomplishment of all maintenance servicing overhauling and repair job on all existing plant mechanical equipment, machinery and accessories of new installation projects, revisions, alteration, modification. And commissioning .Also responsible for maintaining an adequate supply of spare parts, tools, and other maintenance material necessary for the continuous and efficient operation of shipyard facilities Duties and Responsibilities 1.Service Diesel Engine Marine Mitsui B&W, Daihatsu, Caterpillar, Rolls Royce, Yanmar, Wartsila, Stork Wartsila, Cummins, Mak.caterpillar (Overhauling, faultfinding, commissioning & maintenance). 2.To overhaul, repair & installation of Marine Propulsion diesel engine (Cylinder head removal, cleaning, pressure test, piston removal, change piston ring, removal of main bearing, big end bearing, cam shaft, crank shaft, connecting rod dismantle, fault finding & troubleshooting 3. To overhaul & repair of Main Engine Generator and Auxiliary Diesel Engine (Cylinder head removal, cleaning, pressure test, piston removal, change piston ring, removal of main bearing, big end bearing, cam shaft, crank shaft, connecting rod dismantle, fault finding & troubleshooting 4.To overhaul various types of Marine application pump & Valves (Fuel pump, Lube oil pump, Fresh water pump, Seawater pump, Cooling pump, Fire pump, General service pump. Glove valve, gate valve, ball valve, safety valve, check valve, relief valves etc 5.To overhaul Propeller & Rudder including CPP (Control pitch propeller, Oil seal box, Control rod, control tube, Oil distribution box, Propeller polishing, Propeller dye check, Propeller pumping, Measure rudder clearance, Rudder stock renewal, renewal of rudder pintle bush & bearings & stern tube seal renewal) 6. To overhaul Deck & Auxiliary machineries (Winch gear box, clutch, brake lining, mooring roller, Anchor windlass, brake holding test, Hose handling & Deck provision crane 7.Troubleshoot & rectify common faults in Hydraulic & Pneumatic systems (Hydraulic cylinder, Hydraulic motor, hydraulic pump & gear etc) 8) To overhaul various types of Compressor, Cooler & Heaters Single acting, double acting & other compressors, luboil, fuel oil, & fresh water heater & cooler. Additional: I). To attend vessel safety meeting ii) To Co-operation between the Yard maintenance and Ship chief officer & Engineer. iii). To supply Shore power, cooling water upon ship over comes to shipyard. iv). To provide ventilation for gas free. v). Preparing the work done list for the jobs carried out during the repair period of the Vessel and making sea trial. IX
  • 10. Resume of Work Company: (NAOC) Nigerian AGIP Oil Company Limited Location:Land Area Base Obiafu, Obrikom, Omoku Rivers State Nigeria Position:Field Mechanical Engineer (Team Leader) Period:July 02, 2002 up to Oct 30,2006 Function of the Position Carrying out the day-to-day maintenance of the onshore/offshore mechanical systems installation and commissioning rotating equipment. Ensuring that the facilities integrity, reliability, availability and maintainability of the relevant mechanical and rotating equipment are optimized, so that production targets can be achieved. Integrating maintenance change and control communicated by the Lead Mechanical Technician and Maintenance Supervisor in conjunction with Onshore/offshore Support Engineers through pre-defined condition monitoring practices and procedures. Provide first line onshore/offshore presence for the execution of the maintenance strategy to include planned and corrective maintenance. Attend to all equipment breakdowns and plan maintenance work using the Computerized Maintenance Management System. (CMMS Mp2 Program.) And SAP, Maximo Duties and Responsibilities 1.Responsible of commissioning and installation of gas and diesel equipment including full engine overhauls and subsequent testing operational fault finding trouble shooting and defect repair knowledge of low emission engine and control system hydraulic and Woodward electric governors, ignition system EIS system, turbotronic controller 2. Implementation of plan CMMS Mp2 maintenance program. 3. Responsible for planning, coordinating, monitoring, and recording the short term plans. Such as daily weekly monthly preventive maintenance activities plan. 4. Perform operational check of caterpillar gas engine such as G399 SI, D399 PC, G3408, G3512 SI, G3512 EIS, D3508 DITA, D3616 DITA gas and diesel engine in field location with total of 36 units of Caterpillar genset engine. And also assist work maintenance such turbines PGT10, PGT5, MS1001, MS1002, MS5001 Nuovo Pignone and Centaur 40 turbine and gas compression units such BCL 406 and BCL 306 and PGT 10 MW gas turbine driven ansaldo generator and other control mechanism HMI power system generator, Speed-tronic MARK V tmr gas/de-tronics 5. Checking of all equipment to check of their performance using special tools. 6. Perform the overall execution of the permit to work system and ensuring the require precaution are stipulated and applied as per operating procedures and good practice. 7.Monitor and Supervision of daily operations, including safety briefing, Planning activities maintaining good house keeping at the job site, ensuring availability of materials and consumable. 8.Attend to all equipment breakdowns and Planned Maintenance work with minimum direction and Supervision. 9.Monitor any repeated breakdown takes proper modification to resolve the problem Experience in the field of condition. Monitoring working under permit to work system 10.Performs other duties as maybe assigned by management in furtherance of the company’s goal and Objective: X
  • 11. Resume of Work Company: Ministry of Municipal and Rural Affairs Water and Sewage Authority Qassim Region (Kingdom of Saudi Arabia) Location: Badaya-Al-Olya Al-Qassim (Kingdom of Saudi Arabia) Position: Plant Supervisor/Mechanical Period: June 23, 2000 to August 16, 2001 Function of the Position Establishing and maintaining the overall Plant Maintenance Strategy/Plan including preventive, Predictive & Corrective Maintenance/Repair; Troubleshooting Plant Performance Issues; Client liaison/management and relationship development, On-Site experience in the Maintenance and Operations of Instrumentation and Controls systems with particular application to installation and commissioning Rotating Plant such as Gas Turbines, Compressors, Pumps, and Mechanical Drive Sets etc. Reporting to maintenance engineers monitors and maintains a variety of mechanical equipment. Operates various machine tools and techniques. Interrogates condition-monitoring data to determine remedial action. Duties and Responsibilities 1.Reporting to the maintenance manger, responsible for the Planning, directing, execution. Monitoring and evaluation for the plants, mechanical strategies, Program and system with Objective of operational continuity and Maximum Plant efficiency. 2Responsible of maintenance of various auxiliaries of reverse osmosis plant and 7 units of MAK Motoren In – Line Engine (Engine Type MAK 6m82 In line) and 2 units Ruston T2500 Gas Turbine 3.Provide daily technical support to activities related to utilities maintenance including operation of water treatment plant and electrical distribution system. Ensure that established safety procedures and adhered to in the area of maintenance work. 4.Performs preventive maintenance using applicable maintenance requirements card for each item of support equipment to include replacement of consumable parts and structural inspection. 5.Perform operational check and all other required repair actions on assigned equipment. 6..Prepare servicing schedule of plant mechanical equipment and machinery; determine necessity of maintenance inspection to correct early stages of defect so as to prevent the occurrence of major breakdowns. 7.Work ─ with/support the superintendent in the general supervision of the maintenance men during emergency repairs, unit shutdown and major overhauls. 8.Direct and coordinate the activities of subordinates, sees to it that the machinery and equipment to be repaired re properly clear and tagged off. 9.Keep complete records of maintenance manual, reports, brochures and memos pertaining to maintenance. 10.Observe, comply and enforce the existing rules and regulation, code of disciplines, corporate policies and guidelines and special instructors or orders. XI
  • 12. Resume of Work Company: Rolls - Royce Power Ventures Phils. (Orca Energy Inc.) Location:Inside Coca-Cola Bottling Co. Sta. Rosa, Laguna 1.8 MW Power Co-Generation and 2000 kg/H. CO2 Plant 25 MW Rolls-Royce Avon 1534 Generators Position: Senior Plant Operator/ Senior Plant Mechanic Period:Sept. 15, 1999 up to June 20, 2000 Function of Position  Assist in the operation of assigned utilities areas of the processing plant by monitoring the operation of all utility equipment including water, air, system, CO2 power generation and fuel systems and make adjustments as instructed. Continuously monitors the functioning of assigned equipment by reading gauges, levels, and amperages and records findings on daily log sheet. Informs shift supervisor or maintenance engineer of unusual observations such as noise, critical designated area and report any malfunction to shift supervisor. Also known in RCM (Reliability Centered Maintenance) and Allen Bradley controllogix, siemens, ABB control system. With also DCS, PLC, SCADA control system. Duties and Responsibilities 1.Operates the different production machinery and equipment auxiliaries, monitors and maintains the operational parameters in accordance to specified standard 2.Supervises and directs a group of plant operator to ensure a continuous production workflow. 3.Plans, schedules workload distribution and shifts of subordinates to achieve production workflow. 4.Ensuring that the routine maintenance tasks are completed according to planning and scheduled procedure of maintenance 5.Maintain detailed maintenance records in respect of the plant assist the maintenance supervisor with short and long term of planning 6.Weekly implementation of maintenance PM and CM work activities 7.Ensuring that all site maintenance activities and operation are executed in a safe,timely and cost effective manner 8.Coordinates with maintenance as required promoting productivity and quality improvement. 9.Coordinates with quality assurance with respect to production and operational standards and specification to ensure quality output.10. 10.Prepare, submit daily and periodic production reports to immediate superior and discuss recommended solutions to problems encountered and or to improve production operations. 11.Observe safety rules, corporate policies and regulations; observe proper turnover of responsibilities 12.performs good housekeeping, performs other related tasks that may be assigned. 13.Performs communication jobs; coordinates with operation and other support group. 14.Responsible for maintaining the plant equipment and auxiliaries in good operating condition, 15.monitoring plant parameters & analyzing any abnormality, iniating corrective actions or performing minor trouble-shooting, and complying with all safety & quality policies and quality policies and procedures. 16.Performs other duties as may be assigned by the superiors in furtherance of the company’s goals and objectives. XII
  • 13. Resume of Work Company: Paragua Power Company Phils. Inc. Location: Km. 13, Brgy. Sta. Lourdes Puerto Princesa City, Palawan, Philippines 4 units of 16 SW 280 vee Engine stork Wartsila 280 w/ cap of 4.1 MW each Position: Shift Engineer (Power Generation Plant Operation) Period: February 01, 1997 to September 10, 1999 Function of the Position:  Under the general supervision of the operation manager, is held responsible for the generation of steam and electrical power during my shift, ensuring minimal work stoppages and interruptions, tasked with planning, leading, directing, supervising, coordinating and controlling the resources as well as the technical and administrative activities within my shift, with the ultimate objective of contributing to the company’s trusts of profitably and growth. Also known in SiemensDCS, PLC Control system. Topec engineering  Supervise the technical activities of personne l 4 ─ control room operator 8 ─ plant electrician 11─ plant technician (mech’l) 15 ─ general labor (helper) Duties and Responsibilities 1.Plan, directs, controls, coordinates and services activities in my shift to ensure a steady supply of air, steam fuel and electrical power to different points of utilization in the plant. 2.Daily routine of plant status of generating sets, and auxiliaries’ ─ perform record, data and performance of the plant. and assist for supervision of overhauling and other maintenance jobs. 3.Assist immediate superior and associates in planning and scheduling over all operations of the department and conduct proper use of equipment tools and measurement. 4.Coordinates with other work units to ensure a smooth and uninterrupted operation. 5.Decide and implements appropriate disciplinary measures against department personnel for infractions committed or violation of company rules and regulations. 6.Plans and implements strategies to ensure the target parameters for steam, fuel, and power achieve. 7.Ensures proper turnover of work before and after assigned shift schedule to ensure safety and continuity of unfinished/ongoing work. 8.Performs other duties as may be assigned by management in furtherance of the company’s goals and objectives. XIII
  • 14. Resume Of Work Company:KEPPEL FELS Energy and Shipbuilding Inc. Location:Inside of National Power Corporation, Brgy. San Rafael, Calaca, Batangas 90 Mw floating power barges / With 25 units WARTSILA DIESEL ENGINE Position:Maintenance Engineer MECHANICAL(Power Generation Plant) Period:September 01, 1993 to January 30, 1997 Function of the Position:  Responsible for the accomplishment of all maintenance servicing overhauling and repair job on all existing plant mechanical equipment, machinery and accessories of new installation projects, revisions, alteration and modification. Also responsible for maintaining an adequate supply of spare parts, tools, and other maintenance material necessary for the continuous and efficient operation on an electric generating diesel power Generation plant with total of 25 units of Wartsila diesel Genset. And knowledge in DCS and PLC control system, with Topec engineering, Siemens PLC Control System, Vaasa PLC engineering control System, ABB control system and switchgear Duties and Responsibilities 1.Check daily maintenance work orders; assign job to maintenance personnel through the chief maintenance engineer giving specific instruction regarding trouble analysis, repair procedures, materials to be used and priority of the job. 2.Supervise the plant mechanic and auxiliary mechanic on the performance of the day-to-day schedule and unscheduled maintenance. 3.Performs preventive maintenance using applicable maintenance requirements cards for each item of support equipment to include replacement of consumable parts and structural inspection. 4.Coordinates with the shift engineer, system maintenance and electrical department to ensure that maintenance work on the engineering set is carried-out smoothly without hindering the output of the power plant. 5.Performs troubleshoot and rectifies generating sets problems that are beyond the capability of the shift on duty from time to time. 6.To direct and supervised the installation, maintenance, repair, troubleshooting, and modification activities carried out on a wide range of mechanical static and rotating equipment in the plant, including turbo machinery, compressor, heat exchangers, diesel generator. 7.Scrutinize and study operation logbook and daily operational and alarm record in order to identify potential problems and take necessary actions to rectify them. 8.Prepare performance evaluation report of subordinate’s recommended training need and conduct lectures and on-the-job training to subordinates to improve their skills and to promote effectively flexibility among them. XIV
  • 15. Resume of Work Company: National Power Corporation 300 MW Coal Fired Thermal Power Plant (300 MW BCFTPP) w/W501 Westinghouse Steam Turbine Location: Brgy. San. Rafael, Calaca, Batangas Position: Senior Plant Operator / Senior Plant Mechanic Period: May 01, 1990 to August 31, 1993 Function of the Position  Reports to maintenance head. Responsible for operating and maintenance, control and optimization of pulverized coal fired steam generation equipment and its auxiliary equipment including coal handling, flue-gas cleaning, etc. Assists in undertaking major/complete engine overhaul at motor pool mechanical and power generation plant section. Duties and Responsibilities 1.Responsible for maintaining the plant equipment and auxiliaries in good operating condition, monitoring plant parameters and analyzing any abnormality, iniating any corrective actions or performing minor trouble-shooting, and complying with all safety and quality policies and procedures. 2.Responsible for performing all preventive and corrective maintenance of large automotive maintenance facilities equipment. 3.Assist and troubleshoot and diagnose various types of hydraulic and pneumatic problems of the above equipment; utilizing the appropriate test equipment. 4.Responsible for engine inspection and troubleshooting repair, and replace defective parts, preventive maintenance, and adjustment of engine components. 5.Assist also mechanical maintenance repair and overhauling of reciprocating, dozing, and centrifugal (single and multistage) and vacuum pumps, screw type compressor, maintenance of different valves and electrical chain hoist. 6.Undertakes thorough and proper turnover of work at the start and end my shift schedule to ensure safety and continuity of unfinished/ongoing work. 7.Attends to daily care, cleaning and, maintenance of machines/ equipment/ devices/ tools operates duly schedules maintenance works/jobs needed to ensure that these are kept in optimum operating condition at all times. 8.Performs other duties as may be assigned by superiors in furtherance of the company’s goals and objectives. 9.Observe safety rules, corporate policies and regulations; observes proper turnover of responsibilities, performs good housekeeping, performs other related task that may be assigned. 10.And with good interpersonal relations and computer literate. Have leadership ability and can motivate people at work towards a common goal. XV
  • 16. Job Dimension: 1. Having logical, hardworking, and committed to work. And be alert and have a presence of mind. 2. Have a reliable, productive and proactive, have a positive work attitude and able to effectively communicate with my superiors, peers and subordinates. Also posses the necessary leadership traits of self-discipline and creative thinking and be stable under stress. 3. Have a sense of urgency, hardworking and initiative. 4. Team player, with degree of adaptability and ability to work independently, with minimum supervision. 5. And computer literate Microsoft word, power point, excel, sap, maximo, cmms mp2 Character References: Mr. William Wall Training director General electric Schenectady new York Mr.Vincenzo Mauro Land Area manager (NAOC) Nigerian AGIP Oil Company Limited Land Area Base LNG Gas Plant Obiafu, Obrikom, Omoku Rivers State Nigeria Mr. Erick Pepper President Rolls-Royce Power Ventures Phil. Inc. 31/F LKG Tower, 6801-6803 Ayala Avenue Makati City 1226, Philippines Mr. Henry Alcalde Sr. Manager National Power Corporation 300-mw Batangas Coal Fired Thermal Power Plant. (BCFTPP) Brgy.San Rafael Calaca, Batangas Philippines Mr. Antonio F. Mendoza XVI