Brunel international south east Asia PTE LTD
Position :FSE mechanical by GE oil and gas LNG plant
Nov 08,2013 up to MARCH 30 2014
Location port Moresby Papua New Guinea
Project: CJJV PNG LNG ECP3 project train 1 and train 2 installation and commissioning mechanical works
Oil flushing corrective punch list of mechanical machineries
GEoil and gas PGT 25+ DLE LM 2500+G4+ and compressor MCL +BCL
Granite services international Inc. GSII Affiliated GE energy
June 25, 2007 to Oct 01,2013
Location: General Electric Bonifacio Global City 1634 Philippines
Position: FIELD SERVICE ENGINEER (mechanical) TECHNICAL ADVISOR
Work GE GasTurbine Frame3, 5, 6,7, 9,
And LM 2500+G4, PGT 25, LM6000 Aero gas turbine installation and commissioning
And compressor MCL1402, BCL1003, 3MCL1403, MCL1805, 2BCL10, PCL 803
Have knowledge in H2S environment hands-on experience in high toxicity (H2S) gas environment, Sulphur/Sulfur
granulation & Processing experience, safety & operating environment, zoning principals, permit to work, task
assessment. Training with Qatar gas LNG plant and Karachaganak LNG plant AGIP AND BP JV
Keppel Sing marine Shipbuilding Inc.
February 16,2007 up to May 26,2007
Location: brgy san Miguel bauan batangas
Position: Mechanical engineer (ROTATING MACHINERY)
Nigerian Agip Oil Company Limited (NAOC)
Liquefied Natural Gas Recycling Plant
July 02, 2002 to October 30 2006
Land Area Base Location
Obiafu, Obrikom, Omoku
River, State Nigeria
Position: Field Mechanical Engineer. (Team Leader)Rotating equipment machinery
Ministry of Municipal and Rural Affairs Water and Sewage Authority Qassim Region, Kingdom of
Saudi Arabia
(June 23, 2000 up to August 16, 2001)
Al-Rass/Badaya Water Treatment Plant
Badaya ─Al ─ Olya
Al ─ Qassim, Kingdom of Saudi Arabia
6.7 MW Diesel Power Plant- 7 units of MAK Diesel Engine
2 Units Ruston TA 2500 turbine generators
Position: Plant Supervisor Mechanical
Rolls - Royce Power Ventures Phils. (ORCA Energy Inc)
(Sept. 15, 1999 to June 20, 2000)
Inside Coca-Cola Bottlers Co. Sta. Rosa, Laguna
12.1 MW Power Plant and 2000 Kg/ HC02 Plant
4- Unit of 4008 Allen Diesel engine and
I
2. 3-Unit of KTTA50-G2 Cummins Diesel engine
1 unit of Rolls-Royce Avon generators
Cochran Thermal Steam Boiler -2 x 1000, Kg/hr
Positions. Senior Plant Operator/ Sr. Plant Mechanic
PARAGUA power Company Phil’s. Inc.
(Feb. 01, 1997 to Sept. 10, 1999)
Km. 13, Brgy. Sta. Lourdes Puerto Princesa City, Palawan Phil’s
16 MW Diesel Power Plants -4units of 16V 280 Stork Wartsila Diesel Engine
Position: Shift Engineer (Power Generation plant)
KEPPEL FELS Energy Inc.
(Sept. 01, 1993 to Jan. 26, 1997)
3x30 MW Floating Power Plant Barges
OPERATION AND MAINTENANCE 25 UNITS WARTSILA ENGINE VAASA
Napocor Compound, Brgy. San Rafael, Calaca, Batangas
Position: Maintenance Engineer (Power Generation Plant ,Marine engine)
National Power Corporation (BCFTPP)
(August 01, 1990 to August 30, 1993)
300 MW Batangas Coal- Fired Thermal Plant
Brgy. San Rafael, Calaca, Batangas
Position: Senior Plant Operator/ Senior Plant Mechanic
Seminars and Training Attended:
H2S competency certificate
Conduct :Karachaganak LNG plant Feb 02 2009 Expires May 26,2012
H2S training & Breathing apparatus familiarization course
Conduct QATAR GAS april 20,2008 expires april 20,2010
Operation and maintenance GE Gas turbine procedure and inspection
Conducted by: GE training director MR.William Wall
Optn and maint of QSV91G,QSK60-64,QST30,64 and Genset control system
(Cummins Wartsila CwP91Gas engine 18V)
Conducted by: Green Combined Power Limited
(Netharhall Road Roy don, Harlow Essex CM19 5JP ENGLAND)
CMMS MP2 (Computerized Maintenance Management System)
Maintenance Program 2
Conducted by: Data stream’s training services and (NAOC) Nigerian Agip Oil Company limited
HSE Training Program
Conducted by: Precision drilling corp.
Marine Diesel Engine Course Stork Wartsila 28, Wartsila 25,
Wartsila 46 and PROPAC (Propulsion)
Conducted By: Mr. Reidar Steen slid (General Manager)
Water Treatment Training Program
Conducted by Keppel ─ Fels Energy
Calaca, Batangas Phils.
Oil Analysis And Proactive Maintenance Seminar
Conducted by: Jess C. Gregorio (Instructor)
Anselmo V. Escano (Fulltech Inc. General Manager)
Allen Diesel Engine Course (Rolls - Royce Power Ventures Phil’s)
Conducted By: Norwegian Training Center ─ Manila (NMYC/TESDA)
Jan Braaksma ─ Training Manager (WARTSILA NSD Phils Inc)
Fire Prevention and Fire Fighting Seminar
Conducted By: Bureau of fire Protection
WARTSILA Vasaa 32 Operation and Maintenance Training Program
Conducted By: C.G. Evars and Markku Aspholm (Superintendent Engineer)
II
3. Wartsila Diesel Oy, Vaasa Finland (Marine Gas, Diesel Engine Services)
Mobil EM/PA Program
Conducted By: Mobil oil Phil’s. Inc.
Work Attitude and Values Seminar Towards Achieving Corporate Excellence
Conducted By: Tomas Quintin D. Andres
Marine Engines, Fuel And Lubricant Seminar
Conducted By: Petron oil Corporation
Basic Lubrication
Conducted By: Petron oil Corporation (Manila, Philippines)
Engine Indicator Diagram Presentation
Conducted By: Petron Corporation (Manila, Philippines)
Stork Wartsila Diesel B.V. (16SW280)
Operation and Maintenance Diesel Power -Cogen Plant
Conducted By: Mr. Jan Braaksma ─ Training Executive Wartsila NSD Phil’s
National Power Corporation
300-mw coal- fired Operation &Maintenance Program
Coal ─ Fired Thermal Power Plant (BCFTPP) Batangas, Philippines
Conducted By: Mr. Albert E.A. Macalintal (Vice-Pres. H.R.) Napocor
Fundamental Service For Diesel Engine
Power Train, Hydraulic System
Personal Data:
Date of Birth: November 26, 1967
Place of Birth: Manila
Civil Status: Married
Name of Spouse: Violeta T. Mendoza
Name/Birth date: 1.) Mark Hendrix T. Mendoza ─ November 16, 1992
2.) Roxanne T. Mendoza ─ May 08, 1995
Others :
SSS: 03-8640771-2
TIN: 143-734-317
Pag-ibig: 0009-009820-10
Pass Port No: EB7093895
Date Issue: JANUARY 08,2013
Date Expired: JANUARY 07,2018
Persons to be Contact In Case of Emergency :
Mrs. Violeta T. Mendoza
Pantay, Calaca, Batangas
Tel no. (+63)9493426006
Mobile no. (+63) 9163276001
Educational Attainment:
Primary: Rosario Elementary School
Rosario, Pasig City
1974 ─1980
Secondary: Dacanlao Gregorio Agoncillo National High School
Dacanlao, Calaca, Batangas
1981 ─ 1984
III
4. College: Technological institute of the Phil. (TIP)
(BSME) Bachelor of Science in Mechanical Engineering
1985 ─ 1989
Knowledge/Skills
Have twenty three years backgrounds and work experience on the various fields/area of operation and
maintenance at power generation plant, CO2 processing plant, water treatment plant, LNG Gas plant.
With general process control field automation. Also known in CMMS Mp2, SAP, MAXIMO
(Computerized Maintenance Management System) and RCM (Reliability Centered Maintenance) and
also known DCS, PLC, control system with Allen Bradley controllogix, digiconcontrol flatform, GE
Fanuc 90/70 control platform
Resume of work:
Brunel international south east Asia PTE LTD
Position: mechanical team leader
Nov 08, 2013 up to MARCH 20 2014
Location port Moresby Papua New Guinea
Project: CJJV PNG LNG ECP3 project train 1 and train 2 installation and commissioning mechanical works
Oil flushing corrective punch list of mechanical machineries
Function of the Position
Responsible all rotating machineries and auxiliary of GE PGT 25+DLE gas turbine10 units installation and commissioning
Coordination to chiyoda for any alternation and mark-up drawing changes modification
installation of 10 PGT 25+ Aeroderevatives rotating machinery
ExxonMobil PNG LNG: 10no PGT25+G4 + Compressor Skids
ExxonMobil PNG HGCP: 3no PGT25+G4 + Compressor Skids
Alignment of BCL and MCL compressor to foundation.
· Unloading and Inspection of the gas turbine major auxiliaries at the installation site and their placement
on the foundation
· Geometric dimensional check of foundation, equipment and auxiliaries skids positioning, levelling (ensure
levelness and elevations of sub sole plates and perform contact checks between sub sole plates and
package supports) and alignment
· Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500
SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT
· Advise on interpretation of GE drawings for installation optimization
· Gas Generator assembly and disassembly activities
· Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air
system, interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc.
· Clearances check, especially on power turbine PGT25
· Perform lube oil and cooling water systems flushes as per GE recommended procedures
· Install inlet and exhaust systems per GE / Vendor specifications
· Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system
· perform all gas piping and orifices are correctly installed for each piping system
· Mark-up all piping drawings to show piping modifications Piping Instruments (P&I) Marked-up
· perform packages/rotors are aligned to GE Aero specifications
· Work closely with Instrument Engineer during the installation, calibration and set-up electrical
instrumentation (such as vibration probes, temperature elements, servo actuators calibration, etc.)
· Inlet Duct Pre-Start-up checks
· Pre-start-up & Start-up checks
Management competences include:
IV
5. · Good attitude to manage relationships with customer and Oil & Gas HQ, concerning technical
and contractual aspects
· Follow up all quality aspects according to Six Sigma approach and GE Oil &Gas QA manual
and procedures
· Working knowledge and application of EHS rules
· Coordination and management of GE
Resume of work: Company: G.E energy oil and gas
Location: General Electric Bonifacio Global City 1634 Philippines
Position: Field Service Engineer (Mechanical TA FSR)
Period: June 25, 2007 up to October 31,2013
Function of the Position
The Technical Advisor FSE will be in charge of the management of site activities including planning, organizing, integrating
and monitoring of resources such as labor, tools and technical assistants as required to complete the work scope according to
contractual requirements.
Field experience in heavy gas turbine engines installation and commissioning such as General Electric different model (GE
frame 5, 6, 7,9Ee).and PGT25 LM 2500+DLE Aero gas turbines. The shop floor experience should include assembly,
disassembly, diagnosing, and capability to read and understand engineering drawings and use the original equipment
manufacturer manuals. Should be able to troubleshoot, analyze and write technical reports. The candidate should be capable
of preparing work scopes, and provide recommendations to carry out repairs, modifications and changes as necessary and
capable of carrying out commissioning of gas turbines and be familiar with international standards governing the different
aspects of the gas turbine engines. Have an possess excellent interpersonal and communication skills, and capable of problem
solving and failure analysis.
Duties and Responsibilities
Provide technical advice on disassembly and assembly of various types and sizes of mechanical equipment and related
components (Pumps, Compressors, Gas Turbines, Air Blowers, Gearboxes, etc.) Provide guidance and advice on diagnosis of
parts, sizes and clearance of mechanical equipment and its related components. Help shop craftsmen in the analyzing and
troubleshooting of failed equipment and rework jobs. Provide proper guidance and occasional training to shop craftsmen on
the use of OEM technical manuals, industry standards and company procedures. Provide necessary technical work scopes and
recommendations for equipment machining, welding, balancing, modification, testing and other repair related activities.
Provide assistance and support by conducting field visits for repaired equipment commissioning and start-ups. Should have
excellent problem solving skills and broad knowledge of Root Cause Analysis techniques with the ability to understand
priorities and work with limited supervision. Prepare technical repair work scopes for equipment machining, balancing,
welding, testing and/or modification in line with OEM recommended practices,
Project done:
Tepco power plant Yokosuka japan
Jan 2013 up to june 2013
Operation and maintenance 10 unit TM 2500 + driven brush generator
Installation and commissioning of the units
Level 1 Overhaul activities:
Baroscopic inspection, water wash, high-pressure recoup check and setting, variable stator vane rigging and
calibration, replacement of variable vane actuator, replacement of variable stator feedback cable, replacement of
variable stator vane control, replacement of fuel nozzle, replacement of scavenge pump, replacement of
instrumentation (thermocouple, Thermo resistance, vibration sensor, etc), replacement of pneumatic/hydraulic
starter, replacement of outside piping and flexible hoses connected with Gas Generator (GG), replacement of
air/oil separator, replacement of fuel manifold, replacement of accessory gear box carbon seal, replacement of
bleed valve, replacement of acoustic sensors, replacement of fuel gas valves.
Level 2 Overhaul activities:
In addition to Level 1 activities as per par 5.1): Hot Gas Path Inspection on Power Turbine (PT) on LM 2500+-
HSPTequipments, Gas Generator mid frame replacement, Combustion Chamber replacement, inlet duct
replacement, center body replacement, accessory gear box replacement, radial drive shaft replacement, inlet gear
box replacement, Variable Stator Vane (VSV) actuating mechanism replacement, compressor front frame
replacement, compressor stator case replacement, compressor VSV removal/installation, VSV position indicator
removal/installation, compressor stator variable vane shroud removal/installation, compressor stator fixed vanes
removal/installation, power turbine and gas generator separation and reassembly, miscellaneous sump
components inspection and replacement, compressor rotor blades replacement, power turbine casing
V
6. removal/reinstalling, power turbine inspection, removal and reassembly of power turbine transition piece, power
turbine shaft removal and installation, etc.
Do routine inspection and check of all units running LM2500+
Do the level 1 maintenance of the unit and do baroscopic inspection of all units
Daily check of daily maintenance routine and operation.
Check all the parameters of the unit
Project done:
SonalGaz Marsat TG power plant arsew Oran unit no # 7 and #6 S/n 281771 ,281770
June 26, 2011 to up to Dec 2012
Scope of work
Do major inspection combustion inspection and FMI outages
On unit no #6 check the vibration with Bentley Nevada vibration probe test
On unit #7 major inspection and casing alignment of the turbine
Do the outages inspection and overhauling gas turbine frame 5PA
Project done:
SonalGaz boufarik power plant Unit 51PA S/N 244559
Feb 19, 2011 to March 06, 2011
Scope of work
Forced outages shutdown due high vibration turbine rotor replacement
MAJOR INSPECTION and upgrading and modification frame 5001
Do the installation and commissioning of 2x units of frame 9001 e gas turbine
Project done:
OG-WEPP - Project ASIA GAS PIPELINE SOUTH KAZAKHSTAN
Lugavoy station 704506 code 7107
June 2010 – Oct 30 2010
Scope of work
Installation and commissioning of 4X PGT 25+ DLE aero gas turbine and 4 X PCL803 gas compressors
Supervision of all auxiliary equipment installation booster pump, inlet duct exhaust duct, fuel treatment skid
Boiler and anti-icing skid firefighting Co2 skid. Unloading and Inspection of the gas turbine major auxiliaries at
the installation site and their placement on the foundation
Perform Geometric dimensional check of foundation, equipment and auxiliaries skids positioning, levelling
(ensure levelness and elevations of sub sole plates and perform contact checks between sub sole plates and
package supports) and alignment
Knowledge of IDM (Installation Design Manual GEAE) for all different Gas Generators, such as LM2500
SAC, DLE, Plus, LM6000 SACPB, LM6000 DLEPB, HSPT
Advise on interpretation of GE drawings for installation optimization
Perform Gas Generator assembly and disassembly activities
Installation and assembling activities of gas turbine and auxiliary equipment such as oil console, air system,
interconnection piping, coolers, structure, ducts, oil flushing, blowing, etc.
Clearances check, especially on power turbine PGT25
Perform lube oil and cooling water systems flushes as per GE recommended procedures
Install inlet and exhaust systems per GE / Vendor specifications
Pre-commissioning and commissioning of oil system, starting system, fuel gas system, air system
Perform all gas piping and orifices are correctly installed for each piping system
Mark-up all piping drawings to show piping modifications piping Instruments (P&I) Marked-up
Perform packages/rotors are aligned to GE Aero specifications
Work closely with Instrument Engineer during the installation, calibration and set-up electrical instrumentation
(such as vibration probes, temperature elements, servo actuators calibration, etc.)
Inlet Duct Pre-Start-up checks
Pre-start-up & Start-up checks
VI
7. Project done:
Karachaganak petroleum operating B.V.418440
Western Kazakhstan oblast, burlingsky region aksai 2
Kazakhstan
05-18-09 /april 2010
Scope of work
Operation and maintenance contract with Ge oil and gas maintaining of gas turbine frame 5002 power crystal and
BCL 304Ccentrifugal compressor Knox western/2HM/2 Reciprocating compressor, GHH Borsig dry screw pump.
Gas compressor
Flash gas compressor driven of 3 units of Waukesha engine L5790Gas engine
Gas re-injection compressor driven of 3 units of 3 Units of MS 5004D/power crystals DLN 1 combustion system.
With knowledge in H2S environment. Training H2S feb 06,2009 expires may 26,2012
Project done:
Oman /SHELL LNG LLC plant (sur)
Qalhat Oman p.o box 888 rc 411
04-03-09 until 04-24-09
Scope of work
Turbine frame MS6001B, and frame MS 7001B HGPI hot gas path inspection also included auxiliaries
Calibration of DLN1 combustion system, overhaul/inspection of BHS gear box
Overhaul inspection of 2BCL 806, 3MCL 1004, AN 200 compressor.
Auxiliaries activities for inspection: main lube oil pump aux pump jacking oil pump emergency lube oil pump ,oil
vapor extraction fans, casing cooling air fan, air inlet duct ,silencer elbows, ventilation fan ,turning gear,
emergency turning gear
Project done:
Chiyoda Technip joint venture QCS NLG onshore facilities project
Qatar Liquefied gas development company (QCS) Qatar gas 2
Raslaffan Qatar Gas 11 train no.6&7
Raslaffan industrial city, Qatar
05-30-08 until 03-13-
With training H2S & breating apparatus famililiarizatin course April 2008-expires april 20 2010
Scope of work:
Installation and commissioning of 6 unit of Fr 9001Ee Gas turbine, 4 units BCL1003, 4units MCL1402 for N2,
C3 train 6&7
2units MCL1805, 2units 2BCL1006 for MR Train 6&7 also included 6 units of ANSALDO generators
Installation & maintenance on Gas Turbine, Steam Turbine and Centrifugal Compressor control systems
Trouble shooting and diagnostics on Gas Turbine, Steam Turbine, and Centrifugal Compressor control systems
and Auxiliary System
Ensure the correct GE installation practices are followed
Calibrate and test any type of field instrument
Provide technical expertise to customers, service support, and field contractors
Provide external and internal timely and accurate professional reports
Monitor events and equipments to meet or exceed the requirements
Ensure contractual obligations are met
Interface with all involved functions in GE O&G
Attend the daily technical meetings with Customers regarding the scope of work
VII
8. Ensure all in-field activities carried out safely complying with company environmental health & Safety (EHS)
guidelines and procedures.
Project done:
Qatar Liquefied gas development company (QCS) Qatar gas 1
Raslaffan Qatar Gas 1 train no.1
Raslaffan industrial city, Qatar
04-13-08 until 05-18-08
Scope of work:
Modular replacement of 5units of MS5002 CtoD turbines train 1
Turbine enclosure removal/assembly
Removal exhausts plenum extensor/assembly
Turbine module removal/installation new upgrade MS5002D turbine
Removal/installation of aux gear box, lube oil pump, hydraulic pump, hydraulic manifold
Installation stop/ratio gas control valve, 2nd stage nozzle hydraulic oil vapor seperatorRemoval/installation of
ventilation system, dampers, ventilation duct.
Responsible for the observance of safe work practices in the Field and workshop areas, and ensures that
applicable safety procedures and regulations are followed by the personnel under his jurisdiction.
Ensures that all installation and repair work is carried out according to the applicable standards and codes of
practice and that the workforce under his command is aware of such standards.
Undertakes and directs others in the fault finding, dismantling, inspection, refurbishment, repair, overhaul, re-build
and testing of gas generators, free turbines and their associated component assemblies
Assists in the maintenance of files and records pertaining to the installed equipment.
Carries out efficient remedial action to correct turbine malfunction or failure on a 24-hour basis.
Works closely with local trainees and monitors training progress.
Analyses equipment or system faults and recommends corrective action.
Understands the Company's warehousing system and stock control methods. Prepares stock withdrawal orders on
a routine basis.
Has a high standard of housekeeping, both within the workshop area and on site. Educates trainees in suitable
methods.
Uses a wide variety of test and calibration equipment and knows the limits and capabilities such equipment.
Should have a responsible attitude to the Company's needs and requirements.
Project done:
Gasco UAE LNG Plant onshore project
Abu Dhabi Asab Plant 1&2 gas development. (Gasco)
AG2 Re-injection Compressor Revamping
01-08-07 until 02-20-07
Scope of work:
Modular replacement of 4units of MS5002 C to D Turbines
Installation and commissioning of the 5002 gas turbine
Re-bundle of 4units of BCL l405 C gas compressor, filter house and ventilation duct
Replacement of turbines auxiliaries, modification
Turbine clutch assembly, auxiliary gear assembly, turbine auxiliary
Modification of base plate for starting motor torque converter
Modification existing gas control valve.
Installation of splitter valve and fuel gas piping modification
VIII
9. Resume of work
Company: Keppel Philippines Marine Shipbuilding.
Location: Brgy.san Miguel bauan Batangas philippines
Position: Mechanical Engineer
Period: Jan 16, 2007 up to may 26, 2007
Function of the Position
Responsible for the accomplishment of all maintenance servicing overhauling and repair job on all existing
plant mechanical equipment, machinery and accessories of new installation projects, revisions, alteration,
modification. And commissioning .Also responsible for maintaining an adequate supply of spare parts, tools,
and other maintenance material necessary for the continuous and efficient operation of shipyard facilities
Duties and Responsibilities
1.Service Diesel Engine Marine Mitsui B&W, Daihatsu, Caterpillar, Rolls Royce, Yanmar, Wartsila, Stork
Wartsila, Cummins, Mak.caterpillar (Overhauling, faultfinding, commissioning & maintenance).
2.To overhaul, repair & installation of Marine Propulsion diesel engine (Cylinder head removal, cleaning,
pressure test, piston removal, change piston ring, removal of main bearing, big end bearing, cam shaft, crank
shaft, connecting rod dismantle, fault finding & troubleshooting
3. To overhaul & repair of Main Engine Generator and Auxiliary Diesel Engine (Cylinder head removal,
cleaning, pressure test, piston removal, change piston ring, removal of main bearing, big end bearing, cam
shaft, crank shaft, connecting rod dismantle, fault finding & troubleshooting
4.To overhaul various types of Marine application pump & Valves (Fuel pump, Lube oil pump, Fresh water
pump, Seawater pump, Cooling pump, Fire pump, General service pump. Glove valve, gate valve, ball valve,
safety valve, check valve, relief valves etc
5.To overhaul Propeller & Rudder including CPP (Control pitch propeller, Oil seal box, Control rod, control
tube, Oil distribution box, Propeller polishing, Propeller dye check, Propeller pumping, Measure rudder
clearance, Rudder stock renewal, renewal of rudder pintle bush & bearings & stern tube seal renewal)
6. To overhaul Deck & Auxiliary machineries (Winch gear box, clutch, brake lining, mooring roller,
Anchor windlass, brake holding test, Hose handling & Deck provision crane
7.Troubleshoot & rectify common faults in Hydraulic & Pneumatic systems (Hydraulic cylinder, Hydraulic
motor, hydraulic pump & gear etc) 8) To overhaul various types of Compressor, Cooler & Heaters Single
acting, double acting & other compressors, luboil, fuel oil, & fresh water heater & cooler.
Additional:
I). To attend vessel safety meeting
ii) To Co-operation between the Yard maintenance and Ship chief officer & Engineer.
iii). To supply Shore power, cooling water upon ship over comes to shipyard.
iv). To provide ventilation for gas free.
v). Preparing the work done list for the jobs carried out during the repair period of the Vessel and making sea
trial.
IX
10. Resume of Work
Company: (NAOC) Nigerian AGIP Oil Company Limited
Location:Land Area Base
Obiafu, Obrikom, Omoku
Rivers State Nigeria
Position:Field Mechanical Engineer (Team Leader)
Period:July 02, 2002 up to Oct 30,2006
Function of the Position
Carrying out the day-to-day maintenance of the onshore/offshore mechanical systems installation and
commissioning rotating equipment. Ensuring that the facilities integrity, reliability, availability and
maintainability of the relevant mechanical and rotating equipment are optimized, so that production targets
can be achieved. Integrating maintenance change and control communicated by the Lead Mechanical
Technician and Maintenance Supervisor in conjunction with Onshore/offshore Support Engineers through
pre-defined condition monitoring practices and procedures. Provide first line onshore/offshore presence for
the execution of the maintenance strategy to include planned and corrective maintenance. Attend to all
equipment breakdowns and plan maintenance work using the Computerized Maintenance Management
System. (CMMS Mp2 Program.) And SAP, Maximo
Duties and Responsibilities
1.Responsible of commissioning and installation of gas and diesel equipment including full engine overhauls
and subsequent testing operational fault finding trouble shooting and defect repair knowledge of low emission
engine and control system hydraulic and Woodward electric governors, ignition system EIS system,
turbotronic controller
2. Implementation of plan CMMS Mp2 maintenance program.
3. Responsible for planning, coordinating, monitoring, and recording the short term plans. Such as daily
weekly monthly preventive maintenance activities plan.
4. Perform operational check of caterpillar gas engine such as G399 SI, D399 PC, G3408, G3512 SI, G3512
EIS, D3508 DITA, D3616 DITA gas and diesel engine in field location with total of 36 units of Caterpillar
genset engine. And also assist work maintenance such turbines PGT10, PGT5, MS1001, MS1002, MS5001
Nuovo Pignone and Centaur 40 turbine and gas compression units such BCL 406 and BCL 306 and PGT 10
MW gas turbine driven ansaldo generator and other control mechanism HMI power system generator, Speed-tronic
MARK V tmr gas/de-tronics
5. Checking of all equipment to check of their performance using special tools.
6. Perform the overall execution of the permit to work system and ensuring the require precaution are
stipulated and applied as per operating procedures and good practice.
7.Monitor and Supervision of daily operations, including safety briefing, Planning activities maintaining good
house keeping at the job site, ensuring availability of materials and consumable.
8.Attend to all equipment breakdowns and Planned Maintenance work with minimum direction and
Supervision.
9.Monitor any repeated breakdown takes proper modification to resolve the problem
Experience in the field of condition. Monitoring working under permit to work system
10.Performs other duties as maybe assigned by management in furtherance of the company’s goal and
Objective:
X
11. Resume of Work
Company: Ministry of Municipal and Rural Affairs Water and Sewage Authority Qassim Region
(Kingdom of Saudi Arabia)
Location: Badaya-Al-Olya Al-Qassim (Kingdom of Saudi Arabia)
Position: Plant Supervisor/Mechanical
Period: June 23, 2000 to August 16, 2001
Function of the Position
Establishing and maintaining the overall Plant Maintenance Strategy/Plan including preventive, Predictive &
Corrective Maintenance/Repair; Troubleshooting Plant Performance Issues; Client liaison/management and
relationship development, On-Site experience in the Maintenance and Operations of Instrumentation and
Controls systems with particular application to installation and commissioning Rotating Plant such as Gas
Turbines, Compressors, Pumps, and Mechanical Drive Sets etc. Reporting to maintenance engineers monitors
and maintains a variety of mechanical equipment. Operates various machine tools and techniques.
Interrogates condition-monitoring data to determine remedial action.
Duties and Responsibilities
1.Reporting to the maintenance manger, responsible for the Planning, directing, execution.
Monitoring and evaluation for the plants, mechanical strategies, Program and system with Objective
of operational continuity and Maximum Plant efficiency.
2Responsible of maintenance of various auxiliaries of reverse osmosis plant and 7 units of MAK
Motoren In – Line Engine (Engine Type MAK 6m82 In line) and 2 units Ruston T2500 Gas Turbine
3.Provide daily technical support to activities related to utilities maintenance including operation of
water treatment plant and electrical distribution system. Ensure that established safety procedures
and adhered to in the area of maintenance work.
4.Performs preventive maintenance using applicable maintenance requirements card for each item of
support equipment to include replacement of consumable parts and structural inspection.
5.Perform operational check and all other required repair actions on assigned equipment.
6..Prepare servicing schedule of plant mechanical equipment and machinery; determine necessity of
maintenance inspection to correct early stages of defect so as to prevent the occurrence of major
breakdowns.
7.Work ─ with/support the superintendent in the general supervision of the maintenance men during
emergency repairs, unit shutdown and major overhauls.
8.Direct and coordinate the activities of subordinates, sees to it that the machinery and equipment to
be repaired re properly clear and tagged off.
9.Keep complete records of maintenance manual, reports, brochures and memos pertaining to
maintenance.
10.Observe, comply and enforce the existing rules and regulation, code of disciplines, corporate
policies and guidelines and special instructors or orders.
XI
12. Resume of Work
Company: Rolls - Royce Power Ventures Phils. (Orca Energy Inc.)
Location:Inside Coca-Cola Bottling Co. Sta. Rosa, Laguna
1.8 MW Power Co-Generation and 2000 kg/H. CO2 Plant
25 MW Rolls-Royce Avon 1534 Generators
Position: Senior Plant Operator/ Senior Plant Mechanic
Period:Sept. 15, 1999 up to June 20, 2000
Function of Position
Assist in the operation of assigned utilities areas of the processing plant by monitoring the operation of all
utility equipment including water, air, system, CO2 power generation and fuel systems and make adjustments
as instructed. Continuously monitors the functioning of assigned equipment by reading gauges, levels, and
amperages and records findings on daily log sheet. Informs shift supervisor or maintenance engineer of
unusual observations such as noise, critical designated area and report any malfunction to shift supervisor.
Also known in RCM (Reliability Centered Maintenance) and Allen Bradley controllogix, siemens, ABB
control system. With also DCS, PLC, SCADA control system.
Duties and Responsibilities
1.Operates the different production machinery and equipment auxiliaries, monitors and maintains the
operational parameters in accordance to specified standard
2.Supervises and directs a group of plant operator to ensure a continuous production workflow.
3.Plans, schedules workload distribution and shifts of subordinates to achieve production workflow.
4.Ensuring that the routine maintenance tasks are completed according to planning and scheduled
procedure of maintenance
5.Maintain detailed maintenance records in respect of the plant assist the maintenance supervisor
with short and long term of planning
6.Weekly implementation of maintenance PM and CM work activities
7.Ensuring that all site maintenance activities and operation are executed in a safe,timely and cost
effective manner
8.Coordinates with maintenance as required promoting productivity and quality improvement.
9.Coordinates with quality assurance with respect to production and operational standards and
specification to ensure quality output.10.
10.Prepare, submit daily and periodic production reports to immediate superior and discuss
recommended solutions to problems encountered and or to improve production operations.
11.Observe safety rules, corporate policies and regulations; observe proper turnover of
responsibilities 12.performs good housekeeping, performs other related tasks that may be assigned.
13.Performs communication jobs; coordinates with operation and other support group.
14.Responsible for maintaining the plant equipment and auxiliaries in good operating condition,
15.monitoring plant parameters & analyzing any abnormality, iniating corrective actions or
performing minor trouble-shooting, and complying with all safety & quality policies and quality
policies and procedures.
16.Performs other duties as may be assigned by the superiors in furtherance of the company’s
goals and objectives.
XII
13. Resume of Work
Company: Paragua Power Company Phils. Inc.
Location: Km. 13, Brgy. Sta. Lourdes Puerto Princesa City, Palawan, Philippines
4 units of 16 SW 280 vee Engine stork Wartsila 280 w/ cap of 4.1 MW each
Position: Shift Engineer (Power Generation Plant Operation)
Period: February 01, 1997 to September 10, 1999
Function of the Position:
Under the general supervision of the operation manager, is held responsible for the generation of steam
and electrical power during my shift, ensuring minimal work stoppages and interruptions, tasked with
planning, leading, directing, supervising, coordinating and controlling the resources as well as the technical
and administrative activities within my shift, with the ultimate objective of contributing to the company’s
trusts of profitably and growth. Also known in SiemensDCS, PLC Control system. Topec engineering
Supervise the technical activities of personne l
4 ─ control room operator
8 ─ plant electrician
11─ plant technician (mech’l)
15 ─ general labor (helper)
Duties and Responsibilities
1.Plan, directs, controls, coordinates and services activities in my shift to ensure a steady supply of
air, steam fuel and electrical power to different points of utilization in the plant.
2.Daily routine of plant status of generating sets, and auxiliaries’ ─ perform record, data and
performance of the plant. and assist for supervision of overhauling and other maintenance jobs.
3.Assist immediate superior and associates in planning and scheduling over all operations of the
department and conduct proper use of equipment tools and measurement.
4.Coordinates with other work units to ensure a smooth and uninterrupted operation.
5.Decide and implements appropriate disciplinary measures against department personnel for
infractions committed or violation of company rules and regulations.
6.Plans and implements strategies to ensure the target parameters for steam, fuel, and power achieve.
7.Ensures proper turnover of work before and after assigned shift schedule to ensure safety and
continuity of unfinished/ongoing work.
8.Performs other duties as may be assigned by management in furtherance of the company’s goals
and objectives.
XIII
14. Resume Of Work
Company:KEPPEL FELS Energy and Shipbuilding Inc.
Location:Inside of National Power Corporation, Brgy. San Rafael, Calaca, Batangas
90 Mw floating power barges / With 25 units WARTSILA DIESEL ENGINE
Position:Maintenance Engineer MECHANICAL(Power Generation Plant)
Period:September 01, 1993 to January 30, 1997
Function of the Position:
Responsible for the accomplishment of all maintenance servicing overhauling and repair job on
all existing plant mechanical equipment, machinery and accessories of new installation projects,
revisions, alteration and modification. Also responsible for maintaining an adequate supply of spare
parts, tools, and other maintenance material necessary for the continuous and efficient operation on
an electric generating diesel power Generation plant with total of 25 units of Wartsila diesel Genset.
And knowledge in DCS and PLC control system, with Topec engineering, Siemens PLC Control
System, Vaasa PLC engineering control System, ABB control system and switchgear
Duties and Responsibilities
1.Check daily maintenance work orders; assign job to maintenance personnel through the chief
maintenance engineer giving specific instruction regarding trouble analysis, repair procedures,
materials to be used and priority of the job.
2.Supervise the plant mechanic and auxiliary mechanic on the performance of the day-to-day
schedule and unscheduled maintenance.
3.Performs preventive maintenance using applicable maintenance requirements cards for each item
of support equipment to include replacement of consumable parts and structural inspection.
4.Coordinates with the shift engineer, system maintenance and electrical department to ensure that
maintenance work on the engineering set is carried-out smoothly without hindering the output of the
power plant.
5.Performs troubleshoot and rectifies generating sets problems that are beyond the capability of the
shift on duty from time to time.
6.To direct and supervised the installation, maintenance, repair, troubleshooting, and modification
activities carried out on a wide range of mechanical static and rotating equipment in the plant,
including turbo machinery, compressor, heat exchangers, diesel generator.
7.Scrutinize and study operation logbook and daily operational and alarm record in order to identify
potential problems and take necessary actions to rectify them.
8.Prepare performance evaluation report of subordinate’s recommended training need and conduct
lectures and on-the-job training to subordinates to improve their skills and to promote effectively
flexibility among them.
XIV
15. Resume of Work
Company: National Power Corporation 300 MW Coal Fired Thermal Power Plant (300 MW
BCFTPP) w/W501 Westinghouse Steam Turbine
Location: Brgy. San. Rafael, Calaca, Batangas
Position: Senior Plant Operator / Senior Plant Mechanic
Period: May 01, 1990 to August 31, 1993
Function of the Position
Reports to maintenance head. Responsible for operating and maintenance, control and optimization of
pulverized coal fired steam generation equipment and its auxiliary equipment including coal handling, flue-gas
cleaning, etc. Assists in undertaking major/complete engine overhaul at motor pool mechanical and power
generation plant section.
Duties and Responsibilities
1.Responsible for maintaining the plant equipment and auxiliaries in good operating condition,
monitoring plant parameters and analyzing any abnormality, iniating any corrective actions or
performing minor trouble-shooting, and complying with all safety and quality policies and
procedures.
2.Responsible for performing all preventive and corrective maintenance of large
automotive maintenance facilities equipment.
3.Assist and troubleshoot and diagnose various types of hydraulic and pneumatic problems of the
above equipment; utilizing the appropriate test equipment.
4.Responsible for engine inspection and troubleshooting repair, and replace defective parts,
preventive maintenance, and adjustment of engine components.
5.Assist also mechanical maintenance repair and overhauling of reciprocating, dozing, and
centrifugal (single and multistage) and vacuum pumps, screw type compressor, maintenance of
different valves and electrical chain hoist.
6.Undertakes thorough and proper turnover of work at the start and end my shift schedule to ensure
safety and continuity of unfinished/ongoing work.
7.Attends to daily care, cleaning and, maintenance of machines/ equipment/ devices/ tools operates
duly schedules maintenance works/jobs needed to ensure that these are kept in optimum operating
condition at all times.
8.Performs other duties as may be assigned by superiors in furtherance of the company’s goals and
objectives.
9.Observe safety rules, corporate policies and regulations; observes proper turnover of
responsibilities, performs good housekeeping, performs other related task that may be assigned.
10.And with good interpersonal relations and computer literate. Have leadership ability and can
motivate people at work towards a common goal.
XV
16. Job Dimension:
1. Having logical, hardworking, and committed to work. And be alert and have a presence of
mind.
2. Have a reliable, productive and proactive, have a positive work attitude and able to
effectively communicate with my superiors, peers and subordinates. Also posses the necessary
leadership traits of self-discipline and creative thinking and be stable under stress.
3. Have a sense of urgency, hardworking and initiative.
4. Team player, with degree of adaptability and ability to work independently, with minimum
supervision.
5. And computer literate Microsoft word, power point, excel, sap, maximo, cmms mp2
Character References:
Mr. William Wall
Training director
General electric
Schenectady new York
Mr.Vincenzo Mauro
Land Area manager
(NAOC) Nigerian AGIP Oil Company Limited
Land Area Base LNG Gas Plant
Obiafu, Obrikom, Omoku
Rivers State Nigeria
Mr. Erick Pepper
President
Rolls-Royce Power Ventures Phil. Inc.
31/F LKG Tower, 6801-6803 Ayala Avenue
Makati City 1226, Philippines
Mr. Henry Alcalde
Sr. Manager
National Power Corporation
300-mw Batangas Coal Fired
Thermal Power Plant. (BCFTPP)
Brgy.San Rafael Calaca, Batangas
Philippines
Mr. Antonio F. Mendoza
XVI