Peter Curt Le Muth
Address 1: Block 345, Ang Mo Kio Ave 3, #06-2230, Singapore 560345
Address 2: 201 Bellthorpe Range Road, Bellthorpe, QLD 4514, Australia
Phone: + (61) 427 360 404
Email: petelemuth@yahoo.com.au
Offshore Construction Manager/Client Site Representative/Offshore Diving Supervisor/OHS Advisor
(Marine Construction/Refinery Construction)
Experienced Offshore Construction Manager in the diving/subsea construction industry with a wide skill-set covering all types of
subsea activities, including deep water pipe lay, cable lay & burial, riser & jacket installations. Diving and subsea construction
experience encompassing all aspects of subsea activity from construction to inspection and hyperbaric welding. Dedicated
Diving Superintendent skilled in running SIMOPS operations for subsea installation projects, inclusive of pipeline and flowline
installations and tie-ins, umbilical installations and connections, and manifold and structure installations, both diving and non-
diving. Post-Graduate Diploma of Occupational Health and Safety, NEBOSH and ADAS/ADC onshore/offshore Diving Supervisor
certified. Certified in HSE Pt I Air Diving Oilfield, HSE Pt II Saturation Diving, Advanced Rigger and recognised as Diving
Superintendent by authorities for completing a two-year lump sum contract valued at US$400M on-time in Saudi, further
attaining a completion bonus of US$20,000 from the company; experience in managing 200 team members. Client site
representative, adept in supervising offshore subsea operations and committed to applying knowledge of diving operations to
carefully plan each expedition while ensuring safety of divers and construction teams.
CORE COMPETENCIES
▪ Subsea Engineering ▪ Offshore Construction and Operations ▪ Project Control ▪ Safety Management ▪ Quality Control ▪
Inspection Survey, NDT Inspection and Corrosion Inspection ▪ Diver and ROV Intervention, subsea Cable lay and burial ▪
Umbilicals, Flow Lines, Pipelines, Manifolds ▪
KEY SKILLS AND ACHIEVEMENTS
 Offshore Construction Management, Vessel Movement, Stakeholder Engagement, Simultaneous Operations
System (SIMOPS) (Leighton Offshore) – Successful in completing the high-end Shell Bukom Refinery lump sum Project in
Singapore harbour – as Offshore Construction Manager – involving 48-inch pipeline excavation removal and reinstallation
C/w new subsea plem and SBM changeout one day ahead of the defined strict deadline and with no safety incidents. Played
a major role in managing close-out operations of Do 23 on air diving system and Do 24 saturation system as well as start-up
of phase one of Shell Bukom 48-inch pipeline repair. Managed project remobilisation for commencement of phase two
along with close-out of DP trials for FMEA and Shell. Defined work procedures, undertook risk assessments and completed
tie-in of 48-inch spool to subsea Plem using saturation divers. Closely coordinated with subcontractors, project engineers,
safety representatives, marine crew and Shell CSR while motivating personnel through positive feedback and rewards, thus
ensuring a safe working culture at workplace.
 Inspection, Hazard Analysis, Diving Team Management – Expertise in underwater oxy-arc cutting, welding
and metrology; spool installation and hydratight application of flange bolts surface and subsea; installation of Smart &
Gripper flanges for pipeline repairs, subsea plough cable burial and riser installations/clamps; SBM installation/maintenance
as well as FSPO mooring/platforms/SBM/Plem/Christmas tree installations.
(Smit Subsea International) – Worked as Offshore Project Manager for Inspection Dubai Petroleum Platforms; involved in
UT, MPI, CVI, MG, FM, inspection survey, NDT and GVI using divers and ROV on four platforms and numerous pipelines in
Fateh Field Dubai. Administered open/close work permits and lock-out/tag-outs on platform intakes. Collaborated with DPE
CSR and platform controllers for shutdowns, generated daily reports for project engineer, organised safety drills/meetings,
performed risk assessments and created procedures for work commencement.
(Pertamina Oil) – As Client Site Representative, monitored safe diving operations of diving teams to deliver optimum work
results. Recommended safe procedures for repair of leaking pipelines and oversaw diver UT, MPI and MG inspection, ROV
GVI workpacks on platforms and flare tripods. Executed vessel safety culture audit for DP vessel DSV Penrith and provided
daily progress reports of all operations to clients and stakeholders.
Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au
1
 Health and Safety, Work Class ROV Specialisation and Deep Water Repair/Construction (Rubicon Offshore –
1000 FSW Philippines) – Instrumental in developing safety management procedures and JSAs as part of revamping of single
mooring project; additionally reinstated project of mooring system (short-term lump sum contract) from FSPO in 1000 FSW
Nido Fields Philippines, as Offshore Construction Manager. Devised a safety management and salvage plan while leading
commercial diving team, work class ROV and two salvage vessels in SIMOPS. Recovered subsea USSB and LSSB on URTI to
deck of main salvage vessel, DPDSV Maverik. Enabled umbilical reconnect to tether and pass back mooring system to FSPO.
Created daily progress reports for client and company management.
 Diving Expertise, Complicated Diving Project Execution, Training/Mentoring and Timely Completion
Projection (Global Al Rashald) – Experience of working as Offshore Diving Superintendent and executing the two-year lump
sum project of 40-inch water injection pipeline installation C/W 10 x 70 ton valve skids, 15 x risers and 20 tie-in spools.
Provided training to diving crew on preparing 35% and 40% nitrox breathing mixture to enable longer working times and
minimum decompression. Additionally, coached divers on hydratight procedures on pipeline closing of spool flanges both
on surface and subsea. Facilitated risk assessments, safe working procedures, diving safety drills and daily written progress
reports to clients and stakeholders; proactively implemented the project within set schedule of two years and on budget.
CAREER HISTORY
Ocean Team Asia Pacific Ltd.
DP DSV Shipper – OCM; Client: COOEC/CNOOC China Mar 2014 – Jun 2014
 Mobilising nine sets of mooring chains for re-installation on FSPO STP location at Wencheng Field South China
– each chain set had three lengths of 100m chains with a final weight, C/W connection plates and shackles, of 135 ton.
 Wet stored new chain, picked up old ground wire and ballast chains disconnected upper ground wire to STP;
subsequently, wet stored old chains and ground wires at assigned subsea storage location. Recovered wet stored new chain
to deck.
 Picked up new ground wire and adjustment chain – applied up to 90 ton tension – to remove slack to suction
anchors; connected new adjustment chain to new ballast chain and relayed up to the STP.
 Executed all operations in SIMOPS with two other DP DSVs laying cables and reconnecting ground wires on
STP.
Leighton Offshore
DP DSV Altus Exertus – OCM/CSR/DSV Superintendent; Client: Shell Singapore Mar 2013 – Aug 2013
 Managed phase one activities wherein cut out two FJ of 48” pipeline using subsea diamond saw and attached
wire lifting slings for cut pipe removal. Attached 4 x 48mm wire davit slings for pipeline lift. Air lift under pipeline and fitted
27 x 5 ton lift bags along pipeline to assist lift operations. Drilled 100mm hole from pipeline cut insert pig stopping bar.
 Steered recovery of 2.7km of abandoned 48-inch pipeline in anticipation of 250 ton gravity Plem installation.
 Collated procedures and risk assessments for deployment and tie-in of connecting spool from new pipeline to
Plem in saturation from DSV in SIMOPS with Leighton crane barge Stealth and Boskalis dredger/rock dump barge.
 Cut and fitted slings to old pipeline for recovery by Stealth Barge.
 Ensured timely project completion and vessel de-mobilisation.
Smit Subsea Offshore
Offshore Construction Manager/DSV Superintendent; Client: Dubai Petroleum Nov 2012 – Dec 2012
 Repaired 30-inch oil pipeline, cut out and recovered three MTR section of pipeline - remaining line to be
abandoned; fitted 30-inch smart flange C/W blind flange spool, diving surface gas He 02 84/16 mix gas.
 Formulated operational procedures along with open and close work permits while coordinating with client and
delivering progress reports daily to project engineer.
Offshore Contract/Project Manager; Client: Dubai Petroleum Oct 2012 – Nov 2012
 Compiled procedures for diving using golden gate on DP for diving operations on structures that could not be
reached on normal umbilical excursions.
EARLIER CAREER
International Naval Works, Abu Dhabi, UAE
Project Manager/Diving Superintendent; Client: ADGAS/Hyundai Oct 2011 – Apr 2012
Diving Superintendent; Client: ADGAS/Hyundai Jun 2011 – Aug 2011
Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au
2
KB and Associates Ltd.
Offshore Construction Manager DP DSV Rubicon Maverick Client: Rubicon Offshore Oct 2010 – Nov 2010
Client Site Representative DP DSV Penrith Client: Pertamina PHE Arco Field Indonesia May 2010 – Sep 2010
Global Al Rashaid Offshore
Air Supervisor/Diving Superintendent; Client: Aramco Oil & Gas Feb 2008 – Aug 2009
Global Industries Subtec
Air Supervisor; Client: Chevron (Uganda, Africa) Aug 2007 – Oct 2007
Air Supervisor; Client: Parenco (Gabon, Africa) May 2007 – Aug 2007
Epic Divers and Marine
Life Support Supervisor Saturation Control; Client: Horizon Offshore (Gulf of Mexico, Mexico) Nov 2006 – Mar 2007
Apr 2006 – Sep 2006
Subsea 7 (Rockwater II), Bass Strait, Australia
Saturation Diver/ALST Feb 2006 – Mar 2006
Subtec/Global, Congo, Africa
Air Diving Supervisor Oct 2005 – Jan 2006
Subsea7
Deck Rigger RW2 DPDSV; Client: Petronas (Terengganu, Malaysia) Jun 2005 – Jul 2005
Rescue Diver Saturation Support; Client: Santos (Port Headland, Australia) Jan 2005 – Mar 2005
Global Offshore
Diving Supervisor/Deck Foreman; Client: FMC (Bejaia and Skidka, Algeria) Sep 2004 – Dec 2004
CCC Underwater Constructions
Diving Supervisor; Client: ADMA OPCO NPCC (Total ABK Field in Abu Dhabi, UAE) Apr 2004 – Jul 2004
J Ray McDermott
Diving Supervisor; Client: Rasgas (Qatar) Oct 2003 – Jan 2004
CCC Underwater Construction
Standby Saturation Diver; Client: BP (Red Sea, Egypt) Sept 2003 – Sep 2003
Stolt Comex
Saturation Diver; Client: China Gas (Shekou, China) Jun 2003 – Jul 2003
Subtec Global
Air Supervisor Mixed Gas. He o2 90/10; Client: Du Gas/D.P.C. (Dubai) Mar 2003 – Apr 2003
Saturation Diver; Client: ONGC (Mumbai, India) Dec 2002 – Feb 2003
Borneo Subsea
Air Diving Supervisor; Client: Shell (Brunei) Sep 2002 – Dec 2002
CCC Underwater Engineering
Saturation Diver on DLB750-DLB648; Client: Mersk (Qatar, UAE) Jun 2002 – Sep 2002
Global Subtec
Surface Gas (He 90/10) Supervisor for Smart Flange Repair Spool Installation; Client: DPC (Fatah Field,
Dubai)
Apr 2002 – May 2002
Rockwater, Brown & Root
Saturation Diver; Client: Sambawa Copper Mine (Sambawa Island, Indonesia) Mar 2002 – Apr 2002
Global Subtec
Saturation Diver; Client: Gupco BP (Mediterranean and Red Sea, Egypt) Nov 2001 – Feb 2002
Master Tech Diving Services Pte Ltd.
Project Manager, Diving Superintendent and Global Representative in Hong Kong on Cable Location
Project; Client: Global Marine Cables, NSW Submarine Cables, New TNT Cables
Jul 2001 – Nov 2001
Supervisor and Superintendent in Shanghai, China, for Cable Installation from DP DSV, Adam’s
Challenge; Client: Global Marine Cables
Sep 2000 – Jun 2001
Occupational Health and Safety Consultant Jun 2000 – Aug 2000
Rockwater Brown & Root
Saturation Diver 400ft; Client: CACT (Shekou, China) Mar 2000 – May 2000
Kasel Salvage Pte Ltd., Singapore; Singapore Western Anchorage
Relieving Captain of Cargo Vessel ‘Elondea Rainbow’ Feb 2000 – Feb 2000
Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au
3
Rockwater Brown & Root
Saturation Diver, DP DSV Rockwater I; Client: Sambawa Copper (mine in Sambawa, Indonesia) Dec 1999 – Jan 2000
Hallin Marine
Supervisor/Superintendent; Client: The Club (Insurance Group) Aug 1999 – Sep 1999
Fraser
Lead Diver/Assistant Supervisor; Client: US Navy (Dubai, UAE) Jul 1999 – Jul 1999
Haliburton/Brown & Root Singapore
Safety Officer onboard DP DSV Rockwater II; Client: Rockwater Brown and Root Jun 1999 – Jul 1999
Hallin Marine/Geocean Solmarine
Senior Supervisor/Superintendent; Client: Shell (Sri Lanka) Jan 1999 – Apr 1999
EDUCATIONAL AND PROFESSIONAL QUALIFICATIONS
Post-Graduate Diploma of Occupational Health and Safety (Full-time) Apr 2012 – Sep 2012
TAFE Western Sydney Institute (OTEN), Australia
Other Credentials
 Offshore Survival OPITO Approved – SMTC Singapore (expires 23/03/2017); Certificate No. 8417580812031004
I.D No. E4038189
 Diving Systems Assurance Course. IMCA Audit, Do11, Do 10, Do18, Do23, Do24, Do 37, Do 40 (Passed 9th
Apr,
2012)
 NEBOSH International Occupational Health and Safety Management Certification Course, KB and Associates
Ltd., Singapore (Jan 2010 – Feb 2010) (Passed 20th
Apr, 2010)
 DP Awareness Certificate, Swire Marine Training Centre
 Advanced Rigger Certification, Worksafe Australia – Certificate No. W 0575005
 HSE Pt I Air Diving Oilfield – Heavy Construction
 HSE Pt II Saturation Diving – Heavy Construction
 ADC Surface-Supplied Air Diving Supervisor
 ADAS Onshore Diving Supervisor – 00978
 ADAS Offshore Diving Supervisor – 00978
 Oxygen Provider Course Certificate
 First Aid Certificate
COMPUTER SKILLS
 Proficient in MS Office Applications.
PERSONAL DETAILS
Nationality: Australian Marital Status: Married
Languages: Fluent in English, Papua New Guinea Pidgin Driver’s Licence: Australian
References available on request
Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au
4

Short Resume

  • 1.
    Peter Curt LeMuth Address 1: Block 345, Ang Mo Kio Ave 3, #06-2230, Singapore 560345 Address 2: 201 Bellthorpe Range Road, Bellthorpe, QLD 4514, Australia Phone: + (61) 427 360 404 Email: petelemuth@yahoo.com.au Offshore Construction Manager/Client Site Representative/Offshore Diving Supervisor/OHS Advisor (Marine Construction/Refinery Construction) Experienced Offshore Construction Manager in the diving/subsea construction industry with a wide skill-set covering all types of subsea activities, including deep water pipe lay, cable lay & burial, riser & jacket installations. Diving and subsea construction experience encompassing all aspects of subsea activity from construction to inspection and hyperbaric welding. Dedicated Diving Superintendent skilled in running SIMOPS operations for subsea installation projects, inclusive of pipeline and flowline installations and tie-ins, umbilical installations and connections, and manifold and structure installations, both diving and non- diving. Post-Graduate Diploma of Occupational Health and Safety, NEBOSH and ADAS/ADC onshore/offshore Diving Supervisor certified. Certified in HSE Pt I Air Diving Oilfield, HSE Pt II Saturation Diving, Advanced Rigger and recognised as Diving Superintendent by authorities for completing a two-year lump sum contract valued at US$400M on-time in Saudi, further attaining a completion bonus of US$20,000 from the company; experience in managing 200 team members. Client site representative, adept in supervising offshore subsea operations and committed to applying knowledge of diving operations to carefully plan each expedition while ensuring safety of divers and construction teams. CORE COMPETENCIES ▪ Subsea Engineering ▪ Offshore Construction and Operations ▪ Project Control ▪ Safety Management ▪ Quality Control ▪ Inspection Survey, NDT Inspection and Corrosion Inspection ▪ Diver and ROV Intervention, subsea Cable lay and burial ▪ Umbilicals, Flow Lines, Pipelines, Manifolds ▪ KEY SKILLS AND ACHIEVEMENTS  Offshore Construction Management, Vessel Movement, Stakeholder Engagement, Simultaneous Operations System (SIMOPS) (Leighton Offshore) – Successful in completing the high-end Shell Bukom Refinery lump sum Project in Singapore harbour – as Offshore Construction Manager – involving 48-inch pipeline excavation removal and reinstallation C/w new subsea plem and SBM changeout one day ahead of the defined strict deadline and with no safety incidents. Played a major role in managing close-out operations of Do 23 on air diving system and Do 24 saturation system as well as start-up of phase one of Shell Bukom 48-inch pipeline repair. Managed project remobilisation for commencement of phase two along with close-out of DP trials for FMEA and Shell. Defined work procedures, undertook risk assessments and completed tie-in of 48-inch spool to subsea Plem using saturation divers. Closely coordinated with subcontractors, project engineers, safety representatives, marine crew and Shell CSR while motivating personnel through positive feedback and rewards, thus ensuring a safe working culture at workplace.  Inspection, Hazard Analysis, Diving Team Management – Expertise in underwater oxy-arc cutting, welding and metrology; spool installation and hydratight application of flange bolts surface and subsea; installation of Smart & Gripper flanges for pipeline repairs, subsea plough cable burial and riser installations/clamps; SBM installation/maintenance as well as FSPO mooring/platforms/SBM/Plem/Christmas tree installations. (Smit Subsea International) – Worked as Offshore Project Manager for Inspection Dubai Petroleum Platforms; involved in UT, MPI, CVI, MG, FM, inspection survey, NDT and GVI using divers and ROV on four platforms and numerous pipelines in Fateh Field Dubai. Administered open/close work permits and lock-out/tag-outs on platform intakes. Collaborated with DPE CSR and platform controllers for shutdowns, generated daily reports for project engineer, organised safety drills/meetings, performed risk assessments and created procedures for work commencement. (Pertamina Oil) – As Client Site Representative, monitored safe diving operations of diving teams to deliver optimum work results. Recommended safe procedures for repair of leaking pipelines and oversaw diver UT, MPI and MG inspection, ROV GVI workpacks on platforms and flare tripods. Executed vessel safety culture audit for DP vessel DSV Penrith and provided daily progress reports of all operations to clients and stakeholders. Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au 1
  • 2.
     Health andSafety, Work Class ROV Specialisation and Deep Water Repair/Construction (Rubicon Offshore – 1000 FSW Philippines) – Instrumental in developing safety management procedures and JSAs as part of revamping of single mooring project; additionally reinstated project of mooring system (short-term lump sum contract) from FSPO in 1000 FSW Nido Fields Philippines, as Offshore Construction Manager. Devised a safety management and salvage plan while leading commercial diving team, work class ROV and two salvage vessels in SIMOPS. Recovered subsea USSB and LSSB on URTI to deck of main salvage vessel, DPDSV Maverik. Enabled umbilical reconnect to tether and pass back mooring system to FSPO. Created daily progress reports for client and company management.  Diving Expertise, Complicated Diving Project Execution, Training/Mentoring and Timely Completion Projection (Global Al Rashald) – Experience of working as Offshore Diving Superintendent and executing the two-year lump sum project of 40-inch water injection pipeline installation C/W 10 x 70 ton valve skids, 15 x risers and 20 tie-in spools. Provided training to diving crew on preparing 35% and 40% nitrox breathing mixture to enable longer working times and minimum decompression. Additionally, coached divers on hydratight procedures on pipeline closing of spool flanges both on surface and subsea. Facilitated risk assessments, safe working procedures, diving safety drills and daily written progress reports to clients and stakeholders; proactively implemented the project within set schedule of two years and on budget. CAREER HISTORY Ocean Team Asia Pacific Ltd. DP DSV Shipper – OCM; Client: COOEC/CNOOC China Mar 2014 – Jun 2014  Mobilising nine sets of mooring chains for re-installation on FSPO STP location at Wencheng Field South China – each chain set had three lengths of 100m chains with a final weight, C/W connection plates and shackles, of 135 ton.  Wet stored new chain, picked up old ground wire and ballast chains disconnected upper ground wire to STP; subsequently, wet stored old chains and ground wires at assigned subsea storage location. Recovered wet stored new chain to deck.  Picked up new ground wire and adjustment chain – applied up to 90 ton tension – to remove slack to suction anchors; connected new adjustment chain to new ballast chain and relayed up to the STP.  Executed all operations in SIMOPS with two other DP DSVs laying cables and reconnecting ground wires on STP. Leighton Offshore DP DSV Altus Exertus – OCM/CSR/DSV Superintendent; Client: Shell Singapore Mar 2013 – Aug 2013  Managed phase one activities wherein cut out two FJ of 48” pipeline using subsea diamond saw and attached wire lifting slings for cut pipe removal. Attached 4 x 48mm wire davit slings for pipeline lift. Air lift under pipeline and fitted 27 x 5 ton lift bags along pipeline to assist lift operations. Drilled 100mm hole from pipeline cut insert pig stopping bar.  Steered recovery of 2.7km of abandoned 48-inch pipeline in anticipation of 250 ton gravity Plem installation.  Collated procedures and risk assessments for deployment and tie-in of connecting spool from new pipeline to Plem in saturation from DSV in SIMOPS with Leighton crane barge Stealth and Boskalis dredger/rock dump barge.  Cut and fitted slings to old pipeline for recovery by Stealth Barge.  Ensured timely project completion and vessel de-mobilisation. Smit Subsea Offshore Offshore Construction Manager/DSV Superintendent; Client: Dubai Petroleum Nov 2012 – Dec 2012  Repaired 30-inch oil pipeline, cut out and recovered three MTR section of pipeline - remaining line to be abandoned; fitted 30-inch smart flange C/W blind flange spool, diving surface gas He 02 84/16 mix gas.  Formulated operational procedures along with open and close work permits while coordinating with client and delivering progress reports daily to project engineer. Offshore Contract/Project Manager; Client: Dubai Petroleum Oct 2012 – Nov 2012  Compiled procedures for diving using golden gate on DP for diving operations on structures that could not be reached on normal umbilical excursions. EARLIER CAREER International Naval Works, Abu Dhabi, UAE Project Manager/Diving Superintendent; Client: ADGAS/Hyundai Oct 2011 – Apr 2012 Diving Superintendent; Client: ADGAS/Hyundai Jun 2011 – Aug 2011 Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au 2
  • 3.
    KB and AssociatesLtd. Offshore Construction Manager DP DSV Rubicon Maverick Client: Rubicon Offshore Oct 2010 – Nov 2010 Client Site Representative DP DSV Penrith Client: Pertamina PHE Arco Field Indonesia May 2010 – Sep 2010 Global Al Rashaid Offshore Air Supervisor/Diving Superintendent; Client: Aramco Oil & Gas Feb 2008 – Aug 2009 Global Industries Subtec Air Supervisor; Client: Chevron (Uganda, Africa) Aug 2007 – Oct 2007 Air Supervisor; Client: Parenco (Gabon, Africa) May 2007 – Aug 2007 Epic Divers and Marine Life Support Supervisor Saturation Control; Client: Horizon Offshore (Gulf of Mexico, Mexico) Nov 2006 – Mar 2007 Apr 2006 – Sep 2006 Subsea 7 (Rockwater II), Bass Strait, Australia Saturation Diver/ALST Feb 2006 – Mar 2006 Subtec/Global, Congo, Africa Air Diving Supervisor Oct 2005 – Jan 2006 Subsea7 Deck Rigger RW2 DPDSV; Client: Petronas (Terengganu, Malaysia) Jun 2005 – Jul 2005 Rescue Diver Saturation Support; Client: Santos (Port Headland, Australia) Jan 2005 – Mar 2005 Global Offshore Diving Supervisor/Deck Foreman; Client: FMC (Bejaia and Skidka, Algeria) Sep 2004 – Dec 2004 CCC Underwater Constructions Diving Supervisor; Client: ADMA OPCO NPCC (Total ABK Field in Abu Dhabi, UAE) Apr 2004 – Jul 2004 J Ray McDermott Diving Supervisor; Client: Rasgas (Qatar) Oct 2003 – Jan 2004 CCC Underwater Construction Standby Saturation Diver; Client: BP (Red Sea, Egypt) Sept 2003 – Sep 2003 Stolt Comex Saturation Diver; Client: China Gas (Shekou, China) Jun 2003 – Jul 2003 Subtec Global Air Supervisor Mixed Gas. He o2 90/10; Client: Du Gas/D.P.C. (Dubai) Mar 2003 – Apr 2003 Saturation Diver; Client: ONGC (Mumbai, India) Dec 2002 – Feb 2003 Borneo Subsea Air Diving Supervisor; Client: Shell (Brunei) Sep 2002 – Dec 2002 CCC Underwater Engineering Saturation Diver on DLB750-DLB648; Client: Mersk (Qatar, UAE) Jun 2002 – Sep 2002 Global Subtec Surface Gas (He 90/10) Supervisor for Smart Flange Repair Spool Installation; Client: DPC (Fatah Field, Dubai) Apr 2002 – May 2002 Rockwater, Brown & Root Saturation Diver; Client: Sambawa Copper Mine (Sambawa Island, Indonesia) Mar 2002 – Apr 2002 Global Subtec Saturation Diver; Client: Gupco BP (Mediterranean and Red Sea, Egypt) Nov 2001 – Feb 2002 Master Tech Diving Services Pte Ltd. Project Manager, Diving Superintendent and Global Representative in Hong Kong on Cable Location Project; Client: Global Marine Cables, NSW Submarine Cables, New TNT Cables Jul 2001 – Nov 2001 Supervisor and Superintendent in Shanghai, China, for Cable Installation from DP DSV, Adam’s Challenge; Client: Global Marine Cables Sep 2000 – Jun 2001 Occupational Health and Safety Consultant Jun 2000 – Aug 2000 Rockwater Brown & Root Saturation Diver 400ft; Client: CACT (Shekou, China) Mar 2000 – May 2000 Kasel Salvage Pte Ltd., Singapore; Singapore Western Anchorage Relieving Captain of Cargo Vessel ‘Elondea Rainbow’ Feb 2000 – Feb 2000 Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au 3
  • 4.
    Rockwater Brown &Root Saturation Diver, DP DSV Rockwater I; Client: Sambawa Copper (mine in Sambawa, Indonesia) Dec 1999 – Jan 2000 Hallin Marine Supervisor/Superintendent; Client: The Club (Insurance Group) Aug 1999 – Sep 1999 Fraser Lead Diver/Assistant Supervisor; Client: US Navy (Dubai, UAE) Jul 1999 – Jul 1999 Haliburton/Brown & Root Singapore Safety Officer onboard DP DSV Rockwater II; Client: Rockwater Brown and Root Jun 1999 – Jul 1999 Hallin Marine/Geocean Solmarine Senior Supervisor/Superintendent; Client: Shell (Sri Lanka) Jan 1999 – Apr 1999 EDUCATIONAL AND PROFESSIONAL QUALIFICATIONS Post-Graduate Diploma of Occupational Health and Safety (Full-time) Apr 2012 – Sep 2012 TAFE Western Sydney Institute (OTEN), Australia Other Credentials  Offshore Survival OPITO Approved – SMTC Singapore (expires 23/03/2017); Certificate No. 8417580812031004 I.D No. E4038189  Diving Systems Assurance Course. IMCA Audit, Do11, Do 10, Do18, Do23, Do24, Do 37, Do 40 (Passed 9th Apr, 2012)  NEBOSH International Occupational Health and Safety Management Certification Course, KB and Associates Ltd., Singapore (Jan 2010 – Feb 2010) (Passed 20th Apr, 2010)  DP Awareness Certificate, Swire Marine Training Centre  Advanced Rigger Certification, Worksafe Australia – Certificate No. W 0575005  HSE Pt I Air Diving Oilfield – Heavy Construction  HSE Pt II Saturation Diving – Heavy Construction  ADC Surface-Supplied Air Diving Supervisor  ADAS Onshore Diving Supervisor – 00978  ADAS Offshore Diving Supervisor – 00978  Oxygen Provider Course Certificate  First Aid Certificate COMPUTER SKILLS  Proficient in MS Office Applications. PERSONAL DETAILS Nationality: Australian Marital Status: Married Languages: Fluent in English, Papua New Guinea Pidgin Driver’s Licence: Australian References available on request Peter Curt Le Muth | Phone: + (61) 427 360 404 | Email: petelemuth@yahoo.com.au 4