1. ADDRESS
22, Ahamed khalil st. From Elshaawy st. phone: + (2050) 6922263
Dakadoss Mobile: + (2012) 21513867
Mit Ghamer , dakahlia
Zip code 35623
E-mail: Mohamed_Elgohary1983@yahoo.com
Mohamed ElgoharyMohamed Elgohary
PRSONAL INFORMATION
Name : Mohamed Mamdouh Abdelazeem Elgohary
Nationality : Egyptian
Date of Birth : 20 /12 /1983
Marital Status : Single
Military Status : Completed.
Career Objective:
I am delighted to apply for this job, I would like to nourish my skills
and improve my potentialities. Seeking an opportunity in Petroleum field
where my academic background, training, experience and communication.
Skills can be applied and further enhanced.
EDUCATION:
In AY 2006/2007
B.Sc. Petroleum Engineering "Very Good 78.88 %" Suez Canal
University.
In AY 2001/2002
Graduation from technical institute of marine structure &
Economics of marine transports " EXCELLENT degree"
Graduation Project about Ras Ghara oil field, Gulf of Suez, Egypt.
Grade "Excellent".
Current job:
- Drilling & Work over rig supervisor.
- Working for AGIBA Petroleum Company since FEB. 20th
, 2008
- Worked as Work over Consultant in KEC (KWAIT ENERGY
COMPANY), NORPETCO.
- Supervise and Workover many type of wells like sucker rods, ESP,
natural flowing wells, PCP, well services.
- Supervise for workover & all rigless workover operations
2. EXPERIENCE:
• Drilling & Work over rig supervisor.
• Working for AGIBA Petroleum Company since FEB. 20th
, 2008 till
2015 (Work over rig Supervisor and completion engineer land &
offshore).
• Working as a Co-man representative, co-ordinates w/service
companies in workover and completion wells.
• Work in many Drilling &Workover rigs like: weatherford , shingle
bohi, EDC Rigs, DASCO Rigs, and SinoTharwa rigs, Saipem &
Sino Rigs
• Supervise and Work over many type of wells like ESP, sucker
rods ,P.C.P & W.I wells, natural wells.
• Workover & completion supervisor for all activities related to a
Workover operations, from rig acceptance to return well to a
production department.
• Worked as a consultant in many companies inside Egypt
• Work in conjunction with safety, environmental and field operations
personnel to optimize well site safety and environmental
performance.
Job description in details:
• Co-ordinate assembly, testing, and preparation for well workover
and completion.
• Checks list of workover rigs and test it before spud-in.
• Supervise the make-up, testing and breakdown of completion/work
over assemblies at well site.
• Collect all documents for well completion and summarize problems
encountered during operations and how they were solved, including
drawings of completion, making well programs & follow up rigs
operations.
• Help in trouble shooting downhole problems and recommending
ways in overcoming them.
• Supervision of completion, Re-completion, Change status wells.
• Supervision for many fishing jobs (lost well completion equipment,
cleaned out hole from fill or scales, Stuck PKR's).
• Supervision for hydraulic well stimulation FRAC & ACID jobs.
3. • Supervision for perforation jobs using several perforation
techniques like CSG gun & TCP.
• Killing operations and pulling programs.
• Set & unset hydraulic and mechanical packers.
• Test casing by using RTTS packer.
• Set plugs “drill bridge plug” & CMT retainers mechanically or
using wire line.
• Slick & electric Wire line applications (production & CMT
logging , gauge cutter, junk basket, impression block, fishing
operation, shifting tools, perforations, TBG puncher, set &
retrieving all plugs type , chemical & mechanical cutter, logging
operation & witnessing same,…………..etc.
• Secondary cementing jobs “ injectivity test, cement squeeze through
CMT retainer “
• Side track operation, Run & set whipstock in case of short radius
and drill a hole section drain of 300 m to 500 m .
• Preparation of fishing programs.
• Planning and monitoring of workover and completion wells.
• Preparing daily workover operations & cost report (24 hrs)
• Ordering of material and service coordinating material from
different stores / departments / companies.
• Coordinating services e.g . Completion, fishing tools, liner hanger,
stimulation, wire line, lifting, DST.
• Follow up operation and handling operation with services
companies
• Well Testing (Vacuum, Injectivity, D.S.T.).
• Repair on 7” casing, & set up Casing patch.
• Change out X-Mass Tree and wellhead.
• Ensure compliance with well program liaison with client & service
representative on all operational aspects.
• Drilled &completed horizontal, power water injector, horizontal
open hole & cased hole side track, exploration & development oil,
gas, water, high temp & high press deep(16000ft), shallow (1500 ft)
upper & lower completion, smart wells completion .
• Run & cemented different sizes of casings (from 7” to 30”) with
simple & double stages, with blended & light cement,
• Run 4-1/2”&7” mechanical & hydraulic liners.
4. Drilling with water base & oil base mud with different oil & water
ratio, K.cl polymer mud, Saturated salt water mud, blind drilling
with water when total loss encounter, heavy & light mud (19.6 ppg
& 7.16 ppg ) .
• Worked on shallow and deep drilling rigs, involved in drilling High
Pressure Gas wells to a depth of 4000 -4500 mts & Shallow gas
hazards.
Critical maintenance of Well Control Equipment, maintenance of
mud parameters and adherence to the safety norms of the company
were very critical to safe operations in those
• Well control procedure for water oil & gas well. Use of divertor for
shallow gas in surface hole.
• Window cutting with weather ford whip stock & milling
equipments.
• Multilateral wells using BOT window master, weather ford /smith
whip stock & section milling tools.
• Two stage cementation using Halliburton/ weather ford D.V collar.
• TCP gun perforation & smart well & ECP completion.
• Use of LWD/ MWD/ GR tools in horizontal section for steering
while drilling.
• Use of abandonment KIT with CTC pkr for abandonment of bottom
part of drain hole after drilling.
• Scab liners for isolation of any part of any hole.
• Drilling problem-partial & total loss while drilling, running casing
& cementation jobs. Stuck pipe in tight hole & formation swelling,
section drilled with PDC bit & with high ROP.
• Logging procedure in open & case hole , reservoir & the
precautions required during the jobs.
• DST running procedure, packer setting, well flowing through flare
line & separator.
• Completion procedure in-open & cased hole, zone isolation with M-
pass packer, schulmberger & baker hydraulic production setting,
wire line operation.
Training courses:
- Civil defense & fire fighting.
5. - Well test analysis.
- HSE Induction - Near Miss & Hazard observations.
- Risk Assessment & Hazid - Hazop principles.
- Well Cap valid to May 15th
, 2017.
- IWCF valid to to 4th
, September ,2017
- h2s " IADC" valid to 4th
, OCT ,2014
- lean & six sigma ( green built )
- Wire line & Well head control system
LANGUAGES
ARABIC : Mother tongue
ENGLISH : EXCELLENT reading and writing, VERY GOOD Listening and
speaking.
COMPUTER SKILLS
I am excellent in Microsoft Word, Excel, PowerPoint, internet and
very good in VBA.
I have very good background about hardware and software
maintenance.
REFERENCES
Available upon request
6. - Well test analysis.
- HSE Induction - Near Miss & Hazard observations.
- Risk Assessment & Hazid - Hazop principles.
- Well Cap valid to May 15th
, 2017.
- IWCF valid to to 4th
, September ,2017
- h2s " IADC" valid to 4th
, OCT ,2014
- lean & six sigma ( green built )
- Wire line & Well head control system
LANGUAGES
ARABIC : Mother tongue
ENGLISH : EXCELLENT reading and writing, VERY GOOD Listening and
speaking.
COMPUTER SKILLS
I am excellent in Microsoft Word, Excel, PowerPoint, internet and
very good in VBA.
I have very good background about hardware and software
maintenance.
REFERENCES
Available upon request