SlideShare a Scribd company logo
1 of 1
Download to read offline
Job Description
Job Family: ET 77 – Supervision Travaux Filiales
Branch : Exploration Production
Entity : Total E&P Angola / Direction Technique / Division Ingénierie Travaux / Département Opérations Subsea (DT/EPTSUB)
JOB NAME (IN PORTUGUESE)
Chefe de Serviço de Operaçoes FSV
Position within the organisation chart
Name of line manager position: Chefe de Departamento Operaçoes Subsea
Signature
and date :Name and first name of the N+1 manager : VAN DEN BROUCK Benjamin
Name and first name of the N+2 manager : NUNES Joao
Jobs directly subordinated: 10 to 15
JOB’S DIMENSION
 Annual budget of EPT/SUB FSV Vessels: 100 to 200MUSD approx.
 Supervision of at least 2 vessels for subsea works.
ACTIVITIES
HSE
 Active participation in the preparation and analysis of the work (RLO, ARO, ADC …) while maintaining the HSE rules of the group.
 Ensure all the subsea activities are prepared and executed in an efficient and safe manner, following Company Rules and General
Specifications, as well as Oil&Gas standards. Be in charge to make sure that all anomalies are reported, followed and closed.
 Active participation in the preparation and analysis of the work (HIRA, RLO, etc) while maintaining the HSE rules of the group.
 Ensure that the facilities are in compliance with the specification of HSE of Group TOTAL and internal rules SIM of TOTAL EP ANGOLA.
 Ensure that Equipment, Personnel & Material are fit-for-purpose (certificates, trainings, etc)
 Available to be a Duty Officer for EPT/SUB
As Operation Manager
 Insure a good coordination between onshore and offshore operations, and that any engineering requirement are done to support the onshore
& offshore operations, as per planning and budget;
 Actively liaise with EPT/SUB/GEOM, EPT/SUB/DROV, FCP, PBF, other projects when applicable, various Blocks for arbitration when required
 Provides operations and/or projects coordination to ensure that workscopes are identified, agreed and safely executed.
 Manage the Installation Engineers, the Cargo Barge Leader, and Logistic Coordinator (until this role is transferred to Logistic), as well as FSV
Superintendent; Support FSV Superintendent for the management of Offshore Crew;
 Provide long term and medium term view for FSV Superintend to make sure FSVs planning is done in accordance with Construction Dpt,
Drilling Dpt, Subsea exploitation, FPSO and Projects.
 Be ready to replace FSV Superintendent during absence (offshore trip, logistic issues, workload)
 Liaise daily with the vessels’ SUPT (via FSV Superintendent), Installation Engineers. Maintain records of progress and provide updated status
information to planning coordinator.
 Interface with all specific queries from Company specialists. Main matters of concern are Safety, QA, Survey, ROV, Marine and Subsea
(manned or unmanned) operations
 Monitor the good performance of the activities in compliance with the operational procedures and project documentation approved by
Company
 Control and approve procedures in consultation with all involved.
 Control report and feed-back dossier that document the works concluded.
 Verify that the services performed by the contractors comply with the terms and conditions set out in the contracts.
 Check and approve Company and Contractors supplied equipment necessary for the execution of the works
 Liaise with EPT/HSE Service for the reporting and follow up of anomalies reports, near misses, incident, dangerous occurrences and other
information, resulting from activities under his scope of work.
 Manages contracts under his responsibility (Vessels, Cargo barge, Engineering, Seafastening & Fabrication), liaise with Contractor’s for all
contractual and costs matters.
 In coordination with DT/ACT, manages ongoing and forthcoming Call For Tenders applicable to the FSV Ops Service.
 Act as Total EP Angola Diving Competent Person when applicable and if training permitting
CONTEXT AND ENVIRONMENT
 High volumes of work related to the development of Block 17 field mainly.
 Deepwater IMR activities (1400m avg) through use of FSV crane vessels.
 Interfaces with various internal and external entities of Total EP Angola
PURPOSES
 Ensure that any requirement is covered to perform the load-out and installation of TEPA structures onshore and offshore, and that materials
Procurement, Equipment Testing, Construction and Offshore Installation necessary for the realization of EPT/SUB projects are performed
within technical specifications, quality, HSE standards, on time and budget.
 Ensure the marine installation activities are prepared, reviewed and enforced for projects activities and routine works.
 Ensure a constructive relationship between the different intervenients – internal, external.
PROFILE REQUIRED
 Education: Naval or Civil or Mechanical Engineer graduated or equivalent or significant oil&gas experience
 Minimum 12 years experience in supervisory position in offshore and subsea project management, construction, installation, marine operations
and vessels management, including several years in a contracting company (construction, installation and offshore operation).
 Experience project management and as site representative will be appreciated. Skills in primavera are mandatory.
 Fluent in English, knowledge of French and/or Portuguese is a plus.
Name and first name of job holder : Jean-Charles Martin Signature and date :
Signature numérique de
Benjamin VAN DEN
BROUCK J0290986
DN : c=FR, o=TOTAL,
ou=TOTAL
AUTHENTIFICATION
INTERNE,
2.5.4.45=J0290986,
cn=Benjamin VAN DEN
BROUCK J0290986
Date : 2014.07.08
19:11:21 +01'00'
Signature numérique
de Jc MARTIN
L0242294
DN : c=FR, o=TOTAL,
ou=TOTAL
AUTHENTIFICATION
INTERNE,
2.5.4.45=L0242294,
cn=Jc MARTIN
L0242294
Date : 2014.07.08
'19:18:20 +01'00

More Related Content

What's hot

Curriculum Vitae 15 OCTOBER 2016 (5)
Curriculum Vitae 15 OCTOBER 2016 (5)Curriculum Vitae 15 OCTOBER 2016 (5)
Curriculum Vitae 15 OCTOBER 2016 (5)Mohd Sairi
 
Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12raymond mistry
 
My Updated CV Aug 2016
My Updated CV Aug 2016My Updated CV Aug 2016
My Updated CV Aug 2016David Scott
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner UpdatedEric Viner
 
Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016Namig Osmanov
 
Ernesto Casas Resume
Ernesto Casas ResumeErnesto Casas Resume
Ernesto Casas ResumeErnestoCasas7
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 
Ricardo Galvan's CV 5-21-15
Ricardo Galvan's CV 5-21-15Ricardo Galvan's CV 5-21-15
Ricardo Galvan's CV 5-21-15Rick Galvan
 
Barge EngineerRoles
Barge EngineerRolesBarge EngineerRoles
Barge EngineerRolesKevin Clarke
 
Brendan A. Iler Resume
Brendan A. Iler ResumeBrendan A. Iler Resume
Brendan A. Iler ResumeBrendan Iler
 

What's hot (20)

Curriculum Vitae 15 OCTOBER 2016 (5)
Curriculum Vitae 15 OCTOBER 2016 (5)Curriculum Vitae 15 OCTOBER 2016 (5)
Curriculum Vitae 15 OCTOBER 2016 (5)
 
A.Bremner c.v
A.Bremner c.vA.Bremner c.v
A.Bremner c.v
 
Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12
 
My Updated CV Aug 2016
My Updated CV Aug 2016My Updated CV Aug 2016
My Updated CV Aug 2016
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner Updated
 
Moufid_CV06112014
Moufid_CV06112014Moufid_CV06112014
Moufid_CV06112014
 
Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016
 
Ernesto Casas Resume
Ernesto Casas ResumeErnesto Casas Resume
Ernesto Casas Resume
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
DanielFairbairnCV2016
DanielFairbairnCV2016DanielFairbairnCV2016
DanielFairbairnCV2016
 
Job Description
Job DescriptionJob Description
Job Description
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
 
Ricardo Galvan's CV 5-21-15
Ricardo Galvan's CV 5-21-15Ricardo Galvan's CV 5-21-15
Ricardo Galvan's CV 5-21-15
 
Barge EngineerRoles
Barge EngineerRolesBarge EngineerRoles
Barge EngineerRoles
 
Paul details 2014today
Paul details 2014todayPaul details 2014today
Paul details 2014today
 
Resume201503230249
Resume201503230249Resume201503230249
Resume201503230249
 
venkatesh QC resume.
venkatesh QC resume.venkatesh QC resume.
venkatesh QC resume.
 
Brendan A. Iler Resume
Brendan A. Iler ResumeBrendan A. Iler Resume
Brendan A. Iler Resume
 
Chad Carpenter Resume
Chad Carpenter ResumeChad Carpenter Resume
Chad Carpenter Resume
 

Viewers also liked

ATU Involvement Record 2016
ATU Involvement Record 2016ATU Involvement Record 2016
ATU Involvement Record 2016Lisa Buchanan
 
Securing full employment in the UK
Securing full employment in the UKSecuring full employment in the UK
Securing full employment in the UKResolutionFoundation
 
Technology Action Plan
Technology Action PlanTechnology Action Plan
Technology Action Plansappc
 
T3 Technologies Cap Briefing Sept 2010
T3 Technologies Cap Briefing Sept 2010T3 Technologies Cap Briefing Sept 2010
T3 Technologies Cap Briefing Sept 2010Ted Ghinea
 
presentacion ingles PROCESA ingles
presentacion ingles PROCESA  inglespresentacion ingles PROCESA  ingles
presentacion ingles PROCESA inglesAdrian Salgado
 
Annual Report 2012 | Girl Scouts–Arizona Cactus-Pine Council
Annual Report 2012  |  Girl Scouts–Arizona Cactus-Pine CouncilAnnual Report 2012  |  Girl Scouts–Arizona Cactus-Pine Council
Annual Report 2012 | Girl Scouts–Arizona Cactus-Pine Councilfivepenny
 

Viewers also liked (9)

MARTIN JC - JD_FSV_Supt_signed
MARTIN JC - JD_FSV_Supt_signedMARTIN JC - JD_FSV_Supt_signed
MARTIN JC - JD_FSV_Supt_signed
 
ATU Involvement Record 2016
ATU Involvement Record 2016ATU Involvement Record 2016
ATU Involvement Record 2016
 
Securing full employment in the UK
Securing full employment in the UKSecuring full employment in the UK
Securing full employment in the UK
 
Technology Action Plan
Technology Action PlanTechnology Action Plan
Technology Action Plan
 
Germany 1939 40
Germany 1939 40Germany 1939 40
Germany 1939 40
 
T3 Technologies Cap Briefing Sept 2010
T3 Technologies Cap Briefing Sept 2010T3 Technologies Cap Briefing Sept 2010
T3 Technologies Cap Briefing Sept 2010
 
presentacion ingles PROCESA ingles
presentacion ingles PROCESA  inglespresentacion ingles PROCESA  ingles
presentacion ingles PROCESA ingles
 
MARTIN JC - RSES-D_Nom_093-15
MARTIN JC - RSES-D_Nom_093-15MARTIN JC - RSES-D_Nom_093-15
MARTIN JC - RSES-D_Nom_093-15
 
Annual Report 2012 | Girl Scouts–Arizona Cactus-Pine Council
Annual Report 2012  |  Girl Scouts–Arizona Cactus-Pine CouncilAnnual Report 2012  |  Girl Scouts–Arizona Cactus-Pine Council
Annual Report 2012 | Girl Scouts–Arizona Cactus-Pine Council
 

Similar to MARTIN JC - JD_FSV_OpsMan_signed

Similar to MARTIN JC - JD_FSV_OpsMan_signed (20)

NM SM
NM SMNM SM
NM SM
 
Short Resume
Short Resume Short Resume
Short Resume
 
Davide Ansaldi CV
Davide Ansaldi CVDavide Ansaldi CV
Davide Ansaldi CV
 
My CV
My CVMy CV
My CV
 
CRAIG MCKUNE 2016 RESUME docx
CRAIG MCKUNE 2016 RESUME docxCRAIG MCKUNE 2016 RESUME docx
CRAIG MCKUNE 2016 RESUME docx
 
CRAIG MCKUNE 2016 RESUME
CRAIG MCKUNE 2016 RESUMECRAIG MCKUNE 2016 RESUME
CRAIG MCKUNE 2016 RESUME
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015
 
Mohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CMMohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CM
 
Mahmoud Salama C.V 2015
Mahmoud Salama C.V 2015Mahmoud Salama C.V 2015
Mahmoud Salama C.V 2015
 
CV 2015
CV  2015CV  2015
CV 2015
 
OSAGIE OBAZEE'S CV
OSAGIE OBAZEE'S CVOSAGIE OBAZEE'S CV
OSAGIE OBAZEE'S CV
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
A R Ram CV 2016_04 QHSSE Rev00
A R Ram CV 2016_04 QHSSE  Rev00A R Ram CV 2016_04 QHSSE  Rev00
A R Ram CV 2016_04 QHSSE Rev00
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
William masson 2016-cv_a
William masson 2016-cv_aWilliam masson 2016-cv_a
William masson 2016-cv_a
 
CV
CVCV
CV
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
DIWA ERWIN CV_2017
DIWA ERWIN CV_2017DIWA ERWIN CV_2017
DIWA ERWIN CV_2017
 
CV BARRY BURGER.24-02-2015
CV BARRY BURGER.24-02-2015CV BARRY BURGER.24-02-2015
CV BARRY BURGER.24-02-2015
 

MARTIN JC - JD_FSV_OpsMan_signed

  • 1. Job Description Job Family: ET 77 – Supervision Travaux Filiales Branch : Exploration Production Entity : Total E&P Angola / Direction Technique / Division Ingénierie Travaux / Département Opérations Subsea (DT/EPTSUB) JOB NAME (IN PORTUGUESE) Chefe de Serviço de Operaçoes FSV Position within the organisation chart Name of line manager position: Chefe de Departamento Operaçoes Subsea Signature and date :Name and first name of the N+1 manager : VAN DEN BROUCK Benjamin Name and first name of the N+2 manager : NUNES Joao Jobs directly subordinated: 10 to 15 JOB’S DIMENSION  Annual budget of EPT/SUB FSV Vessels: 100 to 200MUSD approx.  Supervision of at least 2 vessels for subsea works. ACTIVITIES HSE  Active participation in the preparation and analysis of the work (RLO, ARO, ADC …) while maintaining the HSE rules of the group.  Ensure all the subsea activities are prepared and executed in an efficient and safe manner, following Company Rules and General Specifications, as well as Oil&Gas standards. Be in charge to make sure that all anomalies are reported, followed and closed.  Active participation in the preparation and analysis of the work (HIRA, RLO, etc) while maintaining the HSE rules of the group.  Ensure that the facilities are in compliance with the specification of HSE of Group TOTAL and internal rules SIM of TOTAL EP ANGOLA.  Ensure that Equipment, Personnel & Material are fit-for-purpose (certificates, trainings, etc)  Available to be a Duty Officer for EPT/SUB As Operation Manager  Insure a good coordination between onshore and offshore operations, and that any engineering requirement are done to support the onshore & offshore operations, as per planning and budget;  Actively liaise with EPT/SUB/GEOM, EPT/SUB/DROV, FCP, PBF, other projects when applicable, various Blocks for arbitration when required  Provides operations and/or projects coordination to ensure that workscopes are identified, agreed and safely executed.  Manage the Installation Engineers, the Cargo Barge Leader, and Logistic Coordinator (until this role is transferred to Logistic), as well as FSV Superintendent; Support FSV Superintendent for the management of Offshore Crew;  Provide long term and medium term view for FSV Superintend to make sure FSVs planning is done in accordance with Construction Dpt, Drilling Dpt, Subsea exploitation, FPSO and Projects.  Be ready to replace FSV Superintendent during absence (offshore trip, logistic issues, workload)  Liaise daily with the vessels’ SUPT (via FSV Superintendent), Installation Engineers. Maintain records of progress and provide updated status information to planning coordinator.  Interface with all specific queries from Company specialists. Main matters of concern are Safety, QA, Survey, ROV, Marine and Subsea (manned or unmanned) operations  Monitor the good performance of the activities in compliance with the operational procedures and project documentation approved by Company  Control and approve procedures in consultation with all involved.  Control report and feed-back dossier that document the works concluded.  Verify that the services performed by the contractors comply with the terms and conditions set out in the contracts.  Check and approve Company and Contractors supplied equipment necessary for the execution of the works  Liaise with EPT/HSE Service for the reporting and follow up of anomalies reports, near misses, incident, dangerous occurrences and other information, resulting from activities under his scope of work.  Manages contracts under his responsibility (Vessels, Cargo barge, Engineering, Seafastening & Fabrication), liaise with Contractor’s for all contractual and costs matters.  In coordination with DT/ACT, manages ongoing and forthcoming Call For Tenders applicable to the FSV Ops Service.  Act as Total EP Angola Diving Competent Person when applicable and if training permitting CONTEXT AND ENVIRONMENT  High volumes of work related to the development of Block 17 field mainly.  Deepwater IMR activities (1400m avg) through use of FSV crane vessels.  Interfaces with various internal and external entities of Total EP Angola PURPOSES  Ensure that any requirement is covered to perform the load-out and installation of TEPA structures onshore and offshore, and that materials Procurement, Equipment Testing, Construction and Offshore Installation necessary for the realization of EPT/SUB projects are performed within technical specifications, quality, HSE standards, on time and budget.  Ensure the marine installation activities are prepared, reviewed and enforced for projects activities and routine works.  Ensure a constructive relationship between the different intervenients – internal, external. PROFILE REQUIRED  Education: Naval or Civil or Mechanical Engineer graduated or equivalent or significant oil&gas experience  Minimum 12 years experience in supervisory position in offshore and subsea project management, construction, installation, marine operations and vessels management, including several years in a contracting company (construction, installation and offshore operation).  Experience project management and as site representative will be appreciated. Skills in primavera are mandatory.  Fluent in English, knowledge of French and/or Portuguese is a plus. Name and first name of job holder : Jean-Charles Martin Signature and date : Signature numérique de Benjamin VAN DEN BROUCK J0290986 DN : c=FR, o=TOTAL, ou=TOTAL AUTHENTIFICATION INTERNE, 2.5.4.45=J0290986, cn=Benjamin VAN DEN BROUCK J0290986 Date : 2014.07.08 19:11:21 +01'00' Signature numérique de Jc MARTIN L0242294 DN : c=FR, o=TOTAL, ou=TOTAL AUTHENTIFICATION INTERNE, 2.5.4.45=L0242294, cn=Jc MARTIN L0242294 Date : 2014.07.08 '19:18:20 +01'00