Polytechnic University of the Philippines
Bachelor of Science in Electrical Engineering
SEMINARS ATTENDED
Fluor Daniel/AG&P Inc.
Computer Aide Drafting and Design/Facet
Atlantic Gulf & Pacific Co. Inc.
Design & Engineering Training Program Electro-Mechanical Works
SUMMARY OF WORK EXPERIENCE
More than 27 years of experience in Instrument and Electrical Engineering Design and
Construction in Oil & Gas, Refineries, Cement Plant, Petrochemical and Power Plant
projects.
2. WORK EXPERIENCE
POSITION : Instrument Engineer
COMPANY/PERIOD: RAPID-PMC/ Dec’15 – June 16; AMEC-PMC/Apr’03-Nov’03
PROJECT : Petronas Rapid Project; Malaysian NPK Fertilizer Plant
RESPONSIBILITIES
Review and Approve the EPCC Contractor Engineering and Vendor Document.
Participation on the Engineering and Safety Reviews.
Coordination of Interface within EPCC Contractors.
Technical assessment of EPCC Contractor design changes or deviation request from
EPCC Contractor for IPMT further management.
Ensure Design and Engineering Integrity.
Participate in the Performance Tests and provide evaluation to the test report issued by
EPCC Contractor.
POSITION : Instrument Field Engineer
COMPANY/PERIOD: Technip Malaysia/Aug’12 - Mar’13; Oil Line Engineering &
Associates Sdn. Bhd Seconded to SAIBOS (Technip/Saipem)/
Mar‘05 - Aug’06; Oil Line Engineering & Associates Sdn. Bhd.
Seconded to Technip Geoproduction Sdn. Bhd/ Aug’01-Nov’01;
Atlantic Gulf & Pacific Company of Manila, Inc./ May’88-Aug’89
PROJECT : Gumusut Kakap Semi FPS – (Shell/MISC/MMHE); AKOGEP
Phase 2 Amenam 2 Topside; LDPE Plant-Kerteh, Malaysia; ONGC
Project (Bauan, Batangas)
RESPONSIBILITIES
Responsible to answer the site query regarding instrumentation that has been raised by
client.
Review and prepare a red line mark-up for all instrumentation related on the package
vendor document.
Responsible to answer the SDM, STQ and Waiver regarding instrumentation that have
been raised by the subcontractor.
Review and endorsed the instrument deliverables that have been modified by the
subcontractor to accommodate the site condition.
Liaise with client and other department, not limited to, such & quality control, project
management team for necessary interface control and coordination to attain.
Attend factory acceptance test to check if the vendor compliance with our specification,
design and requirement.
Review together with the subcontractor on the PDS model to check if any clashing of
instrument design with other discipline design.
Prepare fabrication drawings for instrument, telecommunication and fire & gas.
Monitor weekly/monthly progress of Instrument subcontractor.
Responsible to close all the instrument punch list items and prepare the close out report.
Prepare a change order list to be send to the project management that have been encounter
during the design development.
Prepare documents and supporting papers on change orders/extra works.
Supervise group of workers in various instrumentation works such as instrument
installation loop checking, cable filling, control room works and pre-commissioning job.
3. POSITION : Instrument Design Engineer
COMPANY/PERIOD: Plant and Offshore Technology Sdn. Bhd/Sept’06-Sept’07; Oil
Line Engineering & Associates Sdn. Bhd Seconded to TPK
Engineering & Construction (M) Sdn Bhd/Dec’01-Jan’03; Oil Line
Engineering & Associates Sdn. Bhd/Apr-’04-Feb’05
PROJECT : Chermingat A- Topside & Jacket;100,000MTPY Plant Biofuels
Biodiesel Plant; 350MW Prai Power Plant; Putrajaya Precinct 1
Cogen/DCS Annex Plant
RESPONSIBILITIES
Review and comment on the instrument deliverables prepared by the engineering
contractor such as Instrument and Fire & Gas Location Layout, Hook-up, Material Take-
off, Instrument List, Datasheet and Specification.
Review instrument vendor quotation and prepare technical clarification to the vendor.
Attend factory acceptance test to check if the vendor compliance with our specification,
design and requirement.
Prepare technical bid evaluation of the instrument vendor and to recommend which
vendor compliance to the project specification.
Review and comment on other discipline drawings related to instrumentation.
Liaise with project management team and other department, not limiting to such and
quality control, for necessary interface control and coordination to attain the best result of
the project completion.
Prepare instrument deliverables such as Instrument Location Layout, Hook-up, Material
Take-off, Instrument List, Datasheet and Specification.
Prepare requisition on bulk materials and field instrument.
Ensure all drawings, technical specifications and other document in orderly manner.
Maintain complete files of correspondence and updated drawing regarding all
classifications of various disciplines.
POSITION : Instrument Lead Senior Designer
COMPANY/PERIOD: Technip Malaysia/Apr’13-Sept’15/Sept’07-Jul’12; Oil Line
Engineering & Associates Sdn. Bhd. Seconded to Technip/Jul’95-
Jul’01; Sime Sembawang Engineering Sdn. Bhd./Jun’93-May’95
PROJECT : Maharaja Lela Project; Martin Linge Project; Petronas Rapid Feed
Project; Detail Design Tukau Platform; Turmenistan Block 1 Field
Development; Optimal Tail gas Compressor; Petronas-UCC OSBL;
D-35JT-C Detail Design and Tie-In; Lemai Satellite Paltform; F6
Complex modification; Polyethylene Merak Work; Butson Cement
Plant; M3PQ TOPSIDE-Shell; Jerneh A-EPMI
RESPONSIBILITIES
Assign Work to individual Designer and Drafting personnel.
Review and comment on the instrument deliverables such as Instrument and Fire & Gas
Location Layout, Cable Routing, Cable Schedule, Wiring Diagram, Loop Diagram Hook-
up, Material Take-off, Field Instrument List and etc.
Prepare specification and requisition for instrument bulk materials such as cables, cable
ladder/tray, junction boxes & cable gland, tubing & fittings and etc.
Review instrument vendor quotation and prepare technical clarification to the vendor.
Prepare technical bid evaluation of the instrument vendor and to recommend which
vendor compliance to the project specification.
4. Attend factory acceptance test to check if the vendor compliance with our specification,
design and requirement.
Prepare weekly and monthly progress report.
Prepare a change order list to be send to the project management that have been encounter
during the design development.
Prepare lesson & learn upon completion of the project for future reference to the
upcoming new project.
Review and comment on inter discipline documents/drawings.
Review and comment on package vendor document related to the designer scope.
POSITION : Instrument Designer
COMPANY/PERIOD: Fluor Daniel/AG&P Inc./Aug’90-Jun’93
PROJECT : Valero I & II; Star Project-Shell Phils;Enron Power Plant I & II
RESPONSIBILITIES
Prepare instrument deliverables such as Instrument Location Layout, Hook-up, Electrical
Equipment Layout, Material Take-off, Instrument & Electicral Equipment List, Datasheet
and Specification.
Studies and interpret specifications, process engineering flow schemes prior to design and
detailing works.
Coordinate with other discipline about the progress of the project during weekly task
force meeting.
Perform design layout of cable and conduit by the use of AutoCad
Prepare necessary data and information for the project.
Develop basic electrical engineering design criteria on assigned contract.
Prepare calculations, sketches and wiring diagram.
Provide technical information and data design.
Responsible for review of vendor data.
POSITION : Electrical Engineer
COMPANY/PERIOD: Atlantic Gulf & Pacific Company of Manila, Inc./Sept’88-
Feb’89/Jan’90-Aug’90
PROJECT : Manila International Container Terminal Phase II Project; Asahi
Glass Phils. Inc.
RESPONSIBILITIES
Design electrical system for commercial buildings and industrial plants.
Established electrical equipment location and draft it for electrical location plan.
Perform design layout of cable, conduit and cable tray.
Prepare quantity take-off and price estimates.
Analyze and interpret plans and design for purposes of revision and estimating.
Undertake field assignments and inspections of electrical equipment to insure compliance
to specification.
Initiate electrical equipment quotations, purchase request and prepare bid summary.
5. POSITION : Electrical Field Engineer
COMPANY : Atlantic Gulf & Pacific Company of Manila, Inc./Feb’89-Oct’89
PROJECT : Red Dog Project (Bauan, Batangas)
RESPONSIBILITIES
Prepare preliminary and final bill of quantity for procurement.
Prepare a change order list to be send to the project management that have been encounter
during the design development.
Prepare documents and supporting papers on change orders/extra works.
Monitor daily and monthly work progress.
Prepare as-built drawings and detailed drawings for construction.
Coordinate with other discipline regarding any problem that may affect work progress.
Maintain records of all inspection and other correspondence in the office.