SlideShare a Scribd company logo
1 of 3
Francisco Cortez
Cell: (832) 497-7093
Email: fcortez76@hotmail.com
SUMMARY:
I am a self-motivated drafter-designer with 9+ years of experience and 15 years of experience in construction. I am most familiar with Industrial, Petrochemical and
the Construction field. I have a creative approach to problem-solving, dedicated, focused and able to prioritize and complete multiple tasks that are needed to be
done in a timely manner. I work well independently and am self-motivated but also work well with a team. I am able to grow positive relationships with clients and
colleagues at all organizational levels. I take pride in what I do and who I work for. I am willing to learn new things that will better me as an individual and employee.
PROFESSIONAL EXPERIENCE:
CDI April 2015 – Current
I/E Drafter-Designer ContractorforHuntsman
 Responsible for developing scope of work details.
 Provide design assistance to the Site CAPEX coordinator in the design, construction, and documentation phases for Capital projects
involving small pilot plants and bench scale equipment.
 Ensure that engineering specifications are followed in the detailed engineering phase of projects and specifically for purchased equipment.
 Develop P&ID, Vessel drawings, Instrument Loops, and electrical schematic drawings from a Project Scope.
 Development master equipment lists and equipment datasheets from P&ID’s and Project Scopes.
 Provide design assistance on drawings to support onsite business groups.
 Interpret and follow Huntsman Chem-Gems, PIP Industry Practices, and all applicable design Codes including, but not limited to ASME
Section VIII, NFPA.
 Created G.U.I's for Operators in control room using PI Processbook.
Kelly Staffing July 2013 – April 2015
Designer ContractorforBaker Hughes
 Analyzes drawings, sketches, and assist with designing specialty parts for cement mixing units.
 Assist with mechanical and structural designs by using information derived from equipment drawings, general design criteria, codes and
standards and data supplied by engineers; prepares drawings reflecting those designs.
 Review vendor drawings, standard details, codes and standards, field data and information provided by project personnel for developing
drawings.
 Update/prepares bill of materials according to design documentation.
 Working with minimum supervision, conferring with supervisor on unusual matters.
 Handles special projects as assigned.
 Assisted with designs of parts for cement mixing units.
 Document controls.
Chicago Bridge & Iron (CB&I) March 2012 – June 2013
Programmer / Designer
 Analyzes drawings, sketches, and design data of part to determine dimension and configuration of cuts, select of cutting tools, machine
speeds and feed rates.
 Determines reference points and direction of machine cutting paths.
 Computes angular and linear dimensions, and outlines sequence of operations required to machine part.
 Write program of machine instruction in symbolic language to encode numerical control tape or direct numerical control database to
regulate movement of machine along cutting path.
 Compares encoded computer printout with original program sheet to assure accuracy.
 Responsible to maintain a record of equipment that falls below the inventory level.
 Improve usage through control and identification of property that is surplus or underutilized.
Babcock Eagleton Inc. May 2011 – January 2012
Designer/Drafter
 Developed engineering designs by utilizing pipe, piping components, instruments, supports and equipment while implementing issues of
constructability, maneuverability, maintenance and cost. Routing of piping in model utilizing P&ID’s.
 Depicting relationship of components and parts; identifying dimensions, angles, curvatures, tolerances and materials. Modify drawings by
studying changes; redrawing system, components, and parts; changing identifications using CADWorx.
 Assisted with structural and instrumentation designs as needed.
 Consistently communicated amongst all necessary disciplines/engineers to insure that all company and client-specific standards and
procedures were met throughout each project.
 Utilized isometrics, plot plans and P&ID’s. Studied engineering sketches, specifications, and supporting
Documents.
Fireproof Contractors January 2010 – May 2011
Foreman/Certified Safetyman
 Estimated the labor hours and supplies required for projects.
 Managed job, making sure the project was being done in a timely manner and meeting project specifications.
 Supervise, operate, and direct the use of heavy machinery.
 Oversee projects to ensure that safety meets all OSHA safety regulations.
 Blue print reading, essential to configure location, type, and measurements of insulation used in ceilings and walls.
 Training all new crew employees; tracking time for all employees as well as sending them to job sites.
 Worked directly with the superintendents; to ensure the job was being ran to his/her expectations.
 Worked with Commercial & Residential projects.
FosterWheeler December 2006 – February 2009
Midlevel Pipe Designer III (Aboveground /Underground)
 Responsible for developing engineered designs by utilizing pipe, piping components, instruments, supports and equipment while
implementing issues of constructability, maneuverability, maintenance and cost. Routing of piping in model utilizing P&ID’s.
 PDS shell, creation of equipment in PDS model based on vendor information.
 Depicting relationship of components and parts; identifying dimensions, angles, curvatures, tolerances and materials. Modify drawings by
studying changes; redrawing system, components, and parts; changing identifications.
 Consistently communicated amongst all necessary disciplines to insure that all company and client-specific standards and procedures are
met throughout each project.
 Isometric document control - included all pipe lengths and all necessary datum’s identifying the pipe location in the region where it is to be
installed. The isometric includes a part list identifying all component parts of the pipe being detailed based of the BOM. Creation and error
handling of Isometrics, scrubbing of piping Isometrics in PDS, ISO control.
 Incorporate drafting and piping knowledge into PID’s, PFD’s, MOC’s, DPDT’s, and other piping drawings in order to precisely present
timely and efficient projects to our respected clients. Other duties include batch plotting, teaching others and involving any innovative ideas
that would improve the company.
Client’s worked for with AutoCad & Smart Plant: Sinclair, Tulsa, Oklahoma – Delayed Coker Unit (36), Valero, Port Arthur, Texas – Delayed
Coker Unit DCU-844, BP Products North American Inc., Whiting – OCC Coker, Ecopetrol Barrancabermeja, Colombia- Expansion Project, Valero
Port Arthur, Texas – Desalter Unit Revamp, Lyondell-Bassell Bay City, TexasCoke Drum Replacement, Chevron El Segunda, CA – Heavy Crude
Expansion Project, Exxon Novokuibyshevsk, Russia - RHC Unit, Total-Saudi Aramco Jubail Export Refinery, Flint Hills Pine Bend Refinery
Fireproof Contractors January 1993 – December 2006
Foreman
 Estimated the labor hours and supplies required for projects.
 Managed job, making sure the project was being done in a timely manner and meeting project specifications.
 Supervise, operate, and direct the use of heavy machinery.
 Oversee projects to ensure that safety meets all OSHA safety regulations.
 Blue print reading, essential to configure location, type, and measurements of insulation used in ceilings and walls.
 Training all new crew employees; tracking time for all employees as well as sending them to job sites.
 Worked directly with the superintendents; to ensure the job was being ran to his/her expectations.
 Worked with Commercial & Residential.
EDUCATION:
2003 – 2005 - Houston Community College, Houston, TX
Major in Computer Technology Engineering
2008 – 2009 - Houston Community College, Houston, TX
Computer Drafting Design Houston Community College
SKILLS & TRAINING:
Process based PLC/HMI control system, Siemens NX, Team Center PLM, Inventor, SAP, PDS, CADWorx, Microstation, AutoCAD, Smart Plant
P&ID, Robins Engineering, SPED Certification, MSWord, Excel, Outlook, Lotus Notes, JDE, iDocs, Adobe Acrobat , 10 key by touch
OSHA 30HR Safety Certified, PI Processbook

More Related Content

What's hot

LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6Rajshekharan M
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXummar shaik
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
Construction supervisor
Construction supervisorConstruction supervisor
Construction supervisorSHAMSHER ALAM
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMANSaif kharal
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisorshaikh haroon
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVMOHAMMED ABDUL AZEEM
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 

What's hot (20)

resume piping
resume pipingresume piping
resume piping
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
updated cv 2015
updated cv 2015updated cv 2015
updated cv 2015
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Construction supervisor
Construction supervisorConstruction supervisor
Construction supervisor
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Gunaseelan 2.1.17
Gunaseelan 2.1.17Gunaseelan 2.1.17
Gunaseelan 2.1.17
 
chandankumar
chandankumarchandankumar
chandankumar
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 

Viewers also liked

Tiết 16 bìa lịch treo tường
Tiết 16 bìa lịch treo tườngTiết 16 bìa lịch treo tường
Tiết 16 bìa lịch treo tườngNgochue Phung
 
Compra en china y comienza a generar ventas masivas a través de internet util...
Compra en china y comienza a generar ventas masivas a través de internet util...Compra en china y comienza a generar ventas masivas a través de internet util...
Compra en china y comienza a generar ventas masivas a través de internet util...Luis Xavier Torres
 
Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'
Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'
Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'AlmereDataCapital
 
Bien doi khi hau32
Bien doi khi hau32Bien doi khi hau32
Bien doi khi hau32Phi Phi
 
Trabajo sena 4 jose luna
Trabajo sena 4 jose lunaTrabajo sena 4 jose luna
Trabajo sena 4 jose lunaJose Luna
 
Compra en china de forma 100% legal y crea tu propio negocio ahora
Compra en china de forma 100% legal y crea tu propio negocio ahoraCompra en china de forma 100% legal y crea tu propio negocio ahora
Compra en china de forma 100% legal y crea tu propio negocio ahoraLuis Xavier Torres
 
Microscopia eletrônica de varredura aplicações e preparação de amostras mi...
Microscopia eletrônica de varredura  aplicações e preparação de amostras   mi...Microscopia eletrônica de varredura  aplicações e preparação de amostras   mi...
Microscopia eletrônica de varredura aplicações e preparação de amostras mi...Rafael Souza da Costa
 
Aegon hiek van der scheer
Aegon hiek van der scheerAegon hiek van der scheer
Aegon hiek van der scheerBigDataExpo
 

Viewers also liked (14)

Tiết 16 bìa lịch treo tường
Tiết 16 bìa lịch treo tườngTiết 16 bìa lịch treo tường
Tiết 16 bìa lịch treo tường
 
Physics
PhysicsPhysics
Physics
 
Portfólio Letícia Sacramento
Portfólio Letícia SacramentoPortfólio Letícia Sacramento
Portfólio Letícia Sacramento
 
Compra en china y comienza a generar ventas masivas a través de internet util...
Compra en china y comienza a generar ventas masivas a través de internet util...Compra en china y comienza a generar ventas masivas a través de internet util...
Compra en china y comienza a generar ventas masivas a través de internet util...
 
Change Management
Change ManagementChange Management
Change Management
 
Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'
Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'
Roland Haeve (Atos): 'Using the Cloud for Big Data Analytics'
 
Bien doi khi hau32
Bien doi khi hau32Bien doi khi hau32
Bien doi khi hau32
 
Trabajo sena 4 jose luna
Trabajo sena 4 jose lunaTrabajo sena 4 jose luna
Trabajo sena 4 jose luna
 
Compra en china de forma 100% legal y crea tu propio negocio ahora
Compra en china de forma 100% legal y crea tu propio negocio ahoraCompra en china de forma 100% legal y crea tu propio negocio ahora
Compra en china de forma 100% legal y crea tu propio negocio ahora
 
Microscopia eletrônica de varredura aplicações e preparação de amostras mi...
Microscopia eletrônica de varredura  aplicações e preparação de amostras   mi...Microscopia eletrônica de varredura  aplicações e preparação de amostras   mi...
Microscopia eletrônica de varredura aplicações e preparação de amostras mi...
 
งบแสดงฐานะการเงินและงบอื่นๆ
งบแสดงฐานะการเงินและงบอื่นๆงบแสดงฐานะการเงินและงบอื่นๆ
งบแสดงฐานะการเงินและงบอื่นๆ
 
Aegon hiek van der scheer
Aegon hiek van der scheerAegon hiek van der scheer
Aegon hiek van der scheer
 
Frans feldberg
Frans feldbergFrans feldberg
Frans feldberg
 
2 microscópio
2   microscópio2   microscópio
2 microscópio
 

Similar to Experienced Drafter-Designer with 9+ Years in Construction

Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumeSharon Haddix
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015Julie Vonesh
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_ResumeJit Roy
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Akif shirazi
 
Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debi Turkovic
 
C_Michael_Posey_2016_Resume
C_Michael_Posey_2016_ResumeC_Michael_Posey_2016_Resume
C_Michael_Posey_2016_ResumeMike Posey
 
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce Brown
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke
 
Tracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks
 

Similar to Experienced Drafter-Designer with 9+ Years in Construction (20)

Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix Resume
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1
 
Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015
 
CHRISTIAN LEE JUMAMIL
CHRISTIAN LEE JUMAMILCHRISTIAN LEE JUMAMIL
CHRISTIAN LEE JUMAMIL
 
Christian Lee Jumamil
Christian Lee JumamilChristian Lee Jumamil
Christian Lee Jumamil
 
C_Michael_Posey_2016_Resume
C_Michael_Posey_2016_ResumeC_Michael_Posey_2016_Resume
C_Michael_Posey_2016_Resume
 
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
sami haider 5
sami haider 5sami haider 5
sami haider 5
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16
 
Tracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing Engineer
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 

Experienced Drafter-Designer with 9+ Years in Construction

  • 1. Francisco Cortez Cell: (832) 497-7093 Email: fcortez76@hotmail.com SUMMARY: I am a self-motivated drafter-designer with 9+ years of experience and 15 years of experience in construction. I am most familiar with Industrial, Petrochemical and the Construction field. I have a creative approach to problem-solving, dedicated, focused and able to prioritize and complete multiple tasks that are needed to be done in a timely manner. I work well independently and am self-motivated but also work well with a team. I am able to grow positive relationships with clients and colleagues at all organizational levels. I take pride in what I do and who I work for. I am willing to learn new things that will better me as an individual and employee. PROFESSIONAL EXPERIENCE: CDI April 2015 – Current I/E Drafter-Designer ContractorforHuntsman  Responsible for developing scope of work details.  Provide design assistance to the Site CAPEX coordinator in the design, construction, and documentation phases for Capital projects involving small pilot plants and bench scale equipment.  Ensure that engineering specifications are followed in the detailed engineering phase of projects and specifically for purchased equipment.  Develop P&ID, Vessel drawings, Instrument Loops, and electrical schematic drawings from a Project Scope.  Development master equipment lists and equipment datasheets from P&ID’s and Project Scopes.  Provide design assistance on drawings to support onsite business groups.  Interpret and follow Huntsman Chem-Gems, PIP Industry Practices, and all applicable design Codes including, but not limited to ASME Section VIII, NFPA.  Created G.U.I's for Operators in control room using PI Processbook. Kelly Staffing July 2013 – April 2015 Designer ContractorforBaker Hughes  Analyzes drawings, sketches, and assist with designing specialty parts for cement mixing units.  Assist with mechanical and structural designs by using information derived from equipment drawings, general design criteria, codes and standards and data supplied by engineers; prepares drawings reflecting those designs.  Review vendor drawings, standard details, codes and standards, field data and information provided by project personnel for developing drawings.  Update/prepares bill of materials according to design documentation.  Working with minimum supervision, conferring with supervisor on unusual matters.  Handles special projects as assigned.  Assisted with designs of parts for cement mixing units.  Document controls. Chicago Bridge & Iron (CB&I) March 2012 – June 2013 Programmer / Designer  Analyzes drawings, sketches, and design data of part to determine dimension and configuration of cuts, select of cutting tools, machine speeds and feed rates.  Determines reference points and direction of machine cutting paths.  Computes angular and linear dimensions, and outlines sequence of operations required to machine part.  Write program of machine instruction in symbolic language to encode numerical control tape or direct numerical control database to regulate movement of machine along cutting path.  Compares encoded computer printout with original program sheet to assure accuracy.  Responsible to maintain a record of equipment that falls below the inventory level.  Improve usage through control and identification of property that is surplus or underutilized. Babcock Eagleton Inc. May 2011 – January 2012 Designer/Drafter  Developed engineering designs by utilizing pipe, piping components, instruments, supports and equipment while implementing issues of constructability, maneuverability, maintenance and cost. Routing of piping in model utilizing P&ID’s.
  • 2.  Depicting relationship of components and parts; identifying dimensions, angles, curvatures, tolerances and materials. Modify drawings by studying changes; redrawing system, components, and parts; changing identifications using CADWorx.  Assisted with structural and instrumentation designs as needed.  Consistently communicated amongst all necessary disciplines/engineers to insure that all company and client-specific standards and procedures were met throughout each project.  Utilized isometrics, plot plans and P&ID’s. Studied engineering sketches, specifications, and supporting Documents. Fireproof Contractors January 2010 – May 2011 Foreman/Certified Safetyman  Estimated the labor hours and supplies required for projects.  Managed job, making sure the project was being done in a timely manner and meeting project specifications.  Supervise, operate, and direct the use of heavy machinery.  Oversee projects to ensure that safety meets all OSHA safety regulations.  Blue print reading, essential to configure location, type, and measurements of insulation used in ceilings and walls.  Training all new crew employees; tracking time for all employees as well as sending them to job sites.  Worked directly with the superintendents; to ensure the job was being ran to his/her expectations.  Worked with Commercial & Residential projects. FosterWheeler December 2006 – February 2009 Midlevel Pipe Designer III (Aboveground /Underground)  Responsible for developing engineered designs by utilizing pipe, piping components, instruments, supports and equipment while implementing issues of constructability, maneuverability, maintenance and cost. Routing of piping in model utilizing P&ID’s.  PDS shell, creation of equipment in PDS model based on vendor information.  Depicting relationship of components and parts; identifying dimensions, angles, curvatures, tolerances and materials. Modify drawings by studying changes; redrawing system, components, and parts; changing identifications.  Consistently communicated amongst all necessary disciplines to insure that all company and client-specific standards and procedures are met throughout each project.  Isometric document control - included all pipe lengths and all necessary datum’s identifying the pipe location in the region where it is to be installed. The isometric includes a part list identifying all component parts of the pipe being detailed based of the BOM. Creation and error handling of Isometrics, scrubbing of piping Isometrics in PDS, ISO control.  Incorporate drafting and piping knowledge into PID’s, PFD’s, MOC’s, DPDT’s, and other piping drawings in order to precisely present timely and efficient projects to our respected clients. Other duties include batch plotting, teaching others and involving any innovative ideas that would improve the company. Client’s worked for with AutoCad & Smart Plant: Sinclair, Tulsa, Oklahoma – Delayed Coker Unit (36), Valero, Port Arthur, Texas – Delayed Coker Unit DCU-844, BP Products North American Inc., Whiting – OCC Coker, Ecopetrol Barrancabermeja, Colombia- Expansion Project, Valero Port Arthur, Texas – Desalter Unit Revamp, Lyondell-Bassell Bay City, TexasCoke Drum Replacement, Chevron El Segunda, CA – Heavy Crude Expansion Project, Exxon Novokuibyshevsk, Russia - RHC Unit, Total-Saudi Aramco Jubail Export Refinery, Flint Hills Pine Bend Refinery Fireproof Contractors January 1993 – December 2006 Foreman  Estimated the labor hours and supplies required for projects.  Managed job, making sure the project was being done in a timely manner and meeting project specifications.  Supervise, operate, and direct the use of heavy machinery.  Oversee projects to ensure that safety meets all OSHA safety regulations.  Blue print reading, essential to configure location, type, and measurements of insulation used in ceilings and walls.  Training all new crew employees; tracking time for all employees as well as sending them to job sites.  Worked directly with the superintendents; to ensure the job was being ran to his/her expectations.  Worked with Commercial & Residential. EDUCATION: 2003 – 2005 - Houston Community College, Houston, TX Major in Computer Technology Engineering 2008 – 2009 - Houston Community College, Houston, TX Computer Drafting Design Houston Community College
  • 3. SKILLS & TRAINING: Process based PLC/HMI control system, Siemens NX, Team Center PLM, Inventor, SAP, PDS, CADWorx, Microstation, AutoCAD, Smart Plant P&ID, Robins Engineering, SPED Certification, MSWord, Excel, Outlook, Lotus Notes, JDE, iDocs, Adobe Acrobat , 10 key by touch OSHA 30HR Safety Certified, PI Processbook